CN106877262A - A kind of suspension clamp with weight hitch point - Google Patents
A kind of suspension clamp with weight hitch point Download PDFInfo
- Publication number
- CN106877262A CN106877262A CN201710187547.0A CN201710187547A CN106877262A CN 106877262 A CN106877262 A CN 106877262A CN 201710187547 A CN201710187547 A CN 201710187547A CN 106877262 A CN106877262 A CN 106877262A
- Authority
- CN
- China
- Prior art keywords
- hull
- weight
- heavy hammer
- bolt
- suspension
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
- H02G7/053—Suspension clamps and clips for electric overhead lines not suspended to a supporting wire
Landscapes
- Insulators (AREA)
Abstract
本发明公开了一种带有重锤悬挂点的悬垂线夹,两片碗头挂板连接在船体(4)两侧,将螺栓(1)穿过两片碗头挂板(2)上部的螺孔通过碗头挂板(2)与绝缘子底部连接,两个U型螺栓(3)通过船体4上部的凹槽(10)及两侧的卡槽(11)固定位置;导线置于船体(4)的内部用压板(7)压住,并用U型螺栓(3)固定;船体(4)的底部设有带有通孔的重锤悬挂连板(5),重锤悬挂连板(5)通过螺栓悬挂连接重锤装置;作业电工打开用于固定重锤装置的螺栓,将重锤装置取下后传递至地面;并将新重锤装置提升至导线处,通过螺栓与重锤悬挂连板(5)连接,本发明结构简单、安装方便、适用范围广、可简化现场作业程序、降低现场作业强度、提高工作效率。
The invention discloses a suspension wire clamp with a heavy hammer suspension point. Two bowl-head hanging plates are connected on both sides of the hull (4), and a bolt (1) is passed through the upper part of the two bowl-head hanging plates (2). The screw hole is connected to the bottom of the insulator through the bowl head hanging plate (2), and the two U-shaped bolts (3) are fixed through the groove (10) on the upper part of the hull 4 and the slots (11) on both sides; the wire is placed in the hull ( 4) The inside of the hull is pressed down with a pressure plate (7) and fixed with U-shaped bolts (3); the bottom of the hull (4) is provided with a weight hanging connecting plate (5) with a through hole, and the weight hanging connecting plate (5) ) through bolts to hang and connect the heavy hammer device; the working electrician opens the bolts used to fix the heavy hammer device, removes the heavy hammer device and passes it to the ground; lifts the new heavy hammer device to the wire, and connects the heavy hammer device through the bolts plate (5) connection, the present invention has simple structure, convenient installation, wide application range, can simplify on-site operation procedures, reduce on-site operation intensity, and improve work efficiency.
Description
技术领域:Technical field:
本发明涉及一种带有重锤悬挂点的悬垂线夹,属于输电线路检修现场技术领域,广泛应用于输电线路上拔杆塔及转角杆塔加装重锤作业中。The invention relates to a suspension clamp with a heavy hammer suspension point, belongs to the field technical field of power transmission line maintenance, and is widely used in the operation of adding a heavy hammer to a pole tower and a corner pole tower on a power transmission line.
背景技术:Background technique:
输电线路在架设过程中,如果两侧杆塔较高,中间杆塔较低,则两侧较高的杆塔对中间杆塔产生上拔力。当上拔力较大时,容易使导线超过绝缘子片,导线对横担距离减小,造成安全距离不足,当线路出现过电压时,容易发生导线对横担放电的事故。此外,在转角杆塔中,转角度数越大,则外角侧跳线对杆塔距离越小。在大风等极端条件下,外角侧跳线由于摆动,更加靠近杆塔,容易对杆塔放电。在上拔杆塔悬垂线夹处安装重锤,可以有效地抵消两侧杆塔的上拔力,使导线与横担保持足够的安全距离。在转角杆塔外角侧跳线增加悬垂绝缘子并安装重锤,可有效减小跳线摆动,使跳线与杆塔保持足够安全距离。During the erection of the transmission line, if the towers on both sides are taller and the middle tower is lower, the taller towers on both sides will generate a pull-up force on the middle tower. When the pull-up force is large, it is easy to make the wire exceed the insulator sheet, and the distance between the wire and the cross-arm is reduced, resulting in insufficient safety distance. In addition, in the corner tower, the larger the angle of rotation, the smaller the distance between the jumper on the outer corner side and the tower. Under extreme conditions such as strong winds, the jumper on the outer corner side is closer to the tower due to the swing, and it is easy to discharge the tower. Installing a heavy hammer at the suspension line clamp of the uplifting pole tower can effectively offset the uplifting force of the pole towers on both sides, so as to keep a sufficient safe distance between the wire and the cross arm. Adding a suspension insulator and installing a weight to the jumper on the outer corner of the corner tower can effectively reduce the swing of the jumper and keep a sufficient safe distance between the jumper and the tower.
输电线路经过多年的运行,有些杆塔的重锤锈蚀不堪,需要更换,有些线路发生变化,需要增加或减少重锤质量。传统更换重锤的方式是结合停电计划,将用于固定导线的悬垂线夹打开,然后进行重锤更换。此方法的缺点是,需要使用吊线装置,更换过程中,需要打开悬垂线夹,更换重锤后,需再将悬垂线夹装好,操作复杂,作业强度较大,作业效率低下。After many years of operation of transmission lines, the heavy hammers of some towers have been corroded and need to be replaced, and some lines have changed, and the weight of the heavy hammers needs to be increased or decreased. The traditional way to replace the weight is to combine the power outage plan, open the suspension clamp used to fix the wire, and then replace the weight. The disadvantage of this method is that a hanging wire device needs to be used. During the replacement process, the suspension wire clamp needs to be opened. After the weight is replaced, the suspension wire clamp needs to be installed again. The operation is complicated, the work intensity is high, and the work efficiency is low.
发明内容:Invention content:
本发明的目的在于克服上述已有技术的不足而提供一种结构简单、安装方便、适用范围广、可简化现场作业程序、降低现场作业强度、提高工作效率的带有重锤悬挂点的悬垂线夹。The object of the present invention is to overcome the deficiencies of the above-mentioned prior art and provide a suspension line with a heavy hammer suspension point with simple structure, convenient installation, wide application range, simplified on-site operation procedures, reduced on-site operation intensity, and improved work efficiency. folder.
本发明的目的可以通过如下措施来达到:一种带有重锤悬挂点的悬垂线夹,其包括船体,其特征在于船体的两侧设有挂轴,由钢板冲压而成的两片碗头挂板下部安装在船体两侧的挂轴上,挂轴尾部加垫片及R销防脱;将螺栓穿过两片碗头挂板上部的螺孔通过碗头挂板与绝缘子底部连接,螺栓尾部加垫片及R销防脱;船体上部设有4个凹槽、两侧各设有2个卡槽,两个U型螺栓通过船体4上部的凹槽及两侧的卡槽固定位置;船体的内部设有压板,导线置于船体的内部,用压板压住,并用U型螺栓固定;船体的底部设有带有通孔的重锤悬挂连板,重锤悬挂连板通过螺栓悬挂连接重锤装置;需要进行重锤更换时,无需线路停电,作业电工通过绝缘软梯攀登至带电导线处,并迅速与导线等电位;作业电工将打开重锤悬挂连板上用于固定重锤装置的螺栓,将重锤装置取下后,用绝缘绳传递至地面;地面电工将新重锤装置绑扎牢固;作业电工将新重锤装置提升至导线处,将新重锤装置通过螺栓与重锤悬挂连板连接,工作完毕,作业电工返回地面。The purpose of the present invention can be achieved through the following measures: a suspension clamp with a heavy hammer suspension point, which includes a hull, is characterized in that there are hanging shafts on both sides of the hull, and two bowl heads stamped from steel plates The lower part of the hanging plate is installed on the hanging shafts on both sides of the hull, and the tail of the hanging shaft is added with a gasket and R pin to prevent it from falling off; the bolts are passed through the screw holes on the upper part of the two bowl-head hanging plates and connected to the bottom of the insulator through the bowl-head hanging plates. Gaskets and R pins are added to the tail to prevent detachment; there are 4 grooves on the upper part of the hull and 2 slots on each side, and two U-bolts pass through the grooves on the upper part of the hull 4 and the slots on both sides to fix the position; There is a pressure plate inside the hull, and the wires are placed inside the hull, pressed by the pressure plate, and fixed with U-shaped bolts; the bottom of the hull is equipped with a weight suspension connecting plate with a through hole, and the weight suspension connecting plate is connected by bolt suspension Heavy hammer device; when it is necessary to replace the heavy hammer, there is no need for power failure on the line, and the working electrician climbs to the live wire through the insulated ladder, and quickly equalizes the potential with the wire; the working electrician will open the heavy hammer suspension connecting plate to fix the heavy hammer device Bolts, after removing the heavy hammer device, pass it to the ground with an insulating rope; the ground electrician binds the new heavy hammer device firmly; the working electrician lifts the new heavy hammer device to the wire, and hangs the new heavy hammer device through the bolt and the heavy hammer The connecting board is connected, and the work is completed, and the working electrician returns to the ground.
本发明同已有技术相比可产生如下积极效果:本发明可以有效地克服输电线路重锤更换作业操作流程复杂,重复动作较多,作业强度较大等缺点。其具有:Compared with the prior art, the present invention can produce the following positive effects: the present invention can effectively overcome the disadvantages of complex operating procedures, many repetitive actions, and relatively high operating intensity for replacing the weight of the transmission line. which has:
1、结构简单,安装方便。本发明为一种带有重锤悬挂点的悬垂线夹。安装重锤时,直接将重锤装置悬挂在船体底部连板上即可。1. Simple structure and easy installation. The invention is a suspension wire clip with a weight suspension point. When installing the heavy hammer, directly hang the heavy hammer device on the connecting plate at the bottom of the hull.
2、适用范围广。该悬垂线夹可适用于目前输电线路绝大多数上拔杆塔及转角杆塔。2. Wide application range. The suspension clamp can be applied to most of the uplifting pole towers and corner pole towers of current transmission lines.
3、可简化现场操作程序。在需要进行重锤更换作业时,无需进行吊线,也就省略了吊线装置安装及拆卸的步骤。也无需打开线夹,直接将重锤装置与重锤悬挂连板连接的螺栓打开,即可更换重锤。3. It can simplify the on-site operation procedure. When the heavy hammer needs to be replaced, there is no need to hang the wire, so the steps of installing and dismounting the wire hanging device are omitted. There is also no need to open the wire clamp, and the bolts connecting the weight device and the weight suspension connecting plate are directly opened to replace the weight.
4、降低现场作业强度,提高工作效率。由于简化了重锤更换作业程序,作业人员的劳动强度降低,工作效率大幅提高。以往更换一组重锤需用时120分钟,现在仅需要30分钟即可完成。4. Reduce the intensity of on-site operations and improve work efficiency. Due to the simplification of the hammer replacement operation procedure, the labor intensity of the operators is reduced and the work efficiency is greatly improved. In the past, it took 120 minutes to replace a set of weights, but now it only takes 30 minutes to complete.
附图说明:Description of drawings:
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为本发明的侧视图;Fig. 2 is a side view of the present invention;
图3为本发明的俯视图。Fig. 3 is a top view of the present invention.
具体实施方式:detailed description:
下面结合附图对本发明的具体实施方式作详细说明:The specific embodiment of the present invention is described in detail below in conjunction with accompanying drawing:
实施例:一种带有重锤悬挂点的悬垂线夹(参见图1-图3),其包括船体4,船体4的两侧设有挂轴9,挂板2为碗头挂板,由钢板冲压而成,两片碗头挂板2下部安装在船体4两侧的挂轴9上,挂轴9尾部加垫片及R销6防脱。将螺栓1穿过两片碗头挂板2上部的螺孔通过碗头挂板2与绝缘子底部连接,螺栓1尾部加垫片及R销6防脱。船体4上部设有4个凹槽10、两侧各设有2个卡槽11,两个U型螺栓3通过船体4上部的凹槽10及两侧的卡槽11固定位置。船体4的内部设有压板7,导线置于船体4的内部,用压板7压住,并用U型螺栓3固定。船体4的底部设有带有通孔的重锤悬挂连板5,重锤悬挂连板5通过螺栓悬挂连接重锤装置。Embodiment: a kind of suspension line clamp (referring to Fig. 1-Fig. 3) with heavy hammer suspension point, it comprises hull 4, and both sides of hull 4 are provided with hanging shaft 9, and hanging plate 2 is bowl head hanging plate, is made of Steel plate stamping forms, and two bottoms of bowl head hanging plate 2 are installed on the hanging shaft 9 of hull 4 both sides, and pad and R pin 6 anti-off are added at hanging shaft 9 afterbody. Pass the bolt 1 through the screw holes on the upper part of the two bowl-head hanging plates 2 and connect them to the bottom of the insulator through the bowl-head hanging plate 2, and add gaskets and R pin 6 at the end of the bolt 1 to prevent it from falling off. The upper part of the hull 4 is provided with four grooves 10, and two draw-in grooves 11 are respectively provided on both sides, and two U-shaped bolts 3 are fixed in position through the grooves 10 on the upper part of the hull 4 and the draw-in grooves 11 on both sides. The inside of the hull 4 is provided with a pressing plate 7, and the lead is placed inside the hull 4, pressed down with the pressing plate 7, and fixed with a U-shaped bolt 3. The bottom of the hull 4 is provided with a weight suspension connecting plate 5 with a through hole, and the weight suspension connecting plate 5 is suspended and connected to the weight device by bolts.
需要进行重锤更换时,无需申请线路停电,作业电工通过绝缘软梯攀登至带电导线处,并迅速与导线等电位;作业电工将打开重锤悬挂连板5上用于固定重锤装置的螺栓,将重锤装置取下后,用绝缘绳传递至地面;地面电工将新重锤装置绑扎牢固;作业电工将新重锤装置提升至导线处,将新重锤装置通过螺栓与重锤悬挂连板5连接,工作完毕,作业电工返回地面。When it is necessary to replace the heavy hammer, there is no need to apply for a power outage on the line. The working electrician climbs to the live wire through the insulating ladder and quickly equalizes the potential with the wire; the working electrician will open the bolt on the heavy hammer suspension connecting plate 5 for fixing the heavy hammer device. After removing the heavy hammer device, pass it to the ground with an insulating rope; the ground electrician binds the new heavy hammer device firmly; the working electrician lifts the new heavy hammer device to the wire, and hangs the new heavy hammer device through the bolt and the heavy hammer on the connecting plate 5. After the work is completed, the electrician returns to the ground.
以上的实施例仅仅是对本发明的优选实施方式进行描述,其它优选实施方式在此不一一累述,且并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通工程技术人员对本发明的技术方案作出的各种变形和改进,均应落于本发明的权利要求书确定的保护范围内。The above embodiments are only descriptions of the preferred implementations of the present invention. Other preferred implementations are not described here one by one, and are not intended to limit the scope of the present invention. Various modifications and improvements made by engineers and technicians to the technical solution of the present invention shall fall within the scope of protection determined by the claims of the present invention.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710187547.0A CN106877262A (en) | 2017-03-27 | 2017-03-27 | A kind of suspension clamp with weight hitch point |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710187547.0A CN106877262A (en) | 2017-03-27 | 2017-03-27 | A kind of suspension clamp with weight hitch point |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106877262A true CN106877262A (en) | 2017-06-20 |
Family
ID=59173570
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710187547.0A Pending CN106877262A (en) | 2017-03-27 | 2017-03-27 | A kind of suspension clamp with weight hitch point |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106877262A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108860173A (en) * | 2018-06-15 | 2018-11-23 | 宋听动 | A kind of transport locomotive delivery beam anti-dropout suspension arrangement |
| CN110932214A (en) * | 2019-12-17 | 2020-03-27 | 朱永林 | Light transmission line suspension wire clamping pin device and using method thereof |
| CN117578324A (en) * | 2023-11-28 | 2024-02-20 | 青海送变电工程有限公司 | An anti-wear device for drainage lines |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2058174A (en) * | 1933-10-06 | 1936-10-20 | Aluminum Co Of America | Vibration damper |
| CN203504108U (en) * | 2013-09-17 | 2014-03-26 | 火炬电气集团有限公司 | Jump wire suspension clamp |
| CN203747349U (en) * | 2014-03-10 | 2014-07-30 | 浙江维博电力金具有限公司 | Suspension wire clamp |
| CN205212386U (en) * | 2015-12-15 | 2016-05-04 | 四平线路器材厂 | Insulator chain that dangles prevents waving device |
| CN205544116U (en) * | 2016-01-29 | 2016-08-31 | 浙江固来发电力金具有限公司 | Suspension clamp |
-
2017
- 2017-03-27 CN CN201710187547.0A patent/CN106877262A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2058174A (en) * | 1933-10-06 | 1936-10-20 | Aluminum Co Of America | Vibration damper |
| CN203504108U (en) * | 2013-09-17 | 2014-03-26 | 火炬电气集团有限公司 | Jump wire suspension clamp |
| CN203747349U (en) * | 2014-03-10 | 2014-07-30 | 浙江维博电力金具有限公司 | Suspension wire clamp |
| CN205212386U (en) * | 2015-12-15 | 2016-05-04 | 四平线路器材厂 | Insulator chain that dangles prevents waving device |
| CN205544116U (en) * | 2016-01-29 | 2016-08-31 | 浙江固来发电力金具有限公司 | Suspension clamp |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108860173A (en) * | 2018-06-15 | 2018-11-23 | 宋听动 | A kind of transport locomotive delivery beam anti-dropout suspension arrangement |
| CN108860173B (en) * | 2018-06-15 | 2019-10-29 | 宋听动 | A kind of transport locomotive delivery beam anti-dropout suspension arrangement |
| CN110932214A (en) * | 2019-12-17 | 2020-03-27 | 朱永林 | Light transmission line suspension wire clamping pin device and using method thereof |
| CN117578324A (en) * | 2023-11-28 | 2024-02-20 | 青海送变电工程有限公司 | An anti-wear device for drainage lines |
| CN117578324B (en) * | 2023-11-28 | 2024-11-22 | 青海送变电工程有限公司 | Drainage line anti-wear device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202651692U (en) | Large-knife clamp tool for changing double-strain string insulator | |
| CN201638948U (en) | A throw-pull grounding wire for transmission lines | |
| CN201263063Y (en) | Tool for replacing straight-line simply connected double-string overhang insulator | |
| CN102882157B (en) | Portable shockproof hammer tool for replacing tension wire in power cut | |
| CN106877262A (en) | A kind of suspension clamp with weight hitch point | |
| CN202906345U (en) | Electric power system safety ground wire device | |
| CN104752996B (en) | Method for live replacement of tension duplex whole-string insulators of 330kV power transmission line | |
| CN203300837U (en) | Throwing-hanging type ground wire | |
| CN107257040B (en) | Pull-back swing arm type short circuit grounding wire clamp and grounding and disassembling method | |
| CN106450835A (en) | Shoe manufacturer high voltage wire landing device | |
| CN206727557U (en) | High pressure pylon electricity consumption cable stationary fixture | |
| CN209786223U (en) | wire connection wire clamp for distribution line live-line work | |
| CN201774208U (en) | Suspension counter weight for stabilizing lead jumper of high-voltage line tension corner tower | |
| CN202978103U (en) | Insulator fixture | |
| CN102208776B (en) | Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof | |
| CN204517346U (en) | A kind of earth potential erecting tools for leakage conductor | |
| CN203103836U (en) | ±800kV double-connected double-clamp V-type insulator series fixture | |
| CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state | |
| CN106207850B (en) | The operational method of charged for replacement holes duplex board linear insulator chain | |
| CN110061461A (en) | A kind of nuclear power Insulation crane span structure | |
| CN106856317A (en) | The inclined abrasion-proof apparatus of power transmission line wind | |
| CN210723400U (en) | Transmission line earth clamp | |
| CN206559009U (en) | The inclined abrasion-proof apparatus of power transmission line wind | |
| CN208028222U (en) | A kind of arrester pigtail splice | |
| CN206628616U (en) | Fishing type grounding wire device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170620 |
|
| WD01 | Invention patent application deemed withdrawn after publication |