trestle
steel
span
bailey beam
welded pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320608732.XU
Other languages
Chinese (zh)
Inventor
刘文兵
黄景新
匡建国
马海贤
朱善美
沙伟
戴国安
莫立汝
杨曦
吴福莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201320608732.XU priority Critical patent/CN203684059U/en
Application granted granted Critical
Publication of CN203684059U publication Critical patent/CN203684059U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a large-span deck Bailey beam steel trestle structure. The deck Bailey beam steel trestle structure is characterized in that a steel trestle is formed by the design of a 15m auxiliary span plus a 30m main span plus a 15m auxiliary span, wherein the main span is 30m; the main span is matched with a spiral welded pipe to be used as a main span pier of the trestle; double station steel is arranged at the top of the spiral welded pipe and is used as a trestle distributive girder; an open groove for limiting the trestle distributive girder from becoming a main member is formed in the spiral welded pipe; the bailey beam is arranged on the spiral welded pipe; a trestle deck distributive girder adopts a steel plate trestle deck structure from the transverse direction to the longitudinal direction. According to the large-span deck Bailey beam steel trestle structure disclosed by the utility model is reasonable in design; by adopting a reasonable structural arrangement form, the large-span bearing capacity of the bailey beam steel trestle can be obtained, the temporary pass requirement of lines spanning rivers, existing roads and railway business lines and the like having traffic limitation can be met and the pass of vehicles with the maximum load of 100t can be allowed; according to the structural design of the steel trestle, the span of the main span of the steel trestle is increased to the maximum extent and the safety and the reliability of vehicle pass can be ensured.

Description

A kind of large span deck type Bailey beam steel trestle structure
Technical field
The utility model relates to the structure field of steel trestle, relates in particular to a kind of large span deck type Bailey beam steel trestle structure.
Background technology
For the road that needs navigation or driving on need across the larger inland river of span, highway and railway etc., as: for pioneer road need be built in river a temporary construction suspension bridge along connecing, need to meet the wide requirement of navigation navigation channel 25m in river course, current domestic conventional 9m, the 12m adopting and 15m are across all not meeting the demands simultaneously.
Utility model content
The purpose of this utility model is the deficiency in order to make up prior art, and the large span deck type Bailey beam steel trestle structure that a kind of simple structure of constructing is stable is provided.
The utility model is achieved through the following technical solutions:
A kind of large span deck type Bailey beam steel trestle structure, it is characterized in that: steel trestle by 15m auxiliary across+30m main span+15m is auxiliary across designing, its main span is 30m, coordinate spiral welded pipe as trestle main span buttress, the top of described spiral welded pipe is provided with Two bors d's oeuveres station steel, described Two bors d's oeuveres station steel is as trestle distribution beam, it is main open slot that described spiral welded pipe is provided with restriction trestle distribution beam, Bailey beam is positioned in trestle distribution beam, and trestle bridge floor distribution beam adopts first horizontal rear vertical bridge floor of steel plate structure.
Described Bailey beam is long 3 meters of standardized structural element, high 1.5 meters, strengthens chord member for long 1.5 meters of standardized structural elements.
Described trestle main span buttress is the spiral welded pipe of diameter 530mm wall thickness 8mm, and single horizontal four, arrangement pitches is 2 meters, and between helix tube, 2.5 meters of vertical spacing are established and laterally connected together system, laterally connect system and adopt channel-section steel to make.
The shellfish thunder sheet that described Bailey beam is connected by spacing 45cm angle steel standard support frame is made, and under every Bailey beam, a slice that installs additional with bolts is strengthened chord member, adopts 49.5mm truss connecting pin to connect between Bailey beam.
The thickness of described bridge floor of steel plate is 10mm.
The utility model has the advantages that:
The utility model reasonable in design, adopt rational structural arrangement form to solve the supporting capacity of Bailey beam steel trestle large span, can solve the interim current requirement that has traffic restriction across river, river, existing highway, running railway line etc., can meet maximum load is the current of 100t vehicle, by the structure design of steel trestle having been strengthened to greatest extent to the span of steel trestle main span, and guarantee the safe and reliable of vehicle pass-through.
Accompanying drawing explanation
Fig. 1 is the utility model front view.
Fig. 2 is the utility model lateral view.
The specific embodiment
Referring to accompanying drawing, a kind of large span deck type Bailey beam steel trestle structure, steel trestle by 15m auxiliary across+30m main span+15m is auxiliary across designing, its main span is 30m, coordinates spiral welded pipe 1 as trestle main span buttress, and the top of spiral welded pipe 1 is provided with Two bors d's oeuveres station steel 2, Two bors d's oeuveres station steel 2 is as trestle distribution beam, it is main open slot that spiral welded pipe 1 is provided with restriction trestle distribution beam, and Bailey beam 3 is positioned in trestle distribution beam, vertical bridge floor of steel plate 4 structures after the first horizontal stroke of trestle bridge floor distribution beam employing.Described Bailey beam 3 is for long 3 meters of standardized structural element, high 1.5 meters, strengthens chord member 5 for long 1.5 meters of standardized structural elements.
Described steel trestle by 15m auxiliary across+30m main span+15m is auxiliary across designing, steel trestle is laterally by 10 longitudinal 20,5 groups of Bailey beams that the shellfish thunder sheet laterally being connected by spacing 45cm angle steel (L63 × 4) standard support frame is made are as the girder of trestle, under every Bailey beam, adopt M36 × 180mm bolt to connect and install a slice reinforcement chord member additional, between Bailey beam, adopt 49.5mm truss connecting pin to connect.Bailey beam limit earnestly by vertical spacing 2.5m [16 channel-section steels are welded into four spacing 2m Φ 530 helix tubes that horizontal bridging connects and forms, and buttress top cross beam is that 2I45a i iron forms; Middle buttress by double vertical spacing 2.5m [16 channel-section steels are welded into four spacing 2m Φ 530 helix tubes that horizontal bridging connects and forms, longitudinally longitudinal distribution beam of same axial employing 2I45a i iron composition, the crossbeam laterally forming for 3I45a i iron.Bridge deck is mated formation and is formed by horizontal spacing 60cmI28a i iron, longitudinal pitch 30cmI10 i iron, δ 10mm steel plate.
When implementation structure form, adopt pile driver first Φ 530 helix tubes to be squeezed into after below ground reaches bearing capacity and weld channel-section steel bridging between Φ 530 helix tubes, install in length and breadth to I45a distribution beam, after Bailey beam is good by on-site consolidation with crane lifting to transverse distribution beam, the bridge deck of mating formation.

Claims (5)

1. a large span deck type Bailey beam steel trestle structure, it is characterized in that: steel trestle by 15m auxiliary across+30m main span+15m is auxiliary across designing, its main span is 30m, coordinate spiral welded pipe as trestle main span buttress, the top of described spiral welded pipe is provided with Two bors d's oeuveres station steel, described Two bors d's oeuveres station steel is as trestle distribution beam, it is main open slot that described spiral welded pipe is provided with restriction trestle distribution beam, Bailey beam is positioned in trestle distribution beam, and trestle bridge floor distribution beam adopts first horizontal rear vertical bridge floor of steel plate structure.
2. large span deck type Bailey beam steel trestle structure according to claim 1, is characterized in that: described Bailey beam is long 3 meters of standardized structural element, high 1.5 meters, strengthens chord member for long 1.5 meters of standardized structural elements.
3. large span deck type Bailey beam steel trestle structure according to claim 1, it is characterized in that: described trestle main span buttress is the spiral welded pipe of diameter 530mm wall thickness 8mm, single horizontal four, arrangement pitches is 2 meters, between helix tube, 2.5 meters of vertical spacing are established and are laterally connected together system, laterally connect system and adopt channel-section steel to make.
4. large span deck type Bailey beam steel trestle structure according to claim 1, it is characterized in that: the shellfish thunder sheet that described Bailey beam is connected by spacing 45cm angle steel standard support frame is made, under every Bailey beam, a slice that installs additional with bolts is strengthened chord member, adopts 49.5mm truss connecting pin to connect between Bailey beam.
5. large span deck type Bailey beam steel trestle structure according to claim 1, is characterized in that: the thickness of described bridge floor of steel plate is 10mm.
CN201320608732.XU 2013-09-29 2013-09-29 Large-span deck Bailey beam steel trestle structure Expired - Fee Related CN203684059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320608732.XU CN203684059U (en) 2013-09-29 2013-09-29 Large-span deck Bailey beam steel trestle structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320608732.XU CN203684059U (en) 2013-09-29 2013-09-29 Large-span deck Bailey beam steel trestle structure

Publications (1)

Publication Number Publication Date
CN203684059U true CN203684059U (en) 2014-07-02

Family

ID=51005982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320608732.XU Expired - Fee Related CN203684059U (en) 2013-09-29 2013-09-29 Large-span deck Bailey beam steel trestle structure

Country Status (1)

Country Link
CN (1) CN203684059U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060547A (en) * 2014-07-10 2014-09-24 中交二航局第四工程有限公司 Temporary steel trestle constructing method and trestle
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN104674643A (en) * 2015-01-29 2015-06-03 四川路航建设工程有限责任公司 Prestressed steel truss bridge
CN105350426A (en) * 2015-09-29 2016-02-24 中国一冶集团有限公司 Assembling method of pedestrian footpath in mountain construction
CN106978777A (en) * 2017-05-22 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of make-shift bridge device
CN108442232A (en) * 2018-04-30 2018-08-24 安徽省公路桥梁工程有限公司 Assembled steel suspension bridge structure and its construction method
CN108691274A (en) * 2017-04-05 2018-10-23 新疆顺安众达交通技术服务有限公司 Load-bearing is adjustable install convenient steel constructed beam technical method
CN109184699A (en) * 2018-08-20 2019-01-11 中铁六局集团有限公司 Existing river construction is worn under open trench tunnel
CN113356065A (en) * 2021-06-11 2021-09-07 中铁二十局集团第三工程有限公司 Construction method for main trestle in deep water area
CN114525791A (en) * 2022-02-28 2022-05-24 上海巨鲲科技有限公司 Foundation pit steel support and steel trestle combined system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060547A (en) * 2014-07-10 2014-09-24 中交二航局第四工程有限公司 Temporary steel trestle constructing method and trestle
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN104674643A (en) * 2015-01-29 2015-06-03 四川路航建设工程有限责任公司 Prestressed steel truss bridge
CN105350426A (en) * 2015-09-29 2016-02-24 中国一冶集团有限公司 Assembling method of pedestrian footpath in mountain construction
CN108691274A (en) * 2017-04-05 2018-10-23 新疆顺安众达交通技术服务有限公司 Load-bearing is adjustable install convenient steel constructed beam technical method
CN106978777A (en) * 2017-05-22 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of make-shift bridge device
CN108442232A (en) * 2018-04-30 2018-08-24 安徽省公路桥梁工程有限公司 Assembled steel suspension bridge structure and its construction method
CN108442232B (en) * 2018-04-30 2023-09-26 安徽省公路桥梁工程有限公司 Assembled steel temporary bridge structure and construction method thereof
CN109184699A (en) * 2018-08-20 2019-01-11 中铁六局集团有限公司 Existing river construction is worn under open trench tunnel
CN109184699B (en) * 2018-08-20 2020-07-10 中铁六局集团太原铁路建设有限公司 Construction method for passing existing river channel under open trench tunnel
CN113356065A (en) * 2021-06-11 2021-09-07 中铁二十局集团第三工程有限公司 Construction method for main trestle in deep water area
CN114525791A (en) * 2022-02-28 2022-05-24 上海巨鲲科技有限公司 Foundation pit steel support and steel trestle combined system
CN114525791B (en) * 2022-02-28 2023-09-19 上海巨鲲科技有限公司 Foundation pit steel support and steel trestle combined system

Similar Documents

Publication Publication Date Title
CN203684059U (en) Large-span deck Bailey beam steel trestle structure
CN203080736U (en) Combined profile steel box-shaped steel plate shear wall
CN204530475U (en) Little width bridge deck wet seam syndeton
CN106438212B (en) A kind of folding spelling formula tubbiness tower
CN204151666U (en) A kind of steel trestle meeting meeting requirement
CN105568853A (en) Large-span steel concrete combined truss girder side position transverse movement and girder dropping construction method
CN201372404Y (en) Wide-span assembly type steel bridge for road
CN204753354U (en) Cover worker's board landing stage
CN206693029U (en) A kind of Bailey beam steel trestle
CN103774543A (en) Deck bridge with cable-arch combination structure
CN203603020U (en) Highway and railway same layer large cantilever steel box beam
CN205296831U (en) Supporting type that bears joist that uses of support is buckled to socket joint type dish
CN203716044U (en) Low bearing or middle bearing cable arch combined structural bridge
CN206143645U (en) Stride across navigable river ultra -large -span girder steel assembling support
CN203307819U (en) Structurally-enhanced tool-type foundation pit steel supporting member
CN205874978U (en) A tie rod support for $descending hold formula steel pipe concrete tied arch bridge
CN207959499U (en) A kind of steel construction
CN212772814U (en) Steel structure node connection structure
CN204919348U (en) Supplementary head tower of using of self anchored suspension bridge installation
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN204151665U (en) A kind of cable-stayed type opens trestle
CN203716045U (en) Deck type cable-arch combined structure bridge
CN203451109U (en) I-shaped steel truss device for tower crane attachment
CN202559264U (en) Steel-structure assembled-type framework for erecting traffic signal devices
CN203113908U (en) Full assembly structure with enclosing wall and advertising board integrated

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20210929