CN205805593U - A kind of longwell spoil strip-type filling coal mining hydraulic support - Google Patents

A kind of longwell spoil strip-type filling coal mining hydraulic support Download PDF

Info

Publication number
CN205805593U
CN205805593U CN201620545400.5U CN201620545400U CN205805593U CN 205805593 U CN205805593 U CN 205805593U CN 201620545400 U CN201620545400 U CN 201620545400U CN 205805593 U CN205805593 U CN 205805593U
Authority
CN
China
Prior art keywords
hydraulic support
waste rock
strip
spoil
longwell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620545400.5U
Other languages
Chinese (zh)
Inventor
李佳
张勇
李春元
赵健健
熊晓峰
刘钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201620545400.5U priority Critical patent/CN205805593U/en
Application granted granted Critical
Publication of CN205805593U publication Critical patent/CN205805593U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

This utility model relates to a kind of longwell spoil strip-type filling coal mining hydraulic support, including four-leg shock waste filling hydraulic support and the gangue stopping device of band stretchable waste rock stopping plate, wherein: described hydraulic support is two sections of back timbers, the waste filling hydraulic support of the back timber hanging drag conveyor of four hydraulic props, described gangue stopping device is by base, three bottom waste rock boards around base, top waste rock board in the waste rock board of bottom, two columns being positioned on base long axis, the back timber composition being connected with column and top waste rock board, the top waste rock board being connected with back timber in described gangue stopping device can be controlled lifting by double columns, fully to connect top.This utility model longwell spoil strip-type filling coal mining hydraulic support can realize the Fully-mechanized of spoil strip-type filling, reduces labor strength, reduces the danger coefficient of workman's work, improves pack effectiveness.

