CN203785241U - Thrice combusting hot-air boiler - Google Patents

Thrice combusting hot-air boiler Download PDF

Info

Publication number
CN203785241U
CN203785241U CN201420163154.8U CN201420163154U CN203785241U CN 203785241 U CN203785241 U CN 203785241U CN 201420163154 U CN201420163154 U CN 201420163154U CN 203785241 U CN203785241 U CN 203785241U
Authority
CN
China
Prior art keywords
combustion chamber
burner hearth
combustion
expansion chamber
hearth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420163154.8U
Other languages
Chinese (zh)
Inventor
张文天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaiyuan City Iron Grain Is Built Grain Machinery Development In Science And Technology Co Ltd
Original Assignee
Kaiyuan City Iron Grain Is Built Grain Machinery Development In Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaiyuan City Iron Grain Is Built Grain Machinery Development In Science And Technology Co Ltd filed Critical Kaiyuan City Iron Grain Is Built Grain Machinery Development In Science And Technology Co Ltd
Priority to CN201420163154.8U priority Critical patent/CN203785241U/en
Application granted granted Critical
Publication of CN203785241U publication Critical patent/CN203785241U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The utility model discloses a thrice combusting hot-air boiler which comprises a boiler body, wherein the front end of the boiler body is provided with a coal hopper, the rear end of the boiler body is provided with a high-temperature flue gas discharging opening, the side wall of the boiler body is provided with a boiler door, the bottom of a hearth is provided with a chain grate and a slag remover, an ash blocking wall is arranged behind the grate, the ash blocking wall separates the hearth into a combustion area and a depression area, the combustion area consists of a first combustion chamber, a second combustion chamber and a third combustion chamber, a fireproof wall is arranged above and behind the first combustion chamber, the lower edge of the fireproof wall is connected with the front end of a small arch of the hearth, the second combustion chamber is formed between the small arch of the hearth and the grate, the third combustion chamber is formed between the small arch of the hearth and the top of the boiler, and the rear end of the small arch of the hearth is provided with a fire outlet for communicating the second combustion chamber with the third combustion chamber. Fuel is fully combusted when the thrice combusting boiler works, the heat efficiency is high, the energy saving effect is good, the content of sulphur, phosphor and solid particles in discharged flue gas is low, and the environment-friendly effect is good.

