CN106522963B CN201611035721.1A CN201611035721A CN106522963B CN 106522963 B CN106522963 B CN 106522963B CN 201611035721 A CN201611035721 A CN 201611035721A CN 106522963 B CN106522963 B CN 106522963B
Authority
CN
China
Prior art keywords
zone
influence
landslide
tbm
cutterhead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611035721.1A
Other languages
Chinese (zh)
Other versions
CN106522963A (en
Inventor
薛永庆
徐海
王雁军
齐梦学
王建伟
吕二超
杨国清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201611035721.1A priority Critical patent/CN106522963B/en
Publication of CN106522963A publication Critical patent/CN106522963A/en
Application granted granted Critical
Publication of CN106522963B publication Critical patent/CN106522963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

It gets rid of poverty method the invention discloses a kind of TBM tunnel constructions card machine, described method includes following steps:(1), hand excavation longitudinal direction pilot tunnel, cross landslide the zone of influence excavate pipe canopy workplace;(2), reversely to landslide the zone of influence perform Shed-pipe Advanced Support;(3), cave in before hand excavation's cutterhead the zone of influence;(4), pass through longitudinal small pilot tunnel hand excavation cutterhead and shield top landslide area;(5)Cutterhead(10)And shield(1)Periphery cave in quarrel body clean out after, TBM can overcome difficulties.The present invention has the advantages that quick and convenient, safe, construction procedure is few, is got rid of poverty to TBM using this method, not only safe operation, but also can will be got rid of poverty by the TBM machines of card within the extremely short time, has saved cost and time.

Description

A kind of TBM tunnel constructions card machine is got rid of poverty method
Technical field
It gets rid of poverty method the present invention relates to one kind, especially a kind of TBM tunnel constructions card machine is got rid of poverty method.
Background technology
Currently, during big tunnel, for efficient, environmentally friendly and safe consideration, widely used TBM is dug Pick.But since geology influences, when tunneling construction is by unfavorable geology section, often since country rock is extremely broken, lead to TBM Occur by card phenomenon.After some TBM card machine accidents occur, since TBM failures of getting rid of poverty yield TBM and carry out processing of relocating, make At great loss.
The invention that entitled " card machine when rock tunnel(ling) machine is constructed is got rid of poverty method " is disclosed in CN105781562A is special Profit;The method of getting rid of poverty is as follows:One, tunnel boring machine cutterhead is set as welding by center circular panel and along center circular panel outer rim Side panel is constituted;Two, the shield of tunnel boring machine is using the inside and outside double-layer structure that is disposed radially, inside and outside two layers of shield it Between be connected with;Internal layer shield is connected by hydraulically extensible oil with tunnel boring machine needle beam;Three, when tunnel drivage machine knife When disk is by card, cutter plate abandons side panel and unloads outer layer shield, is bounced back internal layer shield by hydraulically extensible oil, using dragging Vehicle deviates from tunnel boring machine complete machine outside tunnel, new side panel is transported to tunnel, then complete machine is transported again to tunnel In hole, the welding of cutterhead and the connection of inside and outside layer shield, installation are completed in tunnel, you can tunnel again.Although this method energy Enough to carry out processing of getting rid of poverty to the rock tunnel(ling) machine of card machine, still, this method is not only complex, and extremely inconvenient, meanwhile, After rock tunnel(ling) machine is got rid of poverty, then cutterhead side panel and outer layer shield are abandoned, has caused great loss.
Invention content
It gets rid of poverty method it is an object of the invention to provide a kind of quick and convenient TBM constructing tunnel card machines for making TBM get rid of poverty.
It is realized the purpose of the present invention is technical solution in this way, a kind of TBM tunnel constructions card machine is got rid of poverty method, It is characterized in, described method includes following steps:
(1), hand excavation longitudinal direction pilot tunnel, cross landslide the zone of influence excavate pipe canopy workplace;
Climbing hole is excavated outward from the relatively preferable position of shield tail portion country rock, by hole of climbing to TBM tunneling direction people Work excavates longitudinal small pilot tunnel, and longitudinal small pilot tunnel laterally excavates pilot tunnel after passing through the landslide zone of influence and digs into pipe canopy workplace.
(2), to landslide the zone of influence perform Shed-pipe Advanced Support;
Super-front large pipe shed, and grouting reinforcement rock reversely are performed to landslide area using pipe canopy workplace, super-front large pipe shed is worn 2-3 meters of the landslide zone of influence is crossed, and passes through 2-3 meters of shield tail portion.
(3), cave in before hand excavation's cutterhead the zone of influence;
Under the protection of super-front large pipe shed, influenced using landslide in front of benching tunnelling method and left and right pilot tunnel method hand excavation cutterhead Area synchronizes and performs solid matter section-steel support, and carries out grouting and reinforcing to rock crusher band.
(4), pass through longitudinal small pilot tunnel hand excavation cutterhead and shield top landslide area;
Supporting is excavated and synchronized to both sides segmentation and regionalization by the small pilot tunnel in the longitudinal direction excavated, and pre-grouting is performed before excavation Anchor tube reinforces country rock, and to collapsing, chamber carries out grouting and reinforcing backfill processing.
(5)Cutterhead and shield periphery cave in quarrel body clean out after, TBM can overcome difficulties.
By adopting the above-described technical solution, the present invention has the advantages that quick and convenient, safe, construction procedure is few, Got rid of poverty to TBM using this method, not only safe operation, but also can within the extremely short time by by the TBM machines of card into Row is got rid of poverty, and cost and time have been saved.
Description of the drawings
The description of the drawings of the present invention is as follows:
Fig. 1 is planar structure schematic diagram of the present invention;
Fig. 2 is schematic view of facade structure of the present invention;
Fig. 3 is that shield and cutterhead get rid of poverty and handle schematic diagram.
Specific implementation mode
Specific embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings, but the present invention does not limit to In these embodiments, any improvement or replacement on the present embodiment essence spirit still falls within the claims in the present invention and is wanted Seek the range of protection.
Embodiment 1:As shown in Figure 1, 2, 3, a kind of 1. TBM tunnel constructions card machines are got rid of poverty method, and the method includes as follows Step:
(1), hand excavation longitudinal direction pilot tunnel, cross landslide the zone of influence excavate pipe canopy workplace;
(2), to landslide the zone of influence perform Shed-pipe Advanced Support;
(3), cave in before hand excavation's cutterhead the zone of influence;
(4), pass through longitudinal small pilot tunnel hand excavation cutterhead and shield top landslide area;
(5)Cutterhead(10)And shield(1)Periphery cave in quarrel body clean out after, TBM can overcome difficulties.
Wherein, described(1)In step, concrete operations are as follows:From shield(1)Tail portion country rock(2)Relatively preferable position to Excavate climbing hole in outside(3), pass through hole of climbing(3)To the longitudinal small pilot tunnel of TBM tunneling directions hand excavation(4), longitudinal small pilot tunnel (4)Across the landslide zone of influence(5)Pilot tunnel is laterally excavated afterwards and digs into pipe canopy workplace(6).
Wherein, described(2)In step, concrete operations are as follows:Utilize pipe canopy workplace(6)It is reversely performed to landslide area super Preceding steel tube shed(7), and grouting reinforcement rock(2), super-front large pipe shed(7)Across zone of influence 2-3 meters of landslide, and pass through shield(1) Tail portion 2-3 meters.
Wherein,(3)In step, concrete operations are as follows:In super-front large pipe shed(7)Protection under, using benching tunnelling method and a left side Cave in the zone of influence in front of right pilot tunnel method hand excavation cutterhead(5), synchronize and perform solid matter section-steel support, and to country rock(2)It is broken Band carries out grouting and reinforcing.
Wherein, described(4)In step, concrete operations are as follows:Pass through the small pilot tunnel in the longitudinal direction excavated(4)It is segmented to both sides Subregion excavates and synchronizes supporting, and forward grouting anchor pile is performed before excavation(8)Reinforce country rock(2), to the chamber that collapses(9)Carry out grouting and reinforcing Backfill is handled.
In the present invention, processing of getting rid of poverty fast and safely easily will can be carried out by the TBM of card by the above method, ensured Construction period, reduce cost.This method shortens 2 months construction times than the existing method of getting rid of poverty.

Claims (1)

  1. A kind of method 1. TBM tunnel constructions card machine is got rid of poverty, characterized in that described method includes following steps:
    (1), hand excavation longitudinal direction pilot tunnel, cross landslide the zone of influence excavate pipe canopy workplace;
    Described(1)In step, concrete operations are as follows:From shield(1)Tail portion country rock(2)Relatively preferable position is excavated outward to be climbed Slope hole(3), pass through hole of climbing(3)To the longitudinal small pilot tunnel of TBM tunneling directions hand excavation(4), longitudinal small pilot tunnel(4)Across landslide The zone of influence(5)Pilot tunnel is laterally excavated afterwards and digs into pipe canopy workplace(6);
    (2), to landslide the zone of influence perform Shed-pipe Advanced Support;
    Described(2)In step, concrete operations are as follows:Utilize pipe canopy workplace(6)Reversely super-front large pipe shed is performed to landslide area (7), and grouting reinforcement rock(2), super-front large pipe shed(7)Across zone of influence 2-3 meters of landslide, and pass through shield(1)Tail portion 2-3 Rice;
    (3), cave in before hand excavation's cutterhead the zone of influence;
    Described(3)In step, concrete operations are as follows:In super-front large pipe shed(7)Protection under, using benching tunnelling method and left and right base tunnel Cave in the zone of influence in front of method hand excavation cutterhead(5), synchronize and perform solid matter section-steel support, and to country rock(2)Crushed zone carries out Grouting and reinforcing;
    (4), pass through longitudinal small pilot tunnel hand excavation cutterhead and shield top landslide area;
    Described(4)In step, concrete operations are as follows:Pass through the small pilot tunnel in the longitudinal direction excavated(4)It is excavated to both sides segmentation and regionalization And supporting is synchronized, perform forward grouting anchor pile before excavation(8)Reinforce country rock(2), to the chamber that collapses(9)It carries out at grouting and reinforcing backfill Reason;
    (5)Cutterhead(10)And shield(1)Periphery cave in quarrel body clean out after, TBM can overcome difficulties.
CN201611035721.1A 2016-11-23 2016-11-23 A kind of TBM tunnel constructions card machine is got rid of poverty method Active CN106522963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611035721.1A CN106522963B (en) 2016-11-23 2016-11-23 A kind of TBM tunnel constructions card machine is got rid of poverty method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611035721.1A CN106522963B (en) 2016-11-23 2016-11-23 A kind of TBM tunnel constructions card machine is got rid of poverty method

Publications (2)

Publication Number Publication Date
CN106522963A CN106522963A (en) 2017-03-22
CN106522963B true CN106522963B (en) 2018-08-31

Family

ID=58356344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611035721.1A Active CN106522963B (en) 2016-11-23 2016-11-23 A kind of TBM tunnel constructions card machine is got rid of poverty method

Country Status (1)

Country Link
CN (1) CN106522963B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893664B (en) * 2017-11-10 2019-02-22 中铁工程装备集团有限公司 A kind of double-shielded TBM shield body card machine prediction technique and system
CN108412509A (en) * 2018-03-30 2018-08-17 重庆大学 The anti-card machine method of double-shielded TBM
CN109322671B (en) * 2018-10-24 2020-05-19 重庆大学 Method for getting rid of worn and trapped shield cutter
CN109681220B (en) * 2018-12-07 2020-08-04 青海大学 TBM (tunnel boring machine) card-sticking reason analysis and difficulty-escaping construction method
CN109653750B (en) * 2018-12-12 2021-03-19 青海大学 Tunnel Boring Machine (TBM) reconstruction chamber expanding excavation design method
CN109779638A (en) * 2018-12-28 2019-05-21 中国水利水电第四工程局有限公司 A kind of double-shielded TBM card machine processing method
CN109958447A (en) * 2019-03-29 2019-07-02 中铁十八局集团有限公司 A kind of open type TBM bad geological section sump remedy method
CN110469340A (en) * 2019-09-27 2019-11-19 中国水利水电第十工程局有限公司 A kind of rock burst tunnel double-shielded TBM card machine is got rid of poverty construction method
CN110905538A (en) * 2019-12-30 2020-03-24 中铁隧道局集团有限公司 Construction method for TBM (Tunnel boring machine) of unfavorable geological section
CN111119913B (en) * 2020-02-24 2024-05-17 中铁二院工程集团有限责任公司 TBM escaping treatment method in tunnel construction and tunnel construction structure
CN111335901A (en) * 2020-04-09 2020-06-26 中铁十八局集团有限公司 Construction method for auxiliary small-diameter open TBM tunneling of pipe shed at unfavorable geological tunnel section
CN111828026B (en) * 2020-07-23 2022-03-25 中建八局轨道交通建设有限公司 Shield tunneling machine escaping method
CN112502723B (en) * 2020-12-04 2023-09-29 中铁十九局集团第一工程有限公司 Single-shield TBM blocking machine escaping construction method
CN113863939A (en) * 2021-09-27 2021-12-31 中铁二院工程集团有限责任公司 Rapid construction method for adopting TBM (tunnel boring machine) to lead double-hole cross tunneling in complex stratum
CN114109400A (en) * 2021-12-03 2022-03-01 中铁隧道局集团有限公司 TBM (Tunnel boring machine) escaping processing method in tunnel construction and construction structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05231087A (en) * 1992-02-21 1993-09-07 Hazama Gumi Ltd Blasting type tunnel excavating method
CN102305082A (en) * 2011-07-23 2012-01-04 中铁十二局集团第二工程有限公司 Method for relieving and cutterhead repairing of shield machine in weathering groove
CN203499699U (en) * 2013-09-27 2014-03-26 中国水电顾问集团贵阳勘测设计研究院 Supporting structure of corrosion and collapse tunnel section
CN104060999A (en) * 2014-03-03 2014-09-24 中国水电顾问集团贵阳勘测设计研究院有限公司 Method and structure for treating tunnel collapse
CN104533451A (en) * 2014-12-05 2015-04-22 中国电建集团成都勘测设计研究院有限公司 Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN104975861A (en) * 2015-07-21 2015-10-14 招商局重庆交通科研设计院有限公司 Non-disturbance type supporting structure used for tunnel vault collapsed cavity processing
CN105257301A (en) * 2015-10-16 2016-01-20 中铁十局集团济南铁路工程有限公司 Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel
CN105781562A (en) * 2016-03-10 2016-07-20 黄河勘测规划设计有限公司 Stuck machine extricating method for tunnel boring machine (TBM) during construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05231087A (en) * 1992-02-21 1993-09-07 Hazama Gumi Ltd Blasting type tunnel excavating method
CN102305082A (en) * 2011-07-23 2012-01-04 中铁十二局集团第二工程有限公司 Method for relieving and cutterhead repairing of shield machine in weathering groove
CN203499699U (en) * 2013-09-27 2014-03-26 中国水电顾问集团贵阳勘测设计研究院 Supporting structure of corrosion and collapse tunnel section
CN104060999A (en) * 2014-03-03 2014-09-24 中国水电顾问集团贵阳勘测设计研究院有限公司 Method and structure for treating tunnel collapse
CN104533451A (en) * 2014-12-05 2015-04-22 中国电建集团成都勘测设计研究院有限公司 Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN104975861A (en) * 2015-07-21 2015-10-14 招商局重庆交通科研设计院有限公司 Non-disturbance type supporting structure used for tunnel vault collapsed cavity processing
CN105257301A (en) * 2015-10-16 2016-01-20 中铁十局集团济南铁路工程有限公司 Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel
CN105781562A (en) * 2016-03-10 2016-07-20 黄河勘测规划设计有限公司 Stuck machine extricating method for tunnel boring machine (TBM) during construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
复杂地质区TBM卡机成因分析及脱困技术;王焕明;《人民长江》;20140228;第45卷(第3期);第66-69页 *
盘岭公路隧道断层破碎带反向施工技术;王辉;《科技资讯》;20140131(第3期);第98-99页 *

Also Published As

Publication number Publication date
CN106522963A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN106522963B (en) A kind of TBM tunnel constructions card machine is got rid of poverty method
CN105781562B (en) Card machine when tunnel boring machine is constructed is got rid of poverty method
CN112502723B (en) Single-shield TBM blocking machine escaping construction method
CN106150508B (en) A kind of tunnel drilling operation method in karst strata
CN103924975A (en) Water retaining method for coal mining process
CN108412509A (en) The anti-card machine method of double-shielded TBM
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN106522972B (en) A kind of TBM cutterheads and shield card machine processing method
CN109139028B (en) Arc-cutting shield tunneling machine cutterhead
CN110017145A (en) A kind of sea area shield mine joins jointing and its construction method in Tunnel
CN109630148A (en) A kind of dual thrust multi-cutter-disk rock tunnel(ling) machine and its driving method
CN105275478A (en) Recessed type shield machine cutter head
CN106837357A (en) A kind of no-dig technique pipe-roof method of use curve pipe canopy
CN109026029A (en) A kind of construction method suitable for breaking surrounding rock tunnel excavation support
CN111472801A (en) Construction method for passing existing line under shallow-buried underground excavation drainage gallery
CN107489433A (en) A kind of tunnel CRD engineering methods anti-leakage structure and Antiseep method
CN207063984U (en) A kind of soft soil layer slurry shield extra long distance tunnels combined type cutterhead
CN105041327B (en) Bored tunnel is counter to dig shield method of reseptance
CN212359762U (en) High-speed intelligent shield constructs machine
CN210564541U (en) Quick heading machine
CN105888664A (en) Mining method for extremely-thick hard coal
CN103291312A (en) Shield tunneling machine capable of realizing three-dimensional grouting
CN103352704B (en) Construction method for enabling tunnel shield to pass through vertical shaft structure
CN209324360U (en) A kind of dual thrust multi-cutter-disk rock tunnel(ling) machine
CN112709579A (en) Quick-forming development machine for river and canal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant