CN207524479U - A kind of double hose track - Google Patents

A kind of double hose track Download PDF

Info

Publication number
CN207524479U
CN207524479U CN201721441773.9U CN201721441773U CN207524479U CN 207524479 U CN207524479 U CN 207524479U CN 201721441773 U CN201721441773 U CN 201721441773U CN 207524479 U CN207524479 U CN 207524479U
Authority
CN
China
Prior art keywords
track
plate
fixed plate
connection fixed
double hose
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721441773.9U
Other languages
Chinese (zh)
Inventor
马亚胜
张旭耀
黎树中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Tap Intelligent Technology Co., Ltd.
Original Assignee
Guangzhou Wisdom Logistics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Wisdom Logistics Co Ltd filed Critical Guangzhou Wisdom Logistics Co Ltd
Priority to CN201721441773.9U priority Critical patent/CN207524479U/en
Application granted granted Critical
Publication of CN207524479U publication Critical patent/CN207524479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of double hose track, which includes the pipeline and support plate of two side-by-side parallel arrangements, be connected between two pipelines by the support plate.Compared with the prior art, twin-tube type structure intensity higher, stability is more preferable, and is connected conducive to the banding of locomotive, reduces the risk of locomotive derailing.

Description

A kind of double hose track
Technical field
The utility model is related to logistics equipment technical field more particularly to a kind of double hose tracks.
Background technology
With the further development of internet trade, quantity that commodity strike a bargain is in explosive growth, the thing followed, then It is that the development of China's logistic industry at this stage does not catch up with the growth rate of internet trade, for example, " shopping such as double 11 " saved Afterwards, huge exchange hand brings the pressure for being difficult to bear to the logistic industry in China, and transport, which is exceeded the time limit, wharf explosion, goods part are lost etc. asks Topic emerges in an endless stream, and not only affects the shopping experience of customer, even more limits the next step development of internet trade.It is meanwhile existing Stage China Logistics industry is still based on highway, railway and air transportation, and the cost of highway transportation is relatively low, but timeliness It is low, also easily cause road traffic congestion;Although the timeliness of air transportation is higher, its high cost and limited fortune Range is sent to also limit its promotion to development of logistics line;Compared with for the above two, cost is not high for railway transportation, and timeliness is not yet It is low, it is the main logistics transportation means in China, but the shortcomings of its site density is low, and circuit flexibility ratio is small restricts China Logistics The further promotion of transport capacity.In addition to this, traditional vehicles are big to the pollution of environment, this is advocated with the world today Energy conservation and environmental protection theory is disagreed.
The logistics cost that is faced for logistics is excessively high, it is homogeneous it is serious, effective supply is insufficient, low side energy consumption, profit energy The problems such as power is low, spontaneous cost declining mend short slab, and upgrading synergy, to innovate technologies be the certainty of logistic industry sustainable development Selection.Therefore, research and development one kind is sent out at any time, is arrived on time, speed is fast, and novel logistics transportation system at low cost is extremely urgent, and is somebody's turn to do The hardware facility of system is us firstly the need of solving the problems, such as using which kind of structure.
Invention content
In order to solve the above technical problems, the utility model provides a kind of double hose track, the orbit strength is high, stability It is good, and connected conducive to the banding of locomotive, reduce the risk of locomotive derailing.
Based on this, the utility model provides a kind of double hose track, and the track includes what two side-by-side parallels were arranged Pipeline and support plate are connected by the support plate between two pipelines.
Preferably, the support plate is equipped with several pieces, is equidistantly separated by between each support plate.
Preferably, the track is equipped with several sections, and two sections of track side-by-side parallels are arranged and pass through the branch Support, which is connected, forms one group of two-way track, and two-way track described in end to end two groups is connected also by support frame as described above.
Preferably, support frame as described above includes connection fixed plate and supporting beam, and the connection fixed plate is equipped with two pieces, Two pieces of connection fixed plate side-by-side parallels set and are connected by the supporting beam, two sections of two-way track described in same group The track is connected respectively with two pieces of connection fixed plates.
Preferably, the connection fixed plate is bathtub construction, and the notch of two pieces of connection fixed plates is opposite, institute The U-shaped connecting plate that supporting beam is set by its both ends is stated to be connected in the vallecular cavity of the connection fixed plate, and the U-shaped connecting plate U-shaped bottom wall and the medial surface of flute profile bottom wall of the connection fixed plate fit, the both ends of the track are equipped with installing plate, institute The lateral surface for stating installing plate and the flute profile bottom wall of the connection fixed plate fits, and the installing plate is equipped with bolt, the company The flute profile bottom wall for connecing fixed plate is equipped with the first connecting hole, and the U-shaped bottom wall of the U-shaped connecting plate is equipped with the second connecting hole, institute It states bolt to fasten with nut across first connecting hole and second connecting hole, realizes that the track, the connection are fixed Plate and the supporting beam three are connected.
Preferably, the cross section of first connecting hole is strip, and the long side of the cross section is parallel to institute Plane where stating track.
Preferably, the pipeline is any one in square tube, rectangular tube, six angle pipes, duck's egg pipe, section bar or bar Kind.
Implement the utility model embodiment, have the advantages that:
Double hose track provided by the utility model includes the pipeline and support plate of two side-by-side parallel arrangements, two institutes It states and is connected by the support plate between pipeline.Compared with the prior art, twin-tube type structure intensity higher, stability is more preferable, And connected conducive to the banding of locomotive, reduce the risk of locomotive derailing.
Description of the drawings
Fig. 1 is the structure diagram of the low latitude logistics transportation runway of the embodiment of the present invention.
Fig. 2 is the structure diagram of the track of the embodiment of the present invention.
Fig. 3 is the structure diagram of the two-way track of the embodiment of the present invention.
Fig. 4 is the structure diagram of the supporting rack of the embodiment of the present invention.
Fig. 5 is the supporting rack of the embodiment of the present invention and the connection diagram of track
Fig. 6 is the enlarged drawing in I regions in Fig. 2.
Reference sign:
1st, track, 11, pipeline, 12, support plate, 121, insulating pad, 122, fixing buckle, 13, installing plate, 131, bolt, 2nd, supporting rack, 21, connection fixed plate, the 211, first connecting hole, 22, supporting beam, 23, anchor ear, 231, hoop plate, 232, connecting cavity Body, 24, U-shaped connecting plate, the 241, second connecting hole, 25, gap, 26, strengthen screw rod, 27, platen, 28, supporting leg, 3, support Stake, 4, photovoltaic panel, 5, conductive cable wire.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained all other without creative efforts Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, the embodiment of the present invention provides a kind of low latitude logistics transportation runway of simple beam structure, mainly including rail Road 1, supporting rack 2, support stake 3, photovoltaic panel 4 and conductive cable wire 5.Track 1 is equipped with several sections, two sections of 1 side-by-side parallel cloth of track It puts and forms one group of two-way track, pass through branch between two sections of tracks 1 of same group of two-way track and between the two-way track of each group Support 2 is connected, and photovoltaic panel 4 is installed on two-way track and supporting rack 2 to absorb solar energy, and conductive cable wire 5 is installed on rail Electric energy is used for transmission on road 1, support stake 3 is fixedly connected by its top with supporting rack 2 sets up whole track 1 in the air.
Based on above structure, which can be along existing road green belt construction, and space hold is few, and Constructing, convenient, construction cost is low, by setting up logistics warehouse, relay centre or collecting and distributing centre then in the terminal of every transport runway The similar national transportation network of a Ge Yu highways, railway can be become;Secondly, which uses simply supported beam Structure, environmental suitability are high, influenced by landform and weather it is smaller, can deep enough more remote mountain area and borderland, compare Highway, railway, air transportation can be significantly expanded the coverage area of the existing logistics in China;In addition to this, which runs Dao Yu highways, railway are mutual indepedent, do not interfere with each other, and low latitude logistics transportation runway is responsible for the transport of cargo, and highway is responsible for railway The transport of passenger so as to fulfill passenger trains and freight trains are seperated, not only mitigates the transport pressure of highway, railway, alleviates the road of China's getting worse Road congestion problems also provide a round-the-clock straightway aerial high-speed road of whole process for cargo transport, greatly improve cargo fortune Defeated actual effect;Most of all, the low latitude logistics transportation runway makes full use of the natural new energy such as solar energy to provide power, symbol Close energy-saving and environment-friendly theory.The connection mode between each component of the low latitude logistics transportation runway and concrete structure is explained in detail below.
As shown in Figure 1 to Figure 3, track 1 uses twin-tube type structure, includes the pipeline of about two side-by-side parallel arrangements 11, it is connected by several support plates 12 between two pipelines 11, is equidistantly separated by between each support plate 12;Two sections of isometric tracks The 1 one group of two-way track of composition of side-by-side parallel setting in the horizontal direction, the both ends of two sections of tracks 1 are connected by supporting rack 2, phase Adjacent two-way track connects into the main body of whole low latitude logistics transportation runway in a manner of end to end by supporting rack 2.It is two-tube Formula structure can not only improve the banding connection of the strength and stability of track 1, more conducively locomotive, significantly reduce locomotive and take off The risk of rail;And two-way track then improves the transport capacity of low latitude logistics transportation runway.It should be pointed out that above-mentioned two pipes The arrangement mode in road 11 is not limited to the arrangement of side-by-side parallel up and down on vertical direction, can be arranged side by side with the left and right in horizontal direction Parallel arrangement;Square tube, rectangular tube, six angle pipes, duck's egg pipe, section bar, bar etc., pipeline 11 and support can be selected in the type of pipeline 11 Steel, copper material, aluminium etc. can be selected in the material of plate 12, and different types of tubing can be selected in two pipelines 11 of track 1.
As shown in Fig. 4 to Fig. 5, supporting rack 2 includes connection fixed plate 21, supporting beam 22, anchor ear 23 and lifting platform.Connection Fixed plate 21 be bathtub construction, two pieces connection fixed plates 21 in the horizontal direction in the form of notch is opposite side-by-side parallel setting and It is connected by two supporting beams 22;Supporting beam 22 uses channel steel, and the U-shaped connecting plate 24 that supporting beam 22 is set by its both ends blocks It is connected in the vallecular cavity of connection fixed plate 21, and side-by-side parallel is set two supporting beams 22 in the form of notch is opposite in the horizontal plane It puts, passes through several reinforcement 26 phases of screw rod there are gap 25 between two supporting beams 22, between the flute profile bottom wall of two supporting beams 22 Connection, it is each to strengthen equidistantly being separated by between screw rod 26;Anchor ear 23 includes the semicircular hoop plate 231 of two panels, and hoop plate 231 is set on supporting beam The lateral surface of 22 flute profile bottom wall, two panels hoop plate 231 are open relatively, are surrounded in the gap 25 between aforementioned two supporting beams 22 One cylindrical connection cavity 232 for banding support stake 3, the central axes of connection cavity 232 are perpendicular to two supporting beams Plane where 22, two panels hoop plate 231 are locked by fastener, and 131 nut of bolt can be used in fastener.Lifting platform includes platform Plate 27 and supporting leg 28, platen 27 are set on the top of connection cavity and the opening of face connection cavity 232, platen 27 and aforementioned two It is connected between supporting beam 22 by supporting leg 28.Based on above structure it is found that one of supporting rack 2 functions as low latitude The support stress point of logistics transportation runway, when stake 3 is supported to be connect with supporting rack 2, support stake 3 passes through connection cavity from the bottom up And up to the bottom surface of platen 27, at this point, anchor ear 23 is by fastener and strengthens screw rod 26 to stake 3 is supported to generate tightening force, on the contrary , support stake 3 generate support force by bind round plate 231 pass to two supporting beams 22 and its between reinforcement screw rod 26 on, most The main body of whole low latitude logistics transportation runway is erected in low latitude at last.Only pass through fastener stress compared to traditional anchor ear And easily occur to loosen because fastener or while coming off causes to connect insecure problem, the anchor ear 23 in the supporting rack 2 is by its institute The active force born be dispersed to two supporting beams 22 and its between reinforcement screw rod 26 on, the stress for making fastener is more balanced, Anchor ear 23 is not susceptible to deform, and the structure of supporting rack 2 is more secured, more stable.Further, between support stake 3 and platen 27 Equipped with rubber slab layer (not shown), rubber slab layer can also pass through in allowed limits other than playing the role of damping Change the height of the thickness adjustment supporting rack 2 of rubber slab layer, 3 height of support stake caused by making up orographic factor or construction error is partially Difference.
In conjunction with shown in Fig. 2 and Fig. 4 on the basis of Fig. 5, the both ends of track 1 are equipped with installing plate 13, are set on installing plate 13 There is bolt 131, the flute profile bottom wall of connection fixed plate 21 is equipped with the first connecting hole 211, is set on the U-shaped bottom wall of U shapes connecting plate 24 There is the second connecting hole 241.When track 1 is connect with supporting rack 2, the outside of flute profile bottom wall of the installing plate 13 with connecting fixed plate 21 Face fits, and the medial surface of flute profile bottom wall of the U-shaped bottom wall of U-shaped connecting plate 24 with connecting fixed plate 21 fits, and first connects It connects 211 and second connecting hole 241 of hole to be just aligned, bolt 131 passes through the first connecting hole 211 and the second connecting hole 241 and nut Fastening realizes that track 1, connection fixed plate 21 and 22 three of supporting beam are connected.Based on above structure it is found that supporting rack 2 Another effect is the two sections of tracks 1 connected in same group of two-way track and connects two groups of end to end two-way tracks.For Increase the connection reliability between two groups of two-way tracks, can also increase welding, consolidation by jacketing or bushing at the docking of two to connect section track 1 Wait connection modes.Further, the cross section of the first connecting hole 211 is strip, and the long side of cross section is parallel to two-way rail Plane where road, therefore, supporting rack 2 can adjust supporting rack 2 and track in the horizontal direction when connecting with two groups of two-way tracks 1 relative position the purpose is to adjust the foothold of support stake 3 in allowed limits, makes up orographic factor or construction error Caused by support 3 position deviation of stake.
To ensure that the locomotive on the logistics transportation runway of low latitude is run at a high speed, steadily, entire low latitude logistics transportation runway needs Gentle tendency is kept, therefore according to different geographical environments, it is each to support between the height of stake 3 and adjacent two supports stake 3 Span is not quite similar, wherein, the altitude range of support stake 3 is 0 to 15 meter, and span scope is 1 to 60 meter, standard span 12 Rice.
As shown in fig. 6, the low latitude logistics transportation runway uses side compression type power supply structure, the track 1 of metal material itself is made For the zero curve of circuit, 1 upper edge pipeline 11 of track moves towards firewire of the conductive cable wire 5 of arrangement as circuit.Specifically, track 1 Support plate 12 is equipped with the insulating pad 121 for completely cutting off zero curve and firewire towards the side outside runway, and insulating pad 121 is equipped with U The fixing buckle 122 of shape, conductive cable wire 5 are installed on by fixing buckle 122 in support plate 12.In low latitude, logistics transportation runway is transported at a high speed Capable locomotive is by being in contact with track 1 and conductive cable wire 5 simultaneously and forming power circuit, so as to fulfill persistently by electricity;Moreover, it leads Electric cable wire 5 and track 1 arrange closely, not only succinct neat in appearance without additional cable bearer, convenient for construction, more improve The safety that track 1 is powered.
As shown in Figure 3 and Figure 5, photovoltaic panel 4 is additionally provided on the low latitude logistics transportation runway, photovoltaic panel 4 is laid on same group Between two sections of tracks 1 of two-way track and on the platen 27 of lifting platform;The solar energy of absorption is converted into electric energy storage by photovoltaic panel 4 There are in accumulator, then by above-mentioned power supply structure to the locomotive or other electrical equipments run on the logistics transportation runway of low latitude Power is provided.To cope with emergency, the also external public electricity-using of low latitude logistics transportation runway, it is ensured that low latitude logistics transportation runway is forever It does not power off.
In addition, the low latitude logistics transportation runway is also used as the common lines system such as traffic lighting, safety monitoring, communication Carrier, multi-purpose content realizes making full use of for space and resource.
It should be pointed out that above-mentioned low latitude logistics transportation runway is mainly used in a kind of Intelligent logistics transportation system, this is System includes above-mentioned low latitude logistics transportation runway and a kind of unmanned shuttle machine.Unmanned shuttle machine is connected by low latitude logistics transportation runway City and the large-scale wholesale logistics center of agricultural trade, village office service station of going directly, fundamentally solve Taobao and go to the countryside difficulty, and agricultural product are gone down town The problem of difficult;Moreover, unmanned shuttle machine only consumes a small amount of electric energy when driving on the logistics transportation runway of low latitude, not only eliminate Road and bridge expense, fuel oil take and the recruitment expense of driver, substantially reduces the cost of logistics transportation, will not also generate exhaust gas and noise is dirty Dye, environmental protection;The operation of unmanned shuttle machine is not interfered by extraneous factors such as weather, speed limit, traffic congestions, and timeliness is high, revolution Property realization logistics transportation at any time special train send, and can accurate specified time of arrival, thoroughly solve the problems, such as Cold Chain Logistics.In short, The system meets future and transports the trend changed to " small lot is multiple batches of ", is that can uniquely meet following logistics four simultaneously to tell greatly It asks:It sends out, arrives on time at any time, speed is fast, novel logistics transportation system at low cost.
To sum up, a kind of low latitude logistics transportation runway provided in this embodiment mainly includes track 1, supporting rack 2, support stake 3rd, photovoltaic panel 4 and conductive cable wire 5.Track 1 is equipped with several sections, and two sections of 1 side-by-side parallel of track arrangements form one group of two-way track, It is connected between two sections of tracks 1 of same group of two-way track and between the two-way track of each group by supporting rack 2, photovoltaic panel 4 It is installed on two-way track and supporting rack 2 to absorb solar energy, conductive cable wire 5 is installed on track 1 and is used for transmission electric energy, branch Support stake 3 is fixedly connected by its top with supporting rack 2 sets up whole track 1 in the air.Compared with the prior art, with following Advantage:
1st, this low latitude logistics transportation track elements are simple, space hold is few, construction is convenient, construction cost is low;
2nd, the low latitude logistics transportation runway environment is adaptable, influenced by landform and weather it is smaller, can it is deep enough more Remote mountain area and borderland expands the coverage area of the existing logistics in China;
3rd, the low latitude logistics transportation runway and highway, railway are mutual indepedent, do not interfere with each other, and realize passenger trains and freight trains are seperated, not only delay The congestion in road problem of China's getting worse is solved, also an aerial high-speed road is provided for cargo transport, greatly improves cargo transport Actual effect;
4th, the low latitude logistics transportation runway makes full use of the natural new energy such as solar energy to provide power, meets energy-saving and environment-friendly Theory.
5th, the low latitude logistics transportation runway is also used as the carrier of common line system, multi-purpose content, realize space and Resource makes full use of.
It should be understood that various information, but these information are described using term " first ", " second " etc. in the present invention These terms are should not necessarily be limited by, these terms are only used for same type of information being distinguished from each other out.For example, not departing from the present invention In the case of range, " first " information can also be referred to as " second " information, similar, and " second " information can also be referred to as " first " information.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principle of the present invention, several improvement and deformation can also be made, these are improved and deformation is also considered as Protection scope of the present invention.

Claims (7)

1. a kind of double hose track, which is characterized in that the track includes the pipeline and support plate of two side-by-side parallel arrangements, It is connected between two pipelines by the support plate.
2. double hose track according to claim 1, which is characterized in that the support plate is equipped with several pieces, each branch Equidistantly it is separated by between fagging.
3. double hose track according to claim 1, which is characterized in that the track is equipped with several sections, two sections of rails Road side-by-side parallel, which is arranged and is connected by support frame as described above, forms one group of two-way track, two-way rail described in end to end two groups Road is connected also by support frame as described above.
4. double hose track according to claim 3, which is characterized in that support frame as described above includes connection fixed plate and support Beam, the connection fixed plate are equipped with two pieces, and two pieces of connection fixed plate side-by-side parallels set and are connected by the supporting beam It connects, two sections of tracks of two-way track described in same group are connected respectively with two pieces of connection fixed plates.
5. double hose track according to claim 4, which is characterized in that the fixed plate that connects is bathtub construction, two pieces The notch of the connection fixed plate is opposite, and it is solid that the U-shaped connecting plate that the supporting beam is set by its both ends is connected in the connection In the vallecular cavity of fixed board, and the U-shaped bottom wall of the U-shaped connecting plate and the medial surface of the flute profile bottom wall of the connection fixed plate are affixed It closes, the both ends of the track are equipped with installing plate, and the lateral surface of the installing plate and the flute profile bottom wall of the connection fixed plate is affixed It closes, the installing plate is equipped with bolt, and the flute profile bottom wall of the connection fixed plate is equipped with the first connecting hole, the U-shaped connection The U-shaped bottom wall of plate is equipped with the second connecting hole, and the bolt passes through first connecting hole and second connecting hole and nut Fastening realizes that the track, the connection fixed plate and the supporting beam three are connected.
6. double hose track according to claim 5, which is characterized in that the cross section of first connecting hole is strip Shape, the long side of the cross section are parallel to plane where the track.
7. according to claim 1-6 any one of them double hose tracks, which is characterized in that the pipeline for square tube, rectangular tube, Any one in six angle pipes, duck's egg pipe, section bar or bar.
CN201721441773.9U 2017-10-31 2017-10-31 A kind of double hose track Active CN207524479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721441773.9U CN207524479U (en) 2017-10-31 2017-10-31 A kind of double hose track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721441773.9U CN207524479U (en) 2017-10-31 2017-10-31 A kind of double hose track

Publications (1)

Publication Number Publication Date
CN207524479U true CN207524479U (en) 2018-06-22

Family

ID=62571869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721441773.9U Active CN207524479U (en) 2017-10-31 2017-10-31 A kind of double hose track

Country Status (1)

Country Link
CN (1) CN207524479U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108792397A (en) * 2018-07-23 2018-11-13 苏州小微仓储设备有限公司 A kind of automatic rotary shelf

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108792397A (en) * 2018-07-23 2018-11-13 苏州小微仓储设备有限公司 A kind of automatic rotary shelf

Similar Documents

Publication Publication Date Title
CN104742913B (en) Realize the system and method turned back before city rail traffic station
CN102717802A (en) Double-row series-connection train-set passenger transport system for urban mass transit
CN104015732A (en) Passenger car high-speed rail express system for solving world problem of urban traffic congestion
CN205688290U (en) Straddle type monorail rail tracks
CN207524479U (en) A kind of double hose track
CN102991376B (en) A kind of existing double-circuit pulls and connects the construction method of contact net simultaneously
CN205205637U (en) Box U roof beam for inter -city railway
CN207645210U (en) A kind of low latitude logistics transportation runway
CN206843866U (en) A kind of magnetic floats joint for track panel and magnetic levitation track
CN102556079A (en) Control method for improving train operation efficiency
CN106868957A (en) A kind of magnetic floats joint for track panel and magnetic levitation track
CN207537822U (en) A kind of supporting rack of low latitude logistics transportation runway
CN207631023U (en) A kind of track of side compression type power supply
CN107060390B (en) Rail vehicle stop station
CN205203003U (en) System for turn back before realizing urban rail transit station
CN107738879A (en) A kind of low latitude logistics transportation runway
CN203144916U (en) Combined protecting system with photovoltaic generation function for railway or highway
CN208023391U (en) A kind of novel low latitude logistics transportation runway
CN204296710U (en) A kind of standardization bridge type elevated station
CN201390928Y (en) Support rail continuous beam in double track railway
CN206785002U (en) A kind of rail vehicle bus stop
CN203888647U (en) Power supplying track system and current receiving system
CN207331384U (en) A kind of aerocycle road structure based on new energy
CN106968144A (en) New continental rise threeway grade separation traffic system
Belošević et al. Challenges in the railway yards layout designing regarding the implementation of intermodal technologies

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190917

Address after: 510030 room 08, 19 / F, xingguangyingjing, NO.119, Shuiyin Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong Tap Intelligent Technology Co., Ltd.

Address before: 510000 Guangdong city of Guangzhou province Yuexiu District Shuiyin Road No. 119 room 05 19 stars reflect scene

Patentee before: Guangzhou wisdom Logistics Co., Ltd.

TR01 Transfer of patent right