CN204298813U - Ash Foundation in a kind of liquefying soil - Google Patents
Ash Foundation in a kind of liquefying soil Download PDFInfo
- Publication number
- CN204298813U CN204298813U CN201320820507.2U CN201320820507U CN204298813U CN 204298813 U CN204298813 U CN 204298813U CN 201320820507 U CN201320820507 U CN 201320820507U CN 204298813 U CN204298813 U CN 204298813U
- Authority
- CN
- China
- Prior art keywords
- ash
- pile
- coal
- pulverized
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
An Ash Foundation in liquefying soil, comprises castinplace pile, and described castinplace pile is pulverized-coal-ash pile.Pulverized-coal-ash pile and liquefying soil contact surface, flyash penetrates in liquefying soil.The utility model injects the pulverized-coal-ash pile being mixed with 1% ~ 3% activating agent in liquefaction earth by pressure, pulverized-coal-ash pile is at the effect generation chemical reaction of activating agent, impel flyash and the surrounding soil consolidation of pulverized-coal-ash pile, pore water can be made to overflow simultaneously, improve the shear strength of the soil body, eliminate liquefaction characteristics.This Ash Foundation not only can reach the object of eliminating liquefaction but also can improve holds ground base load power.
Description
Technical field
The utility model relates to a kind of liquefied foundation, specifically refers to the Ash Foundation in a kind of liquefying soil.
Background technology
During earthquake, liquefying soil is under the effect of earthquake, and its granulated aggregate produces plastic strain, and volume reduces.Because earthquake motion ringing speed is much larger than the discharge rate of liquefying soil, therefore in moment of geological process, liquefying soil pore water has little time to discharge, now pore water pressure rises rapidly, the effective stress in soil particle is caused to reduce rapidly, the soil body is tending towards softening, and when the effective stress of soil equals zero, the total stress of upper overburden layer is all born by pore water.Under the ringing of earthquake motion, soil body particle is suspended in pore water, loses its shear strength completely, causes foundation soil to lose efficacy and occurs sandblasting preventing water phenomenon, building sinks, tilts or cracking, the safety of impact building.Need to process liquefying soil for this reason, eliminate its liquefaction property, conventional punching of shaking in engineering, arrange ooze, the method liquefied foundation processing such as strong rammer, although the respond well restriction all having applicable elements.
Utility model content
For deficiency of the prior art, the utility model proposes a kind of raising and hold Ash Foundation in the liquefying soil of ground base load power.
To achieve these goals, the technical solution adopted in the utility model is: the Ash Foundation in a kind of liquefying soil, comprises castinplace pile, and described castinplace pile is pulverized-coal-ash pile.
Described pulverized-coal-ash pile and liquefying soil contact surface, flyash penetrates in liquefying soil.
Described pulverized-coal-ash pile top is the thick hardcore bed of 200-400mm.
Thick 300 mm of described hardcore bed.
The utility model is inserted the pulverized-coal-ash pile being mixed with 1% ~ 3% activating agent in liquefaction earth by pressure, pulverized-coal-ash pile is at the effect generation chemical reaction of activating agent, impel flyash and the surrounding soil consolidation of pulverized-coal-ash pile, pore water can be made to overflow simultaneously, improve the shear strength of the soil body, eliminate liquefaction characteristics.This Ash Foundation not only can reach the object of eliminating liquefaction but also can improve holds ground base load power.
Accompanying drawing explanation
Fig. 1 is the layout schematic diagram of flyash slip casting point;
Fig. 2 is the longitudinal sectional drawing of flyash slip casting method liquefied foundation processing.
Reference numeral: 1, pulverized-coal-ash pile; 2, hardcore bed.
Detailed description of the invention
As depicted in figs. 1 and 2, the Ash Foundation in a kind of liquefying soil, comprises castinplace pile, and described castinplace pile is pulverized-coal-ash pile 1.Pulverized-coal-ash pile 1 and liquefying soil contact surface, flyash penetrates in liquefying soil.Pulverized-coal-ash pile 1 top is thick 200-400mm hardcore bed 2.Thick 300 mm of hardcore bed 2.
