CN203856160U - Dry hanging structure for adjusting stone veneer - Google Patents

Dry hanging structure for adjusting stone veneer Download PDF

Info

Publication number
CN203856160U
CN203856160U CN201420237152.9U CN201420237152U CN203856160U CN 203856160 U CN203856160 U CN 203856160U CN 201420237152 U CN201420237152 U CN 201420237152U CN 203856160 U CN203856160 U CN 203856160U
Authority
CN
China
Prior art keywords
decorative panel
stone material
fastener
steel
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420237152.9U
Other languages
Chinese (zh)
Inventor
胡庆红
张亚翠
金山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRSC Construction Group Co Ltd
Original Assignee
深圳市深装总装饰工程工业有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳市深装总装饰工程工业有限公司 filed Critical 深圳市深装总装饰工程工业有限公司
Priority to CN201420237152.9U priority Critical patent/CN203856160U/en
Application granted granted Critical
Publication of CN203856160U publication Critical patent/CN203856160U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a dry hanging structure for adjusting a stone veneer. The dry hanging structure is simple in structure and capable of fine adjusting displacement distances of the transverse dry hanging stone veneer in a horizontal plane and a vertical direction. A plurality of groups of hooking components are hooked on a vertical face of a horizontal angle steel beam. The angle steel beam is mounted on a vertical metallic framework which is fixedly connected with a built-in fitting of a construction body. Each hooking component comprises a steel hanging fastener, a connecting part and a fixing bolt. The connecting part is fixedly connected with the steel hanging fastener through the fixing bolt. A corner brace is formed at the bottom of the connecting part and fixedly connected with the transverse stone veneer. The dry hanging structure keeps a connection between the transverse stone veneer or between the transverse stone veneer and a longitudinal stone veneer perfect so as to achieve best decorative effect of a whole wall surface decorating program. The hooking components can be produced in large scale in factories. By the dry hanging structure, construction efficiency of field operation staffs can be greatly improved, and manufacturing costs of related elements can be lowered.

