CN202055122U - Steel rail with seamless connection - Google Patents

Steel rail with seamless connection Download PDF

Info

Publication number
CN202055122U
CN202055122U CN201120104102XU CN201120104102U CN202055122U CN 202055122 U CN202055122 U CN 202055122U CN 201120104102X U CN201120104102X U CN 201120104102XU CN 201120104102 U CN201120104102 U CN 201120104102U CN 202055122 U CN202055122 U CN 202055122U
Authority
CN
China
Prior art keywords
rail
hole
utility
model
seamless connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120104102XU
Other languages
Chinese (zh)
Inventor
贾俊成
杨丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120104102XU priority Critical patent/CN202055122U/en
Application granted granted Critical
Publication of CN202055122U publication Critical patent/CN202055122U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model relates to a steel rail with seamless connection, which belongs to the technical field of skew intersection or lap joint groups at tail ends of the steel rails. The utility model particularly relates to the steel rail with the seamless connection. The utility model provides the steel rail with the seamless connection, which can realize smooth transition of wheels and is simple in structure. The steel rail with the seamless connection comprises the steel rail, and the key points of the structure are as follows: orthogonal projection lines of the parallel end lines of the two steel rails on the bottom surfaces of the steel rails form 45-degree angles with the horizontal line at the butt joint of the steel rails and the two steel rails are connected through connecting devices at the side parts.

Description

The seamless link rail
Technical field
The utility model is divided the fixed building portion, the big class of the building of road, railway or bridge, railroad track of belonging to by International Patent Classification (IPC) (IPC); The railroad track annex; Lay the mechanical group of different kinds of railways, big group of the joint of rail, rail end oblique or overlap little technical group field; Relate in particular to a kind of seamless link rail.
Background technology
Rail is the main building block of railroad track.Its function is that the wheel of pilot engine vehicle advances, and bears the immense pressure of wheel, and is delivered on the sleeper.Rail is necessary for wheel rolling surface continuous, smooth-going and that resistance is minimum is provided.At electric railway or automatic block district, rail also can doublely be done the usefulness of track circuit.
Existing rail in use, when wheel when track bond place, can produce and jolt, vibrate, the transport of railway is caused adverse effect.
Summary of the invention
The utility model is exactly at the problems referred to above, and a kind of seamlessly transitting and seamless link rail simple in structure of wheel of realizing is provided.
For achieving the above object, the utility model adopts following technical scheme, and the utility model comprises rail, and its structural feature is in track bond place, the parallel end line of two rails is at the orthography line and the horizon angle at 45 of rail foot surface, and described two rails links to each other by the linkage of sidepiece.
As a kind of preferred version, linkage described in the utility model comprises clamping plate, bolt, the nut with first through hole, rail is provided with and corresponding second through hole of described first through hole, be provided with in second through hole can be in second through hole movable sleeve pipe, casing length is greater than the length of second through hole, and described bolt links to each other clamping plate by first through hole, sleeve pipe, second through hole, nut with rail.
The utility model beneficial effect
1, can realize seamlessly transitting of wheel
The utility model track bond place, the parallel end line of two rails are at the orthography line and the horizon angle at 45 of rail foot surface, and described two rails links to each other by the linkage of sidepiece; Owing to done 45, make that the termination of joint two rails is interlaced, when wheel crosses, do not have the unsettled moment all the time.So the utility model can be realized seamlessly transitting of wheel.
2, thermal adaptability is strong
The utility model linkage comprises clamping plate, bolt, the nut with first through hole, rail is provided with and corresponding second through hole of described first through hole, be provided with in second through hole can be in second through hole movable sleeve pipe, casing length is greater than the length of second through hole, and described bolt links to each other clamping plate by first through hole, sleeve pipe, second through hole, nut with rail; By above-mentioned linkage, rail can be stretched, well compensated expanding with heat and contract with cold of rail.
3, simple in structure
The utility model just will carry out tilt variation at the track bond end line, the linkage of employing form by the parts that are easy on the market purchase and compound mode simple, so the utility model is simple in structure.
Description of drawings
Clearer for technical problem, technical scheme and beneficial effect that the utility model is solved, below in conjunction with the drawings and the specific embodiments, the utility model is further elaborated.Should be appreciated that the specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
Fig. 1 is the utility model vertical view;
Fig. 2 is the utility model side portion structure schematic diagram;
Among the figure, 1 is that clamping plate, 2 are that bolt, 3 is rail.
The specific embodiment
As shown in the figure, the utility model comprises rail 3, and at rail 3 joints, the parallel end line of two rails 3 is at the orthography line and the horizon angle at 45 of rail 3 bottom surfaces, and described two rails 3 links to each other by the linkage of sidepiece.
Described linkage comprises clamping plate 1, bolt 2, the nut with first through hole, rail 3 is provided with and corresponding second through hole of described first through hole, be provided with in second through hole can be in second through hole movable sleeve pipe, casing length is greater than the length of second through hole, and described bolt 2 links to each other clamping plate 1 by first through hole, sleeve pipe, second through hole, nut with rail 3.
Above content is to further describing that the utility model is done in conjunction with concrete preferred implementation; can not assert that concrete enforcement of the present utility model is confined to these explanations; for the utility model person of an ordinary skill in the technical field; under the prerequisite that does not break away from the utility model design; can also make some simple deduction or replace, all should be considered as belonging to the definite protection domain of claims that the utility model is submitted to.

