CN204000807U - A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne - Google Patents

A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne Download PDF

Info

Publication number
CN204000807U
CN204000807U CN201420457473.XU CN201420457473U CN204000807U CN 204000807 U CN204000807 U CN 204000807U CN 201420457473 U CN201420457473 U CN 201420457473U CN 204000807 U CN204000807 U CN 204000807U
Authority
CN
China
Prior art keywords
colour bar
bar cloth
positioning
cloth
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420457473.XU
Other languages
Chinese (zh)
Inventor
施永富
陈凤来
童亮
杨娟
朱森林
王青
孔华南
鲁宏战
陆成学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU PROVINCE NANJING NAVIGATION CHANNEL ADMINISTRATIVE OFFICE
Original Assignee
JIANGSU PROVINCE NANJING NAVIGATION CHANNEL ADMINISTRATIVE OFFICE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU PROVINCE NANJING NAVIGATION CHANNEL ADMINISTRATIVE OFFICE filed Critical JIANGSU PROVINCE NANJING NAVIGATION CHANNEL ADMINISTRATIVE OFFICE
Priority to CN201420457473.XU priority Critical patent/CN204000807U/en
Application granted granted Critical
Publication of CN204000807U publication Critical patent/CN204000807U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

The utility model discloses a kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne, this anti-pollution rail is formed by the staggered overlap joint in a plurality of colour bar cloth unit, described colour bar cloth unit comprises colour bar cloth, positioning and anchoring bar, buoyant device, on described colour bar cloth, interval arranges positioning and anchoring bar, and adjacent two positioning and anchoring bars are separately positioned on colour bar cloth both sides; Colour bar cloth bottom and positioning and anchoring bar bottom are fastenedly connected, and colour bar cloth top is loosely connected with positioning and anchoring bar; Interval, colour bar cloth top arranges buoyant device.The colour bar cloth low price that the utility model adopts, can not pollute pool.Adopt the staggered overlap joint of segmentation colour bar cloth, it is convenient to lay, remove, and has reduced labour; Can prevent because Lidar Equation causes colour bar cloth integral inclination; Colour bar cloth top is loosely connected with positioning and anchoring bar, can follow SEA LEVEL VARIATION automatic lifting, reaches once and lays and just meet the demands.Adjacent positioned anchor rod is arranged on colour bar cloth both sides, alleviates the impact of both sides stormy waves on colour bar cloth.

Description

A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne
Technical field
The utility model relates to a kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne, is specifically related to a kind of anti-pollution rail that adopts colour bar cloth to make.
Background technology
On lake, coastal waters, riverbed, pile up a lot of mud, while affecting water quality and navigation channel, need to dredge mud, the marine sediments that dredging works waterborne produces or the secondary pollution of mud cause certain destruction to aquatic ecosystem, ecological around impact is mainly contained: (1), dredge the material disturbance of polluted bed mud layer and diffusion aggravation in process, the suspension dredging thing producing causes suspended material in water sharply to increase in a short time, makes water quality deterioration.(2), dredging uncontamination organic suspended matter in process produces and destroys aquatic ecosystem.(3), dredging sanitary sewage, the oil-polluted water that in process, construction ship produces pollutes water environment.Therefore, in dredging works, the dredging thing that in dredged area, sediment deposit is dredged is out transferred to mud dumping area on the water, avoids marine sediments or mud to pollute water body around, but the construction of mud dumping area cofferdam can acquire a certain degree of difficulty, and understand some mud and pass back into lake.
Existing cofferdam can be earth fill cofferdam, earth bag cofferdam.But in the depth of water, surpass the pool of 2 meters, earth fill cofferdam can only excavate on the spot, excavate, fill the diffuse pollution that has just caused mud in process, top, cofferdam is under the erosion repeatedly of wave, need to constantly fill up, the simultaneously rise of water level is to the width of earth fill cofferdam, requirement for height all in continuous variation, and it is too high, uneconomical that this just causes earth fill cofferdam to fill cost.Earth bag cofferdam can reduce the pollution of the process of filling to pool, but high to depth of water requirement, the depth of water surpasses 2 meters just needs personnel to carry out diving operation, and the construction of earth bag needs a large amount of artificial layings in addition, in the situation that current price of labour service is high, also uneconomical.
Summary of the invention
The purpose of this utility model is to provide a kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne, the protection by this anti-pollution rail for dredging works mud dumping area waterborne, can effectively stop mud excessive, prevent secondary pollution of water around.
The object of the invention is to be achieved through the following technical solutions:
A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne, this anti-pollution rail is formed by the staggered overlap joint in a plurality of colour bar cloth unit, described colour bar cloth unit comprises colour bar cloth, positioning and anchoring bar, buoyant device, on described colour bar cloth, interval arranges positioning and anchoring bar, and adjacent two positioning and anchoring bars are separately positioned on colour bar cloth both sides; Colour bar cloth bottom and positioning and anchoring bar bottom are fastenedly connected, and colour bar cloth top is loosely connected with positioning and anchoring bar; Interval, colour bar cloth top arranges buoyant device.
The lap length of adjacent two colour bar cloth unit is 2~4m, is preferably 3m.
The length of the colour bar cloth of each colour bar cloth unit is 40~60m, is preferably 50m.The height of colour bar cloth arranges according to the water level in hydrological data over the years and stage, to guarantee that the top of colour bar cloth exceeds the water surface.
Described colour bar cloth is selected polyethylene colour bar cloth or polypropylene colour bar cloth, is preferably polyethylene colour bar cloth.Commercially available colour bar is covered with foot channel to intensity >=2100N/5CM, latitudinal strength >=1600N/5CM, water pressure resistance value >=2000MM water column, and intensity is large, for the fence of mud dumping area, can resist Lidar Equation, also can play waterproof action.
On described colour bar cloth, interval 3~25m arranges positioning and anchoring bar; Described positioning and anchoring bar is bamboo pole or steel pipe; The length of described positioning and anchoring bar is 12m; The diameter of described bamboo pole is 10~12cm, and the diameter of described steel pipe is 30~50mm.When positioning and anchoring bar is selected bamboo pole, preferred interval 3m arranges positioning and anchoring bar; When positioning and anchoring bar is selected steel pipe, the spacing of adjacent steel pipe suitably strengthens, and is preferably 10~25m.Can colour bar cloth top be loosely connected with positioning and anchoring bar by nylon wire; Also can be by connecting ring being set on colour bar cloth top, the internal diameter of connecting ring is greater than the diameter of positioning and anchoring bar, by connecting ring, colour bar cloth top is set on positioning and anchoring bar and is realized loose connection; By colour bar cloth top and positioning and anchoring bar, be loosely connected and guarantee that colour bar cloth top can be with the rise automatic lifting of water level.