Description

The dried hanging hang structure of adjustable decorative panel of stone material
Technical field
The utility model relates to architectural decoration field, particularly a kind of dried hanging hang structure that can regulate horizontal cladding decorative panel of stone material.
Background technology
Along with the development of architectural decoration, decorative panel of stone material has obtained increasingly extensive application; Existing decorative panel of stone material dried hanging hang structure has following several mode: one, utilize stainless steel adapting piece that decorative panel of stone material is directly hung in agent structure; Two,, when agent structure is concrete frame, first metallic framework is arranged in agent structure, and then utilizes stainless steel adapting piece that decorative panel of stone material is hung on metallic framework; The former is called direct-type dried hanging hang structure, and the latter is skeleton dried hanging hang structure;
As shown in Figure 1, existing skeleton dried hanging hang structure all has identical structure to laterally cladding decorative panel of stone material (calling horizontal decorative panel of stone material 40 in the following text) and vertical cladding decorative panel of stone material (calling vertical decorative panel of stone material 60 in the following text), its structure is, the metallic framework 10 of vertical state is installed on the built-in fitting 101 of building body 100, on metallic framework 10, be fixedly connected with angle steel crossbeam 20, on angle steel crossbeam 20, by set bolt 33, be fixed with respectively several stainless steel adapting pieces 31, the stainless steel corner brace 312 of stainless steel adapting piece 31 is inserted and is arranged in the mounting groove at corresponding decorative panel of stone material back, afterwards by structure glue (for example, saturated epoxy) this decorative panel of stone material is fixed on described stainless steel adapting piece 31.
There is following defect in above-mentioned dried hanging hang structure:
1) when design, syndeton between decorative panel of stone material and metallic framework is rigid connection structure before fixing, before fixing relative position therebetween without the leeway of activity adjustment, and in practice of construction process, owing to there is error in the size of associated components in above-mentioned syndeton, make decorative panel of stone material can not accurately be fixed on determined position in designing requirement, finally cause decorative engineering whole structure variation.
2) when decorative panel of stone material, install and occur after deviation, field operation personnel have to process on the spot suitable connecting elements, both consuming time, consume again power, and greatly reduce efficiency of construction.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of simple in structure, dried hanging hang structure that can the decorative panel of stone material that the shift length in horizontal plane and in vertical direction is finely tuned to horizontal dry-hang stone decoration panel.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is:
The dried hanging hang structure of adjustable decorative panel of stone material of the present utility model, the metallic framework that comprises vertical setting and be fixedly connected with the built-in fitting of building body and be horizontally disposed with and be arranged on the angle steel crossbeam on this metallic framework, on the vertical surface of described angle steel crossbeam, be mounted with at least one group of hitch assembly, this hitch assembly comprises the steel hanging fastener being articulated on angle steel crossbeam vertical surface, the set bolt that the connector being connected with this steel hanging fastener and being used for is fixed together this steel hanging fastener and this connector, the bottom of described connector be provided with can insert the horizontal groove that is arranged on horizontal decorative panel of stone material back in and by structure glue and the affixed corner brace of this decorative panel of stone material,
Forward position on described steel hanging fastener is provided with that Open Side Down and be plugged on the slot that is " U " shape on described angle steel crossbeam vertical surface, and rearward position is thereon provided with the through hole passing for described set bolt adaptation; On described connector, be provided with the vertical groove passing for described set bolt adaptation.
Described through hole is circular hole.
Described through hole is horizontally disposed bar hole.
Described steel hanging fastener is the rectangular corrosion resistant plate of profile; Described connector is the rectangular corrosion resistant plate of profile.
Described metallic framework is " U " shape channel-section steel.
On the horizontal plane of described angle steel crossbeam, be interval with at least one stainless steel fastener, the rear end of this stainless steel fastener is fixed on angle steel crossbeam, and the front end of stainless steel fastener inserts in the perpendicular grooves that is arranged on vertical decorative panel of stone material back and is fixed together by structure glue and this vertical decorative panel of stone material.
Compared with prior art, the utility model arranges on the angle steel crossbeam being fixed on metallic framework can do the hitch assembly that slight distance regulates in horizontal plane and in vertical direction, make to adopt between the horizontal decorative panel of stone material that the utility model dried hanging hang structure installs or laterally being connected between decorative panel of stone material and longitudinal decorative panel of stone material can reach perfect engagement state, thereby make whole wall decoration engineering can realize best decorative effect.Hitch assembly used in dried hanging hang structure of the present utility model can be produced in plant layoutization, and it not only can improve field operation personnel's efficiency of construction greatly, and can also reduce the manufacturing cost of associated components.
Accompanying drawing explanation
Fig. 1 is the dried hanging hang structure schematic diagram of existing decorative panel of stone material.
Fig. 2 is dried hanging hang structure schematic diagram of the present utility model.
Fig. 3 is the enlarged diagram of A portion in Fig. 2.
Fig. 4 is hitch assembly of the present utility model and angle steel crossbeam connection diagram.
Fig. 5 is hitch assembly example one decomposing schematic representation in the utility model.
Fig. 6 is hitch assembly example two decomposing schematic representations in the utility model.
Reference numeral is as follows:
Building body 100, built-in fitting 101, metallic framework 10, angle steel crossbeam 20, vertical surface 21, horizontal plane 22, hitch assembly 30, connector 31, vertical groove 311, corner brace 312, steel hanging fastener 32, slot 321, circular hole 322, bar hole 323, set bolt 33, horizontal decorative panel of stone material 40, horizontal groove 41, stainless steel fastener 50, vertical decorative panel of stone material 60, perpendicular grooves 61.
The specific embodiment
As shown in Figure 2,3, 4, the dried hanging hang structure of adjustable decorative panel of stone material of the present utility model by be embedded in steel built-in fitting 101 in building body 100, be vertically arranged on made on this built-in fitting 101 and by channel-section steel and be " U " type metallic framework 10, be horizontally disposed with and be welded on the angle steel crossbeam 20 on metallic framework 10 and be arranged on the hitch assembly 30 on this angle steel crossbeam 20 and form with the horizontal and vertical dry-hang stone decoration panel that this hitch assembly 30 is fixed together.
Structural meterials used in the decorative engineering that described metallic framework 10 and angle steel crossbeam 20 are prior art.
The utility model angle steel crossbeam 20 used is welded on metallic framework 10 in mode upper and that be parallel to metallic framework 10 place planes towards indoor, vertical surface 21 with its opening.
As shown in Figure 5,6, described hitch assembly 30 is comprised of steel hanging fastener 32, connector 31 and the set bolt 33 that steel hanging fastener 32 and stainless steel adapting piece 31 can be linked together.
Described steel hanging fastener 32 is preferably the rectangular corrosion resistant plate of profile, in its forward position, (indoor direction is front, after metallic framework 10 sides are, be provided with the through hole (calling slot 321 in the following text) that is down " U " shape down together), the lower end of this slot 321 is uncovered, rearward position at steel hanging fastener 32 is provided with the through hole that can make described set bolt 33 adaptations pass, and this through hole is circular hole 322, also can be horizontally disposed bar hole 323.
Described connector 31 is preferably the rectangular corrosion resistant plate of profile, and on the flat board of this connector 31, midline position is provided with vertical groove 311, in the bottom of connector 31, is provided with corner brace 312, and this corner brace 312 can be single hook, also can be double hook.This corner brace 312 can be inserted in the horizontal groove 41 that is arranged on horizontal decorative panel of stone material 40 backs and be fixed together with this decorative panel of stone material.
Installment and debugging of the present utility model is as follows:
1) first by metallic framework 10 upright be arranged on the built-in fitting 101 of building body 100, then angle steel crossbeam 20 is horizontally disposed with and is welded on metallic framework 10 position (position of welding is set according to the position of actual dry-hang stone decoration panel) of setting.
2) mode steel hanging fastener 32 described in several being buckled on the vertical surface 21 of described angle steel crossbeam 20 with described slot 321 is articulated on this angle steel crossbeam 20, two steel hanging fastener 32 intervals arrange, its spacing adapts and (temporarily transfers whole distance therebetween and regulate horizontal decorative panel of stone material 40 left and right displacement distance in horizontal plane with itself and decorative panel of stone material link position, with observer, towards angle steel crossbeam 20, stand, left hand is left, the right hand is right), after location positioning, be welded on angle steel crossbeam 20.
3) with described set bolt 33 through vertical groove 311 and the circular hole 322 on steel hanging fastener 32 or bar hole 323 on described connector 31, connector 31 and steel hanging fastener 32 are linked together, the unsuitable tension of fastening degree therebetween, in order to after adjust again.
4) corner brace of connector 31 312 is plugged in the horizontal groove 41 being arranged on horizontal decorative panel of stone material 40 back sides, again structure glue (preferably saturated epoxy) is filled in this horizontal groove 41, connector 31 and horizontal decorative panel of stone material 40 are fixed together.
5) on the horizontal plane 22 of described angle steel crossbeam 20, a plurality of stainless steel fasteners 50 are established at interval, the rear end of this fastener 50 is bolted on angle steel crossbeam 20, its front end inserts and is arranged in the perpendicular grooves 61 at vertical decorative panel of stone material 60 backs, adopts described structure glue to be filled in this perpendicular grooves 61 this vertical decorative panel of stone material 60 is cladding on angle steel crossbeam 20.
6), when the through hole on described steel hanging fastener 32 is circular hole 322, can regulate horizontal decorative panel of stone material 40 shift length in vertical direction by adjusting the upper-lower position of the vertical groove 311 of connector 31; When the through hole on described steel hanging fastener 32 is bar hole 323, can by adjust connector 31 vertical groove 311 upper-lower position bar hole 323 relative to connector 31 move horizontally position regulate horizontal decorative panel of stone material 40 in vertical direction with horizontal plane in shift length on fore-and-aft direction.
7) regulate and determine behind the position of horizontal decorative panel of stone material 40, set bolt 33 is fixing locked, as need, gain in strength and can add again welding sequence.

