CN202787287U - Bearing platform water stopping structure - Google Patents
Bearing platform water stopping structure Download PDFInfo
- Publication number
- CN202787287U CN202787287U CN 201220399260 CN201220399260U CN202787287U CN 202787287 U CN202787287 U CN 202787287U CN 201220399260 CN201220399260 CN 201220399260 CN 201220399260 U CN201220399260 U CN 201220399260U CN 202787287 U CN202787287 U CN 202787287U
- Authority
- CN
- China
- Prior art keywords
- water
- stopping structure
- cushion cap
- collecting well
- structure according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model relates to the technical field of engineering elevators, in particular to a bearing platform water stopping structure capable of being applied to an elevator. The bearing platform water stopping structure comprises a foundation pit and a water-collecting well arranged under the foundation pit. A secondary pouring part is arranged in the foundation pit, and the secondary pouring part and the water-collecting well are communicated through a pipeline. The pipeline is arranged in the foundation pit, penetrates through the secondary pouring part and stretches into the water-collecting well. In the bearing platform water stopping structure capable of being applied to the elevator, the secondary pouring part is arranged in the foundation pit, and the pipeline is arranged to enable the secondary pouring part to be communicated with the water-colleting well. The method of secondary pouring water outlet is adopted, so that water stopping effect of a bearing platform is achieved and the quality of a base plate concrete is guaranteed.
Description
Technical field
The utility model relates to engineering elevator technology field, relates in particular to a kind of cushion cap water-stopping structure that can be used for the elevator position.
Background technology
General absolute altitude-the 12.5m in axial region position of engineering elevator foundation ditch than the dark 4.5m in other positions of foundation ditch, does deep water around when excavation of foundation pit and stirs water-stop curtain, but position, Foundation Pit bottom water burst always, wall place, hole part water burst.The delivery port water burst has certain hydraulic pressure, has adopted several different methods all can't stop, and adopts the method precipitation that draws water when excavation of foundation pit, and construction can be carried out smoothly, but when building bottom board concrete, ending such as water incessantly will be on the concrete mass formation impact of building.
The utility model content
For the shortcoming of prior art, the utility model provides a kind of cushion cap water-stopping structure that can be used for the elevator position.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of cushion cap water-stopping structure, it is characterized in that: comprise foundation ditch and be located at collecting well under the foundation ditch, be provided with secondary in the described foundation ditch and build the position, described secondary is built between position and the collecting well and is passed through pipeline communication, described pipeline is located in the foundation ditch, and it passes secondary and builds the position and stretch in the collecting well.
Further, described foundation ditch bottom surface is provided with the drainage layer, and the drainage layer is provided with bed course.
One of improve, described bed course is provided with well head at the collecting well position, and well head is provided with prefabricated cover plate.
Two of improvement is provided with isolation layer between described drainage layer and the bed course.
Preferably, described isolation layer is comprised of Polypropylence Sheet and glass-fiber-fabric.
Preferably, described bed course is concrete cushion.
Three of improvement is provided with water pumper in the described collecting well, and water pumper is connected with described pipeline.
Preferably, described water pumper comprises feed pump and reserve pump.
Four of improvement, described collecting well and secondary are built and are provided with stock mould between the position.
Five of improvement, the part that described pipeline is built in the position at secondary is provided with valve.
Compared with prior art, the beneficial effects of the utility model are:
The utility model can be used for the cushion cap water-stopping structure at elevator position, is provided with secondary and builds the position in foundation ditch, and be provided with pipeline it is communicated with collecting well, and the method that adopts secondary to build delivery port reaches the effect of cushion cap sealing, has guaranteed the quality of bottom board concrete.
Description of drawings
Fig. 1 is the schematic diagram of the utility model cushion cap water-stopping structure.
The specific embodiment
Below in conjunction with the Concrete facts mode the utility model is further described.
