China
Prior art keywords
warning device
display instrument
foundation pit
casing
strain gauge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320478138.3U
Other languages
Chinese (zh)
Inventor
刘卓
张译文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201320478138.3U priority Critical patent/CN203411967U/en
Application granted granted Critical
Publication of CN203411967U publication Critical patent/CN203411967U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses an automatic subway station foundation pit construction collapse risk early-warning device which comprises a box body; a bottom plate of the box body is provided with a strain gauge, a connecting device and a digital display instrument; an opening is formed in a side plate of the box body corresponding to a display panel of the digital display instrument; a probe arranged on the strain gauge extends outside the box body through an opening formed in a top plate; the box body is externally provided with an alarm bell; the digital display instrument is connected with the alarm bell; the digital display instrument is connected with the strain gauge by virtue of the connecting device. The automatic subway station foundation pit construction collapse risk early-warning device can be used for solving the problem that in the prior art, a great deal of human resources are arranged to make daily check regularly, so that the time for eliminating hidden danger is delayed, and the danger is caused. The automatic subway station foundation pit construction collapse risk early-warning device can be used for automatically monitoring the construction process and can be used for early warning and monitoring the automation and informatization of a project, thus guaranteeing that the subway foundation pit construction is safe.

Description

The Metro station excavation construction dangerous automatic warning device that caves in
Technical field
The utility model belongs to constructing metro tunnel technical field, is specifically related to a kind of Metro station excavation construction dangerous automatic warning device that caves in.
Background technology
In Metro station excavation work progress, because subway cave-in accident causes many people injures and deaths and property loss, therefore, the safety problem in work progress is extremely important.The safety measure of generally taking is at present to utilize around existing building composition deformation, underground water, solum settlement, and go along with sb. to guard him self and carry out safety monitoring, lay earth pressure cell, inclinometer, deep settlement mark, reinforcement stresses meter and carry out survey data, its monitoring point distributes comparatively sparse, monitored data is isolated, and need every day special messenger to check, once occur that data exception stops construction, does not set up the system of a set of real-time monitoring; Meanwhile, because regularly check every day, delayed the time of getting rid of hidden danger.This kind of mode, because the standard of forecast is too general, enough warns to administrative staff, causes idea of leaving things to chance, easily causes failing evacuating in time, causes casualties.Therefore, studying and a kind ofly can cave in and carry out dangerous automatic early-warning and device simple to operate Metro station excavation construction, be necessary for guaranteeing the personal security of work progress and increasing work efficiency.
Summary of the invention
The defect or the deficiency that for above-mentioned prior art, exist, the purpose of this utility model is, a kind of Metro station excavation construction dangerous automatic warning device that caves in is provided, this device has solved in prior art and has arranged a large amount of manpower regularly to check every day, and the time of having delayed eliminating hidden danger causes dangerous problem.The utility model can be monitored also automation and the informationization of early warning and monitoring engineering to work progress automatically, guarantees subway foundation pit safe construction.
In order to achieve the above object, the technical scheme that the utility model adopts is as follows:
The construction dangerous automatic warning device that caves in, comprises casing, and strain gauge, data processor and data display instrument are installed on the base plate of casing; The side plate of the corresponding casing of display floater of data display instrument is provided with opening; Casing outside is provided with alarm bell; Data display instrument is connected with alarm bell; Data display instrument is connected by data processor with strain gauge.
The utility model also comprises following other technologies feature:
Described device also comprises a computer, and computer is connected with data display instrument.
Described computer is connected with printer.
The top board of described casing is detachable.
