CN203783107U - Climbing frame with connector reinforcing device for construction - Google Patents

Climbing frame with connector reinforcing device for construction Download PDF

Info

Publication number
CN203783107U
CN203783107U CN201320863758.9U CN201320863758U CN203783107U CN 203783107 U CN203783107 U CN 203783107U CN 201320863758 U CN201320863758 U CN 201320863758U CN 203783107 U CN203783107 U CN 203783107U
Authority
CN
China
Prior art keywords
square steel
climbing frame
floor
steel pipe
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320863758.9U
Other languages
Chinese (zh)
Inventor
包海明
杨晓东
陈晓东
于光
孙涛
张平平
张磊
史一剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Baili Engineering Technology Development Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201320863758.9U priority Critical patent/CN203783107U/en
Application granted granted Critical
Publication of CN203783107U publication Critical patent/CN203783107U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a climbing frame with a connector reinforcing device for construction. The climbing frame comprises at least two vertical rods arranged outside a floor, cantilever beams are connected with the vertical beams, the outer ends of the cantilever beams are connected with the vertical rods, the inner ends of the cantilever beams extend to the floor and anchored to the floor, inclined pull rods are connected between the cantilever beams and the vertical rods, a reinforcing rib is arranged between every two adjacent vertical rods, the reinforcing rib comprises a square steel pipe and connecting flanges arranged at the two ends of the square steel pipe, a reinforcing rib is arranged between each connecting flange and the square steel pipe, the vertical rods are connected through the square steel pipe with the connecting flanges, and the climbing frame has the advantages of being small in material consumption for connection, light in weight and rapid and efficient in assembly and disassembly.

Description

一种建筑用带接头加强装置的爬架Climbing frame with joint strengthening device for construction

技术领域 technical field

本实用新型涉及一种建筑用混凝土施工装置,特别涉及一种建筑用带接头加强装置的爬架。 The utility model relates to a concrete construction device for building, in particular to a climbing frame with a joint reinforcing device for building.

背景技术 Background technique

爬架又叫提升架,依照其动力来源可分为液压式、电动式、人力手拉式等主要几类。它是近年来开发的新型脚手架体系,主要应用于高层剪力墙式楼盘。它能沿着建筑物往上攀升或下降。这种体系使脚手架技术完全改观:一是不必翻架子;二是免除了脚手架的拆装工序(一次组装后一直用到施工完毕),且不受建筑物高度的限制,极大的节省了人力和材料。并且在安全角度也对于传统的脚手架有较大的改观。在高层建筑中极具发展优势。 The climbing frame is also called the lifting frame, which can be divided into hydraulic type, electric type, manual type and other main types according to its power source. It is a new type of scaffolding system developed in recent years, mainly used in high-rise shear wall buildings. It can climb up or down the building. This system has completely changed the scaffolding technology: first, there is no need to turn over the shelf; second, the disassembly and assembly process of the scaffold is eliminated (it is used after one assembly until the construction is completed), and it is not limited by the height of the building, which greatly saves manpower. and materials. And from the perspective of safety, it has greatly improved the traditional scaffolding. It has great development advantages in high-rise buildings.

在《绿色施工导则》中,模板、脚手架作为周转材料和机具,着重强调了:①应选用耐用、维护与拆卸方便的周转材料和机具;②优先选用制作、安装、拆除一体化的专业队伍进行模板工程施工;③模板应以节约自然资源为原则,推广使用定型钢模、钢框竹模、竹胶板;④施工前应对模板工程的方案进行优化。多层、高层建筑使用可重复利用的模板体系,模板支撑宜采用工具式支撑;⑤优化高层建筑的外脚手架方案,采用整体提升、分段悬挑等方案;⑥推广采用外墙保温板替代混凝土施工模板的技术;⑦采取有效的技术和管理的节材措施,提高模板、脚手架等的周转次数;⑧要大力发展清水混凝土施工技术和新型模板及脚手架技术的研究与应用。 In the "Green Construction Guidelines", templates and scaffolding are used as turnover materials and tools, emphatically emphasizing: ① should choose durable, easy maintenance and disassembly turnover materials and tools; Carry out formwork engineering construction; ③ formwork should be based on the principle of saving natural resources, and promote the use of shaped steel molds, steel frame bamboo molds, and bamboo plywood; ④ the formwork project plan should be optimized before construction. Multi-storey and high-rise buildings use reusable formwork systems, and formwork supports should be supported by tools; ⑤ optimize the external scaffolding scheme of high-rise buildings, and adopt schemes such as overall lifting and segmental overhang; 6. Promote the use of external wall insulation boards instead of concrete Construction formwork technology; ⑦ Take effective technical and management material-saving measures to increase the turnover times of formwork and scaffolding; 8. Vigorously develop the research and application of fair-faced concrete construction technology and new formwork and scaffolding technology.

然而,现有的爬架的不足之处在于:爬架材料浪费、拆装费工时、效率低下、连接强度不足。 However, the disadvantages of the existing climbing frame are: waste of climbing frame materials, time-consuming disassembly and assembly, low efficiency, and insufficient connection strength.

实用新型内容 Utility model content

本实用新型要解决的技术问题在于克服现有技术的上述不足,提供一种立杆稳定性更强、重量轻、拆装便捷的建筑用带接头加强装置的爬架。 The technical problem to be solved by the utility model is to overcome the above-mentioned deficiencies in the prior art, and provide a climbing frame with a joint reinforcement device for construction with stronger vertical pole stability, light weight, and convenient disassembly and assembly.

为解决上述技术问题,本实用新型提供了以下技术方案: In order to solve the above technical problems, the utility model provides the following technical solutions:

一种建筑用带接头加强装置的爬架,包括设置于楼板外侧的立杆,所述立杆连接有悬挑梁,所述悬挑梁的外端与立杆连接,所述悬挑梁的内端延伸至楼板、并与楼板锚固,所述悬挑梁与立杆之间还连接有斜拉杆,所述立杆的数量至少为两个,相邻两个竖杆之间设置有加强肋,所述加强肋包括方钢管、以及设置于方钢管两端的连接法兰,各连接法兰与方钢管之间均设置有加强筋。 A climbing frame with a joint strengthening device for construction, comprising a vertical rod arranged on the outside of the floor, the vertical rod is connected with a cantilever beam, the outer end of the cantilever beam is connected with the vertical rod, and the cantilever beam The inner end extends to the floor and is anchored to the floor. Diagonal tie rods are also connected between the cantilever beam and the vertical rods. The number of the vertical rods is at least two, and reinforcing ribs are arranged between adjacent two vertical rods. , the reinforcing ribs include square steel pipes and connecting flanges arranged at both ends of the square steel pipes, and reinforcing ribs are arranged between each connecting flange and the square steel pipes.

采用这样的结构,通过带有连接法兰的方钢管对立杆进行连接,具有连接用材料少,重量轻,安装和拆卸快速高效的有益效果。 With such a structure, the upright rods are connected through square steel pipes with connecting flanges, which has the beneficial effects of less material used for connection, light weight, fast and efficient installation and disassembly.

优选的,所述加强筋两端分别与方钢管和连接法兰相互焊接。采用这样的结构,具有连接结构简单、制造方便、连接强度好的有益效果、 Preferably, both ends of the reinforcing rib are welded to the square steel pipe and the connecting flange respectively. Adopting such a structure has the beneficial effects of simple connection structure, convenient manufacture, and good connection strength.

优选的,所述连接法兰与立杆之间通过螺栓连接。采用这样的结构,具有拆装便捷的有益效果。 Preferably, the connecting flange and the vertical pole are connected by bolts. Adopting such a structure has the beneficial effect of convenient disassembly and assembly.

与现有技术相比,本实用新型的有益效果是:通过带有连接法兰的方钢管对立杆进行连接,具有连接用材料少,重量轻,安装和拆卸快速高效的有益效果。 Compared with the prior art, the beneficial effect of the utility model is that the vertical rods are connected by square steel pipes with connecting flanges, which have the beneficial effects of less connecting materials, light weight, fast and efficient installation and disassembly.

附图说明 Description of drawings

图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;

图2为本实用新型中加强肋的结构示意图。 Fig. 2 is a structural schematic diagram of the reinforcing rib in the present invention.