Be illustrated in figure 1 as the embodiment of the utility model cushion cap water-stopping structure, comprise foundation ditch 10 and be located at collecting well 20 under the foundation ditch 10, be provided with secondary in the foundation ditch 10 and build position 30, secondary is built between position 30 and the collecting well 20 and is communicated with by pipeline 40, pipeline 40 is located in the foundation ditch 10, and it passes secondary and builds position 30 and stretch in the collecting well 20; Foundation ditch 10 bottom surfaces are provided with drainage layer 101, and drainage layer 101 is provided with bed course 102, are provided with isolation layer 103 between drainage layer 101 and the bed course 102; Bed course 102 is provided with well head 104 at collecting well 20 positions, and well head 104 is provided with prefabricated cover plate 105; Be provided with water pumper 201 in the collecting well 20, water pumper 201 is connected with pipeline 40; Collecting well 20 and secondary are built and are provided with stock mould 106 between the position 30, and the part that pipeline 40 is built in the position 30 at secondary is provided with valve 401.Wherein, isolation layer 103 is comprised of Polypropylence Sheet and glass-fiber-fabric; Bed course 102 is concrete cushion; Water pumper 201 comprises feed pump 202 and reserve pump 203.
During practice of construction, in foundation ditch 10 bottoms with the method excavated by manual work collecting well 20 of brick open caisson, about collecting well 20 degree of depth 2m, simultaneously at two water pumpers 201 of collecting well 20 interior layouts, i.e. a feed pump 202 and a reserve pump 203, and shop, the bottom surface in elevator foundation ditch 10 rubble drainage layer 101, the water burst of the end, hole, hole wall can be converged in collecting well 20; Lay the isolation layer 103 that Polypropylence Sheet and glass-fiber-fabric form on rubble drainage layer 101, build foundation pad 102 at isolation layer 103, bed course 102 is reserved well head 104 at collecting well 20 positions; Make prefabricated cover plate 105 at well head 104, pipeline 40 passes cover plate, forms the individual pressure reduction well that catchments.Water pumper 201 constantly draws water and makes foundation ditch 10 inside without ponding during reinforcing bar binding.
Present embodiment passes the cushion cap position at pipeline 40 the measure sealing that secondary is built position 30 is set.When building bottom board concrete, do a 1m * 1m * 1.2m stock mould 106 with the 3mm steel plate, pipeline 40 passes stock mould 106, a valve 401 is installed on the pipeline 40 in the stock mould 106, stock mould 106 interior concretes are done secondary and are built, water pumper 201 constantly draws water when watering bottom board concrete, make groundwater table at bed course below 102, stock mould 106 interior concretes are not built, until bottom board concrete build finish maintenance a period of time after, stop pumping, valve-off 401, the water pipe of valve more than 401 cuts away sealing, the C45 expansive concrete that is higher than the bottom board concrete one-level in stock mould 106 interior usefulness is built stock mould 106 interior concretes, aqueduct valve 401 is cast in the bottom board concrete, thereby improves self waterproof ability of concrete.
Claims (10)
1. cushion cap water-stopping structure, it is characterized in that: comprise foundation ditch (10) and be located at collecting well (20) under the foundation ditch, be provided with secondary in the described foundation ditch and build position (30), described secondary is built between position and the collecting well and is communicated with by pipeline (40), described pipeline is located in the foundation ditch, and it passes secondary and builds the position and stretch in the collecting well.
2. cushion cap water-stopping structure according to claim 1, it is characterized in that: described foundation ditch bottom surface is provided with drainage layer (101), and the drainage layer is provided with bed course (102).
3. cushion cap water-stopping structure according to claim 2, it is characterized in that: described bed course is provided with well head (104) at the collecting well position, well head is provided with prefabricated cover plate (105).
4. cushion cap water-stopping structure according to claim 2 is characterized in that: be provided with isolation layer (103) between described drainage layer and the bed course.
5. cushion cap water-stopping structure according to claim 4, it is characterized in that: described isolation layer is comprised of Polypropylence Sheet and glass-fiber-fabric.
6. cushion cap water-stopping structure according to claim 2, it is characterized in that: described bed course is concrete cushion.
7. cushion cap water-stopping structure according to claim 1, it is characterized in that: be provided with water pumper (201) in the described collecting well, water pumper is connected with described pipeline.
