CN203080534U - Supporting structure of fractured rock mass side slope - Google Patents
Supporting structure of fractured rock mass side slope Download PDFInfo
- Publication number
- CN203080534U CN203080534U CN 201320012050 CN201320012050U CN203080534U CN 203080534 U CN203080534 U CN 203080534U CN 201320012050 CN201320012050 CN 201320012050 CN 201320012050 U CN201320012050 U CN 201320012050U CN 203080534 U CN203080534 U CN 203080534U
- Authority
- CN
- China
- Prior art keywords
- anchor pile
- grouting
- side slope
- rock mass
- fractured rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a supporting structure of a fractured rock mass side slope, and aims to provide the supporting structure, which is simple in structure and convenient to construct so as to enlarge cement mortar scattering ranges, of the fractured rock mass side slope, and improve mutual contacting ability of an anchor pile in the supporting structure of the fractured rock mass side slope and surrounding rock masses, supporting effect of the anchor pile and stability of the side slope. According to the technical scheme, a grouting hole is drilled in the slope surface of a fractured rock mass, and the supporting structure of the fractured rock mass side slope is characterized in that an anchor pile grouting pipe combined with a grouting pipe consolidation function is arranged inside the grouting hole, grouting consolidation construction is conducted on the anchor pile through the anchor pile grouting pipe, and the anchor pile is formed after the grouting hole is filled up with grouting pressure and grouting liquid. The supporting structure of the fractured rock mass side slope is suitable for adopting a supporting structure mode with the anchor pile and grouting consolidation in supporting of the fractured rock mass side slope, and is mainly applied to hydropower engineering, highway engineering, mine engineering and the like.
Description
Technical field
The utility model relates to a kind of supporting and protection structure of fragmented rock body side slope.Be applicable to and in the fragmented rock body slope retaining, adopt anchor pile to add the supporting and protection structure form of fixed grouting, be mainly used in Hydraulic and Hydro-Power Engineering, highway engineering, mine engineering etc.
Background technology
In the slope treatment of rock mass condition difference, conventional anchor pile is after slip casting, and its cement mortar range of scatter is limited, can not make anchor pile around the fragmented rock body globality effectively improve, thereby cause anchor pile effectively not contact with its surrounding rock body, that does not bring into play anchor pile should have effect.
Summary of the invention
The technical problems to be solved in the utility model is: at the problem of above-mentioned existence, a kind of supporting and protection structure of fragmented rock body side slope of simple in structure, easy construction is provided, to enlarge the cement mortar range of scatter, anchor pile and surrounding rock body are in contact with one another ability in the enhancing fragmented rock body slope retaining, improve the supporting effect of anchor pile and the stability of side slope.
The technical scheme that the utility model adopted is: a kind of supporting and protection structure of fragmented rock body side slope, on fragmented rock body is domatic, be drilled with the injected hole of anchor pile, it is characterized in that: lay the anchor pile Grouting Pipe that has consolidation grouting pipe function concurrently in the described injected hole, described anchor pile is by carrying out the consolidation grouting construction through the anchor pile Grouting Pipe, grouting pressure and grouting liquid form after filling with injected hole.
The beneficial effects of the utility model are: the utility model is for improving the engagement capacity of anchor pile and surrounding rock body, reach the due supporting effect of anchor pile, the Grouting Pipe of anchor pile is used as side slope consolidation grouting pipe, this pipe is brought into play the function of domatic consolidation grouting pipe and anchor pile slip casting simultaneously, construct according to consolidation grouting pressure during slip casting, can improve the compactness of anchor pile surrounding rock body like this, strengthen the adhesion stress of anchor pile and surrounding rock body, make anchor pile and the cement mortar around it form the bigger rigid pile body structure of rigidity, greatly bring into play the anchoring ability of anchor pile, reach the supporting effect of side slope side slope.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, present embodiment is a kind of supporting and protection structure of fragmented rock body side slope, is drilled with the injected hole of anchor pile 2 on fragmented rock body domatic 1, lays anchor pile Grouting Pipe 3 in the injected hole, and this Grouting Pipe can be used as side slope consolidation grouting pipe and uses.According to slip castings in the past anchor pile Grouting Pipe 3 of consolidation grouting pressure, carry out the construction of fragmented rock body consolidation grouting in this example, slurries form anchor pile 2 after filling with injected hole.Present embodiment makes anchor pile 2 and its cement mortar on every side form the bigger rigid pile body structure of rigidity, greatly brings into play the anchoring ability of 2 pairs of side slopes of anchor pile, reaches the supporting effect of side slope.
