Prior art keywords
broken stone
stone pile
cfg stake
composite foundation
cfg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420383252.2U
Other languages
Chinese (zh)
Inventor
王步云
赵秀芹
石春宇
陈友明
董完毛
师凯
高顺峰
贾玉龙
郝建军
武波
管瑜熙
王刚
赵亮
张丙兴
马骐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY
Original Assignee
TAIYUAN DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY filed Critical TAIYUAN DESIGN RESEARCH INSTITUTE FOR COAL INDUSTRY
Priority to CN201420383252.2U priority Critical patent/CN203960843U/en
Application granted granted Critical
Publication of CN203960843U publication Critical patent/CN203960843U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a kind of composite foundation, be specifically related to a kind of broken stone pile and CFG stake combined composite foundation, technical problem to be solved has been to provide a kind of rational in infrastructure, easily construction, supporting capacity is strong, the broken stone pile that foundation stability is high and CFG stake combined composite foundation, the technical scheme adopting is broken stone pile, CFG stake and sandstone cotton-padded mattress lining, the top of broken stone pile and CFG stake is provided with sandstone cotton-padded mattress lining, described broken stone pile spread configuration forms broken stone pile array, is provided with the CFG stake array consisting of CFG stake spread configuration between adjacent two broken stone pile; The utility model easy construction, bearing capacity is strong, is widely used in the building lot in house.

Description

Broken stone pile and CFG stake combined composite foundation
Technical field
The utility model relates to a kind of composite foundation, is specifically related to a kind of broken stone pile and CFG stake combined composite foundation.
Background technology
In engineering practice, people have invented composite foundation, by ground, process, and improve the stress performance of natural ground, make it reach designing requirement.Composite foundation refers to that natural ground part soil body in ground processing procedure is enhanced, or replaced or reinforcement material is set in natural ground, under load action, and the effect of matrix and reinforcement shared load.In engineering reality, for high sensitivity silt, loosening sand Liquefaction Ground, solve the problems such as soil liquefaction, ground weakness simultaneously, traditional, single method for processing foundation does not often reach expected effect.
Utility model content
The utility model overcomes the deficiency that prior art exists, and technical problem to be solved has been to provide a kind of rational in infrastructure, easily construction, and supporting capacity is strong, the broken stone pile that foundation stability is high and CFG stake combined composite foundation.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: broken stone pile and CFG stake combined composite foundation, comprise: broken stone pile, CFG stake and sandstone cotton-padded mattress lining, the top of broken stone pile and CFG stake is provided with sandstone cotton-padded mattress lining, described broken stone pile spread configuration forms broken stone pile array, is provided with the CFG stake array consisting of CFG stake spread configuration between adjacent two broken stone pile.
Preferably, broken stone pile array, the alternate setting of CFG stake array, the thickness 30~50cm of sandstone mattress layer 3.
The beneficial effect that the utility model compared with prior art had is: the utility model is simple in structure, easy construction, adopt the ground that meets of broken stone pile and CFG stake formation, can effectively eliminate liquefaction, foundation capability significantly improves, can be used for polytype building, and foundation deformation dwindles by a small margin, greatly improved the safety of stability and the building of ground.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model broken stone pile and CFG stake combined composite foundation.
Fig. 2 is the arrangement schematic diagram of the stake of the utility model medium stone and CFG stake.
In figure: 1 is broken stone pile, 2 is CFG stake, and 3 is sandstone cotton-padded mattress lining.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described further.
As shown in Figure 1, broken stone pile and CFG stake combined composite foundation, comprise: broken stone pile 1, CFG stake 2 and sandstone cotton-padded mattress lining 3, the top of broken stone pile 1 and CFG stake 2 is provided with sandstone cotton-padded mattress lining 3, described broken stone pile 1 spread configuration forms broken stone pile array, between adjacent two broken stone pile 1, be provided with the CFG stake array being formed by CFG stake 2 spread configurations, described broken stone pile array, the alternate setting of CFG stake array, the thickness 30~50cm of sandstone mattress layer 3.
Adopt the composite foundation that broken stone pile and CFG stake form to process and there is practicality and good economy and social benefit widely highly sensitive soil, liquefaction soil layers ground.Be in particular in: adopt this structure, can significantly improve the supporting capacity of ground, eliminate soil liquefaction.Can adapt to polytype building; And can make foundation deformation significantly dwindle, the stability of ground and the safety of building also can improve greatly.
By reference to the accompanying drawings embodiment of the present utility model is explained in detail above; but the utility model is not limited to above-described embodiment; in the ken possessing those of ordinary skills; the various variations that can also make under the prerequisite that does not depart from the utility model aim, also should be considered as protection domain of the present utility model.

