CN203922362U - Build-up type modularization steel structure lift shaft - Google Patents

Build-up type modularization steel structure lift shaft Download PDF

Info

Publication number
CN203922362U
CN203922362U CN201420279740.9U CN201420279740U CN203922362U CN 203922362 U CN203922362 U CN 203922362U CN 201420279740 U CN201420279740 U CN 201420279740U CN 203922362 U CN203922362 U CN 203922362U
Authority
CN
China
Prior art keywords
steel
framework
channel
girder
nose girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420279740.9U
Other languages
Chinese (zh)
Inventor
张洪量
李元齐
童晓丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Profit Peace Elevator Engineering Technology Service Co Ltd
Original Assignee
Jiangsu Profit Peace Elevator Engineering Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Profit Peace Elevator Engineering Technology Service Co Ltd filed Critical Jiangsu Profit Peace Elevator Engineering Technology Service Co Ltd
Priority to CN201420279740.9U priority Critical patent/CN203922362U/en
Application granted granted Critical
Publication of CN203922362U publication Critical patent/CN203922362U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of build-up type modularization steel structure lift shaft, comprise hoistway body and sole plate, hoistway body comprises several frameworks and forms for being connected the channel-section steel nose girder of adjacent framework, described sole plate is comprised of side plate and base plate, framework comprises the girder steel of vertically disposed steel column and horizontally set, in channel-section steel nose girder and framework, lower end is connected and fixed by connecting panel bolt, between adjacent framework, by the channel-section steel nose girder of epimere framework lower end and the channel-section steel nose girder bolt of hypomere framework upper end, be connected and fixed, channel-section steel nose girder is fixedly connected with house with girder steel external part.Thereby build-up type modularization steel structure lift shaft of the present utility model connects adjacent framework by channel-section steel nose girder and forms hoistway, then hoistway bottom is fixed on sole plate, thereby greatly shorten the construction period that installs elevator additional, MIN reduction is on setting up elevator in the situation of resident's normal life impact existing house.

