CN203669427U - Overhead photovoltaic power generation distribution room inside large factory building - Google Patents
Overhead photovoltaic power generation distribution room inside large factory building Download PDFInfo
- Publication number
- CN203669427U CN203669427U CN201320754826.8U CN201320754826U CN203669427U CN 203669427 U CN203669427 U CN 203669427U CN 201320754826 U CN201320754826 U CN 201320754826U CN 203669427 U CN203669427 U CN 203669427U
- Authority
- CN
- China
- Prior art keywords
- switchgear house
- distribution room
- photovoltaic power
- building
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Photovoltaic Devices (AREA)
Abstract
The utility model relates to an overhead photovoltaic power generation distribution room inside a large factory building. The overhead photovoltaic power generation distribution room comprises a foundation, a distribution room base, a distribution room house framework, a bridge, a panel and a heating and ventilating structure. The distribution room base is arranged on the foundation. The overhead photovoltaic power generation distribution room is characterized in that certain bridge space is formed between the distribution room base and the foundation and is paved with the bridge, the distribution room house framework is arranged on the distribution room base, the panel is arranged on the distribution room house framework, the heating and ventilating structure comprises a draught fan direct drainage pipeline, an air outlet device and an air inlet device. The overhead photovoltaic power generation distribution room has the advantages that after photovoltaic power distribution equipment is installed in the large factory building, the available space and normal production of a workshop cannot be affected, and the space of the factory building can be effectively utilized.
Description
Technical field
The utility model relates to the built on stilts photovoltaic generation distribution chamber in a kind of large-sized workshop.
Background technology
The petroleum times that the human society that enters 21 century is being faced with the situation cheapness of fossil fuel shortage and ecological environment severe contamination, finishes, progressively change the consumption structure of the energy, greatly develop regenerative resource, walk the road of sustainable development, become the common recognition of countries in the world government.Solar energy is a kind of ideal clean energy resource, and according to its feature and practical application needs, at present solar electrical energy generation is divided into two kinds of photo-thermal power generation and photovoltaic generations.
Distributed photovoltaic power generation system is a kind of novel, tool generating with broad prospects for development and comprehensive utilization of energy mode, it advocates generating nearby, grid-connected nearby, conversion nearby, the principle using nearby, not only can effectively improve the generated energy of same size photovoltaic plant, also efficiently solve the loss problem of electric power in boosting and transporting for long-distance simultaneously.
Distributed photovoltaic power generation refers to the building method that is different from centralized photovoltaic generation, generally build user's side in, the electric power of producing mainly personal.Can be applied on industrial premises, public building and resident roof.Especially, current industrial electric weight is larger, and electricity rates are higher, is more suitable for installing.Distributed photovoltaic power generation takes full advantage of the feature that solar energy extensively exists, and has avoided the laying assembly place limiting factor of concentrated construction, has the feature flexibly of building.But because photovoltaic controller switching equipment (as, DC cabinet, exchanging cabinet, the equipment such as inverter) is installed, cable laying etc. are to complete, therefore, be subject to many restrictions of shop coundition in the size of switchgear house, shape, outward appearance etc. on layout basis, existing workshop.
Therefore seek a kind of after in building surface in big industrial factory, photovoltaic controller switching equipment is installed, do not affect workshop can usage space and normal produce can realize the built on stilts photovoltaic generation distribution chamber in the large-sized workshop that effectively utilizes factory building space.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, provides a kind of and can realize the built on stilts photovoltaic generation distribution chamber effectively utilizing in the large-sized workshop of factory building space.
The purpose of this utility model is achieved in that
Built on stilts photovoltaic generation distribution chamber in a kind of large-sized workshop, it comprises basis, switchgear house base, switchgear house skeleton of building, crane span structure, panel and HVAC structure, described switchgear house base is arranged on basis, between described switchgear house base and basis, be provided with certain crane span structure space, described crane span structure is layed in this crane span structure space, described switchgear house skeleton of building is arranged on switchgear house base, described panel is arranged on switchgear house skeleton of building, and described HVAC structure comprises the in line pipeline of blower fan, exhaust apparatus and air-intake device.
Preferred as one, described basis is reinforced concrete foundation, and described switchgear house base is steel work, and described switchgear house skeleton of building is steel work.
Preferred as one, described air-intake device is arranged on the panel of the relative side of exhaust apparatus, and the air intake place of described air-intake device is provided with screen pack.
Compared with prior art, the beneficial effects of the utility model are:
Built on stilts photovoltaic generation distribution chamber in a kind of large-sized workshop of the utility model, it comprises basis, switchgear house base, switchgear house skeleton of building, crane span structure, panel and HVAC structure.Utilize steel work to complete switchgear house base designs overall weight is reduced, be promoted to apart from basic certain altitude simultaneously, this structure and having compared with high stable and safety factor; Crane span structure can be layed under the switchgear house base of steel work, has simple installation, the feature such as stable, attractive in appearance, and according to the pre-testing cable preformed hole in equipment position, the method reduces switchgear house inner cable lays, and convenient construction, saves cable; HVAC structure arranges the in line pipeline of blower fan, sets out air port and the air intake with filter, thereby reaches the requirement of distribution used in room with dust-proof function.Therefore the utlity model has in building surface in big industrial factory after photovoltaic controller switching equipment installs, do not affect workshop can usage space and normal produce can realize the advantage of effectively utilizing factory building space.
Brief description of the drawings
Fig. 1 is basic sectional drawing of the present utility model.
Fig. 2 is switchgear house base longitudinal plan of the present utility model.
Fig. 3 switchgear house base vertical view of the present utility model.
The longitudinal facade skeleton drawing of Fig. 4 switchgear house skeleton of building of the present utility model.
Fig. 5 switchgear house skeleton of building of the present utility model roof skeleton drawing.
Fig. 6 photovoltaic generation switchgear house of the present utility model elevation.
Fig. 7 photovoltaic generation switchgear house of the present utility model air intake drawing of site.
Detailed description of the invention
Referring to Fig. 1 ~ Fig. 7, built on stilts photovoltaic generation distribution chamber in a kind of large-sized workshop that the utility model relates to, it comprises basis, switchgear house base, switchgear house skeleton of building, crane span structure, panel and HVAC structure, described basis is reinforced concrete foundation, described switchgear house base is arranged on basis, described switchgear house base is steel work, this structure has compared with high stable and safety factor, between described switchgear house base and basis, be provided with certain crane span structure space for erection bridge, crane span structure can be layed in this crane span structure space, there is simple installation, fast, stable, the feature such as attractive in appearance, according to the pre-testing cable preformed hole in equipment position, the method reduces switchgear house inner cable and lays, convenient construction, save cable, described switchgear house skeleton of building is arranged on switchgear house base, described switchgear house skeleton of building is steel work, thereby ensure stability and the requirement of strength of skeleton, described panel is dismountable drop front, described panel is arranged on switchgear house skeleton of building, drop front adopt have fireproof performance panel (as, fire prevention rock cotton board), panel is divided into some unit, can according to requirements dismantle separately, described HVAC structure comprises the in line pipeline of blower fan, exhaust apparatus and air-intake device, described exhaust apparatus is positioned on the panel of large and correlation technique requirement place of heat gain from appliance and equipment, described air-intake device is arranged on the panel of the relative side of exhaust apparatus, the air intake place of described air-intake device is provided with screen pack.The air outlet that described exhaust apparatus and air-intake device are corresponding and air intake are shown in respectively Fig. 6 and Fig. 7.
Specific construction step:
1, foundation construction.With reference to Fig. 1 mode, basic material is prepared and construction, and meets related specifications requirement.First, build concrete bed course, if desired utilize plate vibrator to vibrate floating.Secondly, site prefabrication reinforcing bar, puts into foundation ditch after tying up.Finally, template is installed and concreting.Concreting height is concordant with ground.
2, the installation of the switchgear house base of steel work.With reference to Fig. 2, Fig. 3.Vertically stud materials is selected " i iron ", installs and utilizes welding manner, is fixed on post gusset.Horizontal steelframe selects " channel-section steel " to be welded to connect work according to designing requirement, and lays " checkered steel plate " on horizontal steelframe after welding.
3, the installation of switchgear house skeleton of building.With reference to Fig. 4, Fig. 5.The installation of skeleton of building can be carried out this work before equipment is installed or after installing, and specifically adopts which kind of mode to determine according to concrete condition.Present case, because equipment is larger, and carries out the welding job of skeleton, material selection square tube after the installation of field condition restriction employing equipment.
4, the installation of crane span structure.Crane span structure is laid along the horizontal steelframe of steel work switchgear house in " the 2nd step " in present case and is fixed.Simultaneously according to the pre-testing cable preformed hole in equipment position.The method reduces switchgear house inner cable lays, and convenient construction, saves cable.
5, the installation of panel.After equipment is installed and debugged, drop front is installed; Panel, owing to being separate unit, therefore can select to facilitate position to install as required.The installation that is from left to right (people in the face of switchgear house) is installed in present case and completes according to direction, as shown in Figure 6.
6. the installation of HVAC structure.After switchgear house interior works all finishes, require air exhausting device is installed according to heat gain from appliance and equipment and correlation technique, see Fig. 6.Diagonal plane bottom at air outlet is installed into wind apparatus, at air intake place, screen pack is installed, and ensures indoor cleaning, sees Fig. 7.
From with traditional switchgear house comparing result, use the switchgear house of this invention, the usable floor area on ground is reduced to 90%, reach the object that makes full use of space, ensure equipment installation, maintenance object.
Claims (3)
1. the built on stilts photovoltaic generation distribution chamber in a large-sized workshop, it comprises basis, switchgear house base, switchgear house skeleton of building, crane span structure, panel and HVAC structure, described switchgear house base is arranged on basis, it is characterized in that being provided with between described switchgear house base and basis certain crane span structure space, described crane span structure is layed in this crane span structure space, described switchgear house skeleton of building is arranged on switchgear house base, described panel is arranged on switchgear house skeleton of building, and described HVAC structure comprises the in line pipeline of blower fan, exhaust apparatus and air-intake device.
2. the built on stilts photovoltaic generation distribution chamber in a kind of large-sized workshop according to claim 1, is characterized in that described basis is reinforced concrete foundation, and described switchgear house base is steel work, and described switchgear house skeleton of building is steel work.
3. the built on stilts photovoltaic generation distribution chamber in a kind of large-sized workshop according to claim 1, is characterized in that described air-intake device is arranged on the panel of the relative side of exhaust apparatus, and the air intake place of described air-intake device is provided with screen pack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320754826.8U CN203669427U (en) | 2013-11-27 | 2013-11-27 | Overhead photovoltaic power generation distribution room inside large factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320754826.8U CN203669427U (en) | 2013-11-27 | 2013-11-27 | Overhead photovoltaic power generation distribution room inside large factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203669427U true CN203669427U (en) | 2014-06-25 |
Family
ID=50965743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320754826.8U Expired - Fee Related CN203669427U (en) | 2013-11-27 | 2013-11-27 | Overhead photovoltaic power generation distribution room inside large factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203669427U (en) |
-
2013
- 2013-11-27 CN CN201320754826.8U patent/CN203669427U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105317110A (en) | Integrated assembly type steel structure building | |
CN207348267U (en) | A kind of lightgage steel joist irrigates internal partition wall structure | |
EP2547833A2 (en) | Sustainable modular structure powered by green energy | |
CN204927913U (en) | Transformer substation | |
CN205639870U (en) | A pipeline gallows is synthesized in heavy construction | |
CN109518811A (en) | A kind of easy-to-mount building structure | |
CN105863317A (en) | Energy-saving environmentally-friendly type distribution room based on quick construction technique | |
CN102493678B (en) | Fabricated construction method of ecological-type house | |
CN201518457U (en) | Solar energy generation device erected on traffic pavement | |
CN102903776B (en) | Solar combined heat and power supply and building integrated installation bracket | |
CN203669427U (en) | Overhead photovoltaic power generation distribution room inside large factory building | |
JP2012087466A (en) | Solar cell power generating system for group of apartment houses | |
CN104131711A (en) | Building based on integrated modules | |
CN203046928U (en) | Solar electric vehicle charging station | |
CN201874285U (en) | Plug-in type aseismic solar house | |
CN213646046U (en) | Multi-energy complementary energy-saving control equipment | |
CN203361343U (en) | Building based on integrated modules | |
CN202871822U (en) | Solar energy combined heat and power generation and building integrated mounting bracket | |
JP2013044187A (en) | Building | |
CN104821613A (en) | Charging system based on novel electric vehicle | |
CN217652436U (en) | Board house combined with solar panel | |
CN208981552U (en) | Solar energy precast wall body and modular architectural unit with it | |
CN205776753U (en) | A kind of solar energy rope membrane building with auxiliary electricity system | |
CN205777661U (en) | A kind of solar energy simple movable plank house of construction site high-efficiency energy-storage | |
CN214884325U (en) | Assembled integrated house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20180914 Granted publication date: 20140625 |
|
PP01 | Preservation of patent right | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20210914 Granted publication date: 20140625 |
|
PD01 | Discharge of preservation of patent | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 Termination date: 20181127 |
|
CF01 | Termination of patent right due to non-payment of annual fee |