Described adjacent floating power apparatus is spaced apart 1~5m.Described buoyant device is a kind of or both combinations in ball float, cystosepiment.Preferably, at downward 8~12cm place, colour bar cloth top, every 1m, tie up 3 ball floats or 3 blocks of cystosepiments, and ball float or cystosepiment are wrapped in colour bar cloth, the buoyancy producing by ball float or cystosepiment guarantees that colour bar cloth top bubbles through the water column, and can block the diffusion of mud.The diameter of described ball float is the polyethylene ball float of 8~12cm, diameter of bore 1.2~1.8cm.
Further preferred, described colour bar cloth bottom interval 1~5m arranges pendant piece, guarantees that colour bar cloth bottom is close to mud face, can not make sewage ooze out from bottom.More convenient in order to install, reduce pendant piece pendant simultaneously and cause damage at bottom pulling colour bar cloth, described pendant piece is preferably wrapped in colour bar cloth, and adjacent pendant interblock distance is 1m.Described pendant piece is preferentially selected concrete block.
The utility model is applied to Dredging Engineering waterborne while throwing mud antifouling: apart from the mud extraction mouth of pipe 200~300m place, according to the situation of water-bed mud face, positioning and anchoring bar is inserted to 2~3m in mud, by the staggered overlap joint in a plurality of colour bar cloth unit, form anti-pollution rail, can effectively stop mud excessive, prevent secondary pollution of water around.
The beneficial effects of the utility model:
The utility model is economical and practical, and it is antifouling that the Dredging Engineering waterborne that is suitable for water field of big area is thrown mud, can effectively stop mud excessive, prevent secondary pollution of water around, and be conducive to the discharge of top layer clear water after suspension precipitation.
The colour bar cloth low price that the utility model adopts, draws materials conveniently, and intensity is high, in use procedure, can not produce pollution problem to pool.
The utility model adopts the staggered overlap joint of segmentation colour bar cloth, can increase or reduce colour bar cloth unit according to the actual needs of job site, and it is convenient to lay, remove, and has reduced labour; In antifouling process, when as current in fishing boat according to production requirement, can directly at cohesive position, open, recover again after current, and fixed cofferdam reaches and cannot meet this generic request.Can disperse fence stressing conditions simultaneously, effectively prevent because Lidar Equation causes colour bar cloth integral inclination, guarantee that colour bar cloth can be embedded under water by mud stretch bending; And directly adopt whole piece colour bar cloth to form fence, there is the defect that integral body is stressed, easily cause chain effect.
The utility model colour bar cloth top is loosely connected with positioning and anchoring bar, can follow SEA LEVEL VARIATION automatic lifting, reaches once and lays and just can meet the demands.
Because per stage of direction of stormy waves is not the same, so adjacent positioned anchor rod is separately positioned on to colour bar cloth both sides in the inventive method, alleviates the impact of both sides stormy waves on colour bar cloth.
Accompanying drawing explanation
Fig. 1 is that the utility model is thrown the antifouling Fence structure schematic diagram of mud for Dredging Engineering waterborne.
Fig. 2 is the connection diagram of adjacent colour bar cloth unit under the utility model use state.
Fig. 3 is the structural representation of the colour bar cloth unit of embodiment 1.
Fig. 4 is the structural representation of the colour bar cloth unit of embodiment 2.
In figure, the anti-pollution rail of 1-, 2-colour bar cloth unit, 3-colour bar cloth, 4-positioning and anchoring bar, 5-ball float, 6-cystosepiment, 7-falls piece.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing, the utility model is described in further detail.
Embodiment 1