Detachable between each side plate of described casing and adjacent side plates; Each side plate and the base plate all hinged side plate that makes can outwards open.
The top board of described casing is provided with handle.
The beneficial effects of the utility model are:
Automatically the change procedure that object of observation is complete is recorded in monitoring continuously, and obtains in real time observation data, has realized overall process is monitored in real time, and security performance accesses assurance.By network system, data are sent to the department that other need data, compare with existing personal monitoring, automatically monitoring does not need personnel to measure, the setting work of system data can complete in the working design stage, in use after energising, can accomplish does not need special messenger to nurse, and can save a large amount of manpower.This device has been realized directly and has been estimated and obtained data by digital display instrument, also can judge by alarm bell alarm sound, is applicable to noisy tunnel construction environment.
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Number in the figure implication: 1, alarm bell, 2, strain gauge, 3, data processor, 4, data display instrument, 5, probe, 6, casing, 7, computer.
The specific embodiment
As shown in Figure 1, the Metro station excavation of the present utility model construction dangerous automatic warning device that caves in, comprises casing 6, and strain gauge 2, data processor 3 and data display instrument 4 are installed on the base plate of casing 6; The side plate of the corresponding casing 6 of display floater of data display instrument 4 is provided with opening; Casing 6 outsides are provided with alarm bell 1; Data display instrument 4 is connected with alarm bell 1; Data display instrument 4 is connected by data processor 3 with strain gauge 2.
Data display instrument 4 can be connected with a computer 7, and real-time recorded data is as the reference of construction in the future, and computer 7 can be prepared printer to obtain graphic documentation intuitively.
The soil layer that strain gauge 2 is used for gathering a certain measuring point in load bearing wall changes displacement;
Data processor 3 is used for receiving the data of strain gauge 2 collections that are arranged in each measuring point, and receives the threshold value that data display instrument 4 sends, and the data that strain gauge 2 and data display instrument 4 are sent are processed, and controls alarm bell 1 carry out alarm according to result.
Data display instrument 4 is used to provide the platform that testing staff inputs threshold value.
Casing 6 is for fixing each parts, the globality of assurance device.
In the present embodiment, each parts Choice and design is as follows:
Strain gauge 2 adopts FBG displacement transducer;
Data processor 3 adopts the S3C2440 processor of Samsung;
Data display instrument 4 adopts NPXM-2011P5N type data display instrument;
The top board of casing 6 is detachable, and top board is provided with handle; Detachable between each side plate of casing 6 and adjacent side plates; Each side plate and the base plate all hinged side plate that makes can outwards open.It is in order to be put down in use, to expose probe that casing 6 side plates are all made movable.When carrying, side plate to be holded up and fixed and top board is loaded onto, probe 5 is avoided extraneous factor and is disturbed in casing 6 inside, chest is carried and into building site, used, and does not need additionally equipment to be taken out and Installation and Debugging, saves time and also can guarantee the accuracy of equipment.
The course of work of the present utility model:
When the utility model is applied in Metro station excavation construction, a plurality of measuring points are set on load bearing wall, each measuring point needs a set of prior-warning device of the present utility model.During to each measuring point actual measurement, casing 6 is opened, tester sets displacement threshold value by data display instrument 4, then the probe of strain gauge 25 is embedded in its corresponding measuring point, the soil layer that strain gauge 2 is measured its corresponding measuring point in real time changes displacement, and sends to data processor 3, the data that data processor 3 is sent strain gauge 2 and data display instrument 4 compare, if displacement surpasses threshold value, data processor 3 sends control signal to alarm bell 1, and alarm bell 1 is reported to the police.With this, guarantee that each measuring point is monitored, guarantee the safety of work progress.
Threshold value in data display instrument 4 is divided into two kinds: it is abnormal that one is that early warning warns corresponding measuring point monitored data, and related personnel need to investigate corresponding location; It two warn staff and should withdraw immediately for alarm, and the difference of sounding when the two can be reported to the police by alarm bell is distinguished.

Claims (6)

