CN103498570B - The inner storey-adding reconstruction structure of old factory building and construction method thereof - Google Patents
The inner storey-adding reconstruction structure of old factory building and construction method thereof Download PDFInfo
- Publication number
- CN103498570B CN103498570B CN201310476734.2A CN201310476734A CN103498570B CN 103498570 B CN103498570 B CN 103498570B CN 201310476734 A CN201310476734 A CN 201310476734A CN 103498570 B CN103498570 B CN 103498570B
- Authority
- CN
- China
- Prior art keywords
- steel
- additional
- girder steel
- original structure
- additional inner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310476734.2A CN103498570B (en) | 2013-10-12 | 2013-10-12 | The inner storey-adding reconstruction structure of old factory building and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310476734.2A CN103498570B (en) | 2013-10-12 | 2013-10-12 | The inner storey-adding reconstruction structure of old factory building and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103498570A CN103498570A (en) | 2014-01-08 |
CN103498570B true CN103498570B (en) | 2015-09-09 |
Family
ID=49863820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310476734.2A Active CN103498570B (en) | 2013-10-12 | 2013-10-12 | The inner storey-adding reconstruction structure of old factory building and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103498570B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411787A (en) * | 2018-04-11 | 2018-08-17 | 中启胶建集团有限公司 | Existing curtain wall builds freely-supported conversion beam steel construction crossover construction |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106567554A (en) * | 2016-10-19 | 2017-04-19 | 北京城建北方建设有限责任公司 | Reinforcing construction method of masonry structural building |
CN106351339A (en) * | 2016-10-26 | 2017-01-25 | 中国二十二冶集团有限公司 | Construction method for thermal insulating sandwich concrete external wall panel with steel beams and steel columns |
CN108678417B (en) * | 2018-07-31 | 2023-07-21 | 天津市建筑设计院 | Steel construction floor reforms transform node |
CN109930855A (en) * | 2019-03-12 | 2019-06-25 | 北京筑福建筑科学研究院有限责任公司 | A kind of industrial premises transformation use internal concrete-steel adding storey structure and its construction method |
CN110107109A (en) * | 2019-04-24 | 2019-08-09 | 西安长庆科技工程有限责任公司 | A kind of steel and concrete structure extend beam-column joint connecting structure method |
CN111287324B (en) * | 2020-04-28 | 2020-08-04 | 中国船舶重工集团国际工程有限公司 | Large-span prestress box-shaped simply-supported steel beam column structure and installation method |
CN112282408A (en) * | 2020-09-05 | 2021-01-29 | 中建二局基础设施建设投资有限公司 | Municipal garden landscape house old enclosure wall body reinforcing structure and hole opening method |
CN113323435A (en) * | 2021-05-25 | 2021-08-31 | 中北华宇建筑工程公司 | Construction method for modifying old factory building into warehouse by adding layers |
CN114033208A (en) * | 2021-11-11 | 2022-02-11 | 上海诠胜加梯科技有限公司 | Masonry structure foundation reinforced by angle steel frame and newly-added bracket and construction method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1014919B (en) * | 1988-12-13 | 1991-11-27 | 陆建衡 | Storey-adding constructure for low-storey building |
CN2625496Y (en) * | 2003-07-23 | 2004-07-14 | 程宗颢 | Structure of adding floor and elevator in multistoried building |
CN201050198Y (en) * | 2007-04-19 | 2008-04-23 | 程磊 | Structure for integral transformation for old industrial factory building |
CN203603523U (en) * | 2013-10-12 | 2014-05-21 | 北京筑福国际工程技术有限责任公司 | Structure for transforming inner portion of old factory building in floor adding mode |
-
2013
- 2013-10-12 CN CN201310476734.2A patent/CN103498570B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411787A (en) * | 2018-04-11 | 2018-08-17 | 中启胶建集团有限公司 | Existing curtain wall builds freely-supported conversion beam steel construction crossover construction |
Also Published As
Publication number | Publication date |
---|---|
CN103498570A (en) | 2014-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103498570B (en) | The inner storey-adding reconstruction structure of old factory building and construction method thereof | |
CN103498569B (en) | The inner storey-adding reconstruction concrete-steel structure of old factory building and construction method thereof | |
CN203049832U (en) | Assembling type shear wall structure | |
CN104060717B (en) | A kind of fabricated shear wall structural wall board fractionation-assemble method | |
CN102561553B (en) | Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof | |
CN105649360A (en) | Integral assembling type building system and installing method | |
CN203080430U (en) | Assembly and cast-in-place combined type reinforced concrete pipe type culvert | |
CN103388357B (en) | Shatter-proof, prefabricated steel tube shear Temperature Variation In Buildings of Mixed Structures thing | |
CN206016309U (en) | A kind of overall assembled building system | |
CN103711329A (en) | Method for reinforcing structure by means of method of externally attaching steel-reinforced concrete framework | |
CN109457568B (en) | Construction process for prefabricated post-tensioning prestressed assembly pavement of bilateral superposed beam | |
CN104652705A (en) | Prefabricated and assembly type steel reinforced concrete column with high-performance concrete frame and construction method | |
CN105297893A (en) | Tenon-and-mortise type concrete superposed beam cross connection structure and construction method thereof | |
CN105714678B (en) | A kind of combined type gravity anchorage | |
CN203603522U (en) | Steel frame concrete structure used for transforming inner portion of old factory building in floor adding mode | |
CN202430876U (en) | Floor system with structure of steel and concrete precast slabs | |
CN104294920A (en) | Joint assembly of U-shaped steel reinforced concrete combined beam and special-shaped concrete-filled steel tube column and manufacturing method of joint assembly | |
CN103790176B (en) | Construction method for embedded short limb column structure | |
CN203603523U (en) | Structure for transforming inner portion of old factory building in floor adding mode | |
CN108625491B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam L shape connecting node | |
CN103967332B (en) | The construction method of a kind of building site enclosing | |
CN211115052U (en) | Shaft type underground stereo garage structure | |
CN206053079U (en) | Assembled beam slab integrated composite floor | |
CN104775544A (en) | Energy dissipation type coupled anti-seismic wall with reinforcing bars, grouting holes, building blocks and combined coupling beam and manufacturing method | |
CN204081090U (en) | The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Du Lihong Inventor before: Dong You Inventor before: Wan Zhao Inventor before: Ju Shusen Inventor before: Xie Jianming |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171031 Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing Patentee after: Beijing Yong Bo Science and Technology Ltd. Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building Patentee before: Beijing Aeido International Engineering Technology Co., Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180502 Address after: 300300 scientific research building 68, pioneer East Road, Dongli District, Tianjin 818 Patentee after: China Automotive Industry Engineering (Tianjin) Co., Ltd. Address before: 102600 room 2212, 2 tower, Pope center 3, 2 Xinghua street, Daxing District, Beijing. Patentee before: Beijing Yong Bo Science and Technology Ltd. |
|
TR01 | Transfer of patent right |