CN105317444A - Fixing assembly for pre-buried channel - Google Patents

Fixing assembly for pre-buried channel Download PDF

Info

Publication number
CN105317444A
CN105317444A CN201410256339.8A CN201410256339A CN105317444A CN 105317444 A CN105317444 A CN 105317444A CN 201410256339 A CN201410256339 A CN 201410256339A CN 105317444 A CN105317444 A CN 105317444A
Authority
CN
China
Prior art keywords
buried channel
channel flow
cap
connecting rod
alignment pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410256339.8A
Other languages
Chinese (zh)
Inventor
凌敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER
Original Assignee
BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER filed Critical BEIJING ZHONGHAO ENTREPRENEURSHIP TRAFFIC SCIENCES APPLICATION TECHNOLOGY RESEARCH DEVELOPMENT CENTER
Priority to CN201410256339.8A priority Critical patent/CN105317444A/en
Publication of CN105317444A publication Critical patent/CN105317444A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a fixing assembly for a pre-buried channel. The fixing assembly is used for fixedly attaching the pre-buried channel to a duct piece mould, the duct piece mould is provided with a positioning hole, and a thread is formed in the positioning hole; the lower portion of the pre-buried channel is provided with a longitudinal opening, and the back portion of the pre-buried channel is provided with a datum hole; the fixing assembly comprises a positioning pin, a connecting threaded rod and a compressing cap, the positioning pin is of a hollow structure, the internal edge and the exterior of the bottom of the positioning pin are provided with threads, the compressing cap comprises a connecting rod and a screwing cap which are integrally cast, the lower portion of the connecting rod is hollow, the interior of the connecting rod is provided with a thread, and the outer edge of the connecting threaded rod is provided with a thread; the lower end of the positioning pin is connected to the interior of the positioning hole of the duct piece mould in a threaded mode, the connecting rod of the compressing cap penetrates from the datum hole formed in the back portion of the pre-buried channel to be in threaded connection with one end of the connecting threaded rod, the other end of the connecting threaded rod is in threaded connection with the positioning pin, and the screwing cap is clamped on the exterior of the pre-buried channel. According to the fixing assembly for the pre-buried channel, the pre-burying quality is improved.

