CN203742049U - Hook-type ceiling mounting system - Google Patents
Hook-type ceiling mounting system Download PDFInfo
- Publication number
- CN203742049U CN203742049U CN201320687231.5U CN201320687231U CN203742049U CN 203742049 U CN203742049 U CN 203742049U CN 201320687231 U CN201320687231 U CN 201320687231U CN 203742049 U CN203742049 U CN 203742049U
- Authority
- CN
- China
- Prior art keywords
- ganging
- align member
- keel
- hook
- outside
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a hook-type ceiling mounting system. The hook-type ceiling mounting system comprises a plurality of columns of hook-type keels longitudinally arranged in parallel at intervals and a plurality of rows of positioning components laterally arranged in parallel at intervals; every two adjacent columns of hook-type keels are connected with each other through the positioning components laterally arranged between the two adjacent columns of hook-type keels; each position component is a U-shaped groove tube; in the same row of positioning components, an inner positioning component and an outer positioning component are formed by lapping two adjacent positioning components at the inner part and the outer part of the ends; bayonets in the same shape and size are formed in the bottom parts of two sides of each of the inner positioning component and the outer positioning component; mounting holes which allow fastening bolts to penetrate are formed in the top parts of positions where the bayonets of the inner positioning component and the outer positioning component are positioned. Through the adoption of the hook-type ceiling mounting system, the interval position of the keels is standardized and fixed, the mounting efficiency is greatly increased, the phenomenon of plate falling off since a keel swings sideways during the process of mounting, use, and maintenance is prevented, the number of devices for connecting, fixing and the like is reduced to a great degree, and the mounting is faster and more convenient; the hook-type ceiling mounting system is simple in structure, high in strength of the overall structure, and good in safety, and can save mounting space.
Description
Technical field
The utility model relates to a kind of architectural decoration field, relates in particular to one and gangs up with formula smallpox installation system.
Background technology
At present, in architectural decoration field, smallpox is installed and is generally adopted in two ways, and one is by suspension rod, lightgage steel joist to be hung on suspension rod, then will gang up with keel by tooth button and be buckled on lightgage steel joist, then plate is ganged up with and ganged up with on keel.Its shortcoming is: gang up with keel to install plate front position fixing, limit mounting edge to adjust relative position, after plate is put and gone up and adjust to the right place, just fix buckle and gang up with keel.Be characterized in complex structure, installation fitting is many, efficiency is low.Another kind is directly will gang up with keel to be hung on suspension rod, its shortcoming is: suspension rod is difficult to get to the position perpendicular with keel, exist keel spacing there is no standard, produce very large plate seam and fissure of displacement phenomenon, can not contend with and gang up with the eccentric force that keel exist, easily cause ceiling to fall, safety is very poor.
In view of this, provide a kind of formula smallpox installation system of ganging up with simple in structure, that installation effectiveness is high, keel spacing location criteria is fixing to necessitate.
Summary of the invention
Technical problem to be solved in the utility model is, provides one to gang up with formula smallpox installation system.Can reduce installation fitting quantity, improve installation effectiveness, realize keel spacing location criteria and fix, anti-side-sway, has better safety, saves installing space simultaneously.
In order to solve the problems of the technologies described above, the utility model provides one to gang up with formula smallpox installation system, and it comprises: what several column longitudinal separation was arranged side by side gangs up with keel and several column lateral separation align member arranged side by side.
Described in adjacent two row, ganging up with keel is connected by therebetween described align member horizontal arranged side by side.
Wherein, described align member is U-lag pipe, in same a line align member, between adjacent positioned member, is inside and outside overlapped and is formed interior align member and outside fix member by end, two side bottoms of inside and outside align member are provided with the consistent bayonet socket of geomery, are blocked and are ganged up with keel by bayonet socket.Described inside and outside align member is provided with the installing hole that can pass for fastening bolt at the top at position, described bayonet socket place.
As the improvement of technique scheme, two side bottoms of described inside and outside align member are provided with bayonet socket described in two or more at a certain distance.
As the improvement of technique scheme, described in gang up with keel and comprise hanging portion and gang up with portion; Described hanging portion is provided with multiple installing holes that supply suspension rod and fastening bolt to pass, and described hanging portion is fixedly connected with described suspension rod by nut, is fixedly connected with described interior align member or outside fix member by fastening bolt; The described portion of ganging up with is the upper bent groove for link plate.
Further, described hanging portion is connected in series fixing successively with described interior align member, outside fix member by fastening bolt, and the align member of keel both sides also can misplace fixing.
Further, described in gang up with formula smallpox installation system and also comprise multiple plates of ganging up with, described in gang up with two of plates and comprise hook portion, clinch.
Implement the technical solution of the utility model, there is following beneficial effect:
One of the present utility model is ganged up with formula smallpox installation system, compared with prior art, it is ganged up with between keel and accurately locates two by the bayonet socket realization of ganging up with keel, overcome the defect of traditional limit mounting edge adjustment keel relative position of ganging up with the existence of formula smallpox, greatly improve installation effectiveness, simultaneously by utilizing, align member and the fastening bolt that inside and outside close button mode forms of outside fix member, by align member with to gang up with keel further fixing, can reduce largely connection, the fixing quantity that waits device, save installing space, make to install faster, and it is simple in structure, overall construction intensity is high, safety is good, occur without side-sway phenomenon.
Brief description of the drawings
In order to be illustrated more clearly in the technical scheme of the utility model embodiment, below the accompanying drawing to embodiment is briefly described.
Fig. 1 is a kind of structural representation of ganging up with formula smallpox installation system of the utility model;
Fig. 2 is a kind of plan structure schematic diagram of ganging up with formula smallpox installation system of the utility model;
Fig. 3 is the structural representation of align member.
Critical element symbol description
(1) gang up with plate (2) and gang up with the interior align members of keel (3) (4) outside fix member
(5) fastening bolt (6) bayonet socket (7) suspension rod (8) boom hole
Detailed description of the invention
Further describe detailed description of the invention of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, Figure 2, Figure 3 shows, one is ganged up with formula smallpox installation system, and it comprises: what several column longitudinal separation was arranged side by side gangs up with keel and several column lateral separation align member arranged side by side.Described in adjacent two row, ganging up with keel is connected by therebetween described align member horizontal arranged side by side.
Described align member is U-lag pipe, in same row align member, align member (3) and outside fix member (4) in forming by the inside and outside overlap joint in end between adjacent positioned member, specifically, align member can utilize inside and outside close button mode to be coordinated and form with outside fix member (4) by interior align member (3), also can be that single interior align member (3) or single outside fix member (4) dislocation are fixing, compared with prior art, the quantity that reduced connection, fix etc. installed, thus installation effectiveness improved.Two side bottoms of inside and outside align member are provided with the consistent bayonet socket of geomery (6), it is for fixedly ganging up with the distance of keel (2), realize accurately locating between keel, described inside and outside align member is provided with the installing hole that can supply fastening bolt (5) to pass at the top at described bayonet socket (6) position, place, can will gang up with keel (2) by fastening bolt (5) like this and further fix with align member, thereby ensure whole installation system stability and safety.
Preferably, two side bottoms of described inside and outside align member are provided with the consistent bayonet socket of two or more geomeries (6) at a certain distance, can fix two distances of ganging up with between keel (2) for regulating, can also be by the situation of joining of inside and outside align member, extend the length of align member, an align member can be one, two or more distance of ganging up with between keel (2), can reduce installation workload.
The described keel (2) of ganging up with comprise hanging portion and gang up with portion; Described hanging portion is provided with multiple installing holes that supply suspension rod (7) and fastening bolt (5) to pass, to be adapted to the adjustment of site operation position, described hanging portion is fixedly connected with described suspension rod (7) by nut, be fixedly connected with described interior align member (3) or outside fix member (4) by fastening bolt (5), further, be connected by fastening bolt (5) successively or dislocation fixing with described interior align member (3), outside fix member (4) serial connection.Utilize these connected modes, make to install faster, keep in repair more convenient.
Wherein, described in gang up with formula smallpox installation system and also comprise multiple plates (1) of ganging up with, described in gang up with plate (1) two end and comprise hook portion, clinch.
As shown in Figure 1, when smallpox is installed, gang up with keel (2) for two and take the installing hole in portion by least two suspension rods (7) through ganging up with on keel (2) respectively, to gang up with keel (2) by nut, to be connected to suspension rod (7) upper, and will gang up with keel (2) and be hanging connected in preposition.Gang up with at least two align members of setting between keel (2) for two of arbitrary neighborhood, above-mentioned two are ganged up with and between keel (2), carry out horizontal level and fix, be specially according to site operation situation, first interior align member (3) and outside fix member (4) are formed to align member by close button mode inside and outside, then be fastened on the hanging portion of ganging up with keel (2) by the bayonet socket on this align member (6), then will gang up with keel (2) and align member by fastening bolt (5) and be fixed together.Finally the hook portion that gangs up with plate (1) is hooked on a hook part of ganging up with keel (2), the clinch that another piece is ganged up with plate (1) is overlapped in another hook portion that gangs up with plate (1).As can be seen here, it is simple in structure, easy for installation, safe and reliable.
The one that the utility model provides is ganged up with formula smallpox installation system, it is ganged up with between keel (2) and accurately locates two by bayonet socket (6) realization of ganging up with keel (2), overcome the defect of traditional limit mounting edge adjustment keel relative position of ganging up with the existence of formula smallpox, greatly improve installation effectiveness, simultaneously by utilizing, the align member that inside and outside close button mode forms and the fastening bolt (5) of outside fix member, by align member with to gang up with keel (2) further fixing, can reduce largely connection, the fixing quantity that waits device, save installing space, make to install faster, and it is simple in structure, overall construction intensity is high, safety is good.In addition, by ganging up with keel (2) and ganging up with the matching mechanism between plate (1), realize and gang up with the horizontal precision positioning of plate (1) and fix, and avoided occurring between plate and plate large gap, install and easy to maintenance.
Above disclosed is only preferred embodiment of the present utility model, certainly can not limit with this interest field of the utility model, and the equivalent variations of therefore doing according to the utility model claim, still belongs to the scope that the utility model is contained.
Claims (5)
1. gang up with a formula smallpox installation system, it is characterized in that: comprise several column longitudinal separation arranged side by side gang up with keel and several column lateral separation align member arranged side by side;
Described in adjacent two row, ganging up with keel is connected by therebetween described align member horizontal arranged side by side;
Described align member is U-lag pipe, in same a line align member, between adjacent positioned member, inside and outside overlap and form interior align member and outside fix member by end, two side bottoms at the inside and outside align member place of joining are provided with the consistent bayonet socket of geomery and block the Z-shaped keel of ganging up with, and described inside and outside align member is provided with the installing hole that can pass for fastening bolt at the top at position, described bayonet socket place.
2. the formula smallpox installation system of ganging up with according to claim 1, is characterized in that: two side bottoms of described inside and outside align member are provided with bayonet socket described in two or more at a certain distance.
3. the formula smallpox installation system of ganging up with according to claim 1, is characterized in that: described in gang up with keel and comprise the portion of ganging up with and hanging portion; Described hanging portion is provided with multiple installing holes that supply suspension rod and fastening bolt to pass, and described hanging portion is fixedly connected with described suspension rod by nut, is fixedly connected with described interior align member or outside fix member by fastening bolt; The described portion of ganging up with is the upper bent groove for link plate.
4. the formula smallpox installation system of ganging up with according to claim 3, is characterized in that: described hanging portion is connected in series fixing keel two sides successively by fastening bolt align member dislocation with described interior align member, outside fix member is fixing.
5. the formula smallpox installation system of ganging up with according to claim 4, is characterized in that: also comprise multiple plates of ganging up with, described in gang up with hook portion, the clinch that plate comprises two ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320687231.5U CN203742049U (en) | 2013-10-31 | 2013-10-31 | Hook-type ceiling mounting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320687231.5U CN203742049U (en) | 2013-10-31 | 2013-10-31 | Hook-type ceiling mounting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203742049U true CN203742049U (en) | 2014-07-30 |
Family
ID=51341868
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320687231.5U Expired - Fee Related CN203742049U (en) | 2013-10-31 | 2013-10-31 | Hook-type ceiling mounting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203742049U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104563358A (en) * | 2014-12-24 | 2015-04-29 | 广州康普顿至高建材有限公司 | Parallel keel ceiling |
CN105937286A (en) * | 2016-06-29 | 2016-09-14 | 苏州金螳螂建筑装饰股份有限公司 | Adjustable aluminum plate ceiling connecting structure |
CN110387998A (en) * | 2019-07-30 | 2019-10-29 | 深圳市华剑建设集团股份有限公司 | Large-sized special-shaped smallpox assembled suspended ceiling device |
-
2013
- 2013-10-31 CN CN201320687231.5U patent/CN203742049U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104563358A (en) * | 2014-12-24 | 2015-04-29 | 广州康普顿至高建材有限公司 | Parallel keel ceiling |
CN105937286A (en) * | 2016-06-29 | 2016-09-14 | 苏州金螳螂建筑装饰股份有限公司 | Adjustable aluminum plate ceiling connecting structure |
CN105937286B (en) * | 2016-06-29 | 2018-04-13 | 苏州金螳螂建筑装饰股份有限公司 | A kind of adjustable aluminium sheet ceiling connecting structure |
CN110387998A (en) * | 2019-07-30 | 2019-10-29 | 深圳市华剑建设集团股份有限公司 | Large-sized special-shaped smallpox assembled suspended ceiling device |
CN110387998B (en) * | 2019-07-30 | 2024-09-24 | 深圳市华剑建设集团股份有限公司 | Large-scale abnormal shape smallpox assembled furred ceiling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU112917U1 (en) | SPACE FRAME CONNECTION NODE | |
CN203742049U (en) | Hook-type ceiling mounting system | |
CN204040439U (en) | A kind of reducing operation platform installed for steel rectangle column | |
CN204266124U (en) | The pre-assembled moulding bed of large sections steel box-girder | |
CN203878958U (en) | Hanging basket | |
CN214738851U (en) | Beam column node connecting device | |
CN203856160U (en) | Dry hanging structure for adjusting stone veneer | |
CN103883117A (en) | Split mounting type staircase used for scaffold | |
CN202733377U (en) | LCD TV wall-hung bracket convenient to mount | |
CN104110081A (en) | Assembled-type workshop wallboard and upright connecting structure | |
CN201991229U (en) | Combined fixture of beam | |
CN210050544U (en) | Assembled finished product supporting and hanging frame | |
CN202031342U (en) | Edge protective railing | |
CN202007474U (en) | Special positioning component and connecting device for installing hook-up ceiling | |
CN203429801U (en) | Ladder type aluminum alloy node device | |
CN102251682B (en) | Adjacent edge protection railing | |
CN209742088U (en) | Assembled porcelain powder self preservation temperature wallboard fixed knot constructs | |
CN210562785U (en) | Clip type bridge cut-off connecting piece | |
CN213202063U (en) | Evaporate and press sand concrete panel fossil fragments transfer device snatch drill rod | |
CN202259338U (en) | Solar panel fixing bracket | |
CN208203180U (en) | Tower flange well head frame-type sucker rod antirotation tool | |
CN205709522U (en) | A kind of dividing plate technique support | |
CN204455876U (en) | Paste the constructing structure of fiber composite plate | |
CN203257011U (en) | Canopy frame | |
CN208718346U (en) | Building engineering outer scaffold wall connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Kangna Ceiling Co., Ltd., Guangzhou Assignor: Tang Xiwei Contract record no.: 2015440000618 Denomination of utility model: Hook-type ceiling mounting system Granted publication date: 20140730 License type: Exclusive License Record date: 20150908 |
|
LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140730 Termination date: 20151031 |
|
EXPY | Termination of patent right or utility model |