The job practices of present embodiment is as follows: at first, that finishes fragmented rock body domatic 1 is excavated to the design build, is drilled with injected hole; Secondly, in the hole, lay anchor pile Grouting Pipe 3; Carry out the consolidation grouting construction by anchor pile Grouting Pipe 3, the grouting pressure of consolidation grouting is determined according to the geological conditions of domatic fragmented rock body, the grouting pressure size is moderate, and the anchor pile supporting control range that reaches designing requirement gets final product, and concentration of slurry should be determined according to the rock mass condition.
Certainly, above-mentioned explanation is not to restriction of the present utility model, and the utility model also is not limited to above-mentioned giving an example; those skilled in the art; in scope of the present utility model, the variation of making, change and add or replace, all should belong to protection domain of the present utility model.
Claims (1)
1. the supporting and protection structure of a fragmented rock body side slope, on fragmented rock body domatic (1), be drilled with the injected hole of anchor pile (2), it is characterized in that: lay the anchor pile Grouting Pipe (3) that has consolidation grouting pipe function concurrently in the described injected hole, described anchor pile (2) is by carrying out the consolidation grouting construction through anchor pile Grouting Pipe (3), grouting pressure and grouting liquid form after filling with injected hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320012050 CN203080534U (en) | 2013-01-10 | 2013-01-10 | Supporting structure of fractured rock mass side slope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320012050 CN203080534U (en) | 2013-01-10 | 2013-01-10 | Supporting structure of fractured rock mass side slope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203080534U true CN203080534U (en) | 2013-07-24 |
Family
ID=48826390
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320012050 Expired - Fee Related CN203080534U (en) | 2013-01-10 | 2013-01-10 | Supporting structure of fractured rock mass side slope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203080534U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912065A (en) * | 2015-06-09 | 2015-09-16 | 四川路航建设工程有限责任公司 | Underwater anchor pile construction method |
CN108411925A (en) * | 2018-03-28 | 2018-08-17 | 贵州省地质矿产勘查开发局111地质大队 | Slope reinforcement discrete support method |
-
2013
- 2013-01-10 CN CN 201320012050 patent/CN203080534U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912065A (en) * | 2015-06-09 | 2015-09-16 | 四川路航建设工程有限责任公司 | Underwater anchor pile construction method |
CN108411925A (en) * | 2018-03-28 | 2018-08-17 | 贵州省地质矿产勘查开发局111地质大队 | Slope reinforcement discrete support method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112308U (en) | A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum | |
CN103993902B (en) | A kind of mash gas pumping drilling two step slip-casting hole-sealing method | |
CN204645027U (en) | Prose style free from parallelism grouting behind shaft or drift lining strength core composite pile | |
CN203878594U (en) | Slope reinforcement governing structure | |
CN203080534U (en) | Supporting structure of fractured rock mass side slope | |
CN103498478B (en) | Rock curtain grouting in foundation of dam construction method | |
CN203977409U (en) | A kind of prefabricated assembled concrete pile foundation | |
CN204023566U (en) | A kind of secondary high-pressure slip-casting enlarged footing anchor pole | |
CN203701112U (en) | Composite foundation grouting steel tube type reinforced slope | |
CN204371386U (en) | The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor | |
CN203891020U (en) | Bundled type slurry pocket grouting anchor rod | |
CN103498685B (en) | Very soft rock roadway base plate and two helps release window supporting device | |
CN204040022U (en) | Castinplace pile avulsion structure | |
CN205259188U (en) | Miniature pressure -bearing stake of bag pocket type of controllable slip casting scope | |
CN205225301U (en) | Multiple anticorrosive stock of multiplicable anchor power | |
CN104278660B (en) | The earth and rockfill dam of the direct fixed strengthening of the horizontal coiled pipe delamination pour slurry method of construction of building a dam | |
CN205506785U (en) | Crack slip casting analogue test device | |
CN103603356A (en) | Annular post-grouting device for lower pile tips under sandstone geological conditions | |
CN205024694U (en) | Superplasticity concrete drilling bored concrete pile dado | |
CN203174586U (en) | Concrete pipe pile for reinforcing railway soft soil foundation | |
CN204212158U (en) | A kind of Grouting Pipe with well | |
CN102230318A (en) | Two-fluid grouting water plugging construction method for pebble layer with strong permeability | |
CN204662452U (en) | A kind of cast-in-place concrete pile base pressure slurry closing device | |
CN103470290B (en) | The anchor rod anchored device of a kind of circular platform type | |
CN203346890U (en) | Soft foundation grouting reinforcement equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130724 Termination date: 20220110 |