CN203429642U - Bored pile structure - Google Patents

Bored pile structure Download PDF

Info

Publication number
CN203429642U
CN203429642U CN201320529839.5U CN201320529839U CN203429642U CN 203429642 U CN203429642 U CN 203429642U CN 201320529839 U CN201320529839 U CN 201320529839U CN 203429642 U CN203429642 U CN 203429642U
Authority
CN
China
Prior art keywords
pile structure
bored pile
pit shaft
electric hoist
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320529839.5U
Other languages
Chinese (zh)
Inventor
陈春来
黄大文
余剑英
丁智
朱萍
张博文
贾利男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201320529839.5U priority Critical patent/CN203429642U/en
Application granted granted Critical
Publication of CN203429642U publication Critical patent/CN203429642U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to an architectural engineering construction structure, in particular to a bored pile structure. The bored pile structure comprises a shaft and a pile body, wherein a concrete protective wall is arranged on the wall of the shaft, a plurality of drainage ditches are longitudinally formed in the concrete protective wall, a steel support is erected outside the shaft, a transverse steel beam is placed on the steel support, an electric hoist is installed on the transverse steel beam, and the pile body is hung at the bottom of the electric hoist. The bored pile structure has the advantages that the design is reasonable, the construction cost is low, the speed is high, shock resistance is high, and the open caisson foundation is saved.

Description

Hole digging pile structure
Technical field
The utility model relates to a kind of building engineering construction structure, especially relates to a kind of hole digging pile structure.
Background technology
Castinplace pile refers at engineering site and in foundation soil, forms stake hole by means such as machine drilling, steel pipe soil compaction or manpower excavations, and place reinforcing cage, concrete perfusion within it and the stake of making, different according to hole forming method, castinplace pile can be divided into several classes such as tube-sinking cast-in-situ pile, bored pile and digging hole filling pile again.Bored pile is a kind of type of definition by piling method classification.Because the growth of industrial expansion and population, highrise building constantly increases, but because the foundation condition in a lot of cities is poor, can not directly bear the pressure being transmitted by highrise building, earth's surface exists weak soil that thickness is very large or the clay layer of moderate strength below, build highrise building as still continued to use general at that time friction pile, certainly lead to very large sedimentation.Along with the development with rapid changepl. never-ending changes and improvements of science and technology, bored pile is widely used in high level, high-rise building and heavy structure.
Summary of the invention
The utility model is mainly for the existing complex structure of prior art, construction cost is higher, speed is slower, a little less than shock resistance, the technical problem that open caisson foundation is wasted etc., provides a kind of simple in structure, construction cost is lower, speed, shock resistance is strong, the hole digging pile structure that open caisson foundation is saved.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: hole digging pile structure consists of pit shaft and pile body, on well bore wall, be provided with concrete guard wall, on concrete guard wall, be vertically arranged with some gutters, pit shaft outrigger has steel bracket, on steel bracket, lay gooseneck, electric hoist is installed on gooseneck, under electric hoist, is hung with pile body.The anti-sealing in gutter soaks stream at concrete guard wall wall and causes the hole that collapses, and can take in time eliminating away.
As preferably, on pit shaft, be stamped safety cover plate.
Therefore, the utlity model has design more reasonable, construction cost is lower, speed, and shock resistance is strong, and open caisson foundation such as saves at the feature.
Accompanying drawing explanation
Accompanying drawing 1 is overall structure schematic diagram of the present utility model.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: hole digging pile structure consists of pit shaft and pile body, on pit shaft 1 wall, be provided with concrete guard wall 2, on concrete guard wall 2, be vertically arranged with some gutters 3, pit shaft 1 outrigger has steel bracket 4, on steel bracket 4, lay gooseneck 5, electric hoist 7 is installed on gooseneck 5, and electric hoist is hung with pile body 67 times, is stamped safety cover plate 8 (as shown in Figure 1) on pit shaft 1.

Claims (2)

1. a hole digging pile structure, by pit shaft and pile body, formed, it is characterized in that being provided with concrete guard wall (2) on described pit shaft (1) wall, on concrete guard wall (2), be vertically arranged with some gutters (3), pit shaft (1) outrigger has steel bracket (4), on steel bracket (4), lay gooseneck (5), electric hoist (7) is installed on gooseneck (5), under electric hoist (7), be hung with pile body (6).
2. hole digging pile structure according to claim 1, is characterized in that being stamped on described pit shaft (1) safety cover plate (8).
CN201320529839.5U 2013-08-27 2013-08-27 Bored pile structure Expired - Fee Related CN203429642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320529839.5U CN203429642U (en) 2013-08-27 2013-08-27 Bored pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320529839.5U CN203429642U (en) 2013-08-27 2013-08-27 Bored pile structure

Publications (1)

Publication Number Publication Date
CN203429642U true CN203429642U (en) 2014-02-12

Family

ID=50058690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320529839.5U Expired - Fee Related CN203429642U (en) 2013-08-27 2013-08-27 Bored pile structure

Country Status (1)

Country Link
CN (1) CN203429642U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714771A (en) * 2016-02-18 2016-06-29 江西师范大学 Construction method for manual hole digging pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714771A (en) * 2016-02-18 2016-06-29 江西师范大学 Construction method for manual hole digging pile
CN105714771B (en) * 2016-02-18 2018-01-30 江西师范大学 A kind of construction method of artificial digging pile

Similar Documents

Publication Publication Date Title
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN102383431A (en) Sinking device and novel sinking method of center dug prestressed centrifuge pipe pile (square pile)
CN104264663A (en) Hard cutting construction technology for secant piles
CN103266602A (en) Diameter-expanding pile for manual hole digging and construction method thereof
CN202689009U (en) Steel sheet pile and tubular pile combined foundation pit supporting structure
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN104863183B (en) Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction
CN110409420B (en) Underground continuous wall with pit facing surface and precipitation function
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN201762702U (en) Drilling bitten pile
CN103758132B (en) The construction technology of the cantilever soldier pile retaining structure on slope is put in a kind of combination
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN202672149U (en) Height controller for underwater concrete grouting pile
CN104775439A (en) Foundation pit support and water stop integrated structure and construction method thereof
CN110670631A (en) Supporting structure and excavation method of comprehensive pipe gallery foundation pit
CN202644589U (en) Soft soil geology pre-stress tube pile static pressing anti-soil-squeezing structure
CN102134861A (en) Method for testing precast pile in soil body
CN203429642U (en) Bored pile structure
CN203247580U (en) Construction structure of cast-in-place concrete pile of deep soft soil foundation bridge girder
CN102094419A (en) Method for forming drilled pile in foundation with silty sand layer
CN109322315A (en) A kind of retaining structure and its construction method for high Steep Slope Embankment location
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20150827

EXPY Termination of patent right or utility model