CN203960848U - The foundation structure of directly processing on barged-in fill - Google Patents

The foundation structure of directly processing on barged-in fill Download PDF

Info

Publication number
CN203960848U
CN203960848U CN201420332778.8U CN201420332778U CN203960848U CN 203960848 U CN203960848 U CN 203960848U CN 201420332778 U CN201420332778 U CN 201420332778U CN 203960848 U CN203960848 U CN 203960848U
Authority
CN
China
Prior art keywords
barged
fill
foundation structure
drainage plate
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420332778.8U
Other languages
Chinese (zh)
Inventor
付长宏
杨振平
乔丽艳
邓明
郑利涛
吴国松
杨玚
程占云
张志鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN COASTAL ZONE ENGINEERING Co Ltd
Original Assignee
TIANJIN COASTAL ZONE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN COASTAL ZONE ENGINEERING Co Ltd filed Critical TIANJIN COASTAL ZONE ENGINEERING Co Ltd
Priority to CN201420332778.8U priority Critical patent/CN203960848U/en
Application granted granted Critical
Publication of CN203960848U publication Critical patent/CN203960848U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a kind of foundation structure of directly processing on barged-in fill, this structure has been laid on barged-in fill, this structure is on barged-in fill, to be equipped with successively seepage material layer, base fabric, transverse drainage plate, on transverse drainage plate, be provided with many pipes side by side, easy sleeper and light rail are installed on pipe successively, are formed the foundation structure of disposable processing.Effect of the present utility model is to utilize described foundation structure once in barged-in fill, to insert the longitudinal drainage plate about 35m length; Vacuum preloading or combined vacuum and surcharge preloading.This structure has been taken a little materials and artificial when forming " hard pavement ", but compare with the precompressed of secondary-plug band drain secondary vacuum time, manpower, material, energy consumption and the expense that can save 30% left and right, more environmental protection.This foundation structure can be widely used in barged-in fill epeirogenetic engineering, port works, road, railway engineering airport engineering etc.

Description

The foundation structure of directly processing on barged-in fill
Technical field
The utility model relates to a kind of foundation treatment engineering technology, particularly a kind of foundation structure of directly processing on barged-in fill.Belong to foundation treatment engineering technical field.
Background technology
At present, the foundation treatment engineering carrying out on barged-in fill (w=85~100%), on this barged-in fill, carrying out method for processing foundation has multiple, but be mainly preloading: manage to insert vertical drainage passage in barged-in fill, general with band drain, on band drain, apply again prepressing materials or vacuum preloading or combined vacuum and surcharge preloading, moisture in barged-in fill is discharged outside barged-in fill by each drainage channel, reduce the water content of barged-in fill, thereby improve the characteristic load bearing capacity of barged-in fill, reduce barged-in fill compressibilty, reduce the settling amount of building from now on, improve the physico mechanical characteristic of barged-in fill, reach the safety of each building of construction thereon, but it is time-consuming that above-mentioned method for processing foundation exists, expensive, the defect of power consumption etc.
Conventionally in order to wait for that barged-in fill has certain intensity inserting band drain in barged-in fill, making to walk pedestrian and carry out the work of board-plugging device plate, approximately needing for two years, is in order to allow barged-in fill natural air drying, forms a crust layer, then carries out ground processing.Although also have now directly discharging type vacuum prepressing method to reinforce barged-in fill foundation technology, it can reduce the stand-by period, process barged-in fill thickness in 5m left and right, carry out the processing of vacuum method ground.When need processing barged-in fill thickness is greater than 5m, need carry out in barged-in fill, inserting band drain for the second time, carry out vacuum preloading for the second time.Inserting for the first time band drain and vacuum preloading is in order to make slightly intensity of barged-in fill, form fast a crust layer, so that the machinery of band drain is inserted in traveling, though make great progress but still time-consuming, power consumption and cost are still higher, because want, in barged-in fill, insert band drain, twice vacuum preloading twice.
Summary of the invention
The purpose of this utility model is to overcome the deficiency that prior art exists, and a kind of foundation structure of directly processing on barged-in fill is provided, it can once set length at the band drain of 35m left and right and carry out vacuum preloading one time, can improve work efficiency, energy-conserving and environment-protective, reduction construction cost.
For achieving the above object, the technical solution adopted in the utility model is to provide a kind of foundation structure of directly processing on barged-in fill of the present utility model, this structure has been laid on barged-in fill, wherein: this structure is on barged-in fill, to be equipped with successively seepage material layer, base fabric, transverse drainage plate, on transverse drainage plate, be provided with many pipes side by side, easy sleeper and light rail are installed on pipe successively, are formed the foundation structure of disposable processing.
Effect of the present utility model is to utilize described foundation structure once in barged-in fill, to insert the longitudinal drainage plate about 35m length; Vacuum preloading or combined vacuum and surcharge preloading.This structure has been taken a little materials and artificial when forming " hard pavement ", but compare with the precompressed of secondary-plug band drain secondary vacuum time, manpower, material, energy consumption and the expense that can save 30% left and right, more environmental protection.This foundation structure can be widely used in barged-in fill epeirogenetic engineering, port works, road, railway engineering airport engineering etc.
Accompanying drawing explanation
Fig. 1 is the foundation structure plane structure chart of directly processing on barged-in fill of the present utility model.
In Fig. 1:
1, longitudinal drainage plate 2, seepage material layer 3, base fabric 4, pipe
5, transverse drainage plate 6, sleeper 7, light rail
The specific embodiment
By reference to the accompanying drawings the foundation structure of directly processing on barged-in fill of the present utility model is illustrated.
Shown in Fig. 1, the utility model is the foundation structure of directly processing on barged-in fill, this structure is on barged-in fill, to be equipped with successively seepage material layer 2, base fabric 3, transverse drainage plate 5, on band drain 5, be provided with many pipes 4 side by side, simple and easy sleeper 6 and light rail 7 are installed on pipe 4 successively, are formed the foundation structure of disposable processing.Described pipe 4 is plastic pipe or metal pipe material or qi of chong channel ascending adversely capsule.
On the foundation structure of described disposable processing, the longitudinal drainage plate 1 to intubating length in barged-in fill in 35m left and right length.Can carry out the processing of precompressed ground.
The utility model is the foundation structure of directly processing on barged-in fill, and its function is achieved like this:
The utility model is the foundation structure of directly processing on barged-in fill, is on existing barged-in fill, lays seepage material layer 2, lays successively base fabric 3 and transverse drainage plate 5 on seepage material layer 2.On transverse drainage plate 5, lay side by side many pipes 4, under these load effects, the characteristic load bearing capacity of barged-in fill can be significantly improved and form so-called " hard pavement ", can traveling Simple rail type board-plugging device on " hard pavement ".
After processing by said structure, can on pipe 4, lay simple and easy sleeper 6 and light rail 7, form the foundation structure of disposable processing, the foundation structure of this disposable processing can be laid many, and the plate machinery of installing is constructed on light rail 7.
Rail mounted board-plugging device is by designing requirement, in barged-in fill, insert the long longitudinal drainage plate 1 for 35m left and right or the vertical row water body of other infiltrations, as sand wick etc. also can, and carry out according to this horizontal by designing requirement, inserting longitudinal drainage plate 1, after rail mounted board-plugging device one-time positioning, can laterally insert many longitudinal drainage plates 1, then shift forward certain distance, can laterally insert many longitudinal drainage plates 1 again, after row's longitudinal drainage plate 1 has inserted, rail mounted board-plugging device moves forward by designing requirement along track, carrying out second row longitudinal drainage plate 1 inserts, according to this forward, left, right, until gross area scope has been inserted.
Pipe 4 can be different tubing or the qi of chong channel ascending adversely capsules such as plastics, class of metal materials.During laying, can spreading pipe when pipe 4 falls short of.When light rail 7 length are when inadequate, can track advancing, pipe, sleeper and light rail all can be reused.Continue above step until all complete the construction of inserting laying.
After completing plate laying work, can carry out vacuum preloading or combined vacuum and surcharge preloading.