Claims (2)

1. the seamless link rail comprises rail (3), it is characterized in that at rail (3) joint, and the parallel end line of two rails (3) is at the orthography line and the horizon angle at 45 of rail (3) bottom surface, and described two rails (3) links to each other by the linkage of sidepiece.
2. according to the described seamless link rail of claim 1, it is characterized in that described linkage comprises clamping plate (1), bolt (2), the nut with first through hole, rail (3) is provided with and corresponding second through hole of described first through hole, be provided with in second through hole can be in second through hole movable sleeve pipe, casing length is greater than the length of second through hole, and described bolt (2) links to each other clamping plate (1) by first through hole, sleeve pipe, second through hole, nut with rail (3).
CN201120104102XU 2011-04-12 2011-04-12 Steel rail with seamless connection Expired - Fee Related CN202055122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120104102XU CN202055122U (en) 2011-04-12 2011-04-12 Steel rail with seamless connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120104102XU CN202055122U (en) 2011-04-12 2011-04-12 Steel rail with seamless connection

Publications (1)

Publication Number Publication Date
CN202055122U true CN202055122U (en) 2011-11-30

Family

ID=45015101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120104102XU Expired - Fee Related CN202055122U (en) 2011-04-12 2011-04-12 Steel rail with seamless connection

Country Status (1)

Country Link
CN (1) CN202055122U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174066A (en) * 2011-12-23 2013-06-26 金鹏 N-shaped steel rail connector
CN106522042A (en) * 2016-11-28 2017-03-22 黄俊柳 Close jointing seamless train railway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174066A (en) * 2011-12-23 2013-06-26 金鹏 N-shaped steel rail connector
CN106522042A (en) * 2016-11-28 2017-03-22 黄俊柳 Close jointing seamless train railway

Similar Documents

Publication Publication Date Title
CN204608592U (en) A kind of bridge energy-dissipating and shock-absorbing anti-fall girder apparatus
CN201635007U (en) Continuous reinforcement bar connection deck structure for integrated seamless bridge
CN202055122U (en) Steel rail with seamless connection
CN203668767U (en) Assembly rail crawling-prevention device
CN106868957A (en) A kind of magnetic floats joint for track panel and magnetic levitation track
CN201439315U (en) Rolling bearing type expansion joint of steel-aluminum composite rail
CN2758310Y (en) Biblock type rail bearing
CN202830761U (en) Railway steel truss girder bridge ballastless track laying structure
CN203212952U (en) Docking device of train rail
CN206233043U (en) Rail and railroad track
CN201512728U (en) Novel rail connector
CN203782497U (en) Novel freeze joint clamping plate for railway tracks
CN202945544U (en) Novel ballastless track
CN204738189U (en) F of moderate -low speed magnetic levitation system shaped steel double slit attach fitting
CN203639767U (en) Temporary-assembly-type track structure
CN204162955U (en) Soft clay area modern tram subgrade stiffness transition structure
CN204567663U (en) The underground station structure of city track traffic engineering band stop line
CN208733405U (en) A kind of rail defects and failures weld seam bracing means
CN202509342U (en) Insulating board for turnout and turnout insulating structure
CN202202212U (en) Single crossover for urban rail transit
CN211848653U (en) Steel rail fixing device for construction
CN203212947U (en) Rail and connection structure thereof
CN201826224U (en) Railway steel rail inclined plane connection
CN207987630U (en) A kind of track bracing means
CN201187019Y (en) Railway rail without impulsive sound

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130