As shown in Figure 1, 2, 3, a kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne, this anti-pollution rail 1 is formed by the staggered overlap joint in a plurality of colour bar cloth unit 2, and the lap length of adjacent two colour bar cloth unit is 3m; Described colour bar cloth unit 2 comprises colour bar cloth 3, positioning and anchoring bar 4, ball float 5, and the length of described colour bar cloth is that 50m, width are 6m, and on colour bar cloth 3, interval 3m arranges positioning and anchoring bar 4, and adjacent two positioning and anchoring bars 4 are separately positioned on colour bar cloth 3 both sides; Colour bar cloth 3 bottoms and positioning and anchoring bar 4 bottoms are fastenedly connected, and colour bar cloth 3 tops are loosely connected with positioning and anchoring bar 4 by nylon wire; Colour bar cloth 3 interval, top 1m arrange 3 ball floats 5, and described ball float 5 is wrapped in colour bar cloth.
Described positioning and anchoring bar is that length is the bamboo pole that 12m, diameter are 10~12cm.
Described ball float is that diameter is the polyethylene ball float of 10cm, diameter of bore 1.5cm.
The utility model is applied to stone mortar lake, the peaceful high new tunnel Qinhuaihe River section of relocating waterway regulation works, dredger does mainly in 3~June, during this, the depth of water is lower than 6m, most earth is delivered to the mud dumping area outside the 100m of navigation channel nearby, 196 square kilometres of lake region, stone mortar lake areas, water velocity is more slow, but the variation of water level ratio is very fast, and lake region exists large stretch of Culture pure seine and fisherman's fishing fishing net.Apart from the mud extraction mouth of pipe 200~300m place, according to the situation of water-bed mud face, positioning and anchoring bar 4 is inserted to 2~3m in mud, make colour bar cloth bottom be close to mud face, by the staggered overlap joint in a plurality of colour bar cloth unit 2, form anti-pollution rail 1, in antifouling process, colour bar cloth top can be with the rise automatic lifting of water level, can effectively stop mud excessive, prevent secondary pollution of water around; In antifouling process, inclination, fence be not by mud stretch bending for the bamboo pole of using as positioning and anchoring simultaneously, and fence can bear the impact of high sea, convenient and practical.
Embodiment 2
As shown in Fig. 1,2,4, a kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne, this anti-pollution rail 1 is formed by the staggered overlap joint in a plurality of colour bar cloth unit 2, and the lap length of adjacent two colour bar cloth unit is 3m; Described colour bar cloth unit 2 comprises colour bar cloth 3, positioning and anchoring bar 4, cystosepiment 6, pendant piece 7, the length of described colour bar cloth is that 50m, width are 6m, on colour bar cloth 3, interval 10m arranges positioning and anchoring bar 4, and adjacent two positioning and anchoring bars 4 are separately positioned on colour bar cloth 3 both sides; Colour bar cloth 3 bottoms and positioning and anchoring bar 4 bottoms are fastenedly connected, and colour bar cloth 3 tops are loosely connected with positioning and anchoring bar 4 by connecting ring; Colour bar cloth 3 interval, top 1m arrange cystosepiment 6, and described cystosepiment 6 is wrapped in colour bar cloth 3; At colour bar cloth bottom interval 1m, pendant piece 7 is set, described pendant piece 7 is wrapped in colour bar cloth 3.
Described positioning and anchoring bar is that length is the steel pipe that 12m, diameter are 40mm.
Described pendant piece is selected concrete block.
The utility model is applied to stone mortar lake, the peaceful high new tunnel Qinhuaihe River section of relocating waterway regulation works, dredger does mainly in 3~June, during this, the depth of water is lower than 6m, most earth is delivered to the mud dumping area outside the 100m of navigation channel nearby, 196 square kilometres of lake region, stone mortar lake areas, water velocity is more slow, but the variation of water level ratio is very fast, and lake region exists large stretch of Culture pure seine and fisherman's fishing fishing net.Apart from the mud extraction mouth of pipe 200~300m place, according to the situation of water-bed mud face, positioning and anchoring bar 4 is inserted to 2~3m in mud, make colour bar cloth bottom be close to mud face, by the staggered overlap joint in a plurality of colour bar cloth unit 2, form the anti-pollution rail 1 to mud dumping area, in antifouling process, colour bar cloth top can be with the rise automatic lifting of water level, can effectively stop mud excessive, prevent secondary pollution of water around; In antifouling process, inclination, fence be not by mud stretch bending for the steel pipe of using as positioning and anchoring simultaneously, and fence can bear the impact of high sea, convenient and practical.

