CN203499699U - Supporting structure of corrosion and collapse tunnel section - Google Patents

Supporting structure of corrosion and collapse tunnel section Download PDF

Info

Publication number
CN203499699U
CN203499699U CN201320605394.4U CN201320605394U CN203499699U CN 203499699 U CN203499699 U CN 203499699U CN 201320605394 U CN201320605394 U CN 201320605394U CN 203499699 U CN203499699 U CN 203499699U
Authority
CN
China
Prior art keywords
corrosion
concrete lining
lining structure
landslide
collapse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320605394.4U
Other languages
Chinese (zh)
Inventor
周先练
姚元成
罗敏
张庆
谢豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201320605394.4U priority Critical patent/CN203499699U/en
Application granted granted Critical
Publication of CN203499699U publication Critical patent/CN203499699U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a supporting structure of a corrosion and collapse tunnel section. The supporting structure comprises I-beams, the corrosion or collapse tunnel section, sleepers, steel tubes and feet-lock bolts. The corrosion or collapse tunnel section is provided with a permanent concrete lining structure body, a corrosion or collapse cavity is formed above the permanent concrete lining structure body, the I-beams are evenly distributed in the permanent concrete lining structure body and are firmly welded to the feet-lock bolts, the sleepers are arranged on the tops of the I-beams, and the steel tubas are arranged in the corrosion or collapse cavity. The supporting structure has the advantages that construction quality of temporary supporting and safety of constructors are guaranteed in the tunnel construction period, meanwhile, the steel rib binding construction procedure is simplified, the construction process of the concrete lining structure body is accelerated, and project investment is saved.

Description

A kind of supporting and protection structure for corrosion and landslide hole section
Technical field
The utility model relates to a kind of supporting and protection structure for corrosion and landslide hole section, belongs to tunnel support technical field.
Background technology
At present, according to tunnel excavation supporting quality, control feature, when running into corrosion, landslide hole section, generally take to manage canopy or Simple wood support carries out temporary lining processing, after Tunnel excavation completes, again corrosion, landslide hole section are carried out to permanent concrete lining.Because the rigidity such as pipe canopy and Simple wood support are lower; globality is poor; can not effectively tackle corrosion, the piece stone that falls down of landslide section top, hole, and easily by piece stone pound distortion and and lose construction period safeguard protection effect, bring potential safety hazard to engineering construction phase constructor's person.And after pipe canopy and timbering are pounded distortion, occupied concrete lining structure section, can not guarantee concrete lining architecture quality, brought potential safety hazard to the permanent operation of engineering.Facts have proved, adopt in the situation of as above this construction technology, construction period temporary lining measure is not ideal enough, and construction period constructor personal safety exists hidden danger; In addition, because structure section size is occupied, permanent concrete lining structure workmanship can not get guarantee, and the permanent operation of engineering exists potential safety hazard.
Summary of the invention
The purpose of this utility model is to provide a kind of supporting and protection structure for corrosion and landslide hole section, can overcome the deficiencies in the prior art, can simplify reinforcing bar binding working procedure, accelerate concrete lining structure construction speed, save construction investment, ensure construction quality and constructor's safety of supporting simultaneously.
The purpose of this utility model is achieved through the following technical solutions: a kind of supporting and protection structure for corrosion and landslide hole section, it comprises i iron, corrosion or landslide hole section, sleeper, steel pipe and lock foot anchoring stock, in corrosion or landslide hole section, be provided with permanent concrete lining structure, the top of permanent concrete lining structure is corrosion or landslide cavity, i iron be evenly arranged in permanent concrete lining structure and and lock foot anchoring stock firm welding, sleeper is set up the top at i iron, and steel pipe is placed in corrosion or landslide cavity.
In described permanent concrete lining structure, be provided with principal rod.
The beneficial effects of the utility model are: the i iron of employing not only rigidity and toughness high, and with sleeper, pea gravel concreten forms integral body in good condition, can effectively cushion corrosion, the impulse force of piece stone is fallen down at landslide section top, hole, the construction quality of tunnel construction phase temporary lining and constructor have obtained safely guarantee, simultaneously due to i iron and sleeper, pea gravel concreten forms rigid body, can do not pounded distortion by piece stone, can not occupy permanent concrete lining structure section, and i iron can be used as primary structure member and substitutes the corresponding site reinforcing bar in permanent concrete lining structure, simplified reinforcing bar binding working procedure, accelerated concrete lining structure construction speed, saved construction investment.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the sectional view of the utility model i iron;
Fig. 3 is the sectional view of the utility model sleeper;
Fig. 4 is the sectional view of the permanent concrete lining structure of the utility model.
Wherein, 1-i iron, 2-corrosion or landslide hole section, 3-sleeper, 4-corrosion or landslide cavity, 5-pea gravel concreten, 6-steel pipe, the permanent concrete lining structure of 7-, 8-principal rod, 9-lock foot anchoring stock.
The specific embodiment
Below in conjunction with accompanying drawing, further describe the technical solution of the utility model, but described in claimed scope is not limited to.
Fig. 3 as shown in Figure 1, Figure 2,, a kind of supporting and protection structure for corrosion and landslide hole section, it comprises i iron 1, corrosion or landslide hole section 2, sleeper 3, steel pipe 6 and lock foot anchoring stock 9, in corrosion or landslide hole section 2, be provided with permanent concrete lining structure 7, the top of permanent concrete lining structure 7 is corrosion or landslide cavity 4, i iron 1 be evenly arranged in permanent concrete lining structure 7 and and lock foot anchoring stock 9 firm welding, sleeper 3 is set up at the top of i iron 1, and steel pipe 6 is placed in corrosion or landslide cavity 4.
As Fig. 4, in described permanent concrete lining structure 7, be provided with principal rod 8.
Pea gravel concreten 5 is inputed in corrosion or landslide cavity 4 by steel pipe 6, when permanent concrete lining structure 7 pouring construction, i iron 1 can be used as the steel bar stress 8 that primary structure member substitutes corresponding site, because i iron is set up in employing, lay railway sleepers and build pea gravel concreten, construction technology is convenient, feasible, and safe and reliable, i iron, sleeper and pea gravel concreten form rigid body, difficult quilt is pounded distortion, can not occupy permanent concrete lining structure section, guarantee concrete lining structure quality, i iron can be used as primary structure member and substitutes the corresponding site steel bar stress in permanent concrete lining structure simultaneously, simplified reinforcing bar binding working procedure, accelerated concrete lining structure construction speed, saved construction investment.

Claims (2)

1. the supporting and protection structure for corrosion and landslide hole section, it is characterized in that: it comprises i iron (1), corrosion or landslide hole section (2), sleeper (3), steel pipe (6) and lock foot anchoring stock (9), in corrosion or landslide hole section (2), be provided with permanent concrete lining structure (7), the top of permanent concrete lining structure (7) is corrosion or landslide cavity (4), i iron (1) be evenly arranged in permanent concrete lining structure (7) and and lock foot anchoring stock (9) firm welding, sleeper (3) is set up the top in i iron (1), steel pipe (6) is placed in corrosion or landslide cavity (4).
2. the supporting and protection structure for corrosion and landslide hole section according to claim 1, is characterized in that: in described permanent concrete lining structure (7), be provided with principal rod (8).
CN201320605394.4U 2013-09-27 2013-09-27 Supporting structure of corrosion and collapse tunnel section Expired - Lifetime CN203499699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320605394.4U CN203499699U (en) 2013-09-27 2013-09-27 Supporting structure of corrosion and collapse tunnel section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320605394.4U CN203499699U (en) 2013-09-27 2013-09-27 Supporting structure of corrosion and collapse tunnel section

Publications (1)

Publication Number Publication Date
CN203499699U true CN203499699U (en) 2014-03-26

Family

ID=50330688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320605394.4U Expired - Lifetime CN203499699U (en) 2013-09-27 2013-09-27 Supporting structure of corrosion and collapse tunnel section

Country Status (1)

Country Link
CN (1) CN203499699U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065038A (en) * 2015-08-11 2015-11-18 中国电建集团贵阳勘测设计研究院有限公司 Tunnel collapse processing method and tunnel collapse supporting structure
CN106522972A (en) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 Tunnel boring machine (TBM) cutterhead and shield jamming processing method
CN106522963A (en) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 Stuck machine extricating method for TBM during tunnel construction
CN110552723A (en) * 2019-09-16 2019-12-10 中国十九冶集团有限公司 Treatment construction method for continuous collapse roof fall of small-section steep slope tunnel

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065038A (en) * 2015-08-11 2015-11-18 中国电建集团贵阳勘测设计研究院有限公司 Tunnel collapse processing method and tunnel collapse supporting structure
CN106522972A (en) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 Tunnel boring machine (TBM) cutterhead and shield jamming processing method
CN106522963A (en) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 Stuck machine extricating method for TBM during tunnel construction
CN106522972B (en) * 2016-11-23 2018-08-31 中铁十八局集团有限公司 A kind of TBM cutterheads and shield card machine processing method
CN106522963B (en) * 2016-11-23 2018-08-31 中铁十八局集团有限公司 A kind of TBM tunnel constructions card machine is got rid of poverty method
CN110552723A (en) * 2019-09-16 2019-12-10 中国十九冶集团有限公司 Treatment construction method for continuous collapse roof fall of small-section steep slope tunnel
CN110552723B (en) * 2019-09-16 2021-01-26 中国十九冶集团有限公司 Treatment construction method for continuous collapse roof fall of small-section steep slope tunnel

Similar Documents

Publication Publication Date Title
CN207406349U (en) Tunnel Base reinforcing construction
CN203499699U (en) Supporting structure of corrosion and collapse tunnel section
CN103422873B (en) Strong-strength extendable anchor rod
CN102650212A (en) Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel
CN105114098A (en) Method for treating unfavorable geological tunnel section of diversion tunnel and large-diameter diversion tunnel structure
CN204898672U (en) Discard device of pulling out of pile foundation
CN204716253U (en) Circular major diameter diversion tunnel structure
CN205501843U (en) Consolidate rigid framed arch bridge
CN203531922U (en) High-toughness nodular cast iron and reinforced concrete combined tunnel wall plate
CN110424971A (en) The method for handling jacked piles with small section landslide
CN201771514U (en) Concealed tunneling structure with pile foundation
CN206785400U (en) A kind of buffer-type high intensity mine support system
CN203822325U (en) Steel grating steel arch frame combined support for initial stage of expansibility soil layer tunnel
CN204386617U (en) Consolidation grouting structure of low waterhead diversion tunnel
CN204174638U (en) Underground structure ruggedized construction
CN204386611U (en) A kind of tunnel sprayed mortar non-dismantling formwork
CN103277125B (en) With the lock pin ductule that steel plate connects
CN201474703U (en) Bearing structure of consolidated ring of hydraulic tunnel
CN202672174U (en) Cone-shaped upright foundation of frozen soil region
CN201747383U (en) Rapid supporting system for steel shotcrete
CN102505668B (en) Construction method for reinforcing horizontal crack of gravity dam head by using steel bar
CN210396760U (en) Assembled supporting system for diversion tunnel construction
CN203514325U (en) Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles
CN203625915U (en) Embedded creeping formwork structure in caisson prefabrication construction
CN203393904U (en) Reinforcement fabric hoop

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R

Free format text: FORMER NAME: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

Owner name: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP

CP01 Change in the name or title of a patent holder

Address after: 550081 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address before: 550081 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee before: HydroChina Guiyang Engineering Corp.

Address after: 550081 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee after: POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED

Address before: 550081 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20140326

CX01 Expiry of patent term