CN203607723U - Overhead operation platform of isolation switch in electrical network - Google Patents

Overhead operation platform of isolation switch in electrical network Download PDF

Info

Publication number
CN203607723U
CN203607723U CN201320760142.9U CN201320760142U CN203607723U CN 203607723 U CN203607723 U CN 203607723U CN 201320760142 U CN201320760142 U CN 201320760142U CN 203607723 U CN203607723 U CN 203607723U
Authority
CN
China
Prior art keywords
frame
operation platform
climbing
electrical network
isolating switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320760142.9U
Other languages
Chinese (zh)
Inventor
陈亢
徐耀辉
施首健
朱英伟
何正旭
朱建增
许奕飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201320760142.9U priority Critical patent/CN203607723U/en
Application granted granted Critical
Publication of CN203607723U publication Critical patent/CN203607723U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an overhead operation platform of an isolation switch in an electrical network. The operation platform relates to the field of auxiliary tools in electrical network construction. The operation platform aims to overcome the technical problems that the isolation switch in the prior art is high in overhead operation safety risks and inconvenient in operation. The operation platform comprises an uphilling frame and a support frame. The bottom part of the uphilling frame is connected with the support frame. The support frame is provided with a fixing device. The operation platform is used in overhead operation for the isolation switch in the electrical network construction process.

Description

一种电网隔离开关登高作业平台A power grid isolation switch climbing work platform

【技术领域】【Technical field】

本实用新型涉及一种电网施工辅助工具,尤其是一种登高设备。The utility model relates to an auxiliary tool for power grid construction, in particular to a climbing device.

【背景技术】【Background technique】

电网中220千伏隔离开关的最高点距离地面一般在5米左右,且隔离开关瓷瓶直径较细,安装规则中明确规定,作业时梯子不能架在隔离开关瓷瓶上,作业人员安全带不能系在隔离开关瓷瓶上,以防止隔离开关瓷瓶断裂造成危险。The highest point of the 220 kV isolating switch in the power grid is generally about 5 meters from the ground, and the diameter of the isolating switch porcelain bottle is relatively small. The installation rules clearly stipulate that the ladder cannot be placed on the isolating switch porcelain bottle during operation, and the safety belt of the operator cannot be tied to the ground. On the isolating switch porcelain bottle to prevent the breakage of the isolating switch porcelain bottle and cause danger.

为解决220千伏隔离开关登高作业的安全问题,现有技术中采用吊车作业、架设脚手架和使用人字梯三种方法。按现有的隔离开关高处作业方式,存在如下缺陷:吊机作业受场地限制,部分场合下无法使用,且如果带电设备距离较近时,吊机的使用风险会大幅度增加,影响作业安全;采用搭脚手架的方式进行隔离开关登高作业,耗时耗力,每进行一次登高需拆装一次脚手架,使用极为不便;使用人字梯时,因高度较高,在地面不平整的情况下存在较大的风险。In order to solve the safety problem of 220 kV isolating switch climbing operation, three methods of crane operation, scaffolding and use of ladder are adopted in the prior art. According to the existing high-altitude operation method of the isolation switch, there are the following defects: the operation of the crane is limited by the site, and it cannot be used in some occasions, and if the distance between the live equipment is relatively close, the risk of using the crane will increase greatly, which will affect the safety of the operation ;It is time-consuming and labor-intensive to use the scaffolding method to carry out the isolating switch climbing operation, and the scaffolding needs to be disassembled and assembled once every time the climbing is performed, which is extremely inconvenient to use; when using the ladder, due to the high height, there are greater risk.

【发明内容】【Content of invention】

本实用新型解决的技术问题是提供一种电网隔离开关登高作业平台,为施工人员提供快捷、平稳的登高作业装置。The technical problem solved by the utility model is to provide a power grid isolating switch climbing operation platform to provide construction personnel with a fast and stable climbing operation device.

为解决上述技术问题,本实用新型采用如下技术方案:In order to solve the above technical problems, the utility model adopts the following technical solutions:

一种电网隔离开关登高作业平台,包括登高架和支撑架,所述登高架的底部连接所述支撑架,所述支撑架上设有固定装置。A power grid isolation switch climbing operation platform includes a climbing frame and a supporting frame, the bottom of the climbing frame is connected to the supporting frame, and the supporting frame is provided with a fixing device.