Description

A kind of longwell spoil strip-type filling coal mining hydraulic support
Technical field
This utility model relates to a kind of longwell spoil strip-type filling coal mining hydraulic support.
Background technology
At present, east China coal field development intensity is higher, most mine residual recoverable reserves seldom, and " three times " (under building, under water body and under railway) pressure coal amount occupies the major part in residual recoverable reserves.These dull coal money Source shortens the length of service of mine, limits the development of coal enterprise, these coal enterprise's exigence exploitation " three times " Pressure coal.
The method of exploitation " three times " pressure coal mainly has post and stall and a method of collecting coal by the means of filling, but post and stall coal Recovery ratio is relatively low, causes a large amount of wastes of coal resources.The method of collecting coal by the means of filling is by utilizing gangue, flyash the like waste filling Goaf, the most controllably table sinks but also can utilize garbage in a large number, meets the theory of Green Mine.But for a long time, The high cost of filling mining and low pack effectiveness seriously limit the popularization and application of filling mining.The part method of collecting coal by the means of filling is led to Cross reduction pack completeness to reduce filling cost, covert raising pack effectiveness, reduces the defect of the method for collecting coal by the means of filling own and is applied to Impact.
The strip-type part method of collecting coal by the means of filling has been applied in China's part mining area, but in on-the-spot application, manifold is the most manually constructed Pack wall or bamboo hedge etc. form strip filling space, and this danger not only adding workman's work also reduces pack effectiveness, Limit the application of the strip-type method of collecting coal by the means of filling.
Utility model content
In view of this, this utility model provides a kind of longwell spoil strip-type filling coal mining hydraulic support.
The technical solution adopted in the utility model is: a kind of longwell spoil strip-type filling coal mining hydraulic support, by four posts The gangue stopping device composition of brace type waste filling hydraulic support and band stretchable waste rock stopping plate, wherein said hydraulic support is two sections Back timber, four hydraulic props back timber hanging drag conveyor waste filling hydraulic support, described gangue stopping device by base, three Two columns that face around the top waste rock board in the bottom waste rock board, bottom waste rock board of base, is positioned on base long axis and The back timber composition that column and top waste rock board are connected, the top waste rock board being connected with back timber in described gangue stopping device can be by double Column controls lifting, fully to connect top.
Described hydraulic support is to be removed ramming device repacking by common waste filling hydraulic support to prepare.Described hydraulic pressure props up Frame back timber and gangue stopping device back timber are separate.
Described hydraulic support top beam is hinged with front column, rear column and straight guide rod, gangue stopping device back timber and top waste rock board Weld together and hinged with front column and rear column, front and back's column control lifting.
Described hydraulic support is connected by two hydraulic jacks with gangue stopping device.Described bottom waste rock board is hollow, top Waste rock board is positioned at bottom waste rock board.
This utility model longwell spoil strip-type filling coal mining hydraulic support, is arranged in longwell waste filling by be spaced Work surface, in order to form strip filling space, the spacing distance that obturator width is arranged by this utility model determines.Obturator with The propelling of work surface and extend forward, finally form strip filling body along advance of the face direction.
Of the present utility model having the beneficial effect that realizes the Fully-mechanized of spoil strip-type filling, reduces workman and works by force Degree, reduces the danger coefficient of workman's work, improves pack effectiveness.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model (gangue stopping device is in raised configuration).
Fig. 2 is structural upright schematic diagram of the present utility model (gangue stopping device is in half raised configuration).
Fig. 3 is that work surface of the present utility model arranges schematic diagram.
Detailed description of the invention
With embodiment, longwell spoil strip-type filling coal mining hydraulic support of the present utility model is carried out below in conjunction with the accompanying drawings Describe and explanation.
As depicted in figs. 1 and 2, longwell spoil strip-type filling coal mining hydraulic support, it is characterised in that by four-leg shock Waste filling hydraulic support and gangue stopping device composition, hydraulic support includes front-axle beam 1, back timber 2, straight guide rod 3, front column 14, stands afterwards Post 4, hanging drag conveyor 5, base 13 form.Gangue stopping device is by back timber 6, top waste rock board 7, bottom waste rock board 8, rear column 9, front column 10, base 11 form.Described hydraulic support is connected by hydraulic jack 12 with gangue stopping device, described hydraulic support top Beam 2 and gangue stopping device back timber 6 are separate, and hydraulic support top beam 2 is hinged with front column 14, rear column 4 and straight guide rod 3, Gangue stopping device back timber 6 welds together with top waste rock board 7 and hinged with front column 10 and rear column 9, front and back's column control Lifting.Described bottom waste rock board 8 is hollow, and top waste rock board 7 is positioned at bottom waste rock board 8.
13: as it is shown on figure 3, when work surface uses this device, arrange this utility model liquid at work surface open-off cut interval Pressure support 1,6,7,9, arranges the hydraulic support 2 of band ramming device and without the hydraulic support 8 of ramming device in clearance space, Spacing distance determines according to field geology conditions and required pack completeness, so at this utility model support 1,9 and 6,7 and open-off cut It is the formation of filling space between rib, carries out coal mining and filling along with work surface and push ahead, be the formation of strip-type and fill Fill out body 3,5 and unfilled goaf 4.

Claims (5)