Ground first calculates before slip casting, determines the distribution of stake holes point position and the degree of depth of pulverized-coal-ash pile 1; Then in each stake holes, insert the pulverized-coal-ash pile 1 being mixed with 1% ~ 3% activating agent, pulverized-coal-ash pile 1, at the effect generation chemical reaction of activating agent, impels flyash and surrounding soil consolidation, pore water can be made to overflow simultaneously, improve the shear strength of the soil body, eliminate liquefaction characteristics; Pulverized-coal-ash pile 1 arranges the thick hardcore bed 2 of 300mm at ground top after inserting, and this thick hardcore bed 2 plays horizontal drainage effect, is conducive to the rapidly solidified of soil layer after constructing, more can plays obvious stress spread effect, reduces the annex stress of foundation bottom soil layer.
Claims (1)
1. the Ash Foundation in liquefying soil, comprises castinplace pile, it is characterized in that: described castinplace pile is pulverized-coal-ash pile, described pulverized-coal-ash pile and liquefying soil contact surface, and flyash penetrates in liquefying soil, and pulverized-coal-ash pile top is the thick hardcore bed of 300mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320820507.2U CN204298813U (en) | 2013-12-15 | 2013-12-15 | Ash Foundation in a kind of liquefying soil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320820507.2U CN204298813U (en) | 2013-12-15 | 2013-12-15 | Ash Foundation in a kind of liquefying soil |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204298813U true CN204298813U (en) | 2015-04-29 |
Family
ID=53104368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320820507.2U Expired - Fee Related CN204298813U (en) | 2013-12-15 | 2013-12-15 | Ash Foundation in a kind of liquefying soil |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204298813U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108384554A (en) * | 2018-02-12 | 2018-08-10 | 甘肃省地震局(中国地震局兰州地震研究所) | Anti- liquefaction improvement loess of a kind of loess foundation of novel environment friendly and preparation method thereof |
CN115288112A (en) * | 2022-08-17 | 2022-11-04 | 北京市市政一建设工程有限责任公司 | River course soft soil foundation reinforced structure |
-
2013
- 2013-12-15 CN CN201320820507.2U patent/CN204298813U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108384554A (en) * | 2018-02-12 | 2018-08-10 | 甘肃省地震局(中国地震局兰州地震研究所) | Anti- liquefaction improvement loess of a kind of loess foundation of novel environment friendly and preparation method thereof |
CN115288112A (en) * | 2022-08-17 | 2022-11-04 | 北京市市政一建设工程有限责任公司 | River course soft soil foundation reinforced structure |
CN115288112B (en) * | 2022-08-17 | 2024-02-23 | 北京市市政一建设工程有限责任公司 | River course weak soil foundation reinforced structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203546678U (en) | Asphalt concrete core-wall rockfill dam structure | |
CN106246188A (en) | The system and method that the preventing and treating coal mine shaft lining shaft deformation of stratum settlement compatibility of deformation is destroyed | |
CN205778903U (en) | A kind of soft-rock tunnel pucking preventing and treating device | |
CN204298813U (en) | Ash Foundation in a kind of liquefying soil | |
CN203878594U (en) | Slope reinforcement governing structure | |
CN102071675A (en) | Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles | |
CN204000914U (en) | A kind of composite foundation base | |
CN202323963U (en) | Drainage and anchoring combined device for side slope | |
CN203307776U (en) | Concrete face rock fill dam toe board structure | |
CN202830952U (en) | Novel soft soil foundation structure | |
CN203905044U (en) | Overhead deep foundation pit crossing construction elevator beam plate type base structure | |
CN103938584B (en) | The connection construction method of covering layer top panel toe plate, junction plate, impervious wall | |
CN204282395U (en) | A kind of stake holder counterfort retaining wall | |
CN204676565U (en) | A kind of novel pit backfill structure | |
CN202989942U (en) | Wall foundation structure for soft soil or high backfill soil area | |
CN203247598U (en) | Deformation-resisting building foundation in gob area | |
CN203475457U (en) | Composite pile foundation used for soft soil building foundation | |
CN203855959U (en) | Circular-section anti-slide pile with bilateral haunched beams | |
CN106869309A (en) | A kind of automatically reset Windproof anti-seismic building structure and its construction method | |
CN204199321U (en) | A kind of narrow base tower four leg associating open caisson foundation | |
CN204370459U (en) | The outer precipitation system of high sensitivity soil deep foundation pit support foundation ditch | |
CN203960843U (en) | Broken stone pile and CFG stake combined composite foundation | |
CN203755332U (en) | Device for treating collapsible loess with lime-soil compaction piles and CFG rigid piles combined | |
CN206768839U (en) | Mud-rock flow guard system | |
CN203080540U (en) | Iron tower foundation of power transmission line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150429 Termination date: 20161215 |
|
CF01 | Termination of patent right due to non-payment of annual fee |