CN203547554U - Hydraulic mine drilling machine - Google Patents
Hydraulic mine drilling machine Download PDFInfo
- Publication number
- CN203547554U CN203547554U CN201320645956.8U CN201320645956U CN203547554U CN 203547554 U CN203547554 U CN 203547554U CN 201320645956 U CN201320645956 U CN 201320645956U CN 203547554 U CN203547554 U CN 203547554U
- Authority
- CN
- China
- Prior art keywords
- base
- chassis
- drilling machine
- rig
- upright column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a hydraulic mine drilling machine. The hydraulic mine drilling machine comprises a base and a machine body, and is characterized in that the base is arranged on a sleeper; channel steel for reinforcement is welded on each of two sides of the base; a pressing vehicle pillar chassis is welded on the outer side of the base; a drilling machine upright column chassis is fixed on the upper surface of the base through a bolt; the pressing vehicle pillar chassis is positioned on the outer side of the drilling machine upright column chassis and is parallel to the drilling machine upright column chassis; a drilling machine upright column is vertically connected to the drilling machine upright column chassis; the horizontal machine body is connected to the upper end of the drilling machine upright column; the length of the machine body is 2.5m; two inclined type hydraulic supporting oil cylinders are arranged at the front end of the machine body. The hydraulic mine drilling machine can be operated across a belt conveyor, the personal safety of staff can be guaranteed, and the work efficiency of drilling construction is improved.
Description
Technical field
The utility model relates to a kind of hydraulic drill rig, relates in particular to a kind of mining hydraulic drilling rig.
Background technology
Mine, when work plane two crossheading construction concordant boring, is subject to the impact of conveyor in span length and tunnel, and high-power, high efficiency hydraulic drill rig is applied at the scene, cannot enter construction in the tunnel that is provided with conveyor.So, can only adopt the boring of little, the inefficient hydraulic drill rig construction of power concordant.When construction drill, personnel add stacks above need standing in conveyor gap bridge, and potential safety hazard is larger, and drilling machine construction progress is slower, tends to affect work plane and finds time in advance, and the digging that has affected mine is taken over.
When concordant is holed, often adopt common rig to coordinate auger stem and drill bit construction at present, apply wind-force power deslagging mode and manually add and unload drilling rod, rig power is large, efficiency is high, to the strong adaptability of field condition.But during common drilling machine construction concordant boring, because torsional forces is less, very easily there is the phenomenons such as " inhale and bore ", " embrace and bore ", when processing " inhale and bore ", easily cause again the drilling accidents such as the breaking of rod, cause Completion of Drilling Hole rate low, secondly, manually add and unload drilling rod, worker's labour intensity is large, and potential safety hazard is large, efficiency of construction is low, finally, common rig is subject to the impact of drilling machine body mechanism and span length, can not operation in the tunnel that is furnished with conveyor.
Utility model content
The technical problems to be solved in the utility model is to provide one can, across conveyor operation, ensure employee's personal safety, improves the mining hydraulic drilling rig of drilling construction work efficiency.
A kind of mining hydraulic drilling rig, comprises base and fuselage, it is characterized in that: the length of base is 1 meter, and base is placed on sleeper, and the each weld groove steel in base both sides is reinforced; The outside of base is welded with the pillar chassis of delaying unloading, the fixing rig column chassis of the useful bolt of upper surface of base, the pillar chassis of delaying unloading is positioned at the outside on rig column chassis, and with column chassis parallel arranged, rig column is vertically connected with rig column on chassis, the upper end of rig column is connected with the fuselage of level, and the length of fuselage is 2.5 meters; Front fuselage has two tilting support hydraulic pressure oil cylinders.
Compared with prior art, the beneficial effect the utlity model has is:
1. because the length over end sills of this mining hydraulic drilling rig is 1 meter, fuselage length is 2.5 meters, thereby realized fuselage, crosses over conveyor operation, and personnel may stand in outside conveyor and just can tear open it in tunnel, stacks operation.
2. because this mining hydraulic drilling rig personnel when the construction drill add stacks without standing in conveyor above passing a bridge, there is not potential safety hazard, therefore not only can ensure employee's personal safety, and can improve drilling construction work efficiency.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is the structural representation of a kind of mining hydraulic drilling rig of the utility model.
The specific embodiment
As shown in Figure 1, a kind of mining hydraulic drilling rig, comprises base 1 and fuselage 2, and the length of base 1 is 1 meter, and base 1 is placed on sleeper 7, and the base 1 each weld groove steel in both sides is reinforced; The outside of base 1 is welded with the pillar chassis 4 of delaying unloading, the fixing rig column chassis 5 of the useful bolt of upper surface of base 1, the pillar chassis 4 of delaying unloading is positioned at the outside on rig column chassis 5, and with column chassis 5 parallel arranged, on rig column chassis 5, be vertically connected with rig column 6, the upper end of rig column 6 is connected with the fuselage 2 of level, and the length of fuselage 2 is 2.5 meters; Fuselage 2 front ends have two tilting support hydraulic pressure oil cylinders 3.