Description

A kind of three burning hot air boilers
Technical field
The utility model relates to a kind of hot air boiler, especially a kind ofly provides the hot air boiler of thermal source for grain drying tower.
Background technology
Hot air boiler is the requisite corollary equipment of grain drying tower, for the cold air in air heat exchanger, heats, and produces the needed hot blast of grain heat-drying.Hot air boiler of the prior art arranges little arch conventionally in burner hearth, burner hearth interior separation is become to two combustion chambers, adopt the rear end of the little arch of hot air boiler of this structure to there is enclosed construction, high-temperature flue gas in little arch is discharged from fume emission mouth from little arch front opening enters the second combustion chambers burn, enters air heat exchanger cold air is heated.The flue gas time of staying in burner hearth producing while adopting the hot air boiler fuel combustion of this structure is shorter, can not fully be burnt, and therefore, the sulfureous in flue gas discharging, phosphorus and solid content are higher, pollutes more seriously, and the utilization ratio of fuel is lower.
Utility model content
The technical problem that utility model will solve: a kind of three burning hot air boilers are provided, and when these three times burning hot blast kettleman does, fuel combustion is thorough, the thermal efficiency is high, good energy-conserving effect, the sulfureous in flue gas discharging, phosphorus and solid content are low, and environment protecting is good.
The technical scheme of taking of technical solution problem: a kind of three burning hot air boilers, comprise body of heater, at body of heater front end, be provided with coal bunker, in body of heater rear end, be provided with high-temperature flue gas floss hole, at sidewall of the furnace body, be provided with fire door, at burner hearth bottom, be provided with traveling-grate stoker, slag remover, at fire grate rear, be provided with ash retaining wall, ash retaining wall is separated into combustion zone and decanting zone by burner hearth, described combustion zone is by the first combustion chamber, the second combustion chamber and the 3rd combustion chamber form, in the first back upper place, combustion chamber, be provided with firebreak, firebreak lower edge is connected with the little arch front end of burner hearth, between the little arch of burner hearth and fire grate, form the second combustion chamber, between the little arch of burner hearth and furnace roof, form the 3rd combustion chamber, in the little arch of burner hearth rear end, be provided with and be communicated with the second combustion chamber and three-barreled crater.
As improvement of the present utility model: described decanting zone consists of the first expansion chamber and the second expansion chamber, the first expansion chamber and the second expansion chamber bottom UNICOM, between the first expansion chamber and the second expansion chamber, be provided with the choked flow wall being connected with furnace roof, in the bottom of expansion chamber, be provided with ash door.
As further improvement of the utility model: described ash retaining wall consists of vertical section and segmental arc, and the little arch of the upper limb of segmental arc and burner hearth forms crater between rear end.
Beneficial effect: three burning hot air boilers of the present utility model are owing to having adopted described three burning hot air boilers to comprise body of heater, at body of heater front end, be provided with coal bunker, in body of heater rear end, be provided with high-temperature flue gas floss hole, at sidewall of the furnace body, be provided with fire door, at burner hearth bottom, be provided with traveling-grate stoker, slag remover, at fire grate rear, be provided with ash retaining wall, ash retaining wall is separated into combustion zone and decanting zone by burner hearth, described combustion zone is by the first combustion chamber, the second combustion chamber and the 3rd combustion chamber form, in the first back upper place, combustion chamber, be provided with firebreak, firebreak lower edge is connected with the little arch front end of burner hearth, between the little arch of burner hearth and fire grate, form the second combustion chamber, between the little arch of burner hearth and furnace roof, form the 3rd combustion chamber, in the little arch of burner hearth rear end, be provided with the technical scheme that is communicated with the second combustion chamber and three-barreled crater, by three combustion chambers are set in burner hearth, utilize the first top of combustion chamber higher than the second top of combustion chamber, the high-temperature combustible gas producing while extending fuel combustion is in the first combustion chamber time of staying, make the sulphur in flue gas, phosphorus and tar fully participate in burning, decompose, again through the second combustion chamber, after the 3rd combustion chambers burn, discharge, and, high-temperature flue gas is when entering the 3rd combustion chamber from the second combustion chamber, can produce vortex in the 3rd combustion chamber regions being positioned at above the second combustion chamber, make the flue gas also can smooth combustion in the 3rd combustion chamber, and it is more thorough to burn, therefore, when three burning hot blast kettleman of the present utility model do, fuel combustion is thorough, the thermal efficiency is high, good energy-conserving effect, the sulfureous in flue gas discharging, phosphorus and solid content are low, environment protecting is good, owing to having adopted described decanting zone to be formed by the first expansion chamber and the second expansion chamber, the first expansion chamber and the second expansion chamber bottom UNICOM, between the first expansion chamber and the second expansion chamber, be provided with the choked flow wall being connected with furnace roof, in the bottom of expansion chamber, be provided with the technical characterictic of ash door, through twice sedimentation, further reduced the content of solids in the flue gas discharging, not only environment protecting is good, has also extended the deashing maintenance period of air heat exchanger, owing to having adopted described ash retaining wall to be formed by vertical section and segmental arc, between the little arch of the upper limb of segmental arc and burner hearth rear end, form the technical characterictic of crater, make can slow down and enter expansion chamber from the flue gas of the 3rd combustion chamber discharge, be entrained in the fully sedimentation of dust granule in flue gas, the content that has further reduced solids in the flue gas of three burning hot blast boiler emissions of the present utility model, environment protecting is better.
Accompanying drawing explanation
Fig. 1 is the internal structure schematic diagram of three burning hot air boilers of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing, three burning hot air boilers of the present utility model are described in further detail.
As shown in Figure 1, three burning hot air boilers of the present utility model, comprise body of heater 2, at body of heater front end, be provided with coal bunker 1, in body of heater rear end, be provided with high-temperature flue gas floss hole 12, at sidewall of the furnace body, be provided with fire door, at burner hearth bottom, be provided with traveling-grate stoker 13, slag remover 15, at fire grate rear, be provided with ash retaining wall 8, ash retaining wall is separated into combustion zone and decanting zone by burner hearth, described combustion zone is by the first combustion chamber 3, the second combustion chamber 14 and the 3rd combustion chamber 6 form, in the first back upper place, combustion chamber, be provided with firebreak 4, firebreak lower edge is connected with little arch 5 front ends of burner hearth, between the little arch of burner hearth and fire grate, form the second combustion chamber, between the little arch of burner hearth and furnace roof, form the 3rd combustion chamber, in the little arch of burner hearth rear end, be provided with and be communicated with the second combustion chamber and three-barreled crater 7, described ash retaining wall consists of vertical section and segmental arc, the little arch of the upper limb of segmental arc and burner hearth forms crater between rear end, the top of the first combustion chamber is higher than the top of the second combustion chamber, at the first top of combustion chamber, form similar dome structure.Described decanting zone consists of the first expansion chamber 9 and the second expansion chamber 11, and the first expansion chamber and the second expansion chamber bottom UNICOM is provided with the choked flow wall 10 being connected with furnace roof between the first expansion chamber and the second expansion chamber, in the bottom of expansion chamber, is provided with ash door 16.

Claims (3)

  1. One kind three times burning hot air boilers, comprise body of heater, at body of heater front end, be provided with coal bunker, in body of heater rear end, be provided with high-temperature flue gas floss hole, at sidewall of the furnace body, be provided with fire door, at burner hearth bottom, be provided with traveling-grate stoker, slag remover, at fire grate rear, be provided with ash retaining wall, ash retaining wall is separated into combustion zone and decanting zone by burner hearth, it is characterized in that: described combustion zone is by the first combustion chamber, the second combustion chamber and the 3rd combustion chamber form, in the first back upper place, combustion chamber, be provided with firebreak, firebreak lower edge is connected with the little arch front end of burner hearth, between the little arch of burner hearth and fire grate, form the second combustion chamber, between the little arch of burner hearth and furnace roof, form the 3rd combustion chamber, in the little arch of burner hearth rear end, be provided with and be communicated with the second combustion chamber and three-barreled crater.
  2. According to claim 1 three times burning hot air boilers, it is characterized in that: described decanting zone consists of the first expansion chamber and the second expansion chamber, the first expansion chamber and the second expansion chamber bottom UNICOM, between the first expansion chamber and the second expansion chamber, be provided with the choked flow wall being connected with furnace roof, in the bottom of expansion chamber, be provided with ash door.
  3. 3. three burning hot air boilers according to claim 1 and 2, is characterized in that: described ash retaining wall consists of vertical section and segmental arc, and the little arch of the upper limb of segmental arc and burner hearth forms crater between rear end.
CN201420163154.8U 2014-04-04 2014-04-04 Thrice combusting hot-air boiler Expired - Fee Related CN203785241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420163154.8U CN203785241U (en) 2014-04-04 2014-04-04 Thrice combusting hot-air boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420163154.8U CN203785241U (en) 2014-04-04 2014-04-04 Thrice combusting hot-air boiler

Publications (1)

Publication Number Publication Date
CN203785241U true CN203785241U (en) 2014-08-20

Family

ID=51321420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420163154.8U Expired - Fee Related CN203785241U (en) 2014-04-04 2014-04-04 Thrice combusting hot-air boiler

Country Status (1)

Country Link
CN (1) CN203785241U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106838974A (en) * 2017-04-05 2017-06-13 河南农业大学 A kind of biomass bundling fuel chain-grate boiler furnace arch structure
CN110617622A (en) * 2018-06-19 2019-12-27 长春市霸航农机制造有限公司 Biomass three-combustion-chamber all-steel energy-saving hot blast stove
CN110953712A (en) * 2019-12-31 2020-04-03 吉林省东辉生物质能源有限公司 Semi-gasification biomass combustion hot blast stove
CN112833428A (en) * 2021-01-22 2021-05-25 联合优发生物质能源徐州有限公司 Civil biomass briquette and particle dual-purpose cooking and baking stove

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106838974A (en) * 2017-04-05 2017-06-13 河南农业大学 A kind of biomass bundling fuel chain-grate boiler furnace arch structure
CN110617622A (en) * 2018-06-19 2019-12-27 长春市霸航农机制造有限公司 Biomass three-combustion-chamber all-steel energy-saving hot blast stove
CN110953712A (en) * 2019-12-31 2020-04-03 吉林省东辉生物质能源有限公司 Semi-gasification biomass combustion hot blast stove
CN112833428A (en) * 2021-01-22 2021-05-25 联合优发生物质能源徐州有限公司 Civil biomass briquette and particle dual-purpose cooking and baking stove

Similar Documents

Publication Publication Date Title
CN204693377U (en) High-moisture biomass fuel boiler
CN203785241U (en) Thrice combusting hot-air boiler
CN104566338A (en) Hearth structure of biomass chain boiler
CN205191550U (en) High -efficient environmental protection and energy saving coal fired boiler
CN203963897U (en) A kind of biomass-burning steam boiler
CN204345616U (en) Living beings chain-grate boiler chamber structure
CN201513880U (en) Integral gasifying combination burning boiler
CN201212729Y (en) Biomass granular fuel boiler
CN204358948U (en) A kind of second-time burning heating stove
CN203464323U (en) Novel environmental protection boiler with boiler internal smoke and dust abatement clean burning
CN201652323U (en) Synchronous combustion chain furnace with function of full coal layer inflammation
CN104791766A (en) High-water-content biomass fuel boiler
CN201310924Y (en) Gas-making compound combustion vertical-type furnace
CN200975688Y (en) Multipurpose secondary combustion environmental protection energy-saving furnace
CN204665229U (en) The horizontal coal-fired steam boiler of modified list drum
CN103884009A (en) Biomass hot blast stove
CN201897212U (en) Two-stage combustion-supporting reverse burning type combustion furnace
CN201310876Y (en) Gas-making compound combustion chain furnace
CN202371701U (en) Efficient chain furnace
CN110186031B (en) Efficient environment-friendly energy-saving chain furnace
CN202216386U (en) Double-hearth coal gasification boiler
CN201047662Y (en) Chain type fire coal gasfication atmospheric hot-water environmetnal protection boiler
CN201954527U (en) Spiral automatic feed combustion boiler
CN101413658B (en) Gas making compound combustion chain furnace
CN201935212U (en) Boiler rear arch with adjustable coverage rate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

CF01 Termination of patent right due to non-payment of annual fee