Claims (3)

1. a foundation structure of directly processing on barged-in fill, this structure is laid on barged-in fill, it is characterized in that: this structure is on described barged-in fill, to be equipped with successively seepage material layer (2), base fabric (3), transverse drainage plate (5), on transverse drainage plate (5), be provided with many pipes (4) side by side, sleeper (6) and light rail (7) are installed on pipe (4) successively, are formed the foundation structure of disposable processing.
2. the foundation structure of directly processing on barged-in fill according to claim 1, is characterized in that: on the foundation structure of described disposable processing, and the longitudinal drainage plate (1) to intubating length in barged-in fill in 35m length.
3. the foundation structure of directly processing on barged-in fill according to claim 1, is characterized in that: described pipe (4) is plastic pipe or metal pipe material or qi of chong channel ascending adversely capsule.
CN201420332778.8U 2014-06-20 2014-06-20 The foundation structure of directly processing on barged-in fill Expired - Lifetime CN203960848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420332778.8U CN203960848U (en) 2014-06-20 2014-06-20 The foundation structure of directly processing on barged-in fill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420332778.8U CN203960848U (en) 2014-06-20 2014-06-20 The foundation structure of directly processing on barged-in fill

Publications (1)

Publication Number Publication Date
CN203960848U true CN203960848U (en) 2014-11-26

Family

ID=51921450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420332778.8U Expired - Lifetime CN203960848U (en) 2014-06-20 2014-06-20 The foundation structure of directly processing on barged-in fill

Country Status (1)

Country Link
CN (1) CN203960848U (en)

Similar Documents

Publication Publication Date Title
CN204357484U (en) The drainage system of anti-tunnel invert constuction joint infiltration
CN204357485U (en) The drainage system of anti-tunnel double-lining behind ponding crossfire
CN204552818U (en) The drainage system of ditch, side, anti-tunnel bottom leaky
CN203866663U (en) Porous pavement structure
CN203924083U (en) Cushion cap excavation of foundation pit well-points dewatering device
CN207177967U (en) A kind of tunnel pressure release ejectment water installations
CN203256774U (en) Underground cable trench construction structure for electric engineering
CN203346829U (en) Medial strip
CN204492831U (en) Metro built by mining method adit construction component
CN203960848U (en) The foundation structure of directly processing on barged-in fill
CN105696543A (en) Dam front drainage method for sub-dam building in red mud stacking area
CN107700305A (en) A kind of ecological parking lot floor tile and laying method
CN204402513U (en) Device for solving water seepage and leakage of lining surface of underground cavern
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN204174496U (en) A kind of novel town road structure
CN207672616U (en) A kind of outdoor cable penetration pipe is passed by one's way laying structure
CN204039863U (en) Road soil curb edge waterproof/drainage structure
CN204282158U (en) Water drainage skid wood floor bolck
CN207362974U (en) A kind of urban road rain water collecting system
CN206903689U (en) A kind of and water delivery and the Railway Tunnel of communication function
CN203451970U (en) Floor tile
CN103999592A (en) Method for avoiding vegetation degradation of acid mine waste rock yard
CN203960686U (en) The foundation structure of directly processing on bury
CN204311545U (en) Equipment pump house equipment Foundations surrounding ground reserves drainage groove structure
CN204455753U (en) Concrete attractive joint device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141126

CX01 Expiry of patent term