进一步的,所述固定装置包括相对设置的两夹板,所述夹板上连接有驱动两夹板相对运动的驱动装置。Further, the fixing device includes two splints arranged opposite to each other, and a driving device for driving the relative movement of the two splints is connected to the splint.

进一步的,所述驱动装置包括与支撑架转接的螺杆,所述夹板与支撑架滑动连接。Further, the driving device includes a screw connected to the support frame, and the splint is slidably connected to the support frame.

进一步的,所述登高架包括左支架和右支架,所述左支架和右支架之间设有支撑平板,所述左支架上设有踏板。Further, the climbing frame includes a left bracket and a right bracket, a support plate is provided between the left bracket and the right bracket, and a pedal is provided on the left bracket.

进一步的,所述左支架上设有向上延伸的安全带绑接架。Further, the left bracket is provided with a safety belt binding frame extending upwards.

进一步的,所述安全带绑接架上设有防护框,所述防护框位于支撑平板的正上方。Further, the safety belt binding frame is provided with a protective frame, and the protective frame is located directly above the supporting plate.

进一步的,所述防护框与安全带绑接架转接。Further, the protective frame is transferred to the seat belt binding frame.

进一步的,所述登高架沿高度方向设有若干安装孔,所述支撑架上设有连接孔,通过螺钉连接所述安装孔和连接孔。Further, the climbing frame is provided with several installation holes along the height direction, and the support frame is provided with connection holes, and the installation holes and the connection holes are connected by screws.

进一步的,所述登高作业平台还包括斜撑架,所述斜撑架的顶部与左支架转接。Further, the elevated work platform also includes a diagonal brace, the top of which is connected to the left bracket.

本实用新型的有益效果:The beneficial effects of the utility model:

本实用新型的登高作业平台,通过登高架底部的支撑架平稳定位登高作业平台,降低了变电所内隔离开关登高作业的风险系数。并且相对于吊机和搭脚手架的登高方式,该装置的使用更加方便快捷,提高隔离开关作业的工作效率。The climbing operation platform of the utility model stably positions the climbing operation platform through the support frame at the bottom of the climbing frame, which reduces the risk factor of the climbing operation of the isolating switch in the substation. And compared with the climbing way of crane and scaffolding, the use of the device is more convenient and quick, and the work efficiency of the isolating switch operation is improved.

本实用新型的这些特点和优点将会在下面的具体实施方式、附图中详细的揭露。These features and advantages of the present utility model will be disclosed in detail in the following specific embodiments and accompanying drawings.

【附图说明】【Description of drawings】

下面结合附图对本实用新型做进一步的说明:Below in conjunction with accompanying drawing, the utility model is further described:

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型中登高架和支撑架的连接示意图;Fig. 2 is the connection schematic diagram of climbing frame and support frame in the utility model;

图3为本实用新型中斜撑架的结构示意图。Fig. 3 is a schematic diagram of the structure of the diagonal bracing in the utility model.

【具体实施方式】【Detailed ways】

本实用新型提供一种电网隔离开关登高作业平台,包括登高架和支撑架,登高架的底部连接支撑架,支撑架上设有固定装置。支撑架的固定装置用于连接隔离开关底部支座,将登高作业平台平稳定位,登高架提供高度,方便操作人员站立,该装置增强了登高作业的便捷性和安全性。The utility model provides a power grid isolating switch climbing operation platform, which comprises a climbing frame and a supporting frame, the bottom of the climbing frame is connected with the supporting frame, and the supporting frame is provided with a fixing device. The fixing device of the support frame is used to connect the bottom support of the isolation switch to position the climbing operation platform stably. The climbing frame provides a height for the operator to stand on. This device enhances the convenience and safety of the climbing operation.

下面结合本实用新型实施例的附图对本实用新型实施例的技术方案进行解释和说明,但下述实施例仅仅为本实用新型的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其它实施例,都属于本实用新型的保护范围。The technical solutions of the embodiments of the present invention are explained and described below in conjunction with the accompanying drawings of the embodiments of the present invention, but the following embodiments are only preferred embodiments of the present invention, not all of them. Based on the examples in the implementation manners, other examples obtained by those skilled in the art without making creative efforts all belong to the protection scope of the present utility model.

参考图1,所示的一种电网隔离开关登高作业平台,包括登高架1和设置在登高架底部的支撑架2。支撑架2上设有固定装置,固定装置用于连接隔离开关底部支座,将登高作业平台平稳定位,登高架提供高度,施工人员站立在登高架1上进行施工。Referring to FIG. 1 , a power grid isolation switch climbing work platform includes a climbing frame 1 and a support frame 2 arranged at the bottom of the climbing frame. The supporting frame 2 is provided with a fixing device, and the fixing device is used to connect the bottom support of the isolating switch to stably position the climbing operation platform, and the climbing frame provides height, and construction personnel stand on the climbing frame 1 for construction.

本实用新型中固定装置包括设在支撑架2的底部的两夹板21,两夹板21相对设置,夹板21上连接有驱动两夹板相对运动的驱动装置。通过两夹板21夹紧在隔离开关底部支座的两侧,实现将登高作业平台的固定,并且,利用隔离开关底部支座的空间位置,登高作业平台的设置不受场地限制。In the utility model, the fixing device comprises two clamping plates 21 arranged at the bottom of the support frame 2, and the two clamping plates 21 are relatively arranged, and the clamping plates 21 are connected with a driving device for driving the relative movement of the two clamping plates. The two splints 21 are clamped on both sides of the bottom support of the isolating switch to realize the fixing of the climbing work platform, and, utilizing the space position of the bottom support of the isolating switch, the setting of the climbing work platform is not restricted by the site.

采用的驱动装置包括与支撑架2转接的螺杆22,夹板21上设有与支撑架滑动连接的连接槽211,两夹板21上均连接有螺杆22,螺杆22与支撑架2的支杆螺纹连接,螺杆22上连接把手23,旋动把手23,螺杆22沿轴向产生移动,推动夹板21相对靠近或远离,实现支撑架与隔离开关底部支座的连接或分离。The driving device that adopts comprises the screw rod 22 that is connected with support frame 2, and clamping plate 21 is provided with the connecting groove 211 that is slidingly connected with support frame, and screw rod 22 is all connected on the two clamping plates 21, and screw rod 22 is threaded with the pole of support frame 2. Connection, the handle 23 is connected to the screw 22, the handle 23 is rotated, the screw 22 moves in the axial direction, pushes the splint 21 relatively close to or away from, and realizes the connection or separation of the support frame and the bottom support of the isolating switch.

其中登高架1包括左支架11和右支架12,支撑平板3设置在左支架11和右支架12之间,左支架11上设有若干踏板111,踏板111位于支撑架2和支撑平板3之间,通过踏板111登上支撑平板3。Wherein the climbing frame 1 comprises a left support 11 and a right support 12, and the support plate 3 is arranged between the left support 11 and the right support 12, and the left support 11 is provided with some pedals 111, and the pedals 111 are positioned between the support frame 2 and the support plate 3 , board the support plate 3 through the pedal 111 .

并且左支架11上设有向上延伸的安全带绑接架112,安全带绑接架112高于成人的腰部,施工人员的安全带可连接在安全带绑接架112上。优选的,左支架11与安全带绑接架112为一体结构。And the left bracket 11 is provided with a safety belt binding frame 112 extending upwards, the safety belt binding frame 112 is higher than the waist of an adult, and the safety belt of the construction worker can be connected on the safety belt binding frame 112 . Preferably, the left bracket 11 and the safety belt binding frame 112 are integrally structured.

上述安全带绑接架112的顶部设有防护框4,防护框4位于支撑平板3的正上方,防护框4的高度大致位于施工人员的胸部,施工人员从防护框4中穿过,防护框起到防止施工人员从登高作业平台上跌落的作用。The top of the safety belt binding frame 112 is provided with a protective frame 4, the protective frame 4 is located directly above the support plate 3, the height of the protective frame 4 is roughly located at the chest of the construction worker, and the construction personnel pass through the protective frame 4, and the protective frame 4 Play the role of preventing construction personnel from falling from the climbing work platform.

改进的,防护框4与安全带绑接架112转动连接,可方便施工人员从左支架11登上支撑平板3。As an improvement, the protective frame 4 is rotatably connected to the safety belt binding frame 112 , which can facilitate the construction personnel to mount the support plate 3 from the left bracket 11 .

参考图3,由于从左支架11登上支撑平板3的过程中,作业登高平台单侧受力,登高作业平台两侧受力不平衡,可能导致登高平台倾斜,破坏支撑架2与隔离开关底部支座的连接,因此还在作业登高平台中设置了斜撑架5,斜撑架5的顶部与左支架11或是安全带绑接架112转接,斜撑架5的底部斜靠隔离开关底部支座,增强作业登高平台的平稳性。Referring to Fig. 3, during the process of mounting the support plate 3 from the left bracket 11, one side of the working lifting platform is stressed, and the force on both sides of the working lifting platform is unbalanced, which may cause the lifting platform to tilt, and damage the supporting frame 2 and the bottom of the isolating switch. The connection of the support, therefore, a diagonal brace 5 is also set in the work climbing platform, the top of the diagonal brace 5 is connected with the left bracket 11 or the safety belt binding frame 112, and the bottom of the diagonal brace 5 leans against the isolation switch The bottom support enhances the stability of the working climbing platform.

参考图2,由于施工人员的身高不同,因此可能会影响到实际的施工作业,因此在登高架1沿高度方向设有若干安装孔13,支撑架2上设有与安装孔13对应的连接孔,连接孔和安装孔13中连接有螺钉6。通过选择不同的安装孔与连接孔连接,调节作业登高平台的高度。With reference to Fig. 2, because construction personnel's height is different, therefore may affect actual construction operation, therefore be provided with some installation holes 13 along height direction on climbing frame 1, be provided with the connecting hole corresponding to installation hole 13 on support frame 2 , the connecting hole and the mounting hole 13 are connected with screws 6 . By selecting different installation holes and connection holes, the height of the work lifting platform can be adjusted.

具体的,作业登高平台中登高架1采用环氧树脂材料,支撑架2采用铝合金材料,在确保牢固的同时,方便携带安装,现场可由单人完成操作。Specifically, the climbing frame 1 in the work climbing platform is made of epoxy resin material, and the supporting frame 2 is made of aluminum alloy material, which is easy to carry and install while ensuring firmness, and can be operated by a single person on site.

通过上述实施例,本实用新型的目的已经被完全有效的达到了。熟悉该项技术的人士应该明白本实用新型包括但不限于附图和上面具体实施方式中描述的内容。任何不偏离本实用新型的功能和结构原理的修改都将包括在权利要求书的范围中。Through the above embodiments, the purpose of the utility model has been fully and effectively achieved. Those familiar with this technology should understand that the utility model includes but is not limited to the contents described in the accompanying drawings and the above specific embodiments. Any modifications that do not deviate from the functional and structural principles of the present utility model shall be included in the scope of the claims.

Claims (7)

1. an electrical network isolating switch climbing operation platform, it is characterized in that: comprise climbing frame and bracing frame, the bottom of described climbing frame connects support frame as described above, support frame as described above is provided with fixture, described fixture comprises two clamping plate that are oppositely arranged, on described clamping plate, be connected with the drive unit that drives two clamping plate relative motions, the screw rod that described drive unit comprises and bracing frame is transferred, described clamping plate and bracing frame are slidably connected.
2. a kind of electrical network isolating switch climbing operation platform according to claim 1, is characterized in that: described climbing frame comprises left socle and right support, and between described left socle and right support, be provided with support plate, described left socle is provided with pedal.
3. a kind of electrical network isolating switch climbing operation platform according to claim 2, is characterized in that: described left socle is provided with upwardly extending safety belt bind frame.
4. a kind of electrical network isolating switch climbing operation platform according to claim 3, is characterized in that: described safety belt bind frame is provided with protective frame, described protective frame be positioned at support plate directly over.
5. a kind of electrical network isolating switch climbing operation platform according to claim 4, is characterized in that: described protective frame and the switching of safety belt bind frame.
6. according to a kind of electrical network isolating switch climbing operation platform described in claim 1 or 2 or 3, it is characterized in that: described climbing frame is provided with some installing holes along short transverse, and support frame as described above is provided with connecting hole, be connected by screw described installing hole and connecting hole.
7. according to a kind of electrical network isolating switch climbing operation platform described in claim 1 or 2 or 3, it is characterized in that: described climbing operation platform also comprises end wall bracket the top of described end wall bracket and left socle switching.
CN201320760142.9U 2013-11-26 2013-11-26 Overhead operation platform of isolation switch in electrical network Expired - Fee Related CN203607723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320760142.9U CN203607723U (en) 2013-11-26 2013-11-26 Overhead operation platform of isolation switch in electrical network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320760142.9U CN203607723U (en) 2013-11-26 2013-11-26 Overhead operation platform of isolation switch in electrical network

Publications (1)

Publication Number Publication Date
CN203607723U true CN203607723U (en) 2014-05-21

Family

ID=50720385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320760142.9U Expired - Fee Related CN203607723U (en) 2013-11-26 2013-11-26 Overhead operation platform of isolation switch in electrical network

Country Status (1)

Country Link
CN (1) CN203607723U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098635A (en) * 2015-09-01 2015-11-25 国网辽宁省电力有限公司鞍山供电公司 Special overhauling frame for LW9 series circuit breaker and using method thereof
CN109546559A (en) * 2018-12-19 2019-03-29 国网江苏省电力有限公司常州供电分公司 Isolator operating mechanism installation auxiliary device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098635A (en) * 2015-09-01 2015-11-25 国网辽宁省电力有限公司鞍山供电公司 Special overhauling frame for LW9 series circuit breaker and using method thereof
CN105098635B (en) * 2015-09-01 2017-03-08 国网辽宁省电力有限公司鞍山供电公司 A kind of special repairing frame of LW9 type Series Circuit Breakers and its using method
CN109546559A (en) * 2018-12-19 2019-03-29 国网江苏省电力有限公司常州供电分公司 Isolator operating mechanism installation auxiliary device
CN109546559B (en) * 2018-12-19 2023-08-11 国网江苏省电力有限公司常州供电分公司 Installation auxiliary device for isolating switch operating mechanism

Similar Documents

Publication Publication Date Title
CN203321060U (en) Rod centering device
CN204395351U (en) Electric power pole-climbing inspection device
CN102354931A (en) Hot-line insulation tool consisting of multifunctional components
CN203607723U (en) Overhead operation platform of isolation switch in electrical network
CN205265110U (en) Multi -functional electric power overhauls frame
CN206964913U (en) The safety belt hanging bracket of Fast Installation
CN102664377A (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN206111071U (en) Distribution automation overhauls cat ladder of usefulness
CN201981995U (en) Pole ladder for maintenance of single-column device
CN203813313U (en) Mobile workbench for check and repair of strain insulator string
CN205177594U (en) Formula transformer rack on same group
CN203161063U (en) Electric pole cross arm hanging ladder
CN203850744U (en) Live working special tool for pluggable cable terminal
CN206542116U (en) One kind is used for power tool transmission lever on 10kV bars
CN205248704U (en) Overhaul high altitude transmission line's supplementary anchor clamps
CN106334294A (en) Electric power maintenance safety climbing assistor
CN205791355U (en) A kind of cable support bracket easy to use
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN205029217U (en) Overhaul test device
CN204050726U (en) Fixed connector between framework and safety belt during work high above the ground
CN204741222U (en) Portable multi -functional transmission line interruption maintenance appurtenance
CN202282574U (en) ultifunctional components formed live line work insulating tool
CN202949163U (en) Maintenance platform for tubular busbar post insulator
CN201937189U (en) Overhaul working platform for disconnecting link
CN201549792U (en) 220 kV transformer maintenance workbench

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20201126

CF01 Termination of patent right due to non-payment of annual fee