CN203668978U - 一种用于地铁隧道的抗浮结构 - Google Patents

一种用于地铁隧道的抗浮结构 Download PDF

Info

Publication number
CN203668978U
CN203668978U CN201320744261.5U CN201320744261U CN203668978U CN 203668978 U CN203668978 U CN 203668978U CN 201320744261 U CN201320744261 U CN 201320744261U CN 203668978 U CN203668978 U CN 203668978U
Authority
CN
China
Prior art keywords
subway tunnel
pressing plate
soil
floating
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320744261.5U
Other languages
English (en)
Inventor
宁平华
陈水盛
刘芳
吴琦琪
彭聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Original Assignee
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Municipal Engineering Design & Research Institute Co Ltd filed Critical Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Priority to CN201320744261.5U priority Critical patent/CN203668978U/zh
Application granted granted Critical
Publication of CN203668978U publication Critical patent/CN203668978U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种用于地铁隧道的抗浮结构,包括设于地铁隧道上方的压板和与压板两侧端固定连接的锚杆,所述锚杆锚入固定于地铁隧道两侧的土体中,此抗浮结构通过在地铁隧道顶部设置一压板并通过锚杆固定,将原先不能用于地铁隧道抗浮的两侧土体重量,通过锚杆的锚定作用,约束了地铁隧道向上变形的趋势,相当于将两侧土体重量传递并压载于地铁隧道顶部的压板上,补偿了修建地下通道开挖卸除土体重量,从而消除了对地铁隧道抗浮失衡的影响,以保护地铁隧道不会因上方土体卸除而浮起,本实用新型用于地下隧道抗浮结构技术领域。

Description

一种用于地铁隧道的抗浮结构
技术领域
    本实用新型涉及地下隧道抗浮结构技术领域,特别一种用于地铁隧道的抗浮结构。
背景技术
    目前,地铁隧道的抗浮措施是利用深埋于地面以下且位于地铁隧道顶部以上的土体自身重量,使这些土体的重量足以抵抗地铁隧道在地下所可能受到的浮力,当地铁隧道顶部需要修建地下车行通道工程时,由于建造通道需要挖除土体,一方面,当地铁隧道顶面土体重量的减小时,容易导致地铁隧道上浮失去平衡,另一方面,出于保护地铁运营安全的原因,不能在近邻地铁隧道两侧设置安装常规的抗浮杆体,因此,现有的做法通常是修改地下车行通道的路线以避让地铁隧道,或是减小地下车行通道的通行净高,即减小卸土重量,以保证地铁隧道顶面的土体重量来满足地铁隧道的抗浮要求。
实用新型内容
本实用新型所要解决的技术问题是提供一种结构简单、施工方便快捷且不影响地铁隧道上方修建通道的抗浮结构。
为解决上述技术问题所采用的技术方案:一种用于地铁隧道的抗浮结构,包括设于地铁隧道上方的压板和分别与压板两侧端固定连接的若干锚杆,各所述锚杆锚入固定于地铁隧道两侧的土体中。
进一步作为本实用新型技术方案的改进,所述压板包括一底板和自底板两边缘侧端向上延伸的侧板,各所述锚杆的一端固定连接于侧板上,各所述锚杆另一端横斜向锚入至远离地铁隧道两侧的土体中。
进一步作为本实用新型技术方案的改进,位于所述地铁隧道上方的土体通过注浆固化形成加固土体。
进一步作为本实用新型技术方案的改进,所述压板为预制混凝土压板或现浇混凝土压板。
有益效果:此抗浮结构通过在地铁隧道顶部设置一压板并通过锚杆固定,将原先不能用于地铁隧道抗浮的两侧土体重量,通过锚杆的锚定作用,约束了地铁隧道向上变形的趋势,相当于将远离地铁隧道两侧土体重量传递并压载于地铁隧道顶部的压板上,补偿了修建地下通道开挖卸除土体重量,从而消除了对地铁隧道抗浮失衡的影响,以保护地铁隧道不会因上方土体卸除而浮起。整个抗浮结构只需在地铁隧道顶部土层进行施工操作,方便快捷。通过设置抗浮结构使得既有地铁隧道也不因新修建的车行通道而降低其地下结构抗浮性能及水平。
附图说明
下面结合附图和实施例对本实用新型做进一步的说明;
图1为本实用新型实施例的结构示意图。
具体实施方式
参照图1,本实用新型一种用于地铁隧道的抗浮结构,包括设于地铁隧道30上方的压板10和分别与压板10两侧端固定连接的若干锚杆20,各锚杆20锚入固定于地铁隧道30两侧的土体中。
此抗浮结构通过在地铁隧道30顶部设置一压板10并通过锚杆20固定,将原先不能用于地铁隧道抗浮的两侧土体重量,通过锚杆20的锚定作用,约束了地铁隧道30向上变形的趋势,相当于将两侧土体重量传递并压载于地铁隧道30顶部的压板10上,补偿了修建地下通道开挖卸除土体重量,从而消除了对地铁隧道抗浮失衡的影响,以保护地铁隧道30不会因上方土体卸除而浮起。整个抗浮结构只需在地铁隧道30顶部土层进行施工操作,方便快捷。通过设置抗浮结构使得既有地铁隧道30也不因新修建的车行通道而降低其地下结构抗浮性能及水平。
作为本实用新型的优选实施方式,压板10包括一底板11和自底板11两边缘侧端向上延伸的侧板12,各锚杆20的一端固定连接于侧板12上,各锚杆20另一端横斜向锚入至远离地铁隧道30两侧的土体中。
在本实施例中,压板10横截面呈U形,由底板11和侧板12组成,锚杆20是由杆体(一般是钢绞线、钢筋或钢管)、注浆固结体、锚具、套管所组成,其一端与压板10固定连接,另一端锚固在稳定岩土体内,当地铁隧道30受到地下水浮力作用并有向上变形趋势的同时,锚杆20将会随之产生与岩土体的摩擦力与锚固力,并通过锚具作用,把锚固的拉力传递到地铁隧道30顶部的压板10上面,在侧板12上的预定锚杆位置处钻孔以固定安装锚杆20,侧板12上的锚杆20可通过调整钻孔与侧板12交角角度,使锚杆20尽量嵌固在密实坚硬的岩土层内,获得较大的摩阻效应,锚杆20应横斜向锚入至两侧土体中,从而与地铁隧道保持一定距离,使之锚固在密实的土体中,增大锚固力。为提高锚杆20的锚固力,可扩大锚杆20端头直径,形成锚塞,紧扣端部坚硬岩土内。
作为本实用新型的优选实施方式,位于地铁隧道30上方的土体通过注浆固化形成加固土体。
当地铁隧道30上方土体较离散、松软时,可通过注浆固化土体,提高土体强度和密度以及回弹模量等岩土力学指标,更能有效地增加抗浮效果。
作为本实用新型的优选实施方式,压板10为预制混凝土压板或现浇混凝土压板。
压板10根据需要保护的地铁隧道30宽度,可制成预制压板吊装放置现场安装,或现场浇筑形成,其自身应能承受足够的压力,在安装锚杆20处,特别需要局部加固强度。
上面结合附图对本实用新型的实施方式作了详细说明,但是本实用新型不限于上述实施方式,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。

Claims (4)

1.一种用于地铁隧道的抗浮结构,其特征在于:包括设于地铁隧道(30)上方的压板(10)和分别与压板(10)两侧端固定连接的若干锚杆(20),各所述锚杆(20)锚入固定于地铁隧道(30)两侧的土体中。
2.根据权利要求1所述的用于地铁隧道的抗浮结构,其特征在于:所述压板(10)包括一底板(11)和自底板(11)两边缘侧端向上延伸的侧板(12),各所述锚杆(20)的一端固定连接于侧板(12)上,各所述锚杆(20)另一端横斜向锚入至远离地铁隧道(30)两侧的土体中。
3.根据权利要求1或2所述的用于地铁隧道的抗浮结构,其特征在于:位于所述地铁隧道(30)上方的土体通过注浆固化形成加固土体。
4.根据权利要求3所述的用于地铁隧道的抗浮结构,其特征在于:所述压板(10)为预制混凝土压板或现浇混凝土压板。
CN201320744261.5U 2013-11-21 2013-11-21 一种用于地铁隧道的抗浮结构 Expired - Lifetime CN203668978U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320744261.5U CN203668978U (zh) 2013-11-21 2013-11-21 一种用于地铁隧道的抗浮结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320744261.5U CN203668978U (zh) 2013-11-21 2013-11-21 一种用于地铁隧道的抗浮结构

Publications (1)

Publication Number Publication Date
CN203668978U true CN203668978U (zh) 2014-06-25

Family

ID=50965294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320744261.5U Expired - Lifetime CN203668978U (zh) 2013-11-21 2013-11-21 一种用于地铁隧道的抗浮结构

Country Status (1)

Country Link
CN (1) CN203668978U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594920A (zh) * 2014-11-28 2015-05-06 浙江省建筑设计研究院 防止隧道上浮的方法及装置
CN110409418A (zh) * 2019-06-12 2019-11-05 苏州市轨道交通集团有限公司 控制既有地铁隧道变形的地基加固结构及施工方法
CN113685190A (zh) * 2021-08-28 2021-11-23 华东交通大学 一种盾构穿越浅覆软弱粘土的加固体系及施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594920A (zh) * 2014-11-28 2015-05-06 浙江省建筑设计研究院 防止隧道上浮的方法及装置
CN104594920B (zh) * 2014-11-28 2016-08-24 浙江省建筑设计研究院 防止隧道上浮的方法及装置
CN110409418A (zh) * 2019-06-12 2019-11-05 苏州市轨道交通集团有限公司 控制既有地铁隧道变形的地基加固结构及施工方法
CN113685190A (zh) * 2021-08-28 2021-11-23 华东交通大学 一种盾构穿越浅覆软弱粘土的加固体系及施工方法
CN113685190B (zh) * 2021-08-28 2024-02-09 华东交通大学 一种盾构穿越浅覆软弱粘土的加固体系及施工方法

Similar Documents

Publication Publication Date Title
CN100535263C (zh) 竖向预应力锚索抗滑桩滑坡防治施工方法
CN201224889Y (zh) 一种高填方支挡工程中的高轻型锚定板挡墙
CN207633352U (zh) 一种用于快速抢险施工的边坡加固结构
CN104120731A (zh) 一种隧道沉降防护装置及其施工方法
CN204898537U (zh) 一种半柔半刚性棚洞防护结构
CN102330436A (zh) 一种用于半岩土层超深圆形旋流池的组合支护结构及方法
CN103306283B (zh) 一种提高非金属抗浮锚杆抗剪强度的方法
CN203668978U (zh) 一种用于地铁隧道的抗浮结构
CN102304927A (zh) 适用于岩石地基上的预应力锚索扶壁式挡墙
CN109989407B (zh) 铁路新增二线台后路基桩管帷幕支护结构
CN104131566B (zh) 一种地下室无水平支撑基坑的施工方法
CN101691760B (zh) 一种锚杆联合掏挖复合基础及其施工方法
CN103306295A (zh) 刚架桩支挡结构
CN110230273A (zh) 一种小型危岩落石的防护结构
CN207260183U (zh) 一种外挂式挡板预应力锚索桩板挡土墙
CN111549804B (zh) 一种路堑边坡加强型被动防护系统及其施工方法
CN201502065U (zh) 一种锚杆联合开挖类复合基础
CN103147443B (zh) 基坑支护结构及其施工方法
CN206220104U (zh) 一种冻土帷幕复合土钉墙支护结构体系
CN109750568A (zh) 一种具有桩基盖梁的路基结构及其施工方法
CN202131610U (zh) 适用于岩石地基上的预应力锚索扶壁式挡墙
CN210459233U (zh) 一种软土地区用桩锚基坑支护结构
CN108570964A (zh) 一种基于岸坡支护的生态挡墙及施工方法
CN204898700U (zh) 一种桥梁基础结构
CN211571780U (zh) 一种锚杆和锚索联合支护肋板式挡土墙结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 510060, No. 348, East Ring Road, Yuexiu District, Guangdong, Guangzhou

Patentee after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute

Address before: 510060, No. 348, East Ring Road, Yuexiu District, Guangdong, Guangzhou

Patentee before: GUANGZHOU MUNICIPAL ENG DESIGN & Research Institute

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 510060, No. 348, East Ring Road, Yuexiu District, Guangdong, Guangzhou

Patentee before: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140625