CN203924083U - Cushion cap excavation of foundation pit well-points dewatering device - Google Patents

Cushion cap excavation of foundation pit well-points dewatering device Download PDF

Info

Publication number
CN203924083U
CN203924083U CN201420349065.2U CN201420349065U CN203924083U CN 203924083 U CN203924083 U CN 203924083U CN 201420349065 U CN201420349065 U CN 201420349065U CN 203924083 U CN203924083 U CN 203924083U
Authority
CN
China
Prior art keywords
well
cushion cap
dewatering device
point pipe
points dewatering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420349065.2U
Other languages
Chinese (zh)
Inventor
王宁坤
杨涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Sinohydro Tianjin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Tianjin Engineering Co Ltd filed Critical Sinohydro Tianjin Engineering Co Ltd
Priority to CN201420349065.2U priority Critical patent/CN203924083U/en
Application granted granted Critical
Publication of CN203924083U publication Critical patent/CN203924083U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to the area excavation of foundation pit well-points dewatering of a kind of Soft Soil Layer.A kind of cushion cap excavation of foundation pit well-points dewatering device, comprise cushion cap foundation ditch and the well-points dewatering device that is arranged on cushion cap foundation ditch surrounding, described well-points dewatering device comprises the uniform well-point pipe that is arranged on cushion cap foundation ditch surrounding, be arranged on the bridge piece of each well-point pipe upper end, be communicated with the water header of all bridge pieces, and the suction pump being communicated with water header, each described well-point pipe place is provided with sump, all sumps are communicated with by groove, and be communicated with reservoir by groove, in reservoir, be provided with suction pump, the bottom of described well-point pipe is provided with bulk sand stone layer, a side at cushion cap foundation ditch is provided with import and export.The utility model is saved construction cost, can continue to ensure that construction site continues dry state, has ensured construction speed and construction safety.

Description

Cushion cap excavation of foundation pit well-points dewatering device
Technical field
The utility model relates to the area excavation of foundation pit well-points dewatering of a kind of Soft Soil Layer, is specifically related to a kind of cushion cap excavation of foundation pit well-points dewatering device.
Background technology
For Soft Soil Layer or area of heavy rainfull, because its groundwater table is more shallow, at the foundation ditch that carries out high-rise building or high-bearing pilum ground, in work progress, need to carry out the control of groundwater table, effectively control the quality under underground foundation ditch, prevent that the appearance of follow-up construction from rousing the phenomenons such as the end.
Utility model content
The purpose of this utility model is the problem and shortage for above-mentioned existence, and a kind of cushion cap excavation of foundation pit well-points dewatering device at Soft Soil Layer excavation pit good stability is provided.
For achieving the above object, the technical scheme of taking is:
A kind of cushion cap excavation of foundation pit well-points dewatering device, comprise cushion cap foundation ditch and the well-points dewatering device that is arranged on cushion cap foundation ditch surrounding, described well-points dewatering device comprises the uniform well-point pipe that is arranged on cushion cap foundation ditch surrounding, be arranged on the bridge piece of each well-point pipe upper end, be communicated with the water header of all bridge pieces, and the suction pump being communicated with water header, each described well-point pipe place is provided with sump, all sumps are communicated with by groove, and be communicated with reservoir by groove, in reservoir, be provided with suction pump, the bottom of described well-point pipe is provided with bulk sand stone layer, a side at cushion cap foundation ditch is provided with import and export.
Described sump bottom adopts layer of concrete or clay layer, prevent from catchmenting along under well-point pipe, ooze or air along under well-point pipe thoroughly.
On each described bridge piece, be provided with water-control valve, for controlling pump-out, prevent that a large amount of sand grains is drawn out of.
Described well-point pipe bottom connection is provided with one section of filter pipe.
Adopt technique scheme, obtained beneficial effect is:
The utility model is by rational design well-points dewatering device, can effectively improve the stability of Soft Soil Layer excavation pit, compare the process such as steel sheet pile, open caisson, save construction cost, can continue to ensure that construction site continues dry state, ensure construction speed and construction safety.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 be in Fig. 1 A-A to structural representation.
Sequence number in figure: 1 is that cushion cap foundation ditch, 2 is that well-point pipe, 3 is that bridge piece, 4 is that water header, 5 is that suction pump, 6 is that sump, 7 is that groove, 8 is that reservoir, 9 is that sand stone layer, 10 is that import and export, 11 are that water-control valve, 12 is filter pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is elaborated.
Referring to Fig. 1, Fig. 2, a kind of cushion cap excavation of foundation pit of the utility model well-points dewatering device, comprise cushion cap foundation ditch 1 and the well-points dewatering device that is arranged on cushion cap foundation ditch 1 surrounding, described well-points dewatering device comprises the uniform well-point pipe 2 that is arranged on cushion cap foundation ditch 1 surrounding, be arranged on the bridge piece 3 of each well-point pipe 2 upper ends, be communicated with the water header 4 of all bridge pieces 3, and the suction pump 5 being communicated with water header 4, each described well-point pipe 2 places are provided with sump 6, all sumps 6 are communicated with by groove 7, and be connected with reservoir 8 by groove 7, in reservoir 8, be provided with suction pump 5, the bottom of described well-point pipe 2 is provided with bulk sand stone layer 9, be provided with and import and export 10 in a side of cushion cap foundation ditch 1.
Described sump 6 bottoms adopt layer of concrete or clay layers, prevent from catchmenting along under well-point pipe, ooze or air along under well-point pipe thoroughly.
On each described bridge piece 3, be provided with water-control valve 11, for controlling pump-out, prevent that a large amount of sand grains is drawn out of, described well-point pipe 2 bottoms connections are provided with one section of filter pipe 12.
The utility model is by rational design well-points dewatering device, can effectively improve the stability of Soft Soil Layer excavation pit, compare the process such as steel sheet pile, open caisson, save construction cost, can continue to ensure that construction site continues dry state, ensure construction speed and construction safety.

Claims (4)

1. a cushion cap excavation of foundation pit well-points dewatering device, comprise cushion cap foundation ditch and the well-points dewatering device that is arranged on cushion cap foundation ditch surrounding, it is characterized in that, described well-points dewatering device comprises the uniform well-point pipe that is arranged on cushion cap foundation ditch surrounding, be arranged on the bridge piece of each well-point pipe upper end, be communicated with the water header of all bridge pieces, and the suction pump being communicated with water header, each described well-point pipe place is provided with sump, all sumps are communicated with by groove, and be communicated with reservoir by groove, in reservoir, be provided with suction pump, the bottom of described well-point pipe is provided with bulk sand stone layer, a side at cushion cap foundation ditch is provided with import and export.
2. cushion cap excavation of foundation pit well-points dewatering device according to claim 1, is characterized in that, described sump bottom adopts layer of concrete or clay layer, prevent from catchmenting along under well-point pipe, ooze or air along under well-point pipe thoroughly.
3. cushion cap excavation of foundation pit well-points dewatering device according to claim 1, is characterized in that, on each described bridge piece, is provided with water-control valve, for controlling pump-out, prevents that a large amount of sand grains is drawn out of.
4. cushion cap excavation of foundation pit well-points dewatering device according to claim 1, is characterized in that, described well-point pipe bottom connection is provided with one section of filter pipe.
CN201420349065.2U 2014-06-27 2014-06-27 Cushion cap excavation of foundation pit well-points dewatering device Expired - Fee Related CN203924083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420349065.2U CN203924083U (en) 2014-06-27 2014-06-27 Cushion cap excavation of foundation pit well-points dewatering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420349065.2U CN203924083U (en) 2014-06-27 2014-06-27 Cushion cap excavation of foundation pit well-points dewatering device

Publications (1)

Publication Number Publication Date
CN203924083U true CN203924083U (en) 2014-11-05

Family

ID=51819937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420349065.2U Expired - Fee Related CN203924083U (en) 2014-06-27 2014-06-27 Cushion cap excavation of foundation pit well-points dewatering device

Country Status (1)

