CN115126220B - Parapet sliding formwork structure for steel structure building and construction method thereof - Google Patents

Parapet sliding formwork structure for steel structure building and construction method thereof Download PDF

Info

Publication number
CN115126220B
CN115126220B CN202210802210.7A CN202210802210A CN115126220B CN 115126220 B CN115126220 B CN 115126220B CN 202210802210 A CN202210802210 A CN 202210802210A CN 115126220 B CN115126220 B CN 115126220B
Authority
CN
China
Prior art keywords
steel
template
positioning
shaping steel
parapet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210802210.7A
Other languages
Chinese (zh)
Other versions
CN115126220A (en
Inventor
马迅
熊正朝
王冰骋
田兴
付鸣
明皓
依力亚斯·库尔班
郭福天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN202210802210.7A priority Critical patent/CN115126220B/en
Publication of CN115126220A publication Critical patent/CN115126220A/en
Application granted granted Critical
Publication of CN115126220B publication Critical patent/CN115126220B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22—Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention belongs to the technical field of constructional engineering, in particular to a parapet sliding formwork structure for a steel structure building and a construction method thereof, comprising an outer shaping steel formwork; the outer shaping steel template is placed outside the steel bars at the edge of the roof, and a cable rope is fixedly connected to the top end of the outer shaping steel template; through the structural design of outer design steel form, interior profiling steel form and hydraulic drive device, form between outer design steel form and the interior profiling steel form and pour the space, constructor pours the concrete in to pouring the space, hydraulic drive device can drive outer design steel form and interior profiling steel form motion, pour next department position, the function that can pour the concrete has been realized need not to build the scaffold frame, it needs to consume a large amount of time to have solved the parapet construction and has set up the scaffold frame specially, be unfavorable for construction cost's control, in the work process, the workman needs to be in parapet outside operation, comparatively dangerous problem.

