CN203613792U - Parapet wall formwork pouring structure - Google Patents

Parapet wall formwork pouring structure Download PDF

Info

Publication number
CN203613792U
CN203613792U CN201320713037.XU CN201320713037U CN203613792U CN 203613792 U CN203613792 U CN 203613792U CN 201320713037 U CN201320713037 U CN 201320713037U CN 203613792 U CN203613792 U CN 203613792U
Authority
CN
China
Prior art keywords
parapet
steel bar
formwork
pouring
reinforcing steel
Prior art date
Application number
CN201320713037.XU
Other languages
Chinese (zh)
Inventor
李景轩
Original Assignee
中国建筑第八工程局有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国建筑第八工程局有限公司 filed Critical 中国建筑第八工程局有限公司
Priority to CN201320713037.XU priority Critical patent/CN203613792U/en
Application granted granted Critical
Publication of CN203613792U publication Critical patent/CN203613792U/en

Links

Abstract

The utility model discloses a parapet wall formwork pouring structure, comprising an external formwork, an internal formwork and a pouring space, wherein the external formwork and the internal formwork are arranged on a floor; the pouring space is formed between the external formwork and the internal formwork in a clamping way; the external formwork consists of a plurality of reinforcing steel bar truss plate units; reinforcing steel bar truss plates respectively comprise a base plate and a reinforcing steel bar truss; the peripheries of the base plates are respectively wrapped with angle steel; the reinforcing steel bar truss plates which are mutually and adjacently connected are fixed in a way of connecting with the angle steel; the parts, connected with a parapet wall, on the floor are provided with embedded reinforcing steel bars; the bottoms of the reinforcing steel bar truss plates are fixedly connected with the floor through the embedded reinforcing steel bars. The parapet wall formwork pouring structure has the advantages of simplicity in construction, high speed, low cost and the like, without the need of setting up scaffolds on the outer side of the parapet wall; the operation is only implemented on the inner side of the parapet wall, so that the normal construction of outdoor work is not affected.

Description

Parapet template pouring structure

Technical field

The utility model relates to a kind of steel concrete shuttering pouring structure, espespecially a kind of parapet template pouring structure.

Background technology

In modern construction engineering work progress, parapet generally adopts cast-in-place concrete structure, need to set up in parapet outside handling frame and the protection of scaffold as parapet construction, will expend so a large amount of circulation materials and manually set up and remove, also affected the timely construction of exterior decoration fitting-out work simultaneously, must wait until after external scaffolding is removed and can carry out the construction of exterior components, have a strong impact on the whole duration, and uneconomical, not environmental protection.

Summary of the invention

The purpose of this utility model is to overcome the defect of prior art, and a kind of parapet template pouring structure is provided.

The technical scheme that realizes above-mentioned purpose is:

A kind of parapet template pouring structure of the present utility model, comprises that the exterior sheathing, inner formword and the sandwiched that are arranged on floor are formed at the space of building between exterior sheathing and inner formword; Described exterior sheathing is made up of a plurality of steel bar girder plates unit, and described steel bar girder plate comprises:

Substrate, described substrate comprises that one just to described the first side of building space, and the second side of relatively described first side;

Steel bar girder, is incorporated into the first side of described substrate.

Described parapet template pouring structure, is characterized in that, the periphery of described substrate is coated with angle steel, described in be connected and fixed by described angle steel between the steel bar girder plate that adjoins each other.

Described parapet template pouring structure, is characterized in that, on described floor, be provided with embedded bar in conjunction with parapet position, the bottom of described steel bar girder plate is fixedly connected on described floor by described embedded bar.

Described parapet template pouring structure, it is characterized in that, between described inside and outside template, wear split bolt, the first end of described split bolt is fixedly connected on described steel bar girder, the second end of described split bolt runs through described inner formword, and is fixed on the lateral surface of described inner formword by fixture.

The utility model has been owing to having adopted above technical scheme, makes it have following beneficial effect to be:

1, without setting up scaffold in parapet outside, only carry out the operations such as reinforcing bar and template in parapet inner side, do not affect the normal construction of exterior components, accelerated programming;

2, according to designing requirement, in factory, carry out the processing of steel bar girder plate, be spliced at the scene independently modular unit after transporting to job site, reduce on-the-spot template and reinforcing work amount, efficiency is higher, quality is guaranteed, cost is lower;

3, can adjust according to the thickness of parapet thickness and the arrangement of reinforcement of steel bar girder plate.

Therefore a kind of parapet steel bar girder plated construction of the present utility model has the stronger market competitiveness and good popularizing application prospect.

Accompanying drawing explanation

Fig. 1 is the generalized section of the utility model parapet template pouring structure;

Fig. 2 is the outer elevational schematic view of the utility model parapet template pouring structure;

The specific embodiment

Below in conjunction with specific embodiment, the utility model is described in further detail.

Refer to Fig. 1, a kind of parapet template pouring structure of the present utility model, comprises the exterior sheathing 10, the inner formword 20 that are arranged on floor 40, and sandwiched is formed at and builds space 30 between exterior sheathing 10 and inner formword 20.

Refer to Fig. 2, described exterior sheathing 10 is made up of a plurality of steel bar girder plates unit, and described steel bar girder plate comprises substrate 11 and steel bar girder 12.Described substrate 11 comprises that one just to described the first side 111 of building space 30, and the second side 112 of relatively described first side 111; Described steel bar girder 12, is incorporated into the first side 111 of described substrate 11.The periphery of described substrate 11 is coated with angle steel 13, described in be connected and fixed by described angle steel 13 between the steel bar girder plate that adjoins each other, the thickness of steel bar girder plate and arrangement of reinforcement are prefabricated in factory according to the designing requirement of parapet.

On described floor 40, be provided with embedded bar 41 in conjunction with parapet position, the bottom of described steel bar girder plate is fixedly connected on described floor 40 by described embedded bar 41.

Then between described exterior sheathing 10 and inner formword 20, build the colligation of carrying out other reinforcing bars of parapet in space 30, finally carry out the construction of inner formword 20 in parapet inner side, described inner formword 20 comprises respectively wood glue plate 21, flitch 22, split bolt 23, steel pipe 24 and reinforcing bar anchor ring 25 etc.

Described split bolt 23 is arranged between described inner formword 20 and described exterior sheathing 10, the first end 231 of described split bolt 23 is fixedly connected on described steel bar girder 12, the second end 232 of described split bolt 23 runs through wood glue plate 21 and the flitch 22 of described inner formword, and is fixed on the lateral surface of described inner formword by fixture 233.Described parapet template pouring structure can regulate the distance between described exterior sheathing 10 and inner formword 20 by many groups Screw arbor with nut at both-ends 23, to meet the designing requirement of parapet thickness.

Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thereby some details in embodiment should not form restriction of the present utility model, the utility model by the scope defining using appended claims as protection domain of the present utility model.

Claims (4)

1. a parapet template pouring structure, comprises that the exterior sheathing, inner formword and the sandwiched that are arranged on floor are formed at the space of building between exterior sheathing and inner formword; It is characterized in that, described exterior sheathing is made up of a plurality of steel bar girder plates unit, and described steel bar girder plate comprises:
Substrate, described substrate comprises that one just to described the first side of building space, and the second side of relatively described first side;
Steel bar girder, is incorporated into the first side of described substrate.
2. parapet template pouring structure as claimed in claim 1, is characterized in that, the periphery of described substrate is coated with angle steel, described in be connected and fixed by described angle steel between the steel bar girder plate that adjoins each other.
3. parapet template pouring structure as claimed in claim 2, is characterized in that, on described floor, be provided with embedded bar in conjunction with parapet position, the bottom of described steel bar girder plate is fixedly connected on described floor by described embedded bar.
4. parapet template pouring structure as claimed in claim 1, it is characterized in that, between described inside and outside template, wear split bolt, the first end of described split bolt is fixedly connected on described steel bar girder, the second end of described split bolt runs through described inner formword, and is fixed on the lateral surface of described inner formword by fixture.
CN201320713037.XU 2013-11-12 2013-11-12 Parapet wall formwork pouring structure CN203613792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320713037.XU CN203613792U (en) 2013-11-12 2013-11-12 Parapet wall formwork pouring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320713037.XU CN203613792U (en) 2013-11-12 2013-11-12 Parapet wall formwork pouring structure

Publications (1)

Publication Number Publication Date
CN203613792U true CN203613792U (en) 2014-05-28

Family

ID=50766447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320713037.XU CN203613792U (en) 2013-11-12 2013-11-12 Parapet wall formwork pouring structure

Country Status (1)

Country Link
CN (1) CN203613792U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464133A (en) * 2015-12-31 2016-04-06 上海建工集团股份有限公司 Construction method for long-distance underground passage side wall assembly type formwork
CN106677440A (en) * 2016-12-30 2017-05-17 河北恒山建设集团有限公司 Roofing parapet water-floating structure and construction method thereof
CN107869250A (en) * 2016-09-23 2018-04-03 俊川建筑科技有限公司 A kind of bracing reinforcement system
CN109113335A (en) * 2018-07-10 2019-01-01 中国二十冶集团有限公司 Parapet falsework and construction method
CN110469063A (en) * 2019-08-30 2019-11-19 中国化学工程第三建设有限公司 Daughter's wall construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464133A (en) * 2015-12-31 2016-04-06 上海建工集团股份有限公司 Construction method for long-distance underground passage side wall assembly type formwork
CN105464133B (en) * 2015-12-31 2017-10-31 上海建工集团股份有限公司 A kind of lower channel side wall assembled template construction method over long distances
CN107869250A (en) * 2016-09-23 2018-04-03 俊川建筑科技有限公司 A kind of bracing reinforcement system
CN106677440A (en) * 2016-12-30 2017-05-17 河北恒山建设集团有限公司 Roofing parapet water-floating structure and construction method thereof
CN109113335A (en) * 2018-07-10 2019-01-01 中国二十冶集团有限公司 Parapet falsework and construction method
CN110469063A (en) * 2019-08-30 2019-11-19 中国化学工程第三建设有限公司 Daughter's wall construction method

Similar Documents

Publication Publication Date Title
CN204212405U (en) Box assembling die
CN102121315B (en) Hole reserving construction method for tightly-fixed steel sleeve
CN100469995C (en) Construction method for after-pouring band beam-slab template
CN105756244A (en) Double-steel-plate shear wall combined structure
CN202767522U (en) Shear wall reinforcing system in deformation joint
CN201972269U (en) Prefabricated reinforcing steel bar concrete shear wall
CN203729468U (en) Connecting structure for steel and bamboo combined floor and steel and bamboo combined beam
CN102230315A (en) Prefabricated part and semi-prefabricated construction method for multistory building
CN102251606A (en) Outer partition wall built by adopting light concrete partition wall boards and construction method thereof
CN105019573A (en) Prefabricated external wall template structure system with heat insulation function, and construction method thereof
CN104989102A (en) Improved concrete wall and column construction method
CN204299039U (en) A kind of for after water the concrete prefabricated board of assembling
CN103243838A (en) Connection structure of integrally assembled concrete frame and shear wall
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN102661010B (en) Composite shear wall
CN103161309A (en) Narrow deformation joint inner side template installation and construction method
CN103031952B (en) Assembling exempts from the preparation method supporting prefabricated light composite floor slab with ribbing
CN101852012A (en) Plastic exposed concrete building template
CN104358330A (en) Reinforcement pin connection member for precast concrete walls with formworks and connection method
CN104895279B (en) The cladding attachment structure and its construction method of precast wall panel and precast beam
CN105696789A (en) Vertical aluminum mould building system and construction method thereof
CN104895193B (en) Prefabricated outer wall panel connects box and connecting node
CN105926936A (en) Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system
CN102011442A (en) Light steel-concrete combination structure shear wall and manufacturing method thereof
CN104652815A (en) Construction method for pouring water-stopping upstanding beams in kitchens and toilets

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model