1. a longwell spoil strip-type filling coal mining hydraulic support, it is characterised in that propped up by four-leg shock waste filling hydraulic pressure The gangue stopping device composition of frame and band stretchable waste rock stopping plate, wherein: described hydraulic support is two sections of back timbers, the top of four hydraulic props The waste filling hydraulic support of beam hanging drag conveyor, described gangue stopping device is kept off by base, three bottoms around base Top waste rock board in cash plate, bottom waste rock board, two columns and column and the top waste rock board phase being positioned on base long axis Back timber composition even, the top waste rock board being connected with back timber in described gangue stopping device can be controlled lifting by double columns, to fill Tap top.
Longwell spoil strip-type filling coal mining hydraulic support the most according to claim 1, it is characterised in that: described hydraulic pressure Support is to be removed ramming device repacking by common waste filling hydraulic support to prepare.
Longwell spoil strip-type filling coal mining hydraulic support the most according to claim 1, it is characterised in that: described hydraulic pressure props up Frame back timber and gangue stopping device back timber are separate.
Longwell spoil strip-type filling coal mining hydraulic support the most according to claim 1, it is characterised in that: described hydraulic pressure props up Frame back timber is hinged with front column, rear column and straight guide rod, and gangue stopping device back timber and top waste rock board weld together and vertical with front Post and rear column are hinged, front and back's column control lifting.
Longwell spoil strip-type filling coal mining hydraulic support the most according to claim 1, it is characterised in that: described hydraulic pressure props up Frame is connected by two hydraulic jacks with gangue stopping device;Described bottom waste rock board is hollow, and top waste rock board is positioned at bottom gear cash In plate.
CN201620545400.5U 2016-06-07 2016-06-07 A kind of longwell spoil strip-type filling coal mining hydraulic support Expired - Fee Related CN205805593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620545400.5U CN205805593U (en) 2016-06-07 2016-06-07 A kind of longwell spoil strip-type filling coal mining hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620545400.5U CN205805593U (en) 2016-06-07 2016-06-07 A kind of longwell spoil strip-type filling coal mining hydraulic support

Publications (1)

Publication Number Publication Date
CN205805593U true CN205805593U (en) 2016-12-14

Family

ID=57501931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620545400.5U Expired - Fee Related CN205805593U (en) 2016-06-07 2016-06-07 A kind of longwell spoil strip-type filling coal mining hydraulic support

Country Status (1)

Country Link
CN (1) CN205805593U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915204A (en) * 2019-04-11 2019-06-21 兖矿东华重工有限公司 A method of bank is filled using filling bracket
CN110500114A (en) * 2019-07-29 2019-11-26 何满潮 Keep off cash system, gangue stopping device and its method for carrying out roadway support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915204A (en) * 2019-04-11 2019-06-21 兖矿东华重工有限公司 A method of bank is filled using filling bracket
CN110500114A (en) * 2019-07-29 2019-11-26 何满潮 Keep off cash system, gangue stopping device and its method for carrying out roadway support

Similar Documents

Publication Publication Date Title
CN103410545B (en) The hydraulic support of Sub-Level Caving and packing job can be realized
CN110566205B (en) Mining method for steep coal seam
CN202391424U (en) Supporting type comprehensive bolter miner
CN205805593U (en) A kind of longwell spoil strip-type filling coal mining hydraulic support
CN202391442U (en) Two-column shield type hydraulic support for filling and mining
CN203962014U (en) Combine and adopt the dual-purpose working surface hydraulic support of filling
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN103557023A (en) Hydraulic bracket for extremely soft coal bed
CN203223239U (en) Roadway advance timbering support used for assisting machine to move
CN103032091A (en) Self-moving hydraulic support
CN205558948U (en) Gob entry lane is other from moving formula temporary support device
CN201554482U (en) Hexagonal support type coal mining and filling hydraulic support
CN105952488B (en) Automatic moving type temporary support device by gob side entry retaining lane
CN203383843U (en) Thin coal seam filling and coal mining bracket
CN205558947U (en) Coal face's gob entry floodwater drainage moves support certainly about being fit for
CN203285470U (en) Hydraulic support suitable for steep-grade coal seam mining
CN104806271B (en) Precutting-groove U-shaped steel bracket with automatic propelling function and construction method thereof
CN203114338U (en) Supporting equipment for filling
CN204357457U (en) Crawler type anchor props up machine
CN203717006U (en) Rock-blocking, top-cutting and mold-hanging gob-side entryretaining hydraulic support for mining working face
CN201786365U (en) Hydraulic telescopic bracket for borehole coal mine
CN114776368A (en) System for adopt to fill and stay integration and combine and adopt waste filling working face
CN203412607U (en) Hydraulic support for realizing placing top coal and filling operation
CN102080557A (en) Split type side guard device applicable for transition support of large coal mining height fully-mechanized face
CN208546179U (en) A kind of gob side entry retaining lane gear cash bracket for girdle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20170607