Claims (6)

1. the dried hanging hang structure of an adjustable decorative panel of stone material, comprise vertical setting the metallic framework (10) being fixedly connected with the built-in fitting (101) of building body (100) and be horizontally disposed with and be arranged on the angle steel crossbeam (20) on this metallic framework (10), it is characterized in that: on the vertical surface (21) of described angle steel crossbeam (20), be mounted with at least one group of hitch assembly (30), this hitch assembly (30) comprises the steel hanging fastener (32) being articulated on angle steel crossbeam (20) vertical surface (21), the set bolt (33) that the connector (31) being connected with this steel hanging fastener (32) and being used for is fixed together this steel hanging fastener (32) and this connector (31), the bottom of described connector (31) be provided with can insert the horizontal groove (41) that is arranged on horizontal decorative panel of stone material (40) back in and by structure glue and the affixed corner brace (312) of this decorative panel of stone material (40),
Forward position on described steel hanging fastener (32) is provided with that Open Side Down and be plugged on the slot (321) that is " U " shape on described angle steel crossbeam (20) vertical surface (21), and rearward position is thereon provided with the through hole passing for described set bolt (33) adaptation; On described connector (31), be provided with the vertical groove (311) passing for described set bolt (33) adaptation.
2. the dried hanging hang structure of adjustable decorative panel of stone material according to claim 1, is characterized in that: described through hole is circular hole (322).
3. the dried hanging hang structure of adjustable decorative panel of stone material according to claim 1, is characterized in that: described through hole is horizontally disposed bar hole (323).
4. the dried hanging hang structure of adjustable decorative panel of stone material according to claim 1, is characterized in that: described steel hanging fastener (32) is the rectangular corrosion resistant plate of profile; Described connector (31) is the rectangular corrosion resistant plate of profile.
5. according to the dried hanging hang structure of the adjustable decorative panel of stone material described in any one in claim 1-4, it is characterized in that: described metallic framework (10) is " U " shape channel-section steel.
6. the dried hanging hang structure of adjustable decorative panel of stone material according to claim 5, it is characterized in that: on the horizontal plane (22) of described angle steel crossbeam (20), be interval with at least one stainless steel fastener (50), it is upper that the rear end of this stainless steel fastener (50) is fixed on angle steel crossbeam (20), and the front end of stainless steel fastener (50) inserts in the perpendicular grooves (61) that is arranged on vertical decorative panel of stone material (60) back and is fixed together by structure glue and this vertical decorative panel of stone material (60).
CN201420237152.9U 2014-05-09 2014-05-09 Dry hanging structure for adjusting stone veneer Expired - Fee Related CN203856160U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420237152.9U CN203856160U (en) 2014-05-09 2014-05-09 Dry hanging structure for adjusting stone veneer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420237152.9U CN203856160U (en) 2014-05-09 2014-05-09 Dry hanging structure for adjusting stone veneer

Publications (1)

Publication Number Publication Date
CN203856160U true CN203856160U (en) 2014-10-01

Family

ID=51606022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420237152.9U Expired - Fee Related CN203856160U (en) 2014-05-09 2014-05-09 Dry hanging structure for adjusting stone veneer

Country Status (1)

Country Link
CN (1) CN203856160U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431252A (en) * 2021-06-29 2021-09-24 中建七局建筑装饰工程有限公司 Hoist and mount stone material installation pendant
CN113789905A (en) * 2021-10-19 2021-12-14 上海宝冶建筑装饰有限公司 GRG decorative panel furred ceiling structure
CN114108983A (en) * 2021-12-15 2022-03-01 深圳市华剑建设集团股份有限公司 Wall surface dry hanging structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431252A (en) * 2021-06-29 2021-09-24 中建七局建筑装饰工程有限公司 Hoist and mount stone material installation pendant
CN113789905A (en) * 2021-10-19 2021-12-14 上海宝冶建筑装饰有限公司 GRG decorative panel furred ceiling structure
CN114108983A (en) * 2021-12-15 2022-03-01 深圳市华剑建设集团股份有限公司 Wall surface dry hanging structure
CN114108983B (en) * 2021-12-15 2023-01-10 深圳市华剑建设集团股份有限公司 Wall surface dry hanging structure

Similar Documents

Publication Publication Date Title
CN201062389Y (en) Latch hook type curtain wall column mounting regulating structure
CN203856160U (en) Dry hanging structure for adjusting stone veneer
CN204126102U (en) A kind of sheet material fast-assembling ceiling structure
CN103711258B (en) Fastener plug-in type Curved surface metal roofing and construction method thereof
CN104251028A (en) Combined stone curtain wall
CN206105242U (en) Steel bow member connecting plate and bow member I -steel fixed -position welding device
CN101936049B (en) Mounting structure of stone curtain wall
CN203977672U (en) A kind of roof suspended ceiling integrated member
CN203729544U (en) Adjustable supporting device for clamping type keel
CN202831514U (en) Adjustable wallboard hanging part
CN202596117U (en) Modularized and integrated antistatic floor support
CN110670836A (en) Hang stone material solid parquet subassembly futilely
CN203499191U (en) Tilted stone cladding structure
CN206636110U (en) Connection framework
CN202878459U (en) Template for pouring assembling wallboard with mortise
CN203856158U (en) Ceiling corner enclosure device for dry-hanging stone veneers
CN102251682B (en) Adjacent edge protection railing
CN204059680U (en) Combined stone curtain wall
CN208965849U (en) Fast leveling GRG plate moulding ceiling mounting structure
CN201762851U (en) Installing structure of stone curtain wall
CN114961159A (en) Mounting structure of assembled wallboard
CN208701975U (en) Top mounts curtain wall system assembled by small units
CN221095548U (en) Hanging framework and stone curtain wall mounting system
CN205224356U (en) Unit side hangs sign indicating number system
CN201588357U (en) Weldless exterior wall structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 518029 Guangdong city of Shenzhen province Futian District Free Trade Zone wide Landau A total building No. 6

Patentee after: SHENZHEN SHENZHUANGZONG DECORATION CO., LTD.

Address before: 518029 Guangdong city of Shenzhen province Futian District Free Trade Zone wide Landau A total building No. 6

Patentee before: Shenzhen Deep Fitted Total Decoration Engineering Industry Co., Ltd.

CP01 Change in the name or title of a patent holder

Address after: 518029 Futian District Free Trade Zone, Shenzhen, Guangdong, A Landau 6, Shenzhen General Assembly building.

Patentee after: General construction group Limited by Share Ltd

Address before: 518029 Futian District Free Trade Zone, Shenzhen, Guangdong, A Landau 6, Shenzhen General Assembly building.

Patentee before: SHENZHEN SHENZHUANGZONG DECORATION CO., LTD.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141001

Termination date: 20210509

CF01 Termination of patent right due to non-payment of annual fee