Shaft tower is put, stringing job platform
Technical field
The electrician's safety auxiliary tool that operation is used on shaft tower, particularly a kind of shaft tower that the present invention relates to a kind of electric power system put, stringing job platform.
Background technology
The built on stilts electric wire of carrying of electric power system is to be erected on the cross-arm of shaft tower upper end.While installing electric wiring on cross arm of tower, electrician implements to put above will stepping on shaft tower, stringing operation, and enforcement is put, the construction intensity of stringing operation is larger.When electrician steps on the operation of shaft tower top, first to fasten seat belts, above shaft tower, not facilitate the position of electrician's construction operation.The construction operation position that electrician can utilize only has shaft tower top along cat ladder and the cross-arm of shaft tower direction, electrician may stand on cat ladder, but because cross-arm is longer, and insulator is the two ends at cross-arm, in order to put, stringing operation, when standing on cat ladder, electrician needs oblique body construction operation, do not use power, very inconvenient, if electrician rides over operation on cross-arm bar, do not use power, also there is larger potential safety hazard yet.In prior art, be not suitable for the safety auxiliary tool that electrician is put above shaft tower, stringing operation is used.
Summary of the invention
The object of the invention is in order to overcome above-mentioned deficiency, propose that the shaft tower that a kind of electrician of being suitable for is put above shaft tower, stringing operation is used is put, stringing job platform.
The present invention is achieved using the following method.
Shaft tower is put, stringing job platform has the annular anchor ear matching with shaft tower, annular anchor ear has left and right two and half hoops, there is respectively engaging lug at the two ends of each half hoop, between the adjacent engaging lug of two and half hoops, be connected with bolt, the outer shroud Zhou Lianyou job platform vertical with the axis of annular anchor ear of half hoop.
During installation, annular anchor ear is bound round tightly below the cross-arm of shaft tower, use rope sling in the outside of cross-arm in the outside of job platform, transference cross-arm parallels.When electrician steps on the operation of shaft tower top, after fastening seat belts, electrician may stand on job platform and implements to put, stringing operation.
The present invention can be arranged on job platform under the cross-arm of shaft tower top with annular anchor ear and rope sling, install simple and direct, electrician implements to put above shaft tower, during stringing operation, may stand on job platform, give safety of ascend operation personnel, job platform easily, improve operating personnel's security reliability, be conducive to implement to put, stringing operation.
Below in conjunction with accompanying drawing, the present invention is further described.
Accompanying drawing explanation
Fig. 1 is that a kind of shaft tower proposing according to scheme of the invention of the present invention is put, the master of stringing job platform cuts open schematic diagram depending on office;
Fig. 2 is that schematic diagram cuts open in the side-looking office of Fig. 1;
Fig. 3 is the A-A cross-sectional schematic of Fig. 1;
Fig. 4 is that the present invention is arranged on the schematic diagram on shaft tower.
Embodiment
In Fig. 1 ~ Fig. 3, shaft tower is put, it is the eight prismatic surface shape anchor ears 1 that octagonal shaft tower matches that stringing job platform has with cross section, eight prismatic surface shape anchor ears have two and half hoops 2, 3, there is respectively engaging lug 4 at the two ends of each half hoop, between the adjacent engaging lug of two and half hoops, be connected with bolt 5, before the outer shroud Zhou Buyou of half hoop, rear two blocks of wing plates parallel to each other 6, 7, wing plate plane parallels with the axis of annular anchor ear, left, the front wing panel of right half hoop at grade, left, the rear fender of right half hoop at grade, the lower end in half hoop outer shroud week, before, between rear two blocks of wing plates, there is radially boss 8, job platform 9 is flute profiles, there is the connecting plate 10 matching with the wing plate in half hoop outer shroud week the inner end of job platform, 11 and the projection 12 that matches with boss between two blocks of wing plates, the projection of the inner end of job platform is on the radially boss of all lower ends of half hoop outer shroud, between the connecting plate of job platform and wing plate, be connected with bolt 13.
Above-mentioned annular anchor ear is eight prismatic surface shapes, is adapted to be mounted within eight rib vertebra shape shaft towers.For conical shaft tower, the shaft tower being used in conjunction with is put, the annular anchor ear of stringing job platform is cylindrical.
After in Fig. 4, shaft tower is put, stringing job platform 14 is arranged on shaft tower 15, annular anchor ear 16 binds round tightly below the cross-arm 17 above shaft tower, and the inner end of job platform 18 is connected on annular anchor ear, and the outer end of job platform is hung in the outside of cross-arm with noose 19.