Description

Parapet sliding formwork structure for steel structure building and construction method thereof
Technical Field
The invention relates to the technical field of constructional engineering, in particular to a parapet sliding formwork structure for a steel structure building and a construction method thereof.
Background
The development of building industrialization brings about continuous optimization of an assembled building structure, and steel structure buildings are used as important components of the assembled building, so that the advantages of low resource consumption, less environmental pollution and fast construction rhythm are widely applied, and parapet walls are short walls around the four sides of a building roof.
At present, the parapet wall construction of the steel structure building generally adopts a construction mode of concrete cast-in-place construction, when concrete pouring is carried out on the parapet wall, reinforcing steel bars are required to be bound, a scaffold is required to be built, and finally, pouring is carried out on the parapet wall.
However, a lot of time is consumed for building the scaffold specially for the parapet wall construction, so that the control of construction cost is not facilitated, and in the construction process, workers need to work on the outer side of the parapet wall, so that the parapet wall construction is dangerous; therefore, a parapet sliding formwork structure for a steel structure building and a construction method thereof are provided for the problems.
Disclosure of Invention
In order to make up the defects of the prior art, a great deal of time is required for building a scaffold specially for parapet construction, the control of construction cost is not facilitated, in the construction process, workers need to operate on the outer side of the parapet, and the parapet sliding template structure for the steel structure building and the construction method thereof are provided.
The technical scheme adopted for solving the technical problems is as follows: the invention relates to a parapet sliding formwork structure for a steel structure building, which comprises an outer shaping steel formwork; the outer shaping steel forms are placed on the outer sides of steel bars at the edges of the roof, a cable rope is fixedly connected to the top ends of the outer shaping steel forms, one end of the cable rope is fixedly connected with the roof, an outer form support is arranged below the outer shaping steel forms, the outer form support is fixedly connected to steel beams of a building, the outer form support is used for clamping and locking the outer shaping steel forms, one side of each outer shaping steel form is provided with an inner shaping steel form located on the inner side of the steel bars at the edges of the roof, the top of each outer shaping steel form is fixedly connected with the top of each inner shaping steel form through a shaping fixture, one side of each inner shaping steel form is provided with a hydraulic driving device, channel steel and bolt holes, the bolt holes are formed in the constructed parapet wall, the hydraulic driving device is mounted on the constructed parapet wall through the channel steel and the bolt holes, a counter-pulling screw assembly is fixedly connected between each outer shaping steel form and each inner shaping steel form, and the inner shaping steel forms are provided with positioning mechanisms;
the positioning mechanism comprises four guide rods fixedly connected to the inner shaping steel templates, two adjacent guide rods are connected to the surfaces of the guide rods in a sliding manner, two first springs are fixedly connected between the moving plates and the inner shaping steel templates, the first springs are sleeved on the outer sides of the guide rods, L-shaped plates are fixedly connected to the moving plates, moving columns are fixedly connected to the moving plates, the moving columns penetrate through the inner shaping steel templates in a sliding manner, positioning columns are fixedly connected to one ends of the moving columns, positioning holes are formed in the outer shaping steel templates, and the positioning columns are inserted into the positioning holes.
Preferably, the internal-positioning steel template is provided with a limiting component, the limiting component comprises two fixing plates fixedly connected to the internal-positioning steel template, a connecting column is inserted on the fixing plates in a sliding mode, a pulling plate is fixedly connected to the bottom end of the connecting column, a square plate is fixedly connected to the top end of the connecting column, a second spring is fixedly connected between the bottom of the square plate and the top of the fixing plate, the second spring is sleeved on the outer side of the connecting column, an inserting column is fixedly connected to the top of the square plate, the top end of the inserting column is in tight contact with the bottom of the moving column, and a slot matched with the inserting column is formed in the bottom of the moving column.