Description

A kind of pre-buried channel flow fixation kit
Technical field
The present invention relates to mechanical engineering field, be specifically related to a kind of pre-buried channel flow fixation kit.
Background technology
Pre-buried channel flow can be applied in the occasions such as track traffic, high ferro, building.Pre-buried channel flow in track traffic in Shield-bored tunnels section of jurisdiction is on mould, and the requirement fixing for laminating is very strict.There is multiple fixed form in prior art, but does not also have at present a kind of conduit that can solve completely to fit on segment die fixing method, and such as, existing laminating fixed form exists following problem:
The first, adopt reinforcement welding mode to there is difficulty of construction large, and easily cause unnecessary damage to conduit surface; And when section of jurisdiction is built, the existence due to external vibrator makes conduit and die surface depart from, and cannot reach the pre-buried effect of expectation.
The second, adopt in spot welding conduit fixed form, spot welding all causes certain damage to conduit and segment die; In addition, need first on mould, to carry out conduit location before spot welding, also will polish to mould before by the time next time pre-buried, construction is complicated, cannot efficiently construct.In addition, the position of spot welding and size are manual controls, may cause tunnel segment demoulding difficulty like this.
In addition, when being fixed by above-mentioned method, conduit is covered by section of jurisdiction cement, can not effectively fit when laminating is fixing, after making section of jurisdiction shaping, the conduit be embedded in section of jurisdiction is covered by cement, removes covering conduit wash cement time-consuming, and unsightly, also affect the installation of later stage standing finish; Conduit is fitted fixing on mould, and working space is little, and easily pollutes template face; Template Location precision needs repeated examinations, and also easily produce displacement in concreting process.
Utility model content
The object of this invention is to provide a kind of pre-buried channel flow assembly, the problem that can not meet the demands is fixed in the laminating existed to solve prior art.
For achieving the above object, the invention provides a kind of pre-buried channel flow fixation kit, fit for pre-buried channel flow and segment die are fixed, described segment die has locating hole, described pre-buried channel flow bottom has longitudinal opening, described pre-buried channel flow back has datum hole, described locating hole inwall is provided with screw thread, described fixation kit comprises alignment pin, connecting thread bar and clamping cap, described alignment pin is hollow structure, internal edge is provided with screw thread, described clamping cap comprises the connecting rod and stubborn cap integrally cast, hollow below described connecting rod, and inside has screw thread, described connecting thread bar outer rim arranges screw thread, described alignment pin lower end is screwed onto in the locating hole of described segment die, the described connecting rod of described clamping cap penetrates from the datum hole at the back of institute's pre-buried channel flow, be spirally connected with one end of described connecting thread bar, the other end and the described alignment pin of described connecting thread bar are spirally connected, and it is outside that described stubborn cap is stuck in described pre-buried channel flow.
According to the pre-buried channel flow fixation kit described in the embodiment of the present invention, the top of described stubborn cap is horizontal stripe shape.
According to the pre-buried channel flow fixation kit described in the embodiment of the present invention, the size of described stubborn cap is greater than the size of the described datum hole at described pre-buried channel flow back.
The fixation kit that the embodiment of the present invention provides, due to conduit, on mould, adopt alignment pin fixture to fit fixing, conduit and segment die laminating degree good, demoulding rear slot track is concordant with concrete surface, simple and direct attractive in appearance, improves pre-buried quality.
Accompanying drawing explanation
Fig. 1 is the assembled state figure of pre-buried channel flow fixation kit provided by the invention;
Fig. 2 A is a side sectional view of clamping cap in the present invention;
Fig. 2 B is another side sectional view of clamping cap in the present invention.
Detailed description of the invention
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
As shown in Figure 1, the invention provides a kind of pre-buried channel flow fixation kit, for pre-buried channel flow 10 is fitted with segment die 20 is fixing, described segment die 20 has locating hole 21, the inwall of locating hole 21 is provided with screw thread, described pre-buried channel flow bottom has longitudinal opening 12, described pre-buried channel flow 10 back has datum hole 11, described fixation kit comprises alignment pin 31, connecting thread bar 32 and clamping cap 33, described alignment pin 31 is hollow structure, and internal edge is provided with screw thread, and described connecting thread bar 32 outer rim arranges screw thread;
As shown in Figure 2 A and 2B, described clamping cap 33 comprises the connecting rod 331 and stubborn cap 332 integrally cast, hollow below described connecting rod 331, and inside has screw thread.For the ease of fixing, horizontal stripe shape is arranged to, so that tighten in the top of described stubborn cap 332.
With further reference to Fig. 1, described alignment pin 31 lower end is screwed onto in the locating hole 21 of described segment die 20, the described connecting rod 331 of described clamping cap 33 penetrates from the datum hole 11 at the back of institute's pre-buried channel flow 10, be spirally connected with one end of described connecting thread bar 32, the other end and the described alignment pin 31 of described connecting thread bar 32 are spirally connected, size due to described stubborn cap 332 is greater than the size of the described datum hole 11 at described pre-buried channel flow 10 back, and it is outside that described stubborn cap 332 is stuck in described pre-buried channel flow 10.
During use, first alignment pin 31 is fixed on segment die 20, afterwards connecting thread bar 32 part is screwed into alignment pin 31, afterwards, segment die 20 of being fitted by pre-buried channel flow 10, first tightens datum hole 11 with clamping cap 33, and then fixing lateral opening, make pre-buried position accurate.
The fixation kit that the embodiment of the present invention provides, due to conduit, on mould, adopt alignment pin fixture to fit fixing, conduit and segment die laminating degree good, demoulding rear slot track is concordant with concrete surface, simple and direct attractive in appearance, improves pre-buried quality; Further, alignment pin adopts with locating hole and mould and is threaded, and is a kind of to be widely usedly dismountablely fixedly connected with, have structure simple, connect the advantages such as reliable, mounting or dismounting are convenient.
It should be noted last that, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not depart from the spirit and scope of technical solution of the present invention.

Claims (3)

1. a pre-buried channel flow fixation kit, fit for pre-buried channel flow and segment die are fixed, described segment die has locating hole, described pre-buried channel flow bottom has longitudinal opening, described pre-buried channel flow back has datum hole, it is characterized in that, described locating hole inwall is provided with screw thread, described fixation kit comprises alignment pin, connecting thread bar and clamping cap, described alignment pin is hollow structure, internal edge is provided with screw thread, described clamping cap comprises the connecting rod and stubborn cap integrally cast, hollow below described connecting rod, and inside has screw thread, described connecting thread bar outer rim arranges screw thread, described alignment pin lower end is screwed onto in the locating hole of described segment die, the described connecting rod of described clamping cap penetrates from the datum hole at the back of institute's pre-buried channel flow, be spirally connected with one end of described connecting thread bar, the other end and the described alignment pin of described connecting thread bar are spirally connected, and it is outside that described stubborn cap is stuck in described pre-buried channel flow.
2. pre-buried channel flow fixation kit as claimed in claim 1, it is characterized in that, the top of described stubborn cap is horizontal stripe shape.
3. pre-buried channel flow fixation kit as claimed in claim 1, it is characterized in that, the size of described stubborn cap is greater than the described datum hole at described pre-buried channel flow back.
CN201410256339.8A 2014-06-11 2014-06-11 Fixing assembly for pre-buried channel Pending CN105317444A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410256339.8A CN105317444A (en) 2014-06-11 2014-06-11 Fixing assembly for pre-buried channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410256339.8A CN105317444A (en) 2014-06-11 2014-06-11 Fixing assembly for pre-buried channel

Publications (1)

Publication Number Publication Date
CN105317444A true CN105317444A (en) 2016-02-10

Family

ID=55245646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410256339.8A Pending CN105317444A (en) 2014-06-11 2014-06-11 Fixing assembly for pre-buried channel

Country Status (1)

Country Link
CN (1) CN105317444A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108150188A (en) * 2016-12-05 2018-06-12 上海清远管业科技有限公司 The Rapid-assembling apparatus and assemble method of shield duct piece sliding slot Anchor plate kit
CN112832814A (en) * 2021-03-18 2021-05-25 天津城建大学 Pre-tightening force self-resetting segment joint assembly

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE429142B (en) * 1975-07-28 1983-08-15 Brown Co D S Joint Construction
CN201236421Y (en) * 2008-06-12 2009-05-13 广州市建筑机械施工有限公司 Tunnel segment hanging hole embedded part positioning device
CN101761344A (en) * 2010-01-14 2010-06-30 华南理工大学 Prefabricated pipe section for shield tunnel and preparation method thereof
CN203080695U (en) * 2013-02-06 2013-07-24 上海新奇五金有限公司 Pre-buried channel steel jointing member
CN203867588U (en) * 2014-06-11 2014-10-08 北京中昊创业交通科学应用技术研究发展中心 Pre-buried channel fixing component

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE429142B (en) * 1975-07-28 1983-08-15 Brown Co D S Joint Construction
CN201236421Y (en) * 2008-06-12 2009-05-13 广州市建筑机械施工有限公司 Tunnel segment hanging hole embedded part positioning device
CN101761344A (en) * 2010-01-14 2010-06-30 华南理工大学 Prefabricated pipe section for shield tunnel and preparation method thereof
CN203080695U (en) * 2013-02-06 2013-07-24 上海新奇五金有限公司 Pre-buried channel steel jointing member
CN203867588U (en) * 2014-06-11 2014-10-08 北京中昊创业交通科学应用技术研究发展中心 Pre-buried channel fixing component

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘卡丁: "预埋件施工技术及锌镍渗层防腐技术在地铁工程中的应用探讨——延长工程寿命降低维护运营成本", 《隧道建设》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108150188A (en) * 2016-12-05 2018-06-12 上海清远管业科技有限公司 The Rapid-assembling apparatus and assemble method of shield duct piece sliding slot Anchor plate kit
CN112832814A (en) * 2021-03-18 2021-05-25 天津城建大学 Pre-tightening force self-resetting segment joint assembly
CN112832814B (en) * 2021-03-18 2022-06-21 天津城建大学 Pre-tightening force self-resetting segment joint assembly

Similar Documents

Publication Publication Date Title
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN203867588U (en) Pre-buried channel fixing component
CN105113790A (en) Bare-concrete corner floating window steel formwork structure body device
CN105113789A (en) Bare concrete bay window steel formwork structural body device
CN108868121A (en) A kind of horizontal construction joint reinforcing bolt and the reinforcement means based on the bolt
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN103670452A (en) Installation structure and method for accurately positioning tunnel arch wall lining buried type water-stop belt
CN105317444A (en) Fixing assembly for pre-buried channel
CN203569487U (en) Embedded part for installation of bridge pier hanging basket
CN206844648U (en) A kind of joint part overlaps template
CN204920221U (en) A connecting rod for combination of cast -in -place wall form
CN210888078U (en) Embedded box for hyperboloid structural veneer and hyperboloid veneer construction structure
CN106270007A (en) A kind of correcting tool for bus passenger door
CN203863807U (en) Grouting sleeve locating device for housing industrialization pre-cast concrete component
CN205189403U (en) A steel instrument for making enclosure bears down on one
CN203393992U (en) Guiding ruler for pargeting of building internal and external corners
CN208763396U (en) A kind of horizontal construction joint reinforcing bolt
CN202595959U (en) Novel curtain wall upright column
CN205046845U (en) Window steel form structure device wafts at clear water concrete turning
CN210767857U (en) Embedded part for reinforcing anti-ridge template and anti-ridge template reinforcing structure
CN204299084U (en) A kind of column being connected with upright horizontal joint element for bar
CN203254503U (en) Button type vase column mould
CN203795856U (en) Installation structure of shaping combination formwork
CN103410302B (en) A kind of building operations guiding ruler assembly and using method thereof
CN205382700U (en) Embedded nut formula is wall spare even

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20190326

AD01 Patent right deemed abandoned