CN201141223Y - Self-supporting door type transmission tower for direct current transmission line - Google Patents
Self-supporting door type transmission tower for direct current transmission line Download PDFInfo
- Publication number
- CN201141223Y CN201141223Y CN 200720190579 CN200720190579U CN201141223Y CN 201141223 Y CN201141223 Y CN 201141223Y CN 200720190579 CN200720190579 CN 200720190579 CN 200720190579 U CN200720190579 U CN 200720190579U CN 201141223 Y CN201141223 Y CN 201141223Y
- Authority
- CN
- China
- Prior art keywords
- tower
- transmission line
- self
- shaped
- door type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型提供一种直流输电线路的自立式门型输电铁塔,其包含有人字型塔身、门型塔头和地线支架,主体成对称结构。该门型塔头由与人字型塔身相接的垂直臂、弯折曲臂、横担与地线支架组成。正极导线通过绝缘子串挂置在横担上,负极导线通过绝缘子串挂置在塔身和塔身支架上。本实用新型的门型塔,正极、负极导线采用垂直排列的方式,克服了现有技术中当适用于±800kV直流输电线路的情况下,在水平方向上布置导线导致的线路走廊宽度过宽的缺点。导线的垂直排列,节省走廊,减少植被的砍伐,保护环境,降低造价。塔头的门型结构,导线挂点可以灵活多方案布置,即适用于直线塔,也适用于小角度的转角塔。
The utility model provides a self-supporting gate-shaped transmission iron tower of a direct current transmission line, which comprises a herringbone-shaped tower body, a gate-shaped tower head and a ground wire support, and the main body is in a symmetrical structure. The door-shaped tower head is composed of a vertical arm connected with a herringbone-shaped tower body, a bent curved arm, a cross arm and a ground wire support. The positive wire is hung on the cross arm through the insulator string, and the negative wire is hung on the tower body and the tower body support through the insulator string. In the gate-shaped tower of the utility model, the positive and negative wires are arranged vertically, which overcomes the problem of excessive width of the line corridor caused by the horizontal direction of the wires in the prior art when it is suitable for ±800kV DC transmission lines. shortcoming. The vertical arrangement of wires saves corridors, reduces the felling of vegetation, protects the environment and reduces the cost. The tower head has a door-shaped structure, and the wire hanging points can be flexibly arranged in multiple schemes, which is suitable for both straight towers and corner towers with small angles.
Description
技术领域 technical field
本实用新型是有关一种输电设备,尤指一种±800kV直流输电线路使用的全新输电铁塔。The utility model relates to a power transmission equipment, in particular to a brand-new power transmission tower used in a ±800kV direct current power transmission line.
背景技术 Background technique
目前,我国建设和运行的±500kV直流输电线路直线塔大多采用两极导线水平排列的干字型输电铁塔,如图1所示。为了实现我国建设以特高压为骨架的坚强的电网,国家批准建设我国±800kV直流输电线路,根据有关规范和试验结果,±800kV直流输电线路电气绝缘间隙较±500kV线路增加60%以上,如果±800kV直流输电线路中仍然采用图1所示的输电铁塔,那么将会导致水平排列直线塔的走廊宽度大大增加,如此将会给经济发达地区建设±800kV直流输电线路造成极大的土地资源紧张的局面。为此,设计一种能够有效降低线路走廊宽度的全新输电铁塔对于业界而言是非常有益的。At present, most of the linear towers of ±500kV DC transmission lines constructed and operated in my country adopt dry-shaped transmission towers with two-pole conductors arranged horizontally, as shown in Figure 1. In order to realize my country's construction of a strong power grid with UHV as the skeleton, the state has approved the construction of ±800kV DC transmission lines in my country. According to relevant specifications and test results, the electrical insulation clearance of ±800kV DC transmission lines is more than 60% higher than that of ±500kV lines. If ± The transmission tower shown in Figure 1 is still used in the 800kV DC transmission line, which will greatly increase the width of the corridor of horizontally arranged linear towers, which will cause great land resource shortage for the construction of ±800kV DC transmission lines in economically developed areas situation. For this reason, it is very beneficial for the industry to design a new transmission tower that can effectively reduce the width of the line corridor.
实用新型内容Utility model content
本实用新型的目的在于提供一种新型结构的铁塔,可有效降低线路走廊宽度,节约了自然资源,同时也降低了施工难度,节省了线路工程造价。The purpose of the utility model is to provide an iron tower with a new structure, which can effectively reduce the width of the line corridor, save natural resources, reduce the difficulty of construction, and save the cost of line engineering.
为此,本实用新型采用了如下的技术方案:For this reason, the utility model has adopted following technical scheme:
直流输电线路的电压为±800kV,该直流输电线路的自立式门型输电铁塔,其包含有塔身、塔头及地线支架,其重点在于:The voltage of the DC transmission line is ±800kV. The self-supporting gate-type transmission tower of the DC transmission line includes the tower body, the tower head and the ground wire support. The key points are:
该塔头为门型结构,该门型塔头由相邻接的垂直臂、弯折曲臂、横担与地线支架组成,该垂直臂和塔身相连,正极导线通过绝缘子串挂置在横担上,负极导线通过绝缘子串挂置在塔身上部和塔身上部所设置的挂线支架上。本实用新型的门型塔,正极、负极导线采用垂直排列的方式,该正极导线和负极导线可相互交换设置。The tower head is a door-shaped structure. The door-shaped tower head is composed of adjacent vertical arms, bent arms, cross arms and ground wire brackets. The vertical arms are connected to the tower body, and the positive wire is hung on the On the cross arm, the negative electrode wire is hung on the upper part of the tower body and the wire hanging bracket provided on the upper part of the tower body through the insulator string. In the gate-shaped tower of the utility model, the positive and negative wires are vertically arranged, and the positive and negative wires can be arranged interchangeably.
该塔身为分体人字型结构,并设置在该塔头的垂直臂的下方。The tower body is a split herringbone structure, and is set below the vertical arm of the tower head.
该门型塔可悬挂V型绝缘子串或L型绝缘子串,使得本实用新型可作为直线塔或直线转角塔。The gate-shaped tower can hang V-shaped insulator strings or L-shaped insulator strings, so that the utility model can be used as a straight-line tower or a straight-line corner tower.
本实用新型的门型塔头分别在垂直方向使用绝缘子串挂置两极导线,克服了现有技术中当适用于±800kV直流输电线路的情况下,在水平方向上布置导线导致的线路走廊宽度过宽的缺点。导线的垂直排列,节省走廊,减少植被的砍伐,保护环境,降低造价。塔头的门型结构,导线挂点可以灵活多方案布置,即适用于直线塔,也适用于小角度的转角塔。而由于V型或L型绝缘子串限制了导线的摆动,缩小了塔头在宽度方向上的尺寸,使得线路走廊的宽度得到了进一步的压缩。The gate-shaped tower head of the utility model uses insulator strings to hang the two-pole wires in the vertical direction, which overcomes the excessive width of the line corridor caused by the wires arranged in the horizontal direction when it is suitable for ±800kV DC transmission lines in the prior art. wide disadvantages. The vertical arrangement of wires saves corridors, reduces the felling of vegetation, protects the environment and reduces the cost. The tower head has a door-shaped structure, and the wire hanging points can be flexibly arranged in multiple schemes, which is suitable for both straight towers and corner towers with small angles. However, because the V-shaped or L-shaped insulator strings limit the swing of the wires and reduce the size of the tower head in the width direction, the width of the line corridor is further compressed.
随着铁塔大型化的趋势越来越明显,基础作用力和根开都明显提高,本实用新型可以分散基础作用力,对于地质条件较差的软弱地基土十分有利;同时避免大型施工设备进入施工场地难的问题,因而可以降低工程造价。As the trend of large-scale iron towers becomes more and more obvious, the foundation force and root opening are significantly improved. The utility model can disperse the foundation force, which is very beneficial to the weak foundation soil with poor geological conditions; at the same time, it avoids large-scale construction equipment from entering the construction The difficult problem of the site can reduce the project cost.
附图说明 Description of drawings
图1为常规直流输电铁塔的结构示意图;Fig. 1 is a schematic structural diagram of a conventional DC transmission tower;
图2为本实用新型实施例一所述的直流输电线路门型输电铁塔的正视结构示意图;Fig. 2 is a schematic diagram of the front view structure of the gate-type transmission tower of the direct current transmission line described in the first embodiment of the utility model;
图3为本实用新型实施例一所述的直流输电线路门型输电铁塔的侧视结构示意图;Fig. 3 is a side view structural schematic diagram of the door-type transmission tower of the direct current transmission line described in the first embodiment of the utility model;
图4为本实用新型实施例二所述的直流输电线路门型输电铁塔的正视结构示意图。Fig. 4 is a front view structural diagram of the gate-type transmission tower of the direct current transmission line described in the second embodiment of the utility model.
【图号说明】【Description of figure number】
1塔身 6挂线支架1 Tower body 6 Hanging wire bracket
22塔头 7V型绝缘子串22 tower head 7V type insulator string
2垂直臂 8L型绝缘子串2 vertical arm 8L type insulator string
3曲臂 9极导线3 curved arms 9-pole wire
4横担 10负极导线4 cross arm 10 negative wire
5地线支架5 ground bracket
具体实施方式 Detailed ways
为能使贵审查员清楚本发明的结构组成,以及整体运作方式,兹配合图式说明如下:In order to make the structure and composition of the present invention clear to your examiner, as well as the overall operation mode, the description is as follows in conjunction with the drawings:
本实用新型实施例所述的±800kV直流输电线路自立式门型输电铁塔,是区别于以往塔型的一种全新塔型。其门型结构用作为一种±800kV直流输电线路直线(兼转角)塔,其中塔头由横担(包括地线支架)和左右各两段对称的弯折曲臂及垂直臂构成一个弓门形,塔身采用人字型分体式结构,具有良好的整体稳定性。The ±800kV direct current transmission line self-supporting gate type transmission tower described in the embodiment of the utility model is a new tower type different from the previous tower type. Its door-shaped structure is used as a straight line (and corner) tower of ±800kV DC transmission line, in which the tower head is composed of a cross arm (including the ground wire support) and two symmetrical bending arms and vertical arms on the left and right to form a bow door shape, the tower body adopts a herringbone split structure, which has good overall stability.
下面结合实施例和对比例对本实用新型进行描述。Below in conjunction with embodiment and comparative example the utility model is described.
实施例一Embodiment one
本实用新型实施例一是±800kV直流输电线路直线塔,如图2、3所示,图2为本实用新型实施例一所述的直流输电线路门型输电铁塔的正视结构示意图;图3为本实用新型实施例一所述的直流输电线路门型输电铁塔的侧视结构示意图。本实施例包含有塔身1和塔头22,其重点在于:Embodiment 1 of the present utility model is a linear tower of ±800kV DC transmission line, as shown in Figures 2 and 3, Figure 2 is a front view structural schematic diagram of the door-type transmission tower of DC transmission line described in Embodiment 1 of the present utility model; Figure 3 is A schematic diagram of the side view structure of the door-type transmission tower of the direct current transmission line described in the first embodiment of the utility model. Present embodiment comprises tower body 1 and tower head 22, and its emphasis is on:
该塔头22为门型结构,该门型塔头22由相邻接的垂直臂2和弯折曲臂3组成,左右弯折曲臂之间连有横担4与地线支架5。从图3所示,该塔身1为人字型结构,具有良好的整体稳定性。正极导线9通过V型绝缘子串7挂置在横担4上,负极导线10通过V型绝缘子串7挂置在塔身及挂线支架6上,该正极导线9和负极导线10上下布置,大体成垂直排列。该正极导线和负极导线可相互交换设置。The tower head 22 is a door-shaped structure, and the door-shaped tower head 22 is composed of adjacent vertical arms 2 and bent arms 3, and a cross arm 4 and a ground wire support 5 are connected between the left and right bent arms. As shown in Figure 3, the tower body 1 is a herringbone structure with good overall stability. The positive wire 9 is hung on the cross arm 4 through the V-shaped insulator string 7, and the negative wire 10 is hung on the tower body and the hanging wire bracket 6 through the V-shaped insulator string 7. The positive wire 9 and the negative wire 10 are arranged up and down, roughly arranged vertically. The positive lead wire and the negative lead lead can be arranged interchangeably.
对比例comparative example
如图1所示为常规输直流电铁塔的结构示意图。该输电铁塔是常规的干字型直线塔,其同样也由塔身1、塔头2和导线组成,采用V型绝缘子串连接有两极导线,该输电铁塔通常应用于±500kV直流输电线路,也可用于±800kV直流输电线路。Figure 1 is a schematic structural diagram of a conventional direct current transmission tower. The transmission tower is a conventional dry-shaped straight tower, which is also composed of tower body 1, tower head 2 and wires. V-shaped insulators are used to connect two-pole wires in series. This transmission tower is usually used in ±500kV DC transmission lines. Can be used for ±800kV DC transmission lines.
对照实施例一和对比例一可以看出,实施例一的门型直线输电铁塔和对比例一的常规干字型直线输电铁塔相比,线路走廊宽度可降低53%。Comparing Example 1 and Comparative Example 1, it can be seen that the line corridor width can be reduced by 53% compared with the gate-shaped straight-line transmission tower of Embodiment 1 and the conventional dry-shaped straight-line transmission tower of Comparative Example 1.
实施例二Embodiment two
本实用新型实施例二是±800kV直流输电线路转角塔,如图4所示,图4为本实用新型实施例二所述的直流输电线路门型输电铁塔。实施例二和实施例一基本相同,不同之处在于:选用挂点不等高的L型绝缘子串,实施时通过改变L型绝缘子串左右两串挂点位置,使之能够悬挂不等高L型绝缘子串8,从而使得本实施例二提供的输电铁塔可作为直线转角塔用于线路小转角处。其减小线路走廊宽度的原理和作用与实施例一相同。Embodiment 2 of the utility model is a ±800kV direct current transmission line corner tower, as shown in FIG. 4 , which is a door-type transmission tower for a DC transmission line described in Embodiment 2 of the utility model. Embodiment 2 is basically the same as Embodiment 1, the difference is that: L-shaped insulator strings with unequal heights are selected, and the hanging points of the left and right strings of L-shaped insulator strings are changed during implementation, so that it can be suspended with unequal heights L Type insulator string 8, so that the power transmission tower provided by the second embodiment can be used as a straight corner tower for small corners of the line. The principle and effect of reducing the width of the line corridor are the same as those in the first embodiment.
根据对本实用新型提供的±800kV直流输电线路直线转角塔所进行的电气计算分析,双极直流线路导线下的电场强度、电晕水平、无线电干扰、可听噪音、铁塔设计技术等均可满足现有规程规范。According to the electrical calculation and analysis of the ±800kV DC transmission line straight corner tower provided by the utility model, the electric field strength, corona level, radio interference, audible noise, and iron tower design technology under the bipolar DC line conductor can all meet the current requirements. There are rules and regulations.
综上所述,本实用新型满足设计规范要求,结构新颖美观,铁塔整体和局部构造合理,可有效降低线路走廊宽度,减少房屋拆迁和树木砍伐,特别适用于线路走廊资源紧张的人口稠密地区和多山、林木茂盛地形。同时,对于基础作用力较大的铁塔、现场施工条件差的铁塔,分体式塔身可以有效降低基础单点作用力,从而可以达到避免使用大型施工设备,因而可以降低施工难度,节省工程造价。To sum up, the utility model meets the requirements of design specifications, the structure is novel and beautiful, and the overall and partial structure of the iron tower is reasonable, which can effectively reduce the width of the line corridor, reduce house demolition and tree felling, and is especially suitable for densely populated areas and Mountainous, forested terrain. At the same time, for iron towers with large foundation force and poor site construction conditions, the split tower body can effectively reduce the foundation single-point force, thereby avoiding the use of large construction equipment, thus reducing construction difficulty and saving project cost.
如上所述,本实用新型提供一较佳的新型输电铁塔结构,以及相关的应用,于是依法提呈专利申请;然而,以上的实施说明及图式所示,是本创作较佳实施例,并非以此局限本创作,是以,举凡与本创作的构造、装置、特征等近似、雷同,均应属本创作的创设目的及申请专利范围之内。As mentioned above, the utility model provides a better new power transmission tower structure and related applications, so a patent application is submitted according to law; however, the above implementation description and drawings are the preferred embodiments of the invention, not This creation is limited in this way, therefore, all similarities and similarities with the structure, device, and features of this creation should fall within the creation purpose of this creation and the scope of patent applications.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200720190579 CN201141223Y (en) | 2007-12-04 | 2007-12-04 | Self-supporting door type transmission tower for direct current transmission line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200720190579 CN201141223Y (en) | 2007-12-04 | 2007-12-04 | Self-supporting door type transmission tower for direct current transmission line |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201141223Y true CN201141223Y (en) | 2008-10-29 |
Family
ID=40068936
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200720190579 Expired - Lifetime CN201141223Y (en) | 2007-12-04 | 2007-12-04 | Self-supporting door type transmission tower for direct current transmission line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201141223Y (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105178677A (en) * | 2015-08-21 | 2015-12-23 | 国家电网公司 | Linear tower for ultrahigh-voltage direct-current lines and with two poles arranged vertically |
| CN110306858A (en) * | 2019-08-13 | 2019-10-08 | 中国电建集团贵州电力设计研究院有限公司 | A kind of gate suspension cable Guywire tower and method |
| CN112177419A (en) * | 2020-10-28 | 2021-01-05 | 上海神马电力工程有限公司 | Guyed tower |
| CN117145282A (en) * | 2023-10-31 | 2023-12-01 | 佛山电力设计院有限公司 | Compact corner type power transmission tower for strong wind area |
-
2007
- 2007-12-04 CN CN 200720190579 patent/CN201141223Y/en not_active Expired - Lifetime
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105178677A (en) * | 2015-08-21 | 2015-12-23 | 国家电网公司 | Linear tower for ultrahigh-voltage direct-current lines and with two poles arranged vertically |
| CN110306858A (en) * | 2019-08-13 | 2019-10-08 | 中国电建集团贵州电力设计研究院有限公司 | A kind of gate suspension cable Guywire tower and method |
| CN110306858B (en) * | 2019-08-13 | 2024-03-26 | 中国电建集团贵州电力设计研究院有限公司 | Door type suspension cable pulling tower and method |
| CN112177419A (en) * | 2020-10-28 | 2021-01-05 | 上海神马电力工程有限公司 | Guyed tower |
| CN117145282A (en) * | 2023-10-31 | 2023-12-01 | 佛山电力设计院有限公司 | Compact corner type power transmission tower for strong wind area |
| CN117145282B (en) * | 2023-10-31 | 2024-02-20 | 佛山电力设计院有限公司 | Compact corner type power transmission tower for strong wind area |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201695737U (en) | Double circuit high voltage overhead line tower | |
| CN101451407A (en) | S type power transmission iron tower for DC transmission line | |
| CN201433591Y (en) | A door-shaped straight tower | |
| CN204464916U (en) | Layout Structure of Pole Conductors of ±800kV and ±500kV Mixed Voltage Transmission Lines on the Same Tower | |
| CN200976471Y (en) | DC dual-polar vertical arrangement F-shaped transmission line series iron tower | |
| CN206859804U (en) | A kind of 750kV single loops anchor support tower head | |
| CN205502701U (en) | 750kV and 330kV thoughtlessly press 0~20 angle tower in four return circuits | |
| CN207847235U (en) | No ground pole DC transmission line line pole tower | |
| CN204691375U (en) | The narrow base steel tube tower of a kind of 220kV tetra-return cable terminal | |
| CN105178677A (en) | Linear tower for ultrahigh-voltage direct-current lines and with two poles arranged vertically | |
| CN221568061U (en) | DC mixed-voltage double-loop iron tower | |
| CN207813168U (en) | Singly cut-off π sections towers in double loop | |
| CN219711154U (en) | Cat head tower for transmission line | |
| CN102409888B (en) | Improved cat-head type tower | |
| CN206722513U (en) | A kind of overhead transmission line composite punching tangent tower | |
| CN1979988B (en) | Double-circuit compact corner transmission tower on the same tower | |
| CN201141224Y (en) | S type power transmission iron tower for DC transmission line | |
| CN206346563U (en) | A kind of single loop is arranged vertically compact linear tower | |
| CN201502207U (en) | Overhead line high voltage tower pole | |
| CN216016404U (en) | Double-loop high-voltage direct-current line pole lead and metal return line common-frame angle steel tower | |
| CN206346561U (en) | A kind of single loop is arranged vertically anchor support | |
| CN211369746U (en) | A 500kV jumper wire-wound double-circuit drilling tower | |
| CN108005458A (en) | Singly cut-off π sections towers in double loop | |
| CN203367935U (en) | Phase distance optimization structure for strain tower of compact transmission line | |
| CN210858200U (en) | Single-loop multipurpose tower |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: CHINA ELECTRIC POWER RESEARCH INSTITUTE Free format text: FORMER OWNER: GUOWANG BEIJING POWER BUILDING ACADEMY Effective date: 20090724 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20090724 Address after: Beijing City, Haidian District small business Qinghe Road No. 15 Chinese Electric Power Research Institute of the Ministry of science and technology, zip code: 100192 Patentee after: China Electric Power Research Institute Address before: No. 33 South Binhe Road, Beijing, Xuanwu District: 100055 Patentee before: Beijing Electric Power Construction Research Institute of SGCC |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20081029 |