CN203878594U - Slope reinforcement governing structure - Google Patents

Slope reinforcement governing structure Download PDF

Info

Publication number
CN203878594U
CN203878594U CN201420233545.2U CN201420233545U CN203878594U CN 203878594 U CN203878594 U CN 203878594U CN 201420233545 U CN201420233545 U CN 201420233545U CN 203878594 U CN203878594 U CN 203878594U
Authority
CN
China
Prior art keywords
slope
reinforcement
governing
anchor cable
treatment area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420233545.2U
Other languages
Chinese (zh)
Inventor
李丹丹
雷声军
雷有栋
陈海坤
崔进
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201420233545.2U priority Critical patent/CN203878594U/en
Application granted granted Critical
Publication of CN203878594U publication Critical patent/CN203878594U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a slope reinforcement governing structure. A lattice beam (3) is arranged on the surface of a reinforcement treatment area (2). A pre-stressed anchor cable (5) is arranged at a joint of the lattice beam (3). The pre-stressed anchor cable (5) is sleeved with a floral tube (4) used for slip casting inside the reinforcement treatment area (2). The pre-stressed anchor cable (5) penetrates through the reinforcement treatment area (2) and is anchored inside bed rock (1). According to slope reinforcement governing measures, physical and mechanics parameters of a slope can be improved so that the aim that the reinforcement treatment area is stable can be met. According to the slope reinforcement governing structure, slip casting is carried out through an anchor cable hole, the well cementing procedure is optimized, slope disturbance and the influence on the environment are reduced, the reinforcement governing effect is better, reliability is high, and the slope reinforcement governing structure is economically feasible and has wide application prospects.

Description

A kind of slope reinforcement administration structure
Technical field
The utility model relates to a kind of slope reinforcement administration structure, belongs to geotechnical engineering slope treatment technical field.
Background technology
In geotechnical engineering slope treatment, for deep covering layer slope, conventionally adopt excavation off-load, a gear mode to process.In the time that covering layer slope is higher, open excavation amount is larger, and easily forms extensive high slope; Excavation forms simultaneously Artificial Side-slope difficulty of governance and engineering quantity are all larger.A gear processing mode that adopts antislide pile (or anchor anchor), antislide pile is arranged the restriction that is subject to orographic condition and cutting depth, and only to layout area, especially toe support action is more obvious; Antislide pile excavation causes destruction to a certain degree to natural slope ecological simultaneously.
Utility model content
The purpose of this utility model is greatly, easily to form restriction that extensive high slope and antislide pile be subject to landform and cutting depth, destroy the deficiencies such as ecological for overcoming in prior art excavated volume when deep covering layer slope is adopted to excavation off-load, gear mode, and a kind of slope reinforcement administration structure is provided.
Based on the thinking to prior art, to such side slope, if employing sash beam+prestress anchorage cable+utilize anchor cable boring to carry out slip casting measure, when anchor cable can provide sideway skid resistance, utilize anchor cable boring slip casting Soil Parameters (cohesive force) can be increased to original 1.5~2 times, for administering covering layer slope successful.
The utility model is achieved through the following technical solutions, and on surface, consolidation process district, sash beam is set, and sash girder connection place arranges prestress anchorage cable, and this prestress anchorage cable overcoat is for the floral tube of slip casting in described consolidation process district.Floral tube is set, to the slip casting of consolidation process district in anchor cable hole.Utilize the anchor cable hole floral tube in consolidation process region to carry out slip casting, part slurries are injected to consolidation process district, prestress anchorage cable runs through consolidation process district and is anchored in basement rock.Between the distribution of prestress anchorage cable, array pitch is important technical indicator of the utility model, is generally 4m left and right, can not be less than 2m, and between concrete distribution, array pitch should be according to actual conditions calculative determination.
In above-mentioned slope reinforcement control measures, the anchor cable hole grouting amount in consolidation process district can be determined according to side slope soil property situation, residual pushing force and experiment situation, must control grouting amount.
Compared with prior art, slope reinforcement control measures of the present utility model, can improve the physical and mechanical parameter of side slope, to reach the object that makes consolidation process district meet stability requirement.The utility model utilizes anchor cable hole to carry out slip casting, has optimized the operation of well cementing, reduces the disturbance on side slope and the impact on environment, and Reinforcement effect is better, and reliability is high, is also economically viable, has broad application prospects.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Description of reference numerals: 1-basement rock, 2-consolidation process district, 3-sash beam, 4-floral tube, 5-prestress anchorage cable.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
As shown in Figure 1, slope reinforcement administration structure of the present utility model is to implement like this: on 2 surfaces, consolidation process district, sash beam 3 is set, sash beam 3 Nodes arrange prestress anchorage cable 5, when consolidation process district 2 pore-creating, adopt floral tube 4 to follow up, utilize the anchor cable hole in consolidation process region 2 to carry out slip casting, make slurries inject consolidation process district 2, prestress anchorage cable 5 runs through consolidation process district 2 and is anchored in basement rock 1.
Certainly, be more than concrete exemplary applications of the present utility model, the utility model also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on the desired protection domain of the utility model.

Claims (3)

1. a slope reinforcement administration structure, it is characterized in that: on surface, consolidation process district (2), sash beam (3) is set, sash beam (3) Nodes arranges prestress anchorage cable (5), this prestress anchorage cable (5) overcoat is for the floral tube (4) to the interior slip casting in described consolidation process district (2), and prestress anchorage cable (5) runs through consolidation process district (2) and is anchored in basement rock (1).
2. slope reinforcement administration structure according to claim 1, is characterized in that: between the distribution of described prestress anchorage cable (5), array pitch can not be less than 2m.
3. slope reinforcement administration structure according to claim 2, is characterized in that: between the distribution of described prestress anchorage cable (5), array pitch is 4m.
CN201420233545.2U 2014-05-08 2014-05-08 Slope reinforcement governing structure Expired - Lifetime CN203878594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420233545.2U CN203878594U (en) 2014-05-08 2014-05-08 Slope reinforcement governing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420233545.2U CN203878594U (en) 2014-05-08 2014-05-08 Slope reinforcement governing structure

Publications (1)

Publication Number Publication Date
CN203878594U true CN203878594U (en) 2014-10-15

Family

ID=51679111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420233545.2U Expired - Lifetime CN203878594U (en) 2014-05-08 2014-05-08 Slope reinforcement governing structure

Country Status (1)

Country Link
CN (1) CN203878594U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088109A (en) * 2016-06-06 2016-11-09 中国建筑第八工程局有限公司 Discarded pit slope ecological recovery covers green construction method
CN106284386A (en) * 2016-10-21 2017-01-04 中国地质科学院探矿工艺研究所 Carbon fiber reinforced lattice beam structure and method
CN106498954A (en) * 2016-11-23 2017-03-15 中国电建集团成都勘测设计研究院有限公司 High steep soil deformation slope retaining structure
CN106522248A (en) * 2016-11-25 2017-03-22 重庆市基础工程有限公司 Method for reinforcing soil slope and slope reinforcing device
CN106939609A (en) * 2017-04-25 2017-07-11 安徽宝翔建设集团有限责任公司 Lattice girder slope construction is continuous to become control construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088109A (en) * 2016-06-06 2016-11-09 中国建筑第八工程局有限公司 Discarded pit slope ecological recovery covers green construction method
CN106088109B (en) * 2016-06-06 2019-02-26 中国建筑第八工程局有限公司 Discarded pit slope ecological recovery covers green construction method
CN106284386A (en) * 2016-10-21 2017-01-04 中国地质科学院探矿工艺研究所 Carbon fiber reinforced lattice beam structure and method
CN106498954A (en) * 2016-11-23 2017-03-15 中国电建集团成都勘测设计研究院有限公司 High steep soil deformation slope retaining structure
CN106522248A (en) * 2016-11-25 2017-03-22 重庆市基础工程有限公司 Method for reinforcing soil slope and slope reinforcing device
CN106939609A (en) * 2017-04-25 2017-07-11 安徽宝翔建设集团有限责任公司 Lattice girder slope construction is continuous to become control construction method

Similar Documents

Publication Publication Date Title
CN203878594U (en) Slope reinforcement governing structure
CN103498696B (en) A kind of method from roadway in the roof grouting filling compacting goaf filling body
CN204401634U (en) Highway cut slip casting cutting slope of soil nail
CN103225267B (en) Construction method of deep and thick soft soil foundation bed bridge abutment
CN204401385U (en) A kind of road structure processing Deep Thick Soft Ground karst foundation
CN102996135A (en) Construction method for crossing for complex formation of shield under ultra-deep earth
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN103243721B (en) Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition
CN103074885B (en) Method for foundation settlement control
CN104532855A (en) Combined pile supporting structure in deep and thick peat soil layer
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN203247597U (en) Construction structure of deep soft soil foundation bridge abutment
CN105421469A (en) Geogrid reinforcement covering wall structure and construction method thereof
CN203247598U (en) Deformation-resisting building foundation in gob area
CN204662246U (en) steep slope bridge pier structure
CN204174627U (en) A kind of slope retaining structure
CN206956733U (en) Slope Supporting of Deep Excavation structure
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN203080534U (en) Supporting structure of fractured rock mass side slope
CN204298813U (en) Ash Foundation in a kind of liquefying soil
CN205088696U (en) Interim protective structure of slope tatus body
CN205013010U (en) Pass through pyroclastic flow stratum face sealing wall for tunnel construction
CN108506020A (en) A kind of huge loose U-shaped curtain concretion method of talus earth's surface foam slip casting of tunnel entrance
Chen et al. Application of self-drilling anchor on coal gangue slope treatment
Wang et al. Mechanical mechanism of the post-grouting pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141015

CX01 Expiry of patent term