By improving the length of rig substructure 1, place side by side on will delay unloading pillar chassis and rig column chassis, has saved base space; By reinforcing at base 1 both sides weld groove steel, guaranteed the soundness of base 1; By improving the length of fuselage 2, can guarantee that it can cross over coal road conveyor, thereby realize fuselage 2, cross over conveyor construction, personnel may stand in outside conveyor and just can tear open it in tunnel, stacks operation.By increasing by two tilting support hydraulic pressure oil cylinders 3 at drilling machine body 2 front ends, can play drilling machine body 2 is supported to fixing effect.
This kind of mining hydraulic drilling rig, not only can be across conveyor operation, and can ensure employee's personal safety, improves drilling construction work efficiency.
Claims (1)
1. a mining hydraulic drilling rig, comprises base (1) and fuselage (2), it is characterized in that: the length of base (1) is 1 meter, and it is upper that base (1) is placed in sleeper (7), and the each weld groove steel in base (1) both sides is reinforced; The outside of base (1) is welded with the pillar chassis (4) of delaying unloading, the fixing rig column chassis (5) of the useful bolt of upper surface of base (1), the pillar chassis (4) of delaying unloading is positioned at the outside on rig column chassis (5), and with column chassis (5) parallel arranged, on rig column chassis (5), be vertically connected with rig column (6), the upper end of rig column (6) is connected with the fuselage (2) of level, and the length of fuselage (2) is 2.5 meters; Fuselage (2) front end has two tilting support hydraulic pressure oil cylinders (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320645956.8U CN203547554U (en) | 2013-10-18 | 2013-10-18 | Hydraulic mine drilling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320645956.8U CN203547554U (en) | 2013-10-18 | 2013-10-18 | Hydraulic mine drilling machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203547554U true CN203547554U (en) | 2014-04-16 |
Family
ID=50465683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320645956.8U Expired - Fee Related CN203547554U (en) | 2013-10-18 | 2013-10-18 | Hydraulic mine drilling machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203547554U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104179454A (en) * | 2014-07-09 | 2014-12-03 | 山东矿业管理技术服务集团有限公司 | Method for drilling hole across belt conveyor |
CN106567674A (en) * | 2016-11-07 | 2017-04-19 | 中煤科工集团西安研究院有限公司 | Crawler-type high-rotating-speed spiral drilling machine used under coal mine |
-
2013
- 2013-10-18 CN CN201320645956.8U patent/CN203547554U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104179454A (en) * | 2014-07-09 | 2014-12-03 | 山东矿业管理技术服务集团有限公司 | Method for drilling hole across belt conveyor |
CN106567674A (en) * | 2016-11-07 | 2017-04-19 | 中煤科工集团西安研究院有限公司 | Crawler-type high-rotating-speed spiral drilling machine used under coal mine |
CN106567674B (en) * | 2016-11-07 | 2019-01-22 | 中煤科工集团西安研究院有限公司 | Underground coal mine crawler type high-speed auger creeps into drilling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102900362B (en) | Narrow-machine-body full-hydraulic bolt and anchor cable drill carriage for coal mine tunnel | |
CN101832102B (en) | Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage | |
CN202250086U (en) | Machine for cutting through hills | |
CN202991079U (en) | Base plate type connection device of anchor rod or anchor pipe and structural steel frame | |
CN105178853A (en) | Tracked walking self-rotating bidirectional drilling coal mining machine and application method thereof | |
CN103075153B (en) | Drilling type coal mining machine for open air | |
CN203547554U (en) | Hydraulic mine drilling machine | |
CN103147772B (en) | Method for supporting steel strip connecting bridge of arch-shaped soft rock roadway with large section | |
CN104373122B (en) | Utilize the pick anchor device of star-wheel collection coal | |
CN206554794U (en) | A kind of colliery convertible all-direction borehole rig of crawler travel | |
CN205743941U (en) | A kind of colliery tunnel support plate | |
CN202144748U (en) | Underground truck loading platform of high-end hydraulic support for mining | |
CN208456613U (en) | A kind of Mechanized roadway layout structure | |
CN202673143U (en) | All-directional hydraulic anchor rod drill rig for coal mines | |
CN202645606U (en) | Cantilever type heading machine vehicle-mounted matched supporting and anchoring system | |
CN110118083A (en) | A kind of method of fully-mechanized mining working coal pillar recovery | |
CN205977257U (en) | Mining excavation is walking prop and entry driving machine for working face | |
CN205805593U (en) | A kind of longwell spoil strip-type filling coal mining hydraulic support | |
CN203808829U (en) | Suspension type omnibearing anchor rod drilling carriage | |
CN103883342B (en) | U-shaped steel with anti-end arch interlock is rigidly connected support and construction method thereof | |
CN204532119U (en) | A kind of drill boom device of two-arm hydraulic anchor rod drill carriage | |
CN104358568B (en) | Utilize the pick anchor device of helix drum collection coal | |
CN107083990A (en) | A kind of protector of underground work | |
CN203594358U (en) | Full-hydraulic anchor rod drill carriage | |
CN207620745U (en) | A kind of all-hydraulic coal mine down-hole drilling auxiliary machinery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140416 Termination date: 20141018 |
|
EXPY | Termination of patent right or utility model |