Claims (2)

1. broken stone pile and CFG stake combined composite foundation, comprise: broken stone pile (1), CFG stake (2) and sandstone cotton-padded mattress lining (3), it is characterized in that: the top of broken stone pile (1) and CFG stake (2) is provided with sandstone cotton-padded mattress lining (3), described broken stone pile (1) spread configuration forms broken stone pile array, is provided with the CFG stake array consisting of CFG stake (2) spread configuration between adjacent two broken stone pile (1).
2. broken stone pile according to claim 1 and CFG stake combined composite foundation, is characterized in that: described broken stone pile array, the alternate setting of CFG stake array, the thickness 30~50cm of sandstone mattress layer (3).
CN201420383252.2U 2014-07-12 2014-07-12 Broken stone pile and CFG stake combined composite foundation Expired - Lifetime CN203960843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420383252.2U CN203960843U (en) 2014-07-12 2014-07-12 Broken stone pile and CFG stake combined composite foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420383252.2U CN203960843U (en) 2014-07-12 2014-07-12 Broken stone pile and CFG stake combined composite foundation

Publications (1)

Publication Number Publication Date
CN203960843U true CN203960843U (en) 2014-11-26

Family

ID=51921445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420383252.2U Expired - Lifetime CN203960843U (en) 2014-07-12 2014-07-12 Broken stone pile and CFG stake combined composite foundation

Country Status (1)

Country Link
CN (1) CN203960843U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762957A (en) * 2015-04-22 2015-07-08 中冶成都勘察研究总院有限公司 Construction method for spiral hole forming ram-expanded CFG pile
CN106869128A (en) * 2017-04-07 2017-06-20 东南大学 Treatment bottom is soft layer, top is liquefaction soil layers ground stake machine and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762957A (en) * 2015-04-22 2015-07-08 中冶成都勘察研究总院有限公司 Construction method for spiral hole forming ram-expanded CFG pile
CN104762957B (en) * 2015-04-22 2016-05-18 中冶成都勘察研究总院有限公司 A kind of spiral pore-forming rams the construction method that expands CFG stake
CN106869128A (en) * 2017-04-07 2017-06-20 东南大学 Treatment bottom is soft layer, top is liquefaction soil layers ground stake machine and method

Similar Documents

Publication Publication Date Title
CN203960843U (en) Broken stone pile and CFG stake combined composite foundation
CN206204962U (en) High intensity highway slope protection
CN202936772U (en) Long-short vibro-replacement stone column for treating badly liquefied foundation
CN204000929U (en) Retaining wall for hydraulic engineering
CN202466612U (en) Composite slag foundation
CN205421297U (en) Slope reinforcement software structure
CN204023345U (en) A kind of Freeway Foundation structure
CN104372801A (en) Slope anti-skidding component
CN205259020U (en) Water permeability road structure
CN203475457U (en) Composite pile foundation used for soft soil building foundation
CN203947469U (en) Two carrying helical burr ram for building
CN204298813U (en) Ash Foundation in a kind of liquefying soil
CN207919979U (en) Indoor super large-scale lithotome paving structure
CN103741667B (en) A kind of continous way wicker plaiting article drop
CN202658575U (en) Soil-retaining building block
CN206308823U (en) Rubber granule energy-eliminating shock-insulating structure is filled out outside rammed earth agriculture room constructional column
CN205756060U (en) Plant root safeguard structure in afforestation
CN204875673U (en) Hydraulic engineering uses ecological bank protection
CN205443910U (en) Utilize anti bridge tilting gearing of building rubbish
CN203007998U (en) Apron slope with open trench
CN205223794U (en) Barren rock powder infiltration floor tile
CN204455994U (en) Protection slope
Belabbaci et al. Stabilization of expansive soils with milk of lime: the case of clays of Tlemcen, Algeria
CN203821423U (en) Composite foundation
Vasiliev et al. Ice-and cryogel-soil composites in water-retaining elements in embankment dams constructed in cold regions

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141126

CX01 Expiry of patent term