Description

Build-up type modularization steel structure lift shaft
Technical field
The utility model relates to a kind of build-up type modularization steel structure lift shaft.
Background technology
In recent years, along with improving constantly of life of urban resident level, people are more and more higher to the requirement of living environment, are embodied in and pursue comfortable living environment and traffic easily.Especially China has entered the aging population stage at present, and resident trip, when obtaining good land mass transportation facilities service, also wishes to obtain vertical transportation instrument more easily.But, due to reasons such as historical economy and laws, be built in the 80s and 90s in last century much higher than the house of 7 layers lift-mounting not.Along with the arrival of aging society, existing house is set up the concern that elevator problem more and more causes the common people's (especially living in the middle and old age residents in walk-up building), becomes a social concern urgently to be resolved hurrily.It is mainly to adopt the brick mix structure of site operation and steel structure as elevator hoistways that traditional existing house is set up elevator, lift-mounting equipment again after civil engineering.Traditional elevator installs method additional and disturbs resident's normal life due to long construction period (generally needing 3-6 month, even longer), destroys cell environment, even also can bring potential safety hazard to resident.How to shorten the construction period that installs elevator additional, MIN reduction is on setting up elevator in the situation of resident's normal life impact existing house, and developing fabricated modularization steel structure lift shaft becomes crucial problem.
Utility model content
The technical problems to be solved in the utility model is: for solving the problem of above-mentioned existence, provide a kind of build-up type modularization steel structure lift shaft, solve conventional lift and install long construction period additional, disturb residents, affect environment and the problem of potential safety hazard easily occurs.
The utility model solves the technical scheme that its technical matters adopts: a kind of build-up type modularization steel structure lift shaft, comprise hoistway body and sole plate, hoistway body is steel-frame structure hoistway body, hoistway body comprises several frameworks and forms for being connected the channel-section steel nose girder of adjacent framework, described sole plate is comprised of side plate and base plate, side plate bottom surface and bed bolt are connected and fixed, framework comprises the girder steel of vertically disposed steel column and horizontally set, steel column and girder steel are I-beam section, between steel column and girder steel by being welded and fixed, in channel-section steel nose girder and framework, lower end is connected and fixed by connecting panel bolt, between adjacent framework, by the channel-section steel nose girder of epimere framework lower end and the channel-section steel nose girder bolt of hypomere framework upper end, be connected and fixed, channel-section steel nose girder is fixedly connected with house with girder steel external part, section framework bottom surface, the end and sole plate upper surface are bolted to connection.
Further, in order to promote safety, channel-section steel nose girder one end is fixedly connected with elevator parking layer.
Further, in order to promote firmness, side plate and base plate all adopt precast concrete material
The beneficial effects of the utility model are, build-up type modularization steel structure lift shaft of the present utility model, thereby by channel-section steel nose girder, connect adjacent framework and form hoistway, then hoistway bottom is fixed on sole plate, thereby greatly shorten the construction period that installs elevator additional, MIN reduction is on setting up elevator in the situation of resident's normal life impact existing house.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is lateral plan of the present utility model.
Fig. 3 is connection diagram of the present utility model.
Fig. 4 is the structural representation of the utility model base.
1. frameworks in figure, 2. channel-section steel nose girder, 3. steel column, 4. girder steel, 5. connecting panel.
The specific embodiment
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, basic structure of the present utility model is only described in a schematic way, so it only show the formation relevant with the utility model.
As Fig. 1, Fig. 2, a kind of build-up type modularization steel structure lift shaft shown in Fig. 3 and Fig. 4, comprise hoistway body and sole plate, hoistway body is steel-frame structure hoistway body, hoistway body comprises four frameworks 1 and forms for being connected the channel-section steel nose girder 2 of adjacent framework, sole plate 6 is comprised of side plate 7 and base plate 8, side plate 7 bottom surfaces and base plate 8 bolts are connected and fixed, framework 1 comprises the girder steel 4 of vertically disposed steel column 3 and horizontally set, steel column 3 and girder steel 4 are I-beam section, between steel column 3 and girder steel 4 by being welded and fixed, in channel-section steel nose girder 2 and framework 1, lower end is connected and fixed by connecting panel 5 bolts, between adjacent framework, by the channel-section steel nose girder of epimere framework lower end and the channel-section steel nose girder bolt of hypomere framework upper end, be connected and fixed, channel-section steel nose girder 2 is fixedly connected with house with girder steel 4 external parts, section framework 1 bottom surface, the end and sole plate 6 upper surfaces are bolted to connection.
Further, in order to promote safety, channel-section steel nose girder 2 one end are fixedly connected with elevator parking layer, and further, in order to promote firmness, side plate 7 and base plate 8 all adopt precast concrete material.Thereby build-up type modularization steel structure lift shaft of the present utility model connects adjacent framework by channel-section steel nose girder 2 and forms hoistway, then hoistway bottom is fixed on sole plate 6, thereby greatly shorten the construction period that installs elevator additional, MIN reduction is on setting up elevator in the situation of resident's normal life impact existing house.
The above-mentioned foundation desirable embodiment of the present utility model of take is enlightenment, and by above-mentioned description, relevant staff can, within not departing from the scope of this utility model technological thought, carry out various change and modification completely.The technical scope of this utility model is not limited to the content on specification sheets, must determine its technical scope according to claim scope.

Claims (3)

1. a build-up type modularization steel structure lift shaft, comprise hoistway body and sole plate, it is characterized in that: described hoistway body is steel-frame structure hoistway body, hoistway body comprises several frameworks (1) and forms for being connected the channel-section steel nose girder (2) of adjacent framework, described sole plate (6) is comprised of side plate (7) and base plate (8), described side plate (7) bottom surface and base plate (8) bolt are connected and fixed, described framework (1) comprises the girder steel (4) of vertically disposed steel column (3) and horizontally set, described steel column (3) and girder steel (4) are I-beam section, between steel column (3) and girder steel (4) by being welded and fixed, in described channel-section steel nose girder (2) and framework (1), lower end is connected and fixed by connecting panel (5) bolt, between described adjacent framework, by the channel-section steel nose girder of epimere framework lower end and the channel-section steel nose girder bolt of hypomere framework upper end, be connected and fixed, described channel-section steel nose girder (2) is fixedly connected with house with girder steel (4) external part, described section framework (1) bottom surface, the end and sole plate (6) upper surface are bolted to connection.
2. build-up type modularization steel structure lift shaft according to claim 1, is characterized in that: described channel-section steel nose girder (2) one end is fixedly connected with elevator parking layer.
3. build-up type modularization steel structure lift shaft according to claim 1, is characterized in that: described side plate (7) and base plate (8) all adopt precast concrete material.
CN201420279740.9U 2014-05-28 2014-05-28 Build-up type modularization steel structure lift shaft Expired - Fee Related CN203922362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420279740.9U CN203922362U (en) 2014-05-28 2014-05-28 Build-up type modularization steel structure lift shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420279740.9U CN203922362U (en) 2014-05-28 2014-05-28 Build-up type modularization steel structure lift shaft

Publications (1)

Publication Number Publication Date
CN203922362U true CN203922362U (en) 2014-11-05

Family

ID=51818220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420279740.9U Expired - Fee Related CN203922362U (en) 2014-05-28 2014-05-28 Build-up type modularization steel structure lift shaft

Country Status (1)

Country Link
CN (1) CN203922362U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107215749A (en) * 2017-08-01 2017-09-29 周晓锋 A kind of elevator hoistways structure and method for improving
CN107217815A (en) * 2017-07-28 2017-09-29 江苏沪宁钢机股份有限公司 A kind of resistance to compression, safety-type assembling type steel structure elevator
CN108584646A (en) * 2018-06-29 2018-09-28 华城(天津)建筑科技有限公司 A kind of additional elevator shaft structure of the assembled being adapted to jack-up construction
CN115092792A (en) * 2022-06-21 2022-09-23 上海美上置业开发有限公司 Integrated prefabricated structure of prefabricated elevator concrete structure and method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217815A (en) * 2017-07-28 2017-09-29 江苏沪宁钢机股份有限公司 A kind of resistance to compression, safety-type assembling type steel structure elevator
CN107217815B (en) * 2017-07-28 2022-11-11 江苏沪宁钢机股份有限公司 Resistance to compression, safe type assembled steel construction elevartor shaft
CN107215749A (en) * 2017-08-01 2017-09-29 周晓锋 A kind of elevator hoistways structure and method for improving
CN108584646A (en) * 2018-06-29 2018-09-28 华城(天津)建筑科技有限公司 A kind of additional elevator shaft structure of the assembled being adapted to jack-up construction
CN115092792A (en) * 2022-06-21 2022-09-23 上海美上置业开发有限公司 Integrated prefabricated structure of prefabricated elevator concrete structure and method thereof

Similar Documents

Publication Publication Date Title
CN103991773A (en) Design and installation method of assembly-type modularized steel structure elevator shaft
CN203049832U (en) Assembling type shear wall structure
CN202245617U (en) Elevator well wall assembled by adopting combined type derricks
CN103352580B (en) The construction method of elevator structure is added in multi-story masonry building
CN203922362U (en) Build-up type modularization steel structure lift shaft
CN103498570B (en) The inner storey-adding reconstruction structure of old factory building and construction method thereof
CN104213717B (en) Multi-storey building integration transformation method of construction
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN104818772B (en) A kind of large span long cantilever conjoined structure and construction technology
CN103362317A (en) Story adding and stair adding structure of existing masonry building, and construction method thereof
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN105839784B (en) Assembled jacking type construction techniques
CN106892315A (en) A kind of additional elevator hoistways of framework assembled
CN105297893A (en) Tenon-and-mortise type concrete superposed beam cross connection structure and construction method thereof
CN108643429B (en) But height-adjusting's assembled coincide floor
CN102733307A (en) Method for constructing cast-in-place beam falsework
CN105888281A (en) Method for utilizing jacking storey-adding technique to promote integrated function of community
CN201942994U (en) Bridge bearing pad
WO2003048469A1 (en) Method for constructing tier building and special jack equipment thereof
CN203998514U (en) Modularization elevator hoistways framework
CN103061514A (en) Long-span steel structure corridor construction method
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN103967332B (en) The construction method of a kind of building site enclosing
CN203603523U (en) Structure for transforming inner portion of old factory building in floor adding mode
CN206783059U (en) A kind of additional elevator hoistways of framework assembled

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20170528