Claims (10)

1. an anti-pollution rail of throwing mud for Dredging Engineering waterborne, it is characterized in that this anti-pollution rail is formed by the staggered overlap joint in a plurality of colour bar cloth unit, described colour bar cloth unit comprises colour bar cloth, positioning and anchoring bar, buoyant device, on described colour bar cloth, interval arranges positioning and anchoring bar, and adjacent two positioning and anchoring bars are separately positioned on colour bar cloth both sides; Colour bar cloth bottom and positioning and anchoring bar bottom are fastenedly connected, and colour bar cloth top is loosely connected with positioning and anchoring bar; Interval, colour bar cloth top arranges buoyant device.
2. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 1, the lap length that it is characterized in that adjacent two colour bar cloth unit is 2~4m; The length of the colour bar cloth of each colour bar cloth unit is 40~60m.
3. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 2, the lap length that it is characterized in that adjacent two colour bar cloth unit is 3m; The length of the colour bar cloth of each colour bar cloth unit is 50m.
4. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 1, is characterized in that on described colour bar cloth, interval 3~25m arranges positioning and anchoring bar; Described positioning and anchoring bar is bamboo pole or steel pipe.
5. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 4, is characterized in that the diameter of described bamboo pole is 10~12cm, and the diameter of described steel pipe is 30~50mm.
6. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 1, is characterized in that colour bar cloth top is loosely connected with the realization of positioning and anchoring bar by nylon wire; Or color cloth top is set on positioning and anchoring bar and realized loose connection by connecting ring, the internal diameter of described connecting ring is greater than the diameter of positioning and anchoring bar.
7. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 1, is characterized in that described adjacent floating power apparatus is spaced apart 1~5m; Described buoyant device is a kind of or both combinations in ball float, cystosepiment.
8. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 7, is characterized in that described ball float or cystosepiment interval 1m are wrapped in colour bar cloth.
9. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 1, is characterized in that described interval, colour bar cloth bottom arranges pendant piece, described adjacent pendant piece be spaced apart 1~5m.
10. the anti-pollution rail of throwing mud for Dredging Engineering waterborne according to claim 9, is characterized in that described pendant piece is wrapped in colour bar cloth, adjacent pendant piece be spaced apart 1m.
CN201420457473.XU 2014-08-13 2014-08-13 A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne Expired - Fee Related CN204000807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420457473.XU CN204000807U (en) 2014-08-13 2014-08-13 A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420457473.XU CN204000807U (en) 2014-08-13 2014-08-13 A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne

Publications (1)

Publication Number Publication Date
CN204000807U true CN204000807U (en) 2014-12-10

Family

ID=52040833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420457473.XU Expired - Fee Related CN204000807U (en) 2014-08-13 2014-08-13 A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne

Country Status (1)

Country Link
CN (1) CN204000807U (en)

Similar Documents

Publication Publication Date Title
CN104141284B (en) Antifouling method for dredged mud in construction of water dredging engineering
CN103046553B (en) Method for carrying out deepwater laying on large-volume reinforced mud-filling tubular bags by using geotextiles-laying vessels
KR100927474B1 (en) Surface floating waste collection device
CN101027955B (en) Biological environment improvement method for vertical strong storm bank of lake
CN107988999B (en) Hydrodynamic self-lifting hydro-fluctuation belt wetland ecological management system and construction method thereof
CN102587317B (en) Composite ecological component for weakening waves and controlling, stopping and guiding algae, manufacturing method and application thereof
CN202323865U (en) Novel revetment combined structure
CN203701030U (en) Wharf impounding and scouring structure
CN108668957B (en) Construction method of ecological island reef type marine ranch
CN102433857A (en) Ecological type artificial coast with functions of pollution controlling and coast body self cleaning
Smith Types of marine concrete structures
CN204000807U (en) A kind of anti-pollution rail of throwing mud for Dredging Engineering waterborne
CN201188819Y (en) Ups and downs net cage
CN103552659A (en) Light channel buoy capable of being quickly distributed
CN101922145A (en) Method for arresting entermorpha with air bag type arresting barrier
CN102535416A (en) Floating connection device between soft barricade and hard reinforced dam in water area and manufacture method and application thereof
CN215715490U (en) Distributed gravity anchor structure of artificial fish reef and fan foundation of marine ranching
CN211080123U (en) Ecological bank slope protection device in river lake
RU2562487C2 (en) Method for embedding filtration deformations in channel dam
CN211080094U (en) Erosion-resistant protection structure of lake beach
CN102613116A (en) Artificial low-tide elevation device for protecting islands
CN100366825C (en) Suspension sand-trap mud-filtering water protecting device
RU141832U1 (en) FLOOR SOIL DAM
JP6866777B2 (en) Clam fishing ground
RU2010108291A (en) COMPLEX OF HYDROTECHNICAL STRUCTURES FOR PREVENTING FLOODING OF TERRITORIES BELOW THE DAM OF THE KRASNODAR HYDROGROUND ON THE KUBAN RIVER

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20200813

CF01 Termination of patent right due to non-payment of annual fee