1. the Metro station excavation construction dangerous automatic warning device that caves in, is characterized in that, comprises casing (6), and strain gauge (2), data processor (3) and data display instrument (4) are installed on the base plate of casing (6); The side plate of the corresponding casing of display floater (6) of data display instrument (4) is provided with opening; Casing (6) outside is provided with alarm bell (1); Data display instrument (4) is connected with alarm bell (1); Data display instrument (4) is connected by data processor (3) with strain gauge (2).
2. the Metro station excavation as claimed in claim 1 construction dangerous automatic warning device that caves in, is characterized in that, described device also comprises a computer (7), and computer (7) is connected with data display instrument (4).
3. the Metro station excavation as claimed in claim 2 construction dangerous automatic warning device that caves in, is characterized in that, described computer (7) is connected with printer.
4. the Metro station excavation as claimed in claim 1 construction dangerous automatic warning device that caves in, is characterized in that, the top board of described casing (6) is detachable.
5. the Metro station excavation as claimed in claim 4 construction dangerous automatic warning device that caves in, is characterized in that, detachable between each side plate of described casing (6) and adjacent side plates; Each side plate and the base plate all hinged side plate that makes can outwards open.
6. the Metro station excavation as claimed in claim 4 construction dangerous automatic warning device that caves in, is characterized in that, the top board of described casing (6) is provided with handle.
CN201320478138.3U 2013-08-06 2013-08-06 Automatic subway station foundation pit construction collapse risk early-warning device Expired - Fee Related CN203411967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320478138.3U CN203411967U (en) 2013-08-06 2013-08-06 Automatic subway station foundation pit construction collapse risk early-warning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320478138.3U CN203411967U (en) 2013-08-06 2013-08-06 Automatic subway station foundation pit construction collapse risk early-warning device

Publications (1)

Publication Number Publication Date
CN203411967U true CN203411967U (en) 2014-01-29

Family

ID=49974867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320478138.3U Expired - Fee Related CN203411967U (en) 2013-08-06 2013-08-06 Automatic subway station foundation pit construction collapse risk early-warning device

Country Status (1)

Country Link
CN (1) CN203411967U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115116197A (en) * 2022-06-14 2022-09-27 北京市政建设集团有限责任公司 Automatic monitoring and early warning device for collapse danger of foundation pit construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115116197A (en) * 2022-06-14 2022-09-27 北京市政建设集团有限责任公司 Automatic monitoring and early warning device for collapse danger of foundation pit construction
CN115116197B (en) * 2022-06-14 2023-12-19 北京市政建设集团有限责任公司 Automatic monitoring and early warning device for collapse danger of foundation pit construction

Similar Documents

Publication Publication Date Title
CN101787897B (en) System and method for predicting coal and gas outburst risk of mine in real time
KR102042616B1 (en) IoT Based Safety Management System of Urban Construction Site
RU2630334C2 (en) System of dynamic controlling roof-based separation based on fiber grating and method of preliminary alert
CN108922123B (en) mine slope slip stability monitoring and early warning method
CN108180885B (en) Automatic monitoring system and method for tunnel deformation
CN105865522A (en) Bridge structure monitoring system
CN206987892U (en) A kind of prior-warning device for being used to monitor Propagation in Tunnel Disaster
CN107420105B (en) The vibration of full face rock tunnel boring machine key position and strain monitoring method
CN106090623A (en) Pipe network remote supervision system based on Internet of Things
CN101458069A (en) Tunnel wall rock deformation monitoring method and monitoring system thereof
WO2021190004A1 (en) Personnel positioning system and risk assessment method in foundation pit construction
CN113155186A (en) Dam safety monitoring management equipment and system thereof
CN104088306A (en) Wireless monitoring and early warning system for deep foundation pit comprehensive parameters
CN203924149U (en) The wireless monitor early warning system of deep foundation ditch comprehensive parameters
CN112924061A (en) Wireless real-time monitoring system and method for non-uniform settlement stress of natural gas pipeline
CN209639759U (en) A kind of downstream Tailings Dam dam inside ess-strain comprehensive monitor system
CN203024763U (en) Construction beam posture monitoring system
CN109853578B (en) Foundation pit structure with real-time monitoring and early warning functions and construction method thereof
CN208903300U (en) A kind of construction risk automatic monitoring system based on BIM technology
CN201142127Y (en) Landslide monitoring apparatus
CN104048639A (en) Geological disaster body ground surface building crack on-line monitoring and early-warning instrument
CN203411967U (en) Automatic subway station foundation pit construction collapse risk early-warning device
CN109001810A (en) Gravity dam crack in dam body advanced early warning method based on micro seismic monitoring
CN110307036B (en) Variable cross-section tunnel structure full-life monitoring and early warning method
CN104952226A (en) Wireless testing method, testing device and testing system for deformation of deep pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129