CN206769349U - Light clamper formula scaffold on joist steel upright - Google Patents

Light clamper formula scaffold on joist steel upright Download PDF

Info

Publication number
CN206769349U
CN206769349U CN201720468517.2U CN201720468517U CN206769349U CN 206769349 U CN206769349 U CN 206769349U CN 201720468517 U CN201720468517 U CN 201720468517U CN 206769349 U CN206769349 U CN 206769349U
Authority
CN
China
Prior art keywords
channel
steel
cutting ferrule
section steel
upright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720468517.2U
Other languages
Chinese (zh)
Inventor
陈晋刚
王运法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Shanxi Electric Power Engineering Co Ltd
Original Assignee
China Energy Engineering Group Shanxi Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Shanxi Electric Power Engineering Co Ltd filed Critical China Energy Engineering Group Shanxi Electric Power Engineering Co Ltd
Priority to CN201720468517.2U priority Critical patent/CN206769349U/en
Application granted granted Critical
Publication of CN206769349U publication Critical patent/CN206769349U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the light clamper formula scaffold on a kind of joist steel upright, solves the problems, such as easily to slide existing for existing fixture type scaffold and security is not high.Including joist steel upright(1), channel-section steel cutting ferrule(2)With choose steel pipe outside(3), in joist steel upright(1)Channel-section steel cutting ferrule is connected with the flange plate of upper end(2), in channel-section steel cutting ferrule(2)Outer panel on be fixedly installed and outer choose steel pipe(3), in channel-section steel cutting ferrule(2)Interior plate on be provided with top wire hole(4), in top wire hole(4)Inside it is bolted with jackscrew(5), in channel-section steel cutting ferrule(2)With joist steel upright(1)Slipmat is provided between the flange plate of upper end.The utility model, which is taken, to be torn open simple to operate, is particularly suitable for the characteristics of height is high, and the number of plies is more possessed by the steel construction of station boiler.

Description

Light clamper formula scaffold on joist steel upright
Technical field
A kind of scaffold is the utility model is related to, on more particularly to a kind of joist steel upright of large-sized station boiler Steel Structure The scaffold set up.
Background technology
During large-sized station boiler Steel Structure Installation, the installation of joist steel upright belongs to groundwork, in I-steel Need to set up column cap shelf on the column cap of column, for workmen's operation, setting up for the height scaffolding, presently mainly adopt With fixture type scaffold, i.e. two channel-section steels are held on the column cap of joist steel upright by split bolt, due to various in construction Loose phenomenon can occur for reason, the channel-section steel held, and the channel-section steel for causing to hold slides, and larger potential safety hazard be present.
The content of the invention
The utility model provides the light clamper formula scaffold on a kind of joist steel upright, solves existing fixture type pin Easily slid and the not high technical problem of security existing for hand cradle.
The utility model is that solve above technical problem by the following technical programs:
A kind of light clamper formula scaffold on joist steel upright, including joist steel upright, channel-section steel cutting ferrule and steel pipe is chosen outside, Channel-section steel cutting ferrule is connected with the flange plate of joist steel upright upper end, is fixedly installed on the outer panel of channel-section steel cutting ferrule and chooses steel outside Pipe, is provided with top wire hole on the interior plate of channel-section steel cutting ferrule, jackscrew is bolted with top wire hole, stood in channel-section steel cutting ferrule with I-steel Slipmat is provided between the flange plate of post upper end.
Another channel-section steel cutting ferrule is connected with the opposite side flange plate of joist steel upright upper end, in the outer of another channel-section steel cutting ferrule Be fixedly installed on side plate it is another it is outer choose steel pipe, outer choose steel pipe and outer choose is provided with springboard between steel pipe another.
The utility model, which is taken, to be torn open simple to operate, is particularly suitable for that height possessed by the steel construction of station boiler is high, and the number of plies is more The characteristics of, frame structure is firm, ensure that the safety of workmen.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is channel-section steel cutting ferrule 2 of the present utility model and chooses the attachment structure schematic diagram of steel pipe 3 outside.
Embodiment
The utility model is described in detail below in conjunction with the accompanying drawings:
A kind of light clamper formula scaffold on joist steel upright, including joist steel upright 1, channel-section steel cutting ferrule 2 and steel is chosen outside Pipe 3, channel-section steel cutting ferrule 2 is connected with the flange plate of the upper end of joist steel upright 1, is fixedly installed on the outer panel of channel-section steel cutting ferrule 2 Steel pipe 3 is chosen outside having, top wire hole 4 is provided with the interior plate of channel-section steel cutting ferrule 2, jackscrew 5 is bolted with top wire hole 4, in channel-section steel Slipmat is provided between cutting ferrule 2 and the flange plate of the upper end of joist steel upright 1.
Another channel-section steel cutting ferrule is connected with the opposite side flange plate of the upper end of joist steel upright 1, in another channel-section steel cutting ferrule Be fixedly installed on outer panel it is another it is outer choose steel pipe, outer choose steel pipe and outer choose is provided with springboard 6 between steel pipe 3 another.
The steel construction of station boiler has the characteristics of height is high, and the number of plies is more, it is necessary to take in steel structural upright column installation process If safer and high quality operation scaffold, ensure the safety and high-efficient homework of workmen.When the utility model uses Channel-section steel chuck 2 is inserted on steel frame column wing plate, then locked with bolt jackscrew, can meet that operating personnel is upper and lower on column Climbing and column cap operation.

Claims (2)

1. the light clamper formula scaffold on a kind of joist steel upright, including joist steel upright(1), channel-section steel cutting ferrule(2)With choose outside Steel pipe(3), it is characterised in that in joist steel upright(1)Channel-section steel cutting ferrule is connected with the flange plate of upper end(2), in channel-section steel cutting ferrule (2)Outer panel on be fixedly installed and outer choose steel pipe(3), in channel-section steel cutting ferrule(2)Interior plate on be provided with top wire hole(4), Top wire hole(4)Inside it is bolted with jackscrew(5), in channel-section steel cutting ferrule(2)With joist steel upright(1)It is provided between the flange plate of upper end anti- Skidding.
2. the light clamper formula scaffold on a kind of joist steel upright according to claim 1, it is characterised in that in I-shaped Steel column(1)Another channel-section steel cutting ferrule is connected with the opposite side flange plate of upper end, it is fixed on the outer panel of another channel-section steel cutting ferrule It is provided with outside another and chooses steel pipe, in another outer steel pipe of choosing with choosing steel pipe outside(3)Between be provided with springboard(6).
CN201720468517.2U 2017-04-30 2017-04-30 Light clamper formula scaffold on joist steel upright Active CN206769349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720468517.2U CN206769349U (en) 2017-04-30 2017-04-30 Light clamper formula scaffold on joist steel upright

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720468517.2U CN206769349U (en) 2017-04-30 2017-04-30 Light clamper formula scaffold on joist steel upright

Publications (1)

Publication Number Publication Date
CN206769349U true CN206769349U (en) 2017-12-19

Family

ID=60635216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720468517.2U Active CN206769349U (en) 2017-04-30 2017-04-30 Light clamper formula scaffold on joist steel upright

Country Status (1)

Country Link
CN (1) CN206769349U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265965A (en) * 2017-12-29 2018-07-10 上海建工七建集团有限公司 A kind of outrigger platform device in Construction of Steel Structure
CN108612330A (en) * 2018-06-25 2018-10-02 宁波建工工程集团有限公司 The safe rope support of steel structure high-altitude operation and its construction method of installation
CN113914598A (en) * 2021-11-08 2022-01-11 中国能源建设集团山西电力建设有限公司 Liftable connection method of construction platform cantilever beam based on I-steel stand column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265965A (en) * 2017-12-29 2018-07-10 上海建工七建集团有限公司 A kind of outrigger platform device in Construction of Steel Structure
CN108612330A (en) * 2018-06-25 2018-10-02 宁波建工工程集团有限公司 The safe rope support of steel structure high-altitude operation and its construction method of installation
CN108612330B (en) * 2018-06-25 2023-11-28 宁波建工工程集团有限公司 Steel structure safety rope bracket for high-altitude operation and installation and construction method thereof
CN113914598A (en) * 2021-11-08 2022-01-11 中国能源建设集团山西电力建设有限公司 Liftable connection method of construction platform cantilever beam based on I-steel stand column

Similar Documents

Publication Publication Date Title
CN206769349U (en) Light clamper formula scaffold on joist steel upright
CN204212399U (en) Flip-shell is to clasp
CN103730231B (en) A kind of head cover of transformer lowering or hoisting gear
CN204781881U (en) Elevartor shaft structure construction handling frame
CN103723600A (en) Wall attaching device of construction elevator steel charging platform as well as operation method of wall attaching device
CN201083018Y (en) Mobile multipurpose fast mounting scaffold
CN102921994B (en) Ship stern boring platform
CN202920859U (en) Slot type safety belt hanger
CN206048160U (en) A kind of height-adjustable split heads
CN202499668U (en) Anti-removing jacking cross beam of tower crane
CN107795185A (en) Chimney reinforces pylon high-altitude installation node security construction method
CN204078555U (en) A kind of jacking system that significantly can be elevated manhole cover
CN208869171U (en) One kind lifting reusable porous grade for steelwork tower truss and hangs lid
CN207660275U (en) A kind of scaffold disk
CN208380126U (en) A kind of steelframe sub-assembly
CN203050216U (en) Dual-opening derrick cap
CN208122257U (en) A kind of new steel structure building platform device for high-altitude operation
CN208122242U (en) A kind of shrinkable steel building platform device for high-altitude operation
CN206972148U (en) A kind of vertical ladder fixing device
CN205777406U (en) High stability traveling centering
CN205927652U (en) Total frock of building hoist lifting cage welding
CN102797348A (en) Front-support suspension mechanism for parapet walls
CN208121574U (en) A kind of integral type column one-piece casting stage apparatus
CN201807109U (en) Safety belt suspension system for mounting isolating switch of transformer substation
CN215364738U (en) Fork truck is with boots that rise

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant