CN203585551U - Fixed mounting device for double-layer petroleum pipeline - Google Patents
Fixed mounting device for double-layer petroleum pipeline Download PDFInfo
- Publication number
- CN203585551U CN203585551U CN201320791745.5U CN201320791745U CN203585551U CN 203585551 U CN203585551 U CN 203585551U CN 201320791745 U CN201320791745 U CN 201320791745U CN 203585551 U CN203585551 U CN 203585551U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pair
- backup line
- upper bed
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
The utility model discloses a fixed mounting device for a double-layer petroleum pipeline. The fixed mounting device comprises supporting pillars, an upper base, a lower base, strengthening seats, a main pipeline, a standby pipeline, a pipeline connecting assembly and a sealing element, wherein two supporting pillars are respectively and vertically arranged on two sides of the upper base and the lower base; the standby pipeline is arranged in the upper base; the main pipeline is arranged in the lower base; the strengthening seats are arranged on the outer sides of the supporting pillars; the pipeline connecting assembly is arranged between two adjacent sections of main pipeline and between two adjacent sections of standby pipeline; the pipeline connecting assembly comprises pipeline connecting pieces, connecting rods and a connecting sleeve; the pipeline connecting pieces are arranged on the two adjacent sections of main pipeline or standby pipeline; the connecting rods are connected with the pipeline connecting pieces; the other ends of the connecting rods are arranged in the connecting sleeve; the sealing element is arranged between the two adjacent sections of main pipeline or standby pipeline. According to the fixed mounting device disclosed by the utility model, a mode of transporting petroleum by one or two pipelines at the same time is adopted and the influence on the transportation of the petroleum is avoided when one pipeline is closely maintained, so that the transportation efficiency is increased and the resource waste caused by petroleum leakage is reduced.
Description
Technical field
The utility model relates to oil transportation technology, relates in particular to a kind of double-deck petroleum pipeline secure mounting arrangements.
Background technique
The rich in petroleum resources of China, in petroleum production, the transportation of oil is also very important.Petroleum pipeline is the carrier of oil transportation, and the installation of petroleum pipeline is most important to the protection of the life-span of pipeline, petroleum resources.At present, the accidents such as the waste of the petroleum resources that cause due to pipe leakage, environmental pollution, personal injury, economic loss are very general, petroleum pipeline occurs that crack just must seal maintenance immediately, and the individual layer transportation of petroleum pipeline can not meet the requirement of current oil transportation.
Model utility content
The purpose of this utility model: a kind of double-deck petroleum pipeline secure mounting arrangements is provided, and energy double-layered transporting oil, improves the influence degree of conveying efficiency and maintenance.
To achieve these goals, the technical solution of the utility model is:
A double-deck petroleum pipeline secure mounting arrangements, comprises a pair of supporting post, upper bed-plate, lower bottom base, a pair of reinforced seat, main pipeline, backup line, pipeline connecting assemble and Sealing, described a pair of supporting post is vertically arranged on respectively described upper bed-plate and the both sides of lower bottom base, described upper bed-plate is positioned at the bottom of described supporting post, described lower bottom base is positioned at the middle part of described supporting post, described upper bed-plate and the bottom level of lower bottom base, described upper bed-plate and the top of lower bottom base are curved to lower recess, the arc top surface of described upper bed-plate and described backup line are suitable, described backup line is fixedly mounted in described upper bed-plate, the arc top surface of described lower bottom base and described main pipeline are suitable, described main pipeline is fixedly mounted in described lower bottom base, described main pipeline and backup line are parallel to each other, described a pair of reinforced seat is separately positioned on the outside of described a pair of supporting post, and described reinforced seat is up-narrow and down-wide ladder structure of right angle, and described a pair of supporting post, upper bed-plate, lower bottom base and a pair of reinforced seat are integrative-structures, described pipeline connecting assemble is arranged between described adjacent two sections of main pipelines and between adjacent two sections of backup lines, and described pipeline connecting assemble comprises pair of pipes pipe connecting, a pair of connecting rod and connecting sleeve, described pair of pipes pipe connecting is fixedly installed on respectively on described adjacent two sections of main pipelines or backup line, right angle, the middle part bending of described connecting rod, one end of described a pair of connecting rod and described corresponding being fixedly connected with of pair of pipes pipe connecting, the other end of described a pair of connecting rod is separately positioned in described connecting sleeve, described Sealing is arranged between described adjacent two sections of main pipelines or backup line.
Above-mentioned double-deck petroleum pipeline secure mounting arrangements, wherein, the two ends of described Sealing are round platform column construction, and described Sealing and described main pipeline and backup line are isometrical, and the centre of described Sealing is provided with oil through.
Above-mentioned double-deck petroleum pipeline secure mounting arrangements, wherein, is provided with tension pick-up in described connecting sleeve, and one end that described tension pick-up is positioned at described connecting sleeve with described connecting rod is respectively connected.
Above-mentioned double-deck petroleum pipeline secure mounting arrangements, wherein, the middle part of described supporting post and bottom are provided with two heating pipes, and two described heating pipes lay respectively at described main pipeline and the both sides of backup line.
Above-mentioned double-deck petroleum pipeline secure mounting arrangements, wherein, described main pipeline and the middle part of backup line intersection are communicated with and are X-shaped.
The utility model can adopt single transportation or two modes of simultaneously transporting oil, and a pipe sealing maintenance does not affect the transportation of oil, has improved conveying efficiency, reduces the wasting of resources of Oil spills.
Accompanying drawing explanation
Fig. 1 is the side view of the double-deck petroleum pipeline secure mounting arrangements of the utility model.
Fig. 2 is the plan view of the pipeline connecting assemble of the double-deck petroleum pipeline secure mounting arrangements of the utility model.
Fig. 3 is the sectional view of the Sealing of the double-deck petroleum pipeline secure mounting arrangements of the utility model.
Fig. 4 is main pipeline and the cross-coupled plan view of backup line of the double-deck petroleum pipeline secure mounting arrangements of the utility model.
Embodiment
Below in conjunction with accompanying drawing, further illustrate embodiment of the present utility model.
Refer to shown in accompanying drawing 1 and accompanying drawing 2, a kind of double-deck petroleum pipeline secure mounting arrangements, comprises a pair of supporting post 1, upper bed-plate 2, lower bottom base 3, a pair of reinforced seat 4, main pipeline 5, backup line 6, pipeline connecting assemble and Sealing 7, described a pair of supporting post 1 is vertically arranged on respectively described upper bed-plate 2 and the both sides of lower bottom base 3, described upper bed-plate 2 is positioned at the bottom of described supporting post 1, described lower bottom base 3 is positioned at the middle part of described supporting post 1, described upper bed-plate 2 and the bottom level of lower bottom base 3, described upper bed-plate 2 and the top of lower bottom base 3 are curved to lower recess, the arc top surface of described upper bed-plate 2 and described backup line 6 are suitable, described backup line 6 is fixedly mounted in described upper bed-plate 2, the arc top surface of described lower bottom base 3 and described main pipeline 5 are suitable, described main pipeline 5 is fixedly mounted in described lower bottom base 3, described main pipeline 5 and backup line 6 are parallel to each other, described a pair of reinforced seat 4 is separately positioned on the outside of described a pair of supporting post 1, described reinforced seat 4 is up-narrow and down-wide ladder structure of right angle, described a pair of supporting post 1, upper bed-plate 2, lower bottom base 3 and a pair of reinforced seat 4 are integrative-structures, reinforced bottom firm, described pipeline connecting assemble is arranged between described adjacent two sections of main pipelines 5 and between adjacent two sections of backup lines 6, and described pipeline connecting assemble comprises pair of pipes pipe connecting 8, a pair of connecting rod 9 and connecting sleeve 10, described pair of pipes pipe connecting 8 is fixedly installed on respectively on described adjacent two sections of main pipelines 5 or backup line 6, right angle, the middle part bending of described connecting rod 9, one end of described a pair of connecting rod 9 and described corresponding being fixedly connected with of pair of pipes pipe connecting 8, the other end of described a pair of connecting rod 9 is separately positioned in described connecting sleeve 10, further fastening by connecting sleeve 10 on the normal basis connecting, described Sealing 7 is arranged between described adjacent two sections of main pipelines 5 or backup line 6, plays the effect of further sealing.
Refer to shown in accompanying drawing 3, the two ends of described Sealing 7 are round platform column construction, described Sealing 7 is isometrical with described main pipeline 5 and backup line 6, the centre of described Sealing 7 is provided with oil through 11, can increase the rubbing surface of oil, the pressure that buffering oil causes pipeline, reduces breaking of pipeline.
In described connecting sleeve 10, be provided with tension pick-up 12, one end that described tension pick-up 12 is positioned at described connecting sleeve 10 with described connecting rod 9 is respectively connected, can test the tension force of connecting rod 9 in connecting sleeve 10, once pipeline junction cracking, connecting rod 9 occurs that the test value of loosening tension pick-up 12 can change and report to the police, and plays the effect of early warning.
The middle part of described supporting post 1 and bottom are provided with two heating pipes 13, and two described heating pipes 13 lay respectively at described main pipeline 5 and the both sides of backup line 6, can be pipeline heating in winter, increase velocity of liquid assets.
Refer to shown in accompanying drawing 4, described main pipeline 5 and the middle part of backup line 6 intersection are communicated with and are X-shaped, and main pipeline 5 and backup line 6 can transport or single transportation simultaneously, seal a pipeline and keep in repair whole Transporting impact little.
In sum, the utility model can adopt single transportation or two modes of simultaneously transporting oil, and a pipe sealing maintenance does not affect the transportation of oil, has improved conveying efficiency, reduces the wasting of resources of Oil spills.
Claims (5)
1. a double-deck petroleum pipeline secure mounting arrangements, is characterized in that: comprise a pair of supporting post, upper bed-plate, lower bottom base, a pair of reinforced seat, main pipeline, backup line, pipeline connecting assemble and Sealing, described a pair of supporting post is vertically arranged on respectively described upper bed-plate and the both sides of lower bottom base, described upper bed-plate is positioned at the bottom of described supporting post, described lower bottom base is positioned at the middle part of described supporting post, described upper bed-plate and the bottom level of lower bottom base, described upper bed-plate and the top of lower bottom base are curved to lower recess, the arc top surface of described upper bed-plate and described backup line are suitable, described backup line is fixedly mounted in described upper bed-plate, the arc top surface of described lower bottom base and described main pipeline are suitable, described main pipeline is fixedly mounted in described lower bottom base, described main pipeline and backup line are parallel to each other, described a pair of reinforced seat is separately positioned on the outside of described a pair of supporting post, and described reinforced seat is up-narrow and down-wide ladder structure of right angle, and described a pair of supporting post, upper bed-plate, lower bottom base and a pair of reinforced seat are integrative-structures, described pipeline connecting assemble is arranged between described adjacent two sections of main pipelines and between adjacent two sections of backup lines, and described pipeline connecting assemble comprises pair of pipes pipe connecting, a pair of connecting rod and connecting sleeve, described pair of pipes pipe connecting is fixedly installed on respectively on described adjacent two sections of main pipelines or backup line, right angle, the middle part bending of described connecting rod, one end of described a pair of connecting rod and described corresponding being fixedly connected with of pair of pipes pipe connecting, the other end of described a pair of connecting rod is separately positioned in described connecting sleeve, described Sealing is arranged between described adjacent two sections of main pipelines or backup line.
2. double-deck petroleum pipeline secure mounting arrangements according to claim 1, it is characterized in that: the two ends of described Sealing are round platform column construction, described Sealing and described main pipeline and backup line are isometrical, and the centre of described Sealing is provided with oil through.
3. double-deck petroleum pipeline secure mounting arrangements according to claim 1, is characterized in that: in described connecting sleeve, be provided with tension pick-up, one end that described tension pick-up is positioned at described connecting sleeve with described connecting rod is respectively connected.
4. double-deck petroleum pipeline secure mounting arrangements according to claim 1, is characterized in that: the middle part of described supporting post and bottom are provided with two heating pipes, and two described heating pipes lay respectively at described main pipeline and the both sides of backup line.
5. double-deck petroleum pipeline secure mounting arrangements according to claim 1, is characterized in that: described main pipeline and the middle part of backup line intersection are communicated with and are X-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320791745.5U CN203585551U (en) | 2013-12-05 | 2013-12-05 | Fixed mounting device for double-layer petroleum pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320791745.5U CN203585551U (en) | 2013-12-05 | 2013-12-05 | Fixed mounting device for double-layer petroleum pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203585551U true CN203585551U (en) | 2014-05-07 |
Family
ID=50583466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320791745.5U Expired - Fee Related CN203585551U (en) | 2013-12-05 | 2013-12-05 | Fixed mounting device for double-layer petroleum pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203585551U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104373692A (en) * | 2014-10-31 | 2015-02-25 | 无锡金顶石油管材配件制造有限公司 | Double-pipe supporting frame |
CN104565555A (en) * | 2014-11-28 | 2015-04-29 | 成都锦汇科技有限公司 | Double-layer petroleum pipeline support frame |
CN108533844A (en) * | 2018-04-25 | 2018-09-14 | 吉林建筑大学 | Water supply tube assembly |
CN109514456A (en) * | 2018-12-17 | 2019-03-26 | 江西汇丰管业有限公司 | It is a kind of large size drainpipe carrying use clamp device |
-
2013
- 2013-12-05 CN CN201320791745.5U patent/CN203585551U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104373692A (en) * | 2014-10-31 | 2015-02-25 | 无锡金顶石油管材配件制造有限公司 | Double-pipe supporting frame |
CN104565555A (en) * | 2014-11-28 | 2015-04-29 | 成都锦汇科技有限公司 | Double-layer petroleum pipeline support frame |
CN104565555B (en) * | 2014-11-28 | 2016-08-17 | 成都锦汇科技有限公司 | A kind of double-deck petroleum pipeline bracing frame |
CN108533844A (en) * | 2018-04-25 | 2018-09-14 | 吉林建筑大学 | Water supply tube assembly |
CN108533844B (en) * | 2018-04-25 | 2020-04-28 | 吉林建筑大学 | Water supply pipe assembly |
CN109514456A (en) * | 2018-12-17 | 2019-03-26 | 江西汇丰管业有限公司 | It is a kind of large size drainpipe carrying use clamp device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203585551U (en) | Fixed mounting device for double-layer petroleum pipeline | |
CN203439532U (en) | Tank type container swash plate connecting device | |
CN103122662A (en) | Buckling restrained brace with viscoelastic materials | |
CN203593944U (en) | Connecting structure for steel bar hanging rod and concrete | |
CN204173466U (en) | Novel belt conveyer truss | |
CN204323361U (en) | Box car composite floor board | |
CN203741690U (en) | Pedestrian overcrossing assembling type steel truss girder | |
CN103334373B (en) | A kind of ribbed arch bridge Horizontal Seismic new structural system containing buckling restrained brace | |
CN202954271U (en) | Mining reconstituted bamboo sleeper | |
CN103662383A (en) | Oil pipeline clamping fixture | |
CN203893586U (en) | Freeze dryer | |
CN208545621U (en) | Floating ballast bed plate end large span shear hinge | |
CN202371310U (en) | Pipe-arraying clamping pad for pipeline arrangement of train | |
CN207524479U (en) | A kind of double hose track | |
CN207944347U (en) | A kind of modular bridge structure | |
CN202055122U (en) | Steel rail with seamless connection | |
CN205173856U (en) | Wear -resisting petroleum casing pipe | |
CN204417988U (en) | A kind of city steel bow bridge bottom bracing structure | |
CN209293817U (en) | Section of jurisdiction bracket | |
CN204585989U (en) | Based on the FPSO topside anti-collision structure of steel clamp laminate | |
CN204676424U (en) | Bridge cable body anchoring anchor head | |
CN203948852U (en) | The Glass Steel Tube link that is difficult for toppling over | |
CN203924851U (en) | The small-sized steel column of installing for overhead contact line | |
CN212745450U (en) | Anti-seismic oil conveying pipe | |
CN201014819Y (en) | Engineering machine double-layer bracket structure of solar water heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140507 Termination date: 20141205 |
|
EXPY | Termination of patent right or utility model |