Preferably, two first round holes are formed in the moving plate, and the guide rod penetrates through the first round holes.
Preferably, two first rectangular openings are formed in the inner-positioning steel template, and the moving column penetrates through the first rectangular openings in a sliding mode.
Preferably, one end of the positioning column is provided with a round head.
Preferably, the fixing plate is provided with a second rectangular opening, and the connecting column penetrates through the second rectangular opening in a sliding mode.
Preferably, the top end of the plunger is provided with a round head.
A construction method for a parapet sliding formwork structure of a steel structure building comprises the following steps:
s1: the outer formwork support is installed and fixed on a steel beam of a building, after the parapet wall steel bar is constructed, the outer shaping steel formwork is hoisted to a designated position through a tower crane, and a cable rope is installed between the top of the outer shaping steel formwork and the roof to ensure safety;
s2: hoisting the inner positioning steel template to a designated position through a tower crane, positioning the outer shaping steel template and the inner positioning steel template through a positioning mechanism, positioning the inserting columns outside the slots before positioning, aligning and inserting two positioning columns of the inner positioning steel template into positioning holes when positioning is required, positioning the outer shaping steel template and the inner positioning steel template, and installing shaping fixtures on the outer shaping steel template and the inner positioning steel template;
s3: the method comprises the steps that opposite-pulling screw rod assemblies are installed on an outer shaping steel template and an inner shaping steel template, an operator stands on a roof to sequentially pass the opposite-pulling screw rod assemblies through the inner shaping steel template, parapet steel bars and the outer shaping steel template from the inner side, meanwhile, the outer side of the opposite-pulling screw rod assemblies is connected with inner threads of prefabricated nuts on the outer shaping steel template, and the inner side of the opposite-pulling screw rod assemblies is fixed by a mountain-shaped clamp;
s4: the hydraulic driving device is installed and fixed on the constructed parapet through bolt holes and channel steel, so that hydraulic rods of the hydraulic driving devices on two sides are perpendicular to the outer shaping steel template and the inner shaping steel template;
s5: the outer template support is L-shaped, after the outer shaping steel template and the inner shaping steel template are accurately positioned, the steel rod of the outer template support is extended, so that the outer shaping steel template is fixedly locked by the L-shaped outer template support, and concrete pouring can be performed;
s6: after the concrete pouring is completed and the set strength is reached, a constructor removes the split screw assembly on the roof at the inner side of the parapet wall, taps the outer shaping steel template and the inner shaping steel template, removes the outer template support, and starts the hydraulic driving device to enable the outer shaping steel template and the inner shaping steel template to uniformly and synchronously slide on the outer template support;
s7: after the hydraulic rod of the hydraulic driving device extends to the limit, the position of the hydraulic driving device is adjusted, the two steel templates are pushed to the concrete construction position of the next parapet, the external shaping steel templates are locked through the external template support, and pouring operation is repeated.
The invention has the advantages that:
1. according to the invention, through the structural design of the outer shaping steel template, the inner shaping steel template and the hydraulic driving device, a pouring space is formed between the outer shaping steel template and the inner shaping steel template, a constructor pours concrete into the pouring space, the hydraulic driving device can drive the outer shaping steel template and the inner shaping steel template to move, and the next position is poured, so that the function of pouring concrete without building a scaffold is realized, the problem that a lot of time is required for building the scaffold specially for parapet wall construction, the control of construction cost is not facilitated, in the construction process, workers need to operate outside the parapet wall, and the efficiency of parapet wall construction is improved;
2. according to the positioning mechanism, through the structural design of the positioning mechanism, when the outer shaping steel template and the inner shaping steel template are positioned, the positioning columns are aligned to the positioning holes and inserted into the positioning holes, positioning is completed, when the outer shaping steel template and the inner shaping steel template are required to be disassembled, the L-shaped plates are pulled, the positioning columns leave the positioning holes, under the action of the second springs, the inserting columns are inserted into the slots, the positioning columns are limited, the state of leaving the positioning holes is kept, and the function of rapidly positioning the outer shaping steel template and the inner shaping steel template is realized.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic view of an outer shaping steel form and a bracket according to the first embodiment;
FIG. 2 is a schematic view of the view angle at the time of construction according to the first embodiment;
FIG. 3 is a schematic view of the exterior view of the first embodiment during construction;
FIG. 4 is a schematic view of a first embodiment of a bracket in place;
FIG. 5 is a schematic view showing the support of the first embodiment in place;
FIG. 6 is a schematic diagram of a positioning mechanism according to the first embodiment;
FIG. 7 is an enlarged schematic view of FIG. 6A according to the first embodiment;
fig. 8 is a schematic diagram of the structure of a moving plate and a moving column according to the first embodiment;
FIG. 9 is a schematic view of the structure of the outer shaping steel form and the inner shaping steel form according to the first embodiment;
fig. 10 is a schematic diagram of a fixing plate structure according to the first embodiment.
In the figure: 1. an outer shaping steel template; 2. an outer formwork support; 3. a cable rope; 4. shaping the fixture; 5. a hydraulic drive device; 6. channel steel; 7. internal setting of a steel template; 8. a split screw assembly; 9. bolt holes; 10. a guide rod; 11. a moving plate; 12. a first spring; 13. an L-shaped plate; 14. a moving column; 15. positioning columns; 16. positioning holes; 17. a fixing plate; 18. a connecting column; 19. pulling a plate; 20. a square plate; 21. a second spring; 22. inserting a column; 23. a slot; 24. a first round hole; 25. a first rectangular port; 26. a second rectangular opening.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Example 1
Referring to fig. 1 to 10, a parapet sliding formwork structure for a steel structure building comprises an outer shaping steel formwork 1; the steel bar fixing device is characterized in that the outer shaping steel template 1 is placed on the outer side of a steel bar at the edge of a roof, a cable rope 3 is fixedly connected to the top end of the outer shaping steel template 1, one end of the cable rope 3 is fixedly connected with the roof, an outer template support 2 is arranged below the outer shaping steel template 1, the outer template support 2 is fixedly connected to a steel beam of a building, the outer shaping steel template 1 is locked in a clamping mode, one side of the outer shaping steel template 1 is provided with an inner positioning steel template 7 positioned on the inner side of the steel bar at the edge of the roof, the tops of the outer shaping steel template 1 and the inner positioning steel template 7 are fixedly connected through a shaping fixture 4, one side of the inner positioning steel template 7 is provided with a hydraulic driving device 5, a channel steel 6 and bolt holes 9, the bolt holes 9 are positioned on a constructed parapet, the hydraulic driving device 5 is installed on the constructed parapet through the channel steel 6 and the bolt holes 9, a counter-pulling screw assembly 8 is fixedly connected between the outer shaping steel template 1 and the inner positioning steel template 7, and the positioning steel template 7 are provided with positioning mechanisms;
the positioning mechanism comprises four guide rods 10 fixedly connected to the inner shaping steel template 7, the surfaces of two adjacent guide rods 10 are connected with a moving plate 11 in a sliding manner, two first springs 12 are fixedly connected between the moving plate 11 and the inner shaping steel template 7, the first springs 12 are sleeved on the outer sides of the guide rods 10, an L-shaped plate 13 is fixedly connected to the moving plate 11, a moving column 14 is fixedly connected to the moving plate 11, the moving column 14 penetrates through the inner shaping steel template 7 in a sliding manner, one end of the moving column 14 is fixedly connected with a positioning column 15, a positioning hole 16 is formed in the outer shaping steel template 1, and the positioning column 15 is inserted into the positioning hole 16;
during operation, before the outer shaping steel template 1 and the inner shaping steel template 7 are positioned, the inserting columns 22 are closely contacted with the tops of the moving columns 14, when the outer shaping steel template 1 and the inner shaping steel template 7 are required to be positioned, the two positioning columns 15 of the inner shaping steel template 7 are inserted into the corresponding positioning holes 16, the outer shaping steel template 1 and the inner shaping steel template 7 can be positioned, the outer shaping steel template 1 and the inner shaping steel template 7 can be fixed through the shaping fixture 4, after construction is completed, when the outer shaping steel template 1 and the inner shaping steel template 7 are required to be detached from the parapet wall, the positioning mechanism is required to be released, the L-shaped plate 13 is pulled, the L-shaped plate 13 drives the moving plates 11 and the moving columns 14 to move, the moving columns 14 drive the positioning columns 15 to leave the positioning holes 16, and the positioning columns 15 are limited through the limiting component.
The inner positioning steel template 7 is provided with a limiting assembly, the limiting assembly comprises two fixed plates 17 fixedly connected to the inner positioning steel template 7, a connecting column 18 is inserted on the fixed plates 17 in a sliding manner, a pull plate 19 is fixedly connected to the bottom end of the connecting column 18, a square plate 20 is fixedly connected to the top end of the connecting column 18, a second spring 21 is fixedly connected between the bottom of the square plate 20 and the top of the fixed plate 17, the second spring 21 is sleeved outside the connecting column 18, an inserting column 22 is fixedly connected to the top of the square plate 20, the top end of the inserting column 22 is in tight contact with the bottom of the moving column 14, and a slot 23 matched with the inserting column 22 is formed in the bottom of the moving column 14;
when the positioning mechanism is in operation, after the positioning mechanism is released, the slot 23 at the bottom of the movable column 14 is aligned with the inserting column 22, the inserting column 22 is inserted into the slot 23 under the action of the second spring 21, the positioning column 15 is limited, the positioning column 15 is kept away from the positioning hole 16, the outer shaping steel template 1 and the inner shaping steel template 7 can be removed, when positioning is needed, the pull plate 19 is only pulled downwards, the pull plate 19 drives the connecting column 18 and the square plate 20 to move downwards, the square plate 20 drives the inserting column 22 to leave the slot 23, the limitation on the positioning column 15 is released, and the positioning column 15 moves under the action of the first spring 12, so that positioning operation can be performed.
Two first round holes 24 are formed in the moving plate 11, and the guide rod 10 penetrates through the first round holes 24;
during operation, the guide rod 10 slides in the first round hole 24 during the movement of the moving plate 11, and limits the moving plate 11 in the horizontal direction.
Two first rectangular openings 25 are formed in the inner-positioning steel template 7, and the moving column 14 penetrates through the first rectangular openings 25 in a sliding mode;
during operation, during the movement of the positioning column 15, the moving column 14 slides in the first rectangular opening 25, and the positioning column 15 is limited in the horizontal direction.
One end of the positioning column 15 is provided with a round head;
when in operation, the round head of the positioning column 15 can enable the positioning column 15 to be smoothly inserted into the positioning hole 16.
The fixed plate 17 is provided with a second rectangular opening 26, and the connecting column 18 penetrates through the second rectangular opening 26 in a sliding manner;
in operation, during movement of the post 22, the connecting post 18 slides within the second rectangular opening 26, limiting the post 22 in the vertical direction.
The top end of the inserted column 22 is provided with a round head;
when in operation, the round head of the inserting column 22 can enable the inserting column 22 to be smoothly inserted into the slot 23.
A construction method for a parapet sliding formwork structure of a steel structure building comprises the following steps:
s1: the outer formwork support 2 is installed and fixed on a steel beam of a building, after the parapet wall steel bar construction is finished, the outer shaping steel formwork 1 is hoisted to a designated position through a tower crane, and meanwhile, a cable rope 3 is installed between the top of the outer shaping steel formwork 1 and the roof so as to ensure safety;
s2: hoisting the inner positioning steel template 7 to a designated position through a tower crane, positioning the outer shaping steel template 1 and the inner positioning steel template 7 through a positioning mechanism, positioning the inserting columns 22 outside the inserting grooves 23 before positioning, aligning and inserting the two positioning columns 15 of the inner positioning steel template 7 into the positioning holes 16 when positioning is required, positioning the outer shaping steel template 1 and the inner positioning steel template 7, and installing the shaping fixture 4 on the outer shaping steel template 1 and the inner positioning steel template 7;
s3: the method comprises the steps that a split screw assembly 8 is installed on an outer shaping steel template 1 and an inner shaping steel template 7, an operator stands on a roof to sequentially pass the split screw assembly 8 through the inner shaping steel template 7, parapet steel bars and the outer shaping steel template 1 from the inner side, and meanwhile, the outer side of the split screw assembly 8 is connected with an inner thread of a prefabricated nut on the outer shaping steel template 1, and the inner side is fixed by a mountain-shaped clamp;
s4: the hydraulic driving device 5 is installed and fixed on the constructed parapet through bolt holes 9 and channel steel 6, so that the hydraulic rods of the hydraulic driving devices 5 on two sides are perpendicular to the outer shaping steel template 1 and the inner shaping steel template 7;
s5: the outer formwork support 2 is L-shaped, after the outer shaping steel formwork 1 and the inner shaping steel formwork 7 are accurately positioned, the steel rod of the outer formwork support 2 is extended, so that the outer shaping steel formwork 1 is fixedly locked by the L-shaped outer formwork support 2, and concrete pouring can be performed;
s6: after the concrete pouring is completed and the set strength is reached, a constructor removes the split screw rod assembly 8 on the roof at the inner side of the parapet wall, taps the outer shaping steel template 1 and the inner shaping steel template 7, removes the outer template support 2, and starts the hydraulic driving device 5 to enable the outer shaping steel template 1 and the inner shaping steel template 7 to uniformly and synchronously slide on the outer template support 2;
s7: after the hydraulic rod of the hydraulic driving device 5 stretches to the limit, the position of the hydraulic driving device 5 is adjusted, the two steel templates are pushed to the concrete construction position of the next parapet wall, the outer shaping steel templates 1 are locked through the outer template support 2, and pouring operation is repeated.
Working principle: before the outer shaping steel template 1 and the inner shaping steel template 7 are positioned, the inserting columns 22 are tightly contacted with the tops of the moving columns 14, when the outer shaping steel template 1 and the inner shaping steel template 7 are required to be positioned, the two positioning columns 15 of the inner shaping steel template 7 are inserted into the corresponding positioning holes 16, the outer shaping steel template 1 and the inner shaping steel template 7 can be positioned, the outer shaping steel template 1 and the inner shaping steel template 7 can be fixed through the shaping fixture 4, after construction is completed, when the outer shaping steel template 1 and the inner shaping steel template 7 are required to be detached from the parapet wall, the positioning mechanism is required to be released, the L-shaped plate 13 is pulled, the L-shaped plate 13 drives the moving plates 11 and the moving columns 14 to move, the moving columns 14 drive the positioning columns 15 to leave the positioning holes 16, the inserting columns 22 are aligned with the inserting columns 23, the positioning columns 22 are inserted into the inner positioning columns 23 under the action of the second springs 21, the outer shaping steel template 1 and the inner shaping steel template 7 can be fixed through the shaping fixture 4, when the positioning is required, and when the positioning is completed, the outer shaping steel template 1 and the inner shaping steel template 7 are required to be detached, the positioning columns 19 are required to be pulled downwards, the connecting plates 19 and the positioning columns 20 are driven to move the positioning columns 20 to move, namely, the positioning columns 20 are driven to move the positioning columns 20 to move, and the positioning columns 20 are driven to move.
In the description of the present specification, the descriptions of the terms "one embodiment," "example," "specific example," and the like, mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present invention. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing has shown and described the basic principles, principal features and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present invention, and various changes and modifications may be made without departing from the spirit and scope of the invention, which is defined in the appended claims.

Claims (7)

1. A parapet slip form structure for steel construction building, its characterized in that: comprises an outer shaping steel template (1); the steel reinforcement outside of roof edge is placed to outer shaping steel form (1), the top rigid coupling of outer shaping steel form (1) has cable rope (3), cable rope's (3) one end and roof fixed connection, outer shaping steel form (1) below is equipped with outer form support (2), outer form support (2) rigid coupling is on the girder steel of building, outer form support (2) carries out the block locking to outer shaping steel form (1), one side of outer shaping steel form (1) is equipped with interior profiled steel form (7) that are located the inboard of roof edge steel reinforcement, the top of outer shaping steel form (1) and profiled steel form (7) is through setting fixture (4) fixed connection, interior profiled steel form (7) one side is equipped with hydraulic drive unit (5), channel-section steel (6) and bolt hole (9), bolt hole (9) are located on the interior profiled steel form's that has been under construction, hydraulic drive unit (5) are installed on the interior profiled steel form's that has been under construction through (6) and bolt hole (9), interior profiled steel form's (7) and interior profiled steel form (7) have interior profiled steel form (7) fixed connection, the steel form (8) is equipped with interior profiled steel form (7);
the positioning mechanism comprises four guide rods (10) fixedly connected to an inner shaping steel template (7), the surfaces of two adjacent guide rods (10) are connected with a moving plate (11) in a sliding manner, two first springs (12) are fixedly connected between the moving plate (11) and the inner shaping steel template (7), the first springs (12) are sleeved on the outer sides of the guide rods (10), an L-shaped plate (13) is fixedly connected to the moving plate (11), a moving column (14) is fixedly connected to the moving plate (11), the moving column (14) penetrates through the inner shaping steel template (7) in a sliding manner, one end of the moving column (14) is fixedly connected with a positioning column (15), a positioning hole (16) is formed in the outer shaping steel template (1), and the positioning column (15) is inserted into the positioning hole (16);
be equipped with spacing subassembly on interior profiled steel template (7), spacing subassembly is including two fixed plates (17) on interior profiled steel template (7) of rigid coupling, sliding on fixed plate (17) is inserted and is equipped with spliced pole (18), the bottom rigid coupling of spliced pole (18) has arm-tie (19), the top rigid coupling of spliced pole (18) has square board (20), the rigid coupling has second spring (21) between the bottom of square board (20) and the top of fixed plate (17), the outside at spliced pole (18) is established to second spring (21) cover, the top rigid coupling of square board (20) has spliced pole (22), the top and the bottom in close contact of spliced pole (22) of spliced pole (14), slot (23) with spliced pole (22) looks adaptation are seted up to the bottom of spliced pole (14).
2. A parapet sliding formwork structure for a steel structure building as claimed in claim 1, wherein: two first round holes (24) are formed in the moving plate (11), and the guide rod (10) penetrates through the first round holes (24).
3. A parapet sliding formwork structure for a steel structure building as claimed in claim 2, wherein: two first rectangular openings (25) are formed in the inner-positioning steel template (7), and the movable column (14) penetrates through the first rectangular openings (25) in a sliding mode.
4. A parapet sliding formwork structure for a steel structure building as claimed in claim 3, wherein: one end of the positioning column (15) is provided with a round head.
5. A parapet sliding formwork structure for a steel structure building as claimed in claim 4, wherein: a second rectangular opening (26) is formed in the fixing plate (17), and the connecting column (18) penetrates through the second rectangular opening (26) in a sliding mode.
6. A parapet sliding formwork structure for a steel structure building as claimed in claim 5, wherein: the top end of the inserted column (22) is provided with a round head.
7. The construction method for the parapet sliding formwork structure of the steel structure building according to claim 6, wherein the construction method comprises the following steps: the method comprises the following steps:
s1: the outer formwork support (2) is installed and fixed on a steel beam of a building, after the parapet steel bar construction is finished, the outer shaping steel formwork (1) is hoisted to a designated position through a tower crane, and a cable rope (3) is installed between the top of the outer shaping steel formwork (1) and the roof to ensure safety;
s2: hoisting the inner positioning steel template (7) to a designated position through a tower crane, positioning the outer shaping steel template (1) and the inner positioning steel template (7) through a positioning mechanism, positioning the inserting columns (22) outside the inserting grooves (23) before positioning, aligning and inserting two positioning columns (15) of the inner positioning steel template (7) into positioning holes (16) when positioning is required, positioning the outer shaping steel template (1) and the inner positioning steel template (7), and installing shaping fixtures (4) on the outer shaping steel template (1) and the inner positioning steel template (7);
s3: the method comprises the steps that a counter-pulling screw assembly (8) is installed on an outer shaping steel template (1) and an inner shaping steel template (7), an operator stands on a roof to sequentially pass the counter-pulling screw assembly (8) through the inner shaping steel template (7), parapet steel bars and the outer shaping steel template (1) from the inner side, and meanwhile, the outer side of the counter-pulling screw assembly (8) is connected with an inner thread of a prefabricated nut on the outer shaping steel template (1), and the inner side of the counter-pulling screw assembly is fixed by a mountain-shaped clamp;
s4: the hydraulic driving device (5) is installed and fixed on the constructed parapet through bolt holes (9) and channel steel (6), so that the hydraulic rods of the hydraulic driving device (5) on two sides are perpendicular to the outer shaping steel template (1) and the inner shaping steel template (7);
s5: the outer formwork support (2) is L-shaped, after the outer shaping steel formwork (1) and the inner shaping steel formwork (7) are accurately positioned, the steel rod of the outer formwork support (2) is stretched, so that the L-shaped outer formwork support (2) is fixedly locked to the outer shaping steel formwork (1), and concrete pouring can be performed;
s6: after the concrete pouring is completed and the set strength is reached, a constructor removes the split screw assembly (8) on the roof at the inner side of the parapet wall, taps the outer shaping steel template (1) and the inner shaping steel template (7), removes the outer template support (2), and starts the hydraulic driving device (5) to enable the outer shaping steel template (1) and the inner shaping steel template (7) to uniformly and synchronously slide on the outer template support (2);
s7: after the hydraulic rod of the hydraulic driving device (5) stretches to the limit, the position of the hydraulic driving device (5) is adjusted, two steel templates are pushed to the concrete construction position of the parapet wall of the next section, the external shaping steel templates (1) are locked through the external template support (2), and pouring operation is repeated.
CN202210802210.7A 2022-07-07 2022-07-07 Parapet sliding formwork structure for steel structure building and construction method thereof Active CN115126220B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210802210.7A CN115126220B (en) 2022-07-07 2022-07-07 Parapet sliding formwork structure for steel structure building and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210802210.7A CN115126220B (en) 2022-07-07 2022-07-07 Parapet sliding formwork structure for steel structure building and construction method thereof

Publications (2)

Publication Number Publication Date
CN115126220A CN115126220A (en) 2022-09-30
CN115126220B true CN115126220B (en) 2023-07-04

Family

ID=83381075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210802210.7A Active CN115126220B (en) 2022-07-07 2022-07-07 Parapet sliding formwork structure for steel structure building and construction method thereof

Country Status (1)

Country Link
CN (1) CN115126220B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119243533B (en) * 2024-11-12 2025-04-25 盐城市巨能动力机械有限公司 Quick positioning device and positioning method for ballastless track steel templates
CN121088108B (en) * 2025-11-13 2026-02-13 山西一建集团有限公司 Forming methods of rammed earth city walls and their auxiliary formwork

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203613792U (en) * 2013-11-12 2014-05-28 中国建筑第八工程局有限公司 Parapet wall formwork pouring structure
CN106320283A (en) * 2016-11-08 2017-01-11 中国电建集团贵阳勘测设计研究院有限公司 Ultra-high water head plane sliding accident gate slot structure
JP2017053143A (en) * 2015-09-10 2017-03-16 積水化学工業株式会社 庇 Parapet cover installation structure of entrance porch and installation method of 庇 parapet cover
CN109113335A (en) * 2018-07-10 2019-01-01 中国二十冶集团有限公司 Parapet falsework and construction method
JP2019157614A (en) * 2018-03-07 2019-09-19 建築プランナー株式会社 Foundation formwork structure for house and method for constructing foundation formwork
CN214461428U (en) * 2020-12-25 2021-10-22 湖北正浩建设集团有限公司 Connection structure of building exterior wall and parapet
CN216276881U (en) * 2021-11-08 2022-04-12 中建三局绿色产业投资有限公司 Automatically-sliding steel structure formwork structure for building
CN114482424A (en) * 2022-03-15 2022-05-13 南通新华建筑集团有限公司 Secondary pouring construction method for parapet wall with hidden rabbet

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967050B (en) * 2014-01-29 2015-05-20 广州机施建设集团有限公司 Construction method of a subway station

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203613792U (en) * 2013-11-12 2014-05-28 中国建筑第八工程局有限公司 Parapet wall formwork pouring structure
JP2017053143A (en) * 2015-09-10 2017-03-16 積水化学工業株式会社 庇 Parapet cover installation structure of entrance porch and installation method of 庇 parapet cover
CN106320283A (en) * 2016-11-08 2017-01-11 中国电建集团贵阳勘测设计研究院有限公司 Ultra-high water head plane sliding accident gate slot structure
JP2019157614A (en) * 2018-03-07 2019-09-19 建築プランナー株式会社 Foundation formwork structure for house and method for constructing foundation formwork
CN109113335A (en) * 2018-07-10 2019-01-01 中国二十冶集团有限公司 Parapet falsework and construction method
CN214461428U (en) * 2020-12-25 2021-10-22 湖北正浩建设集团有限公司 Connection structure of building exterior wall and parapet
CN216276881U (en) * 2021-11-08 2022-04-12 中建三局绿色产业投资有限公司 Automatically-sliding steel structure formwork structure for building
CN114482424A (en) * 2022-03-15 2022-05-13 南通新华建筑集团有限公司 Secondary pouring construction method for parapet wall with hidden rabbet

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大直径筒仓模架施工工艺;谢艺;;施工技术(第23期);全文 *

Also Published As

Publication number Publication date
CN115126220A (en) 2022-09-30

Similar Documents

Publication Publication Date Title
CN110424636B (en) Prefabricated building transfer floor reserved sleeve joint bar positioning device and construction method
CN115233819B (en) Assembled lacing wire steel pipe concrete connection structure
CN104018675A (en) Construction method for shear wall concrete formworks and pillar concrete formworks
CN115126220A (en) Parapet sliding formwork structure for steel structure building and construction method of parapet sliding formwork structure
CN111809861B (en) Formwork supporting die for construction of building components on two sides of deformation joint and working method
CN211920744U (en) Steel reinforcement cage lifting device
CN114941411B (en) A BIM-based prefabricated low-carbon building structure and structural connection method
CN216239739U (en) Mould device for pressing windowsill top
CN113668849A (en) Post-cast strip pouring equipment and construction method thereof
CN118793265B (en) Hanging formwork reinforcement device and construction method for steel-concrete mixed structure construction beams
CN104453217A (en) Elevator shaft whole formwork lifting construction method
CN210614974U (en) Multilayer reinforcing bar net high accuracy processing bed-jig of adjustable type of size
CN109571747B (en) Construction method of broken line pretensioning prestressed double T-beam
CN110206323B (en) Reinforcement framework forming system and application method thereof
CN118007536A (en) Civil engineering turnover mould process
CN216340964U (en) Building engineering template fixing device
CN210134655U (en) Steel reinforcement framework forming system
CN119754548B (en) A giant column template climbing device and method, and giant column construction method
CN215519944U (en) Post-cast strip construction equipment
CN223003736U (en) Concrete frame column template fastening system capable of being quickly assembled and disassembled
CN223328853U (en) Prefabricated roof beam hoist mechanism of assembled building
CN221941625U (en) Quick construction structure of steel structure underground garage
CN217581305U (en) Multifunctional fixing clamp for civil engineering foundation mold
CN222333259U (en) Welding-spot-free steel bar truss floor support plate
CN221627626U (en) Assembled steel construction building external formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant