CN106522972B - A kind of TBM cutterheads and shield card machine processing method - Google Patents
A kind of TBM cutterheads and shield card machine processing method Download PDFInfo
- Publication number
- CN106522972B CN106522972B CN201611035722.6A CN201611035722A CN106522972B CN 106522972 B CN106522972 B CN 106522972B CN 201611035722 A CN201611035722 A CN 201611035722A CN 106522972 B CN106522972 B CN 106522972B
- Authority
- CN
- China
- Prior art keywords
- small pilot
- annular
- pilot tunnel
- shield
- shelf
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 10
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 4
- 238000009412 basement excavation Methods 0.000 claims description 9
- 239000011435 rock Substances 0.000 claims description 7
- 230000001360 synchronised effect Effects 0.000 claims description 6
- 230000010412 perfusion Effects 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 238000005476 soldering Methods 0.000 claims description 3
- 238000007569 slipcasting Methods 0.000 claims description 2
- NMFHJNAPXOMSRX-PUPDPRJKSA-N [(1r)-3-(3,4-dimethoxyphenyl)-1-[3-(2-morpholin-4-ylethoxy)phenyl]propyl] (2s)-1-[(2s)-2-(3,4,5-trimethoxyphenyl)butanoyl]piperidine-2-carboxylate Chemical compound C([C@@H](OC(=O)[C@@H]1CCCCN1C(=O)[C@@H](CC)C=1C=C(OC)C(OC)=C(OC)C=1)C=1C=C(OCCN2CCOCC2)C=CC=1)CC1=CC=C(OC)C(OC)=C1 NMFHJNAPXOMSRX-PUPDPRJKSA-N 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a kind of TBM cutterheads and shield card machine processing method, and described method includes following steps:(1), excavate longitudinal small pilot tunnel;(2), several small pilot tunnels of annular of small pilot drive along longitudinal direction;(3), pass through steel construction and carry out supporting and reinforcing;(4), TBM slowly driving pass through shear-zone.The present invention has the advantages that quick and convenient, construction procedure is few, safe and reliable, processing of getting rid of poverty is carried out to the cutterhead and shield of TBM using this method, not only safe operation, but also can will be got rid of poverty by the TBM cutterheads of card and shield machine within the extremely short time, save cost and time.
Description
Technical field
The present invention relates to a kind of processing method, especially a kind of TBM cutterheads and shield card machine processing method.
Background technology
Currently, during big tunnel, for efficient, environmentally friendly and safe consideration, widely used TBM is dug
Pick.But since geology influences, when tunneling construction is by unfavorable geology section, often since country rock is extremely broken, lead to TBM
Cutterhead and shield occur by card phenomenon.After some TBM card machine accidents occur, since TBM failures of getting rid of poverty yield TBM and are changed
Line processing, causes great loss.
Invention content
It is an object of the invention to provide it is a kind of quick and convenient can make TBM take off TBM cutterheads that cutterhead and shield are got rid of poverty and
Shield card machine processing method.
It is realized the purpose of the present invention is technical solution in this way, a kind of TBM cutterheads and shield card machine processing method,
Described method includes following steps:
(1), excavate longitudinal small pilot tunnel;
Hand excavation's longitudinally small pilot tunnel, the synchronous vertical longitudinal small pilot tunnel of branch are carried out from the metastable position of shield tail portion country rock
Gate steelframe, longitudinal small pilot tunnel pass through the areas slump Cha Ti.
(2), several small pilot tunnels of annular of small pilot drive along longitudinal direction;
By the small pilot tunnel in the longitudinal direction excavated by shield and cutterhead by being divided into several small pilot tunnels of annular, subregion excavation section by section ring
The small pilot tunnel of shape, the synchronous vertical small pilot tunnel gate steelframe of annular of branch, the small pilot tunnel gate steel frame column bottom of annular are welded on shield, directly
To excavation supporting to requiring position.
(3), pass through steel construction and carry out supporting and reinforcing;
(4), TBM slowly driving pass through shear-zone.
By the small pilot tunnel of annular being excavated, outer annular steel arch is erected in the small pilot tunnel gate steelframe below the crossbeam of annular
Frame and internal layer annular steel arch-shelf, and the configuration reinforcement between outer annular steel arch-shelf and internal layer annular steel arch-shelf as needed;
Soldering and sealing steel plate on the inside of internal layer annular steel arch-shelf, concrete perfusion backfill is close in outer annular steel arch-shelf and internal layer annular steel arch-shelf
It is real, after concrete strength reaches design requirement, gate steel frame column is cut off, completes interim gate steelframe support system to finally
Annular steelframe support system conversion.
Wherein, in order to improve safety, forward grouting anchor pile slip casting is performed before longitudinal small pilot tunnel and the small pilot drive of annular,
Reinforce front country rock.
By adopting the above-described technical solution, the present invention has the advantages that quick and convenient, construction procedure is few, safe and reliable,
Processing of getting rid of poverty is carried out to the cutterhead and shield of TBM using this method, not only safe operation, but also can be within the extremely short time
It will be got rid of poverty by the TBM cutterheads and shield of card, saved cost and time.
Description of the drawings
The description of the drawings of the present invention is as follows:
Fig. 1:The TBM cutterheads and shield of the present invention, which is got rid of poverty, excavates gib gate steelframe layout diagram;
Fig. 2:The TBM cutterheads and shield of the present invention is got rid of poverty steelframe elevational schematic view;
Fig. 3:Supporting schematic diagram after the TBM cutterheads and shield of the present invention is got rid of poverty.
Specific implementation mode
Specific embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings, but the present invention does not limit to
In these embodiments, any improvement or replacement on the present embodiment essence spirit still falls within the claims in the present invention and is wanted
Seek the range of protection.
Embodiment 1:As shown in Figure 1, 2, 3, a kind of TBM cutterheads and shield card machine processing method, the method includes as follows
Step:
(1), excavate longitudinal small pilot tunnel;
(2), several small pilot tunnels of annular are excavated in small pilot tunnel along longitudinal direction;
(3), pass through steel construction and carry out supporting and reinforcing;
(4), TBM slowly driving pass through shear-zone.
Wherein, above-mentioned(1)In step, concrete operations are as follows:From the 1 metastable position of tail portion country rock of shield into pedestrian
Work excavates longitudinal small pilot tunnel 2, the synchronous vertical longitudinal small pilot tunnel gate steelframe 3 of branch, and longitudinal small pilot tunnel 2 passes through the areas slump Cha Ti 11.
Wherein, above-mentioned(2)In step, concrete operations are as follows:By the small pilot tunnel 2 in the longitudinal direction excavated by shield 1 and knife
Disk 4 founds the small pilot tunnel gate steel of annular by the small pilot tunnel 5 of several annulars, the small pilot tunnel 5 of subregion excavation section by section annular, synchronous branch is divided longitudinally into
Frame 6, small 6 column bottom of pilot tunnel gate steelframe of annular are welded on shield 1, until excavation supporting is to requiring position.
Wherein, above-mentioned(3)In step, concrete operations are as follows:It is small in annular by the small pilot tunnel 5 of annular being excavated
7 lower section of pilot tunnel gate steelframe crossbeam erects outer annular steel arch-shelf 8 and internal layer annular steel arch-shelf 9, and as needed in outer layer ring
Configuration reinforcement between shape steel arch-shelf 8 and internal layer annular steel arch-shelf 9;In 9 inside soldering and sealing steel plate of internal layer annular steel arch-shelf, outer annular
Concrete perfusion 10 backfills closely knit in steel arch-shelf 8 and internal layer annular steel arch-shelf 9, after 10 intensity of concrete reaches design requirement,
Gate steel frame column is cut off, completes interim gate steelframe support system to final annular steelframe support system conversion.
In order to improve construction safety, forward grouting anchor pile note is performed before longitudinal small pilot tunnel 2 and the small pilot tunnel 5 of annular excavate
Slurry reinforces front country rock.
In the present invention, the place that gets rid of poverty quickly and easily will can be carried out by the TBM cutterheads and shield of card by the above method
Reason, ensure that the construction period, reduces cost.This method shortens 2 months construction times than the existing method of getting rid of poverty.
Claims (2)
1. a kind of TBM cutterheads and shield card machine processing method, characterized in that described method includes following steps:
(1), excavate longitudinal small pilot tunnel;
Described(1)In step, concrete operations are as follows:From shield(1)Country rock metastable position in tail portion carries out hand excavation
Longitudinal small pilot tunnel(2), the synchronous vertical longitudinal small pilot tunnel gate steelframe of branch(3), longitudinal small pilot tunnel(2)Across the areas slump Cha Ti(11);
(2), several small pilot tunnels of annular of small pilot drive along longitudinal direction;
Described(2)In step, concrete operations are as follows:Pass through the small pilot tunnel in the longitudinal direction excavated(2)By shield(1)And cutterhead(4)
By being divided longitudinally into several small pilot tunnels of annular(5), the small pilot tunnel of subregion excavation section by section annular(5), the synchronous vertical small pilot tunnel gate of annular of branch
Steelframe(6), the small pilot tunnel gate steelframe of annular(6)Column bottom is welded on shield(1)On, until excavation supporting is to requiring position;
(3), pass through steel construction and carry out supporting and reinforcing
Described(3)In step, concrete operations are as follows:Pass through the small pilot tunnel of annular being excavated(5), in the small pilot tunnel gate of annular
Steelframe crossbeam(7)Lower section erects outer annular steel arch-shelf(8)With internal layer annular steel arch-shelf(9), and as needed in outer annular
Steel arch-shelf(8)With internal layer annular steel arch-shelf(9)Between configuration reinforcement;In internal layer annular steel arch-shelf(9)Inside soldering and sealing steel plate, outer layer
Annular steel arch-shelf(8)With internal layer annular steel arch-shelf(9)Interior concrete perfusion(10)It backfills closely knit, waits for concrete(10)Intensity reaches
After design requirement, gate steel frame column is cut off, interim gate steelframe support system is completed and turns to final annular steelframe support system
It changes;
(4), TBM slowly driving pass through shear-zone.
2. TBM cutterheads as described in claim 1 and shield card machine processing method, it is characterized in that:In longitudinal small pilot tunnel(2)And ring
The small pilot tunnel of shape(5)Forward grouting anchor pile slip casting is performed before excavation, reinforces front country rock(12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035722.6A CN106522972B (en) | 2016-11-23 | 2016-11-23 | A kind of TBM cutterheads and shield card machine processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035722.6A CN106522972B (en) | 2016-11-23 | 2016-11-23 | A kind of TBM cutterheads and shield card machine processing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106522972A CN106522972A (en) | 2017-03-22 |
CN106522972B true CN106522972B (en) | 2018-08-31 |
Family
ID=58356311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611035722.6A Active CN106522972B (en) | 2016-11-23 | 2016-11-23 | A kind of TBM cutterheads and shield card machine processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522972B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893664B (en) * | 2017-11-10 | 2019-02-22 | 中铁工程装备集团有限公司 | A kind of double-shielded TBM shield body card machine prediction technique and system |
CN109779638A (en) * | 2018-12-28 | 2019-05-21 | 中国水利水电第四工程局有限公司 | A kind of double-shielded TBM card machine processing method |
CN110905538A (en) * | 2019-12-30 | 2020-03-24 | 中铁隧道局集团有限公司 | Construction method for TBM (Tunnel boring machine) of unfavorable geological section |
CN111119913B (en) * | 2020-02-24 | 2024-05-17 | 中铁二院工程集团有限责任公司 | TBM escaping treatment method in tunnel construction and tunnel construction structure |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002038897A (en) * | 2000-07-24 | 2002-02-06 | Mitsubishi Heavy Ind Ltd | Tunnel construction method and device |
CN102305082A (en) * | 2011-07-23 | 2012-01-04 | 中铁十二局集团第二工程有限公司 | Method for relieving and cutterhead repairing of shield machine in weathering groove |
CN203499699U (en) * | 2013-09-27 | 2014-03-26 | 中国水电顾问集团贵阳勘测设计研究院 | Supporting structure of corrosion and collapse tunnel section |
CN104060999A (en) * | 2014-03-03 | 2014-09-24 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | Method and structure for treating tunnel collapse |
CN104533451A (en) * | 2014-12-05 | 2015-04-22 | 中国电建集团成都勘测设计研究院有限公司 | Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock |
CN104975861A (en) * | 2015-07-21 | 2015-10-14 | 招商局重庆交通科研设计院有限公司 | Non-disturbance type supporting structure used for tunnel vault collapsed cavity processing |
CN105257301A (en) * | 2015-10-16 | 2016-01-20 | 中铁十局集团济南铁路工程有限公司 | Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel |
CN105781562A (en) * | 2016-03-10 | 2016-07-20 | 黄河勘测规划设计有限公司 | Stuck machine extricating method for tunnel boring machine (TBM) during construction |
-
2016
- 2016-11-23 CN CN201611035722.6A patent/CN106522972B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002038897A (en) * | 2000-07-24 | 2002-02-06 | Mitsubishi Heavy Ind Ltd | Tunnel construction method and device |
CN102305082A (en) * | 2011-07-23 | 2012-01-04 | 中铁十二局集团第二工程有限公司 | Method for relieving and cutterhead repairing of shield machine in weathering groove |
CN203499699U (en) * | 2013-09-27 | 2014-03-26 | 中国水电顾问集团贵阳勘测设计研究院 | Supporting structure of corrosion and collapse tunnel section |
CN104060999A (en) * | 2014-03-03 | 2014-09-24 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | Method and structure for treating tunnel collapse |
CN104533451A (en) * | 2014-12-05 | 2015-04-22 | 中国电建集团成都勘测设计研究院有限公司 | Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock |
CN104975861A (en) * | 2015-07-21 | 2015-10-14 | 招商局重庆交通科研设计院有限公司 | Non-disturbance type supporting structure used for tunnel vault collapsed cavity processing |
CN105257301A (en) * | 2015-10-16 | 2016-01-20 | 中铁十局集团济南铁路工程有限公司 | Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel |
CN105781562A (en) * | 2016-03-10 | 2016-07-20 | 黄河勘测规划设计有限公司 | Stuck machine extricating method for tunnel boring machine (TBM) during construction |
Non-Patent Citations (1)
Title |
---|
双护盾全断面掘进机卡机事故处理方案;张铸;《科技情报开发与经济》;20081031;第18卷(第29期);第3.3节施工顺序及支护体系及图2-3 * |
Also Published As
Publication number | Publication date |
---|---|
CN106522972A (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522963B (en) | A kind of TBM tunnel constructions card machine is got rid of poverty method | |
CN106522972B (en) | A kind of TBM cutterheads and shield card machine processing method | |
CN109578002B (en) | Open type double-structure heading machine and application method thereof | |
CN106761785B (en) | A kind of subway tunnel shield originates construction technology | |
CN105822312A (en) | Construction method for earth pressure balance shield construction pressure launching in subway tunnel engineering | |
CN101963060B (en) | Tunnel construction method based on steel tube arch-rib supporting structure | |
CN205578016U (en) | Shield constructs quick -witted section of jurisdiction handling system | |
CN105041328A (en) | Shield tunneling machine with cast-in-situ supporting function for tunnels with large horseshoe-shaped sections | |
CN107747488B (en) | The construction method of big cross section shape of a hoof shield launching | |
CN205225271U (en) | Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid | |
CN209040835U (en) | A kind of shield sky is pushed away through bored tunnel and the secondary constructing structure originated | |
CN109594988B (en) | Excavation construction method for large-section soft rock tunnel | |
CN112502723B (en) | Single-shield TBM blocking machine escaping construction method | |
CN105781562A (en) | Stuck machine extricating method for tunnel boring machine (TBM) during construction | |
CN105201518A (en) | Method for receiving and disassembly of large-diameter slurry balance shield in hole | |
CN106837357A (en) | A kind of no-dig technique pipe-roof method of use curve pipe canopy | |
CN109184700A (en) | The construction method of rock is pressed from both sides during a kind of weak surrounding rock small-clear-distance tunnel is stable | |
CN209604005U (en) | A kind of open type double structure development machine | |
CN105041327B (en) | Bored tunnel is counter to dig shield method of reseptance | |
CN104612722B (en) | Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe | |
CN204327107U (en) | The TBM of a kind of fragmented rock body hole section tunnels structure | |
CN103953350A (en) | Method for breaking tunnel door of quicksand stratum shield machine | |
CN104453915A (en) | Large-section vertical shaft pre-grouting reinforcement quick excavation method | |
CN206942770U (en) | A kind of shape of a hoof development machine promoted by crawler belt | |
CN205689213U (en) | Open type hard rock tunnel development machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |