CN203867588U - Pre-buried channel fixing component - Google Patents

Pre-buried channel fixing component Download PDF

Info

Publication number
CN203867588U
CN203867588U CN201420307797.5U CN201420307797U CN203867588U CN 203867588 U CN203867588 U CN 203867588U CN 201420307797 U CN201420307797 U CN 201420307797U CN 203867588 U CN203867588 U CN 203867588U
Authority
CN
China
Prior art keywords
buried channel
channel flow
cap
connecting rod
alignment pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420307797.5U
Other languages
Chinese (zh)
Inventor
凌敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Hao new material limited company business
Original Assignee
BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER filed Critical BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER
Priority to CN201420307797.5U priority Critical patent/CN203867588U/en
Application granted granted Critical
Publication of CN203867588U publication Critical patent/CN203867588U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a pre-buried channel fixing component which is used for fixedly attaching a pre-buried channel and a duct piece die. A locating hole is formed in the duct piece die, threads are arranged in the locating hole, a longitudinal opening is formed in the lower portion of the pre-buried channel, a reference hole is formed in the back of the pre-buried channel, the fixing component comprises a locating pin, a connecting threaded rod and a pressing cap, the locating pin is hollow, threads are arranged on the internal edge and the outer side of the bottom of the locating pin, the pressing cap comprises a connecting rod and a screwing cap which are cast integrally, the lower portion of the connecting rod is hollow, threads are arranged in the lower portion of the connecting rod, and threads are arranged on the outer edge of the connecting threaded rod. The lower end of the locating pin is connected into the locating hole in the duct piece die in a threaded mode, the connecting rod of the pressing cap penetrates into the reference hole in the back of the pre-buried channel and is connected with one end of the connecting threaded rod through the threads, the other end of the connecting threaded rod is connected with the locating pin in a threaded mode, and the screwing cap is clamped outside the pre-buried channel. By means of the fixing component, pre-burying quality is improved.

Description

A kind of pre-buried channel flow fixation kit
Technical field
The utility model relates to mechanical engineering field, is specifically related to a kind of pre-buried channel flow fixation kit.
Background technology
Pre-buried channel flow can be applied in the occasions such as track traffic, high ferro, building.Pre-buried channel flow in track traffic in Shield-bored tunnels section of jurisdiction is on mould, very strict for the requirement that laminating is fixing.There is multiple fixed form in prior art, but does not also have at present a kind ofly can solve the conduit fixing method of fitting completely on segment die, and for example, existing laminating fixed form exists following problem:
The first, adopts reinforcing bar welding manner to exist difficulty of construction large, and easily unnecessary damage is caused in conduit surface; And while building in section of jurisdiction, because the existence of external vibrator makes conduit and die surface, depart from, cannot reach the pre-buried effect of expectation.
The second, adopts in spot welding conduit fixed form, and spot welding all causes certain damage to conduit and segment die; In addition, need first on mould, to carry out conduit location before spot welding, also will polish to mould before by the time next time pre-buried, construction is complicated, cannot efficiently construct.In addition, the position of spot welding and size are manual controls, may cause like this tunnel segment demoulding difficulty.
In addition, while being fixed by above-mentioned method, conduit is covered by section of jurisdiction cement, while fitting fixedly, can not effectively fit, make after the moulding of section of jurisdiction, the conduit being embedded in section of jurisdiction is covered by cement, removes covering conduit wash cement time-consuming, and not attractive in appearance, also affect the installation of later stage standing finish; Conduit is fitted fixing on mould, and working space is little, and easily pollutes template face; In Template Location precision, need repeated examinations, and also easily produce displacement in concreting process.
Utility model content
The purpose of this utility model is to provide a kind of pre-buried channel flow assembly, the fixing problem that can not meet the demands of laminating existing to solve prior art.
For achieving the above object, the utility model provides a kind of pre-buried channel flow fixation kit, for pre-buried channel flow and segment die are fixed to laminating, on described segment die, there is locating hole, described pre-buried channel flow bottom has longitudinal opening, described pre-buried channel flow back has datum hole, described locating hole inwall is provided with screw thread, described fixation kit comprises alignment pin, connecting thread bar and clamping cap, described alignment pin is hollow structure, internal edge is provided with screw thread, described clamping cap comprises connecting rod and the stubborn cap that one is cast, described connecting rod below is hollow, and inside has screw thread, described connecting thread bar outer rim arranges screw thread, described alignment pin lower end is screwed onto in the locating hole of described segment die, the described connecting rod of described clamping cap penetrates from the datum hole at the back of institute's pre-buried channel flow, be spirally connected with one end of described connecting thread bar, the other end of described connecting thread bar and described alignment pin are spirally connected, and it is outside that described stubborn cap is stuck in described pre-buried channel flow.
According to the pre-buried channel flow fixation kit described in the utility model embodiment, the top of described stubborn cap is horizontal stripe shape.
According to the pre-buried channel flow fixation kit described in the utility model embodiment, the size of described stubborn cap is greater than the size of the described datum hole at described pre-buried channel flow back.
The fixation kit that the utility model embodiment provides, because conduit adopts the laminating of alignment pin fixture fixing on mould, conduit and segment die laminating degree are good, and demoulding rear slot track is concordant with concrete surface, simple and direct attractive in appearance, has improved pre-buried quality.
Accompanying drawing explanation
The assembled state figure of the pre-buried channel flow fixation kit that Fig. 1 provides for the utility model;
Fig. 2 A is a side sectional view of clamping cap in the utility model;
Fig. 2 B is another side sectional view of clamping cap in the utility model.
The specific embodiment
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
As shown in Figure 1, the utility model provides a kind of pre-buried channel flow fixation kit, for pre-buried channel flow 10 is fitted with segment die 20 is fixing, on described segment die 20, there is locating hole 21, the inwall of locating hole 21 is provided with screw thread, described pre-buried channel flow bottom has longitudinal opening 12, described pre-buried channel flow 10 backs have datum hole 11, described fixation kit comprises alignment pin 31, connecting thread bar 32 and clamping cap 33, described alignment pin 31 is hollow structure, and internal edge is provided with screw thread, and described connecting thread bar 32 outer rims arrange screw thread;
As shown in Figure 2 A and 2B, described clamping cap 33 comprises connecting rod 331 and the stubborn cap 332 that one is cast, and described connecting rod 331 belows are hollow, and inside has screw thread..For the ease of fixing, horizontal stripe shape is arranged in the top of described stubborn cap 332, so that tighten.
With further reference to Fig. 1, described alignment pin 31 lower ends are screwed onto in the locating hole 21 of described segment die 20, the described connecting rod 331 of described clamping cap 33 penetrates from the datum hole 11 at the back of institute's pre-buried channel flow 10, be spirally connected with one end of described connecting thread bar 32, the other end of described connecting thread bar 32 and described alignment pin 31 are spirally connected, because the size of described stubborn cap 332 is greater than the size of the described datum hole 11 at described pre-buried channel flow 10 backs, described stubborn cap 332 is stuck in described pre-buried channel flow 10 outsides.
During use, first alignment pin 31 is fixed on segment die 20, afterwards connecting thread bar 32 parts is screwed into alignment pin 31, afterwards, by pre-buried channel flow 10 laminating segment dies 20, first with clamping cap 33, tighten datum hole 11, and then fixing lateral opening, make pre-buried position accurate.
The fixation kit that the utility model embodiment provides, because conduit adopts the laminating of alignment pin fixture fixing on mould, conduit and segment die laminating degree are good, and demoulding rear slot track is concordant with concrete surface, simple and direct attractive in appearance, has improved pre-buried quality; And alignment pin adopts and is threaded with locating hole and mould, is a kind of widely used dismountable being fixedly connected with, there is the advantages such as simple in structure, connection is reliable, mounting or dismounting are convenient.
It should be noted last that, above embodiment is only unrestricted in order to the technical solution of the utility model to be described, although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify or be equal to replacement the technical solution of the utility model, and not depart from the spirit and scope of technical solutions of the utility model.

Claims (3)

1. a pre-buried channel flow fixation kit, for pre-buried channel flow and segment die are fixed to laminating, on described segment die, there is locating hole, described pre-buried channel flow bottom has longitudinal opening, described pre-buried channel flow back has datum hole, it is characterized in that, described locating hole inwall is provided with screw thread, described fixation kit comprises alignment pin, connecting thread bar and clamping cap, described alignment pin is hollow structure, internal edge is provided with screw thread, described clamping cap comprises connecting rod and the stubborn cap that one is cast, described connecting rod below is hollow, and inside has screw thread, described connecting thread bar outer rim arranges screw thread, described alignment pin lower end is screwed onto in the locating hole of described segment die, the described connecting rod of described clamping cap penetrates from the datum hole at the back of institute's pre-buried channel flow, be spirally connected with one end of described connecting thread bar, the other end of described connecting thread bar and described alignment pin are spirally connected, and it is outside that described stubborn cap is stuck in described pre-buried channel flow.
2. pre-buried channel flow fixation kit as claimed in claim 1, is characterized in that, the top of described stubborn cap is horizontal stripe shape.
3. pre-buried channel flow fixation kit as claimed in claim 1, is characterized in that, the size of described stubborn cap is greater than the described datum hole at described pre-buried channel flow back.
CN201420307797.5U 2014-06-11 2014-06-11 Pre-buried channel fixing component Expired - Fee Related CN203867588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420307797.5U CN203867588U (en) 2014-06-11 2014-06-11 Pre-buried channel fixing component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420307797.5U CN203867588U (en) 2014-06-11 2014-06-11 Pre-buried channel fixing component

Publications (1)

Publication Number Publication Date
CN203867588U true CN203867588U (en) 2014-10-08

Family

ID=51648558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420307797.5U Expired - Fee Related CN203867588U (en) 2014-06-11 2014-06-11 Pre-buried channel fixing component

Country Status (1)

Country Link
CN (1) CN203867588U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317444A (en) * 2014-06-11 2016-02-10 北京中昊创业交通科学应用技术研究发展中心 Fixing assembly for pre-buried channel
CN105350987A (en) * 2015-11-26 2016-02-24 四川中昊创业高铁新技术开发有限公司 Fixed installation structure and method for pre-buried channel in mine digging method trolley
CN109159275A (en) * 2018-09-25 2019-01-08 中铁十二局集团山西建筑构件有限公司 Metro shield section section of jurisdiction pre-buried channel flow fixed structure and pre-embedded construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317444A (en) * 2014-06-11 2016-02-10 北京中昊创业交通科学应用技术研究发展中心 Fixing assembly for pre-buried channel
CN105350987A (en) * 2015-11-26 2016-02-24 四川中昊创业高铁新技术开发有限公司 Fixed installation structure and method for pre-buried channel in mine digging method trolley
CN109159275A (en) * 2018-09-25 2019-01-08 中铁十二局集团山西建筑构件有限公司 Metro shield section section of jurisdiction pre-buried channel flow fixed structure and pre-embedded construction method

Similar Documents

Publication Publication Date Title
CN203867588U (en) Pre-buried channel fixing component
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN103470030B (en) A kind of method of fast inserted formula concrete blinding clamp frame and clamping concrete blinding thereof
CN105113789A (en) Bare concrete bay window steel formwork structural body device
CN108868121A (en) A kind of horizontal construction joint reinforcing bolt and the reinforcement means based on the bolt
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN203569487U (en) Embedded part for installation of bridge pier hanging basket
CN105317444A (en) Fixing assembly for pre-buried channel
CN204920221U (en) A connecting rod for combination of cast -in -place wall form
CN202990421U (en) Reinforcing clamp special for construction beam bottom beam side template
CN205046844U (en) Clear water concrete window steel form structure device that wafts
CN206844648U (en) A kind of joint part overlaps template
CN210888078U (en) Embedded box for hyperboloid structural veneer and hyperboloid veneer construction structure
CN210858016U (en) Building template connecting piece
CN203531399U (en) Fixture for construction casting template
CN208763396U (en) A kind of horizontal construction joint reinforcing bolt
CN210767857U (en) Embedded part for reinforcing anti-ridge template and anti-ridge template reinforcing structure
CN202595959U (en) Novel curtain wall upright column
CN205046845U (en) Window steel form structure device wafts at clear water concrete turning
CN203254503U (en) Button type vase column mould
CN203863807U (en) Grouting sleeve locating device for housing industrialization pre-cast concrete component
CN207892233U (en) Structure and decoration integrated cast-in-place concrete elastic decorative mould system
CN203654747U (en) Tapered opposite-pull screw apparatus
CN203795856U (en) Installation structure of shaping combination formwork
CN207525931U (en) The double assembling assembly of L fonts and double assembly connection system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SICHUAN ZHONGHAO ENTREPRENEURSHIP HIGH-SPEED RAIL

Free format text: FORMER OWNER: BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER

Effective date: 20150811

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150811

Address after: 618300 Sichuan Province, Guanghan City Economic Development Zone north to the new road

Patentee after: Sichuan Zhonghao Chuangye High-Speed Rail New Technology Development Co., Ltd.

Address before: 100097 room B306, agricultural building, 11 middle garden, Shuguang garden, Haidian District, Beijing

Patentee before: BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 618300 Sichuan Province, Guanghan City Economic Development Zone north to the new road

Patentee after: Zhong Hao new material limited company business

Address before: 618300 Sichuan Province, Guanghan City Economic Development Zone north to the new road

Patentee before: Sichuan Zhonghao Chuangye High-Speed Rail New Technology Development Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141008

Termination date: 20170611

CF01 Termination of patent right due to non-payment of annual fee