8. cushion cap water-stopping structure according to claim 7, it is characterized in that: described water pumper comprises feed pump (202) and reserve pump (203).
9. according to claim 1 to 8 each described cushion cap water-stopping structures, it is characterized in that: described collecting well and secondary are built and are provided with stock mould (106) between the position.
10. cushion cap water-stopping structure according to claim 9, it is characterized in that: the part that described pipeline is built in the position at secondary is provided with valve (401).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220399260 CN202787287U (en) | 2012-08-13 | 2012-08-13 | Bearing platform water stopping structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220399260 CN202787287U (en) | 2012-08-13 | 2012-08-13 | Bearing platform water stopping structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202787287U true CN202787287U (en) | 2013-03-13 |
Family
ID=47814569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220399260 Expired - Fee Related CN202787287U (en) | 2012-08-13 | 2012-08-13 | Bearing platform water stopping structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202787287U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797261A (en) * | 2012-08-13 | 2012-11-28 | 云南工程建设总承包公司 | Bearing platform water stopping structure |
CN104131578A (en) * | 2014-02-21 | 2014-11-05 | 中国建筑第四工程局有限公司 | Inverted construction method and structure of bearing platform and base plate of basement under current-formed soils |
-
2012
- 2012-08-13 CN CN 201220399260 patent/CN202787287U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797261A (en) * | 2012-08-13 | 2012-11-28 | 云南工程建设总承包公司 | Bearing platform water stopping structure |
CN104131578A (en) * | 2014-02-21 | 2014-11-05 | 中国建筑第四工程局有限公司 | Inverted construction method and structure of bearing platform and base plate of basement under current-formed soils |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104805854B (en) | A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment | |
CN201896316U (en) | System for reducing and draining confined water in deep foundation pit of rock foundation | |
CN204530732U (en) | A kind of structure of the precipitation based on basement elevator shaft plash | |
CN204000956U (en) | A kind of basement bottom plate rear pouring tape structure | |
CN204023501U (en) | A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam | |
CN103410175B (en) | A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction | |
CN103498486B (en) | A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well | |
CN203924083U (en) | Cushion cap excavation of foundation pit well-points dewatering device | |
CN107268688B (en) | Construction method for reinforcing and sealing I-shaped steel joint of underground continuous wall | |
CN101936032A (en) | Method for mounting and constructing polyethylene double-wall corrugated water discharge pipe | |
CN104452685B (en) | A kind of classification buoyancy lift type checkdam | |
CN202787287U (en) | Bearing platform water stopping structure | |
CN109853477B (en) | Centralized leakage blocking structure and method for changing dynamic water into static water in gallery | |
CN105133619A (en) | Construction method for deep foundation pit of elevator shaft | |
CN201162233Y (en) | Rear irrigation zone structure with higher ground water level | |
CN104975607A (en) | Offshore area local deep foundation pit stanching pit construction method | |
CN107653889A (en) | A kind of shaped steel pressure is poured water the construction method of soil curtain support pile | |
CN203939032U (en) | A kind of for upper lower the formula deep footing groove enclosing structure of wall of ground consisting of hard rock | |
CN203768925U (en) | Seal device for dewatering well in foundation pit | |
CN104060622B (en) | Steel drum Yield rainfall relation method is cheated in a kind of hole | |
CN209040133U (en) | Well-covering device for dewatering well suitable for rich groundwater region | |
CN201933459U (en) | Gravity wharf structure with anti-slide plate | |
CN203514332U (en) | Casing for blocking dewatering tube well of post-cast strip | |
CN202000379U (en) | Blocking device for reserved port on bottom plate of basement | |
CN101812853B (en) | Swimming pool base actively anti-floating construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 27, ring south new village, Kunming, Yunnan Province Patentee after: YUNNAN CONSTRUCTION ENGINEERING GENERAL CONTRACTING CO. Address before: No. 27, ring south new village, Kunming, Yunnan Province Patentee before: YUNNAN CONSTRUCTION ENGINEERING GENERAL CONTRACTING CO. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130313 Termination date: 20210813 |
|
CF01 | Termination of patent right due to non-payment of annual fee |