Country Link
CN (1) CN203924083U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064384A (en) * 2015-09-07 2015-11-18 山西省工业设备安装有限公司 Vacuum tube well precipitation system under special geological conditions
CN106498961A (en) * 2016-11-28 2017-03-15 中铁大桥局集团第工程有限公司 It is provided with the Yield rainfall relation system and its Yield rainfall relation method of detachable header tank
CN107130622A (en) * 2017-05-31 2017-09-05 中铁二十局集团第六工程有限公司 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method
CN107916674A (en) * 2017-12-07 2018-04-17 中冶天工集团有限公司 A kind of shallow foundation cheats dewatering device
CN108385706A (en) * 2018-02-09 2018-08-10 温州嘉成工程项目管理有限公司 A kind of well-points dewatering and drainage arrangement for deep basal pit
CN109736340A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of sole plate reserves the dewatering device and method of dewatering well guarantee bed course integrality
CN109736337A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of substrate elevator catch pit drift sand processing guarantees the dewatering device and method of bed course integrality

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064384A (en) * 2015-09-07 2015-11-18 山西省工业设备安装有限公司 Vacuum tube well precipitation system under special geological conditions
CN105064384B (en) * 2015-09-07 2019-09-27 山西省工业设备安装集团有限公司 Vacuum tube well precipitation system
CN106498961A (en) * 2016-11-28 2017-03-15 中铁大桥局集团第工程有限公司 It is provided with the Yield rainfall relation system and its Yield rainfall relation method of detachable header tank
CN106498961B (en) * 2016-11-28 2018-11-23 中铁大桥局集团第一工程有限公司 Yield rainfall relation system and its Yield rainfall relation method equipped with detachable header tank
CN107130622A (en) * 2017-05-31 2017-09-05 中铁二十局集团第六工程有限公司 Pool Bridge cushion cap foundation ditch subregion vacuum precipitation system and precipitation method
CN107916674A (en) * 2017-12-07 2018-04-17 中冶天工集团有限公司 A kind of shallow foundation cheats dewatering device
CN108385706A (en) * 2018-02-09 2018-08-10 温州嘉成工程项目管理有限公司 A kind of well-points dewatering and drainage arrangement for deep basal pit
CN108385706B (en) * 2018-02-09 2020-04-07 温州嘉成工程项目管理有限公司 Well point dewatering and drainage device for deep foundation pit
CN109736340A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of sole plate reserves the dewatering device and method of dewatering well guarantee bed course integrality
CN109736337A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of substrate elevator catch pit drift sand processing guarantees the dewatering device and method of bed course integrality

Similar Documents

Publication Publication Date Title
CN203924083U (en) Cushion cap excavation of foundation pit well-points dewatering device
CN102995599B (en) Anti-freeze anti-seepage water diversion treatment method of collapsible loess water-conveyance canal
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN104878739B (en) Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly
CN201650119U (en) Soil squeezing amount-adjustable bidirectional spiral squeezing and expanding bit
CN205224010U (en) Quick mud -water separation device of silt is dredged to high moisture content
CN202830952U (en) Novel soft soil foundation structure
CN204238178U (en) Novel water conservancy Ecological Wall
CN204212168U (en) A kind of dam water-retaining structure utilizing solution cavity to combine to build a dam
CN203022015U (en) Foundation raft bottom partial deep foundation pit dewatering device
CN206512698U (en) A kind of layer of blowing-filling sludge superficial recently Quick uniform processing structure
CN206204981U (en) Huge water inlet rock foundation
CN101967834A (en) Pulp concentration pool underground base structure with anti-floating function
CN202000365U (en) Seepage-proof structure for underground continuous wall
CN204875418U (en) Water permeability road surface structure
CN204370378U (en) A kind of flexible blocking slag dam structure
CN202610818U (en) Water dropping structure for foundation pit by pipe sinking of prefabricated concrete pipe
CN202787287U (en) Bearing platform water stopping structure
CN205501984U (en) Collapsible loess composite foundation water proof ponding system
CN205000287U (en) Prevention of seepage panel structure of long -term fluctuation zone of groundwater
CN203411971U (en) Foundation reinforced through combination of horizontal drainage plate and drainage pipe
CN202500143U (en) Built-in dewatering well structure of sump
CN204825938U (en) Local precipitation device of foundation ditch
CN202482881U (en) Precipitation hole structure
CN204040060U (en) Spade retaining wall concrete block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 300384 the Binhai New Area of Tianjin Huayuan Industrial Zone Rong Yuan Road No. 2 4-2101

Patentee after: China Construction Municipal Construction Group Co., Ltd.

Address before: 300384 Tianjin city Nankai District Huayuan Industrial Zone Rong Yuan Road No. 2 4-2101

Patentee before: Sinohydro Tianjin Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20200627