图中标记:立杆—1;加强肋—2;方钢管—2a;连接法兰—2b;加强筋—2c。 Marks in the figure: vertical pole—1; reinforcing rib—2; square steel pipe—2a; connecting flange—2b; reinforcing rib—2c.

具体实施方式 Detailed ways

下面结合附图和具体实施方式对本实用新型作进一步的说明。 Below in conjunction with accompanying drawing and specific embodiment, the utility model is further described.

本实用新型的实施方式不限于以下实施例,在不脱离本实用新型宗旨的前提下做出的各种变化均属于本实用新型的保护范围之内。 The implementation of the utility model is not limited to the following examples, and various changes made on the premise of not departing from the gist of the utility model all belong to the protection scope of the utility model.

如图1和图2所示,本实施例一种建筑用带接头加强装置的爬架,包括设置于楼板外侧的立杆1,立杆1连接有悬挑梁,悬挑梁的外端与立杆1连接,悬挑梁的内端延伸至楼板、并与楼板锚固,悬挑梁与立杆1之间还连接有斜拉杆,立杆1的数量至少为两个,相邻两个竖杆之间设置有加强肋2,加强肋2包括方钢管2a、以及设置于方钢管2a两端的连接法兰2b,各连接法兰2b与方钢管2a之间均设置有加强筋2c,加强筋2c两端分别与方钢管2a和连接法兰2b相互焊接,连接法兰2b与立杆1之间通过螺栓连接,螺栓的规格为M16*90、M16*120,通过螺栓连接达到爬架立杆1有足够的稳定性,通过带有连接法兰2b的方钢管2a对立杆1进行连接,本实施例中,方钢管2a规格为640*50*4mm,连接法兰2b规格为150*50*10mm,加强筋2c规格为50*50*6mm,连接法兰2b焊接在方钢管2a两端,在连接法兰2b与方钢管2a间焊接加强筋2c, As shown in Fig. 1 and Fig. 2, a climbing frame with a joint reinforcing device for construction in this embodiment includes a vertical rod 1 arranged on the outside of the floor, the vertical rod 1 is connected with a cantilever beam, and the outer end of the cantilever beam is connected to the The vertical pole 1 is connected, and the inner end of the cantilever beam extends to the floor and is anchored to the floor. There is also a diagonal tie rod connected between the cantilever beam and the vertical pole 1. The number of vertical poles 1 is at least two, and two adjacent vertical poles Reinforcing ribs 2 are provided between the rods, and the reinforcing ribs 2 include square steel pipes 2a and connecting flanges 2b arranged at both ends of the square steel pipes 2a. Reinforcing ribs 2c are arranged between each connecting flange 2b and the square steel pipe 2a. The two ends of 2c are welded to the square steel pipe 2a and the connecting flange 2b respectively, and the connecting flange 2b and the pole 1 are connected by bolts. The specifications of the bolts are M16*90 and M16*120. 1 have sufficient stability, connect the upright pole 1 through a square steel pipe 2a with a connecting flange 2b, in this embodiment, the specification of the square steel pipe 2a is 640*50*4mm, and the specification of the connecting flange 2b is 150*50* 10mm, the specification of the reinforcing rib 2c is 50*50*6mm, the connecting flange 2b is welded on both ends of the square steel pipe 2a, and the reinforcing rib 2c is welded between the connecting flange 2b and the square steel pipe 2a,

本实施例建筑用带接头加强装置的爬架可广泛应用于建筑爬架前后立杆1接头连接处,具有连接用材料少,重量轻,安装和拆卸快速高效的有益效果。 The climbing frame with joint strengthening device for construction in this embodiment can be widely used in the joint joints of the front and rear poles 1 of the building climbing frame, and has the beneficial effects of less connection materials, light weight, fast and efficient installation and disassembly.

本实用新型并不局限于前述的具体实施方式。本实用新型扩展到任何在本说明书中披露的新特征或任何新的组合,以及披露的任一新的方法或过程的步骤或任何新的组合。 The utility model is not limited to the aforementioned specific embodiments. The utility model extends to any new feature or any new combination disclosed in this specification, as well as the steps of any new method or process or any new combination disclosed.

Claims (3)

1.一种建筑用带接头加强装置的爬架,包括设置于楼板外侧的立杆,所述立杆连接有悬挑梁,所述悬挑梁的外端与立杆连接,所述悬挑梁的内端延伸至楼板、并与楼板锚固,所述悬挑梁与立杆之间还连接有斜拉杆,其特征在于:所述立杆的数量至少为两个,相邻两个竖杆之间设置有加强肋,所述加强肋包括方钢管、以及设置于方钢管两端的连接法兰,各连接法兰与方钢管之间均设置有加强筋。 1. A climbing frame with a joint reinforcing device for construction, comprising a vertical rod arranged on the outside of the floor, the vertical rod is connected with a cantilever beam, the outer end of the cantilever beam is connected with the vertical rod, and the cantilever The inner end of the beam extends to the floor and is anchored to the floor. There is also a diagonal tie rod connected between the cantilever beam and the vertical rod. It is characterized in that: the number of the vertical rods is at least two, and two adjacent vertical rods Reinforcing ribs are arranged between them, and the reinforcing ribs include square steel pipes and connecting flanges arranged at both ends of the square steel pipes, and reinforcing ribs are arranged between each connecting flange and the square steel pipes. 2.根据权利要求1所述的建筑用带接头加强装置的爬架,其特征在于:所述加强筋两端分别与方钢管和连接法兰相互焊接。 2. The building climbing frame with joint reinforcing device according to claim 1, characterized in that: the two ends of the reinforcing rib are respectively welded to the square steel pipe and the connecting flange. 3.根据权利要求1所述的建筑用带接头加强装置的爬架,其特征在于:所述连接法兰与立杆之间通过螺栓连接。 3. The building climbing frame with a joint strengthening device according to claim 1, characterized in that: the connecting flange and the vertical pole are connected by bolts.
CN201320863758.9U 2013-12-26 2013-12-26 Climbing frame with connector reinforcing device for construction Expired - Fee Related CN203783107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320863758.9U CN203783107U (en) 2013-12-26 2013-12-26 Climbing frame with connector reinforcing device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320863758.9U CN203783107U (en) 2013-12-26 2013-12-26 Climbing frame with connector reinforcing device for construction

Publications (1)

Publication Number Publication Date
CN203783107U true CN203783107U (en) 2014-08-20

Family

ID=51319308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320863758.9U Expired - Fee Related CN203783107U (en) 2013-12-26 2013-12-26 Climbing frame with connector reinforcing device for construction

Country Status (1)

Country Link
CN (1) CN203783107U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288823A (en) * 2017-08-23 2017-10-24 国电联合动力技术有限公司 A kind of new pylon of Wind turbines and the Wind turbines including the pylon

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288823A (en) * 2017-08-23 2017-10-24 国电联合动力技术有限公司 A kind of new pylon of Wind turbines and the Wind turbines including the pylon

Similar Documents

Publication Publication Date Title
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN102661019A (en) Heat preservation and decoration integrated construction method for outer wall of building
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN102454292A (en) Supporting steel frame of high altitude large-span cantilever structure mold frame
CN205224288U (en) Connection node of reinforced concrete superposed beam and steel pipe column
CN204212385U (en) Scaffold strengthened by truss
CN204456810U (en) A kind of gaily decorated basket pull bar suspension scaffold
CN203783107U (en) Climbing frame with connector reinforcing device for construction
CN103031949B (en) Arc-shaped main rib template support device
CN206319597U (en) A kind of cantilever steel girder erecting device
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN206128634U (en) Air conditioner shelf and window one -piece casting template support structure that wafts
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN205259593U (en) Whole spelling formula template of cast -in -place floor and support system
CN204359161U (en) A kind of cooling stack with horizontal adapter ring girder construction
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN202990407U (en) Quick-release scaffold
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN201614739U (en) Roof beam support formwork
CN206625550U (en) Composite template for construction core barrel
CN204728485U (en) Concrete post and concrete beam have just connect dry type syndeton
CN208487274U (en) A turnaroundable ground pump riser reinforcement device
CN205242981U (en) Concrete construction operation platform
CN207314793U (en) Operating platform between a kind of regularization precast stair

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20211226

CF01 Termination of patent right due to non-payment of annual fee