CN101458069A - Tunnel wall rock deformation monitoring method and monitoring system thereof - Google Patents

Tunnel wall rock deformation monitoring method and monitoring system thereof Download PDF

Info

Publication number
CN101458069A
CN101458069A CNA2008100725142A CN200810072514A CN101458069A CN 101458069 A CN101458069 A CN 101458069A CN A2008100725142 A CNA2008100725142 A CN A2008100725142A CN 200810072514 A CN200810072514 A CN 200810072514A CN 101458069 A CN101458069 A CN 101458069A
Authority
CN
China
Prior art keywords
signal
tunnel
monitoring
deformation
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100725142A
Other languages
Chinese (zh)
Other versions
CN101458069B (en
Inventor
黄玉仁
黄衍堂
钱寅星
王登科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
China Railway 24th Bureau Group Co Ltd
Fujian Railway Construction Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
Fuzhou University
Fujian Railway Construction Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University, Fujian Railway Construction Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical Fuzhou University
Priority to CN2008100725142A priority Critical patent/CN101458069B/en
Publication of CN101458069A publication Critical patent/CN101458069A/en
Application granted granted Critical
Publication of CN101458069B publication Critical patent/CN101458069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Alarm Systems (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a tunnel surrounding rock deformation monitoring method and a monitoring system thereof. The monitoring method is as below: (1) firstly, a laser is fixed on the inner wall of a stabilized tunnel surrounding rock, then a fixed photosensitive displacement signal monitor is arranged on a preliminary bracing of an unstable surrounding rock in the constructed tunnel, and the signal output end of the laser is opposite to the signal receiving end of the photosensitive displacement signal monitor; (2) during the monitoring, the laser sends a real-time laser signal to the photosensitive displacement signal monitor used for receiving laser signals, and in the monitoring process, the photosensitive displacement signal monitor sends monitoring data on the deformation displacement of the unstable surrounding rock to a signal processing terminal; and (3) the signal processing terminal performs automatic analysis according to collected data, and when the deformation displacement value of the surrounding rock reaches or exceeds a dangerous deformation value, the signal processing terminal sends an alarm signal via an alarming system. The method and the system thereof are favorable for reducing and avoiding casualty and loss caused by serious tunnel and laneway collapse so as to improve the construction safety.

Description

Tunnel wall rock deformation monitoring method and monitoring system thereof
Technical field:
The present invention relates to a kind of tunnel wall rock deformation monitoring method and monitoring system thereof.
Background technology:
Along with the fast development of nation-building, some new characteristics have appearred in present highway, railway tunnel: section is big, the tunnel is long, geologic condition is complicated, and the poor strata condition of side very easily causes Tunnel Landslide, water burst in face of the tunnel piercing.These factors are not only brought great difficulty to constructing tunnel technically, also usually because of burst accident causes personal injury, construction delay, thereby cause enormous economic loss, have also caused the great attention of state supervision department simultaneously.
As on August 16th, 2007, the Ministry of Railways and State Administration of Quality and Technical Supervision issued " circular that closes the prominent mud accident of the great gushing water of tunnel " 8.5 " construction about suitable ten thousand railways wild three " jointly.Circular is introduced, about 1 o'clock morning on the 5th of August in 2007, after suitable ten thousand railways of being responsible for constructing by 16 innings of four company of Chinese railway construction main office wild three close tunnel (Enshi, Hubei Province is domestic) I line DK124+602 face explosions, the prominent mud accident of burst gushing water in organizing the muck removal process, gushing water amount 15.1 ten thousand steres in one and a half hours, mudstone amount 5.35 ten thousand steres, just 52 of operation workmens are stranded in the tunnel.For being strictly on guard against that similar accident takes place, office of relevant portion has proposed requirement, and " each unit in charge of construction wants the reasonable disposition resource, guarantees that coordinative composition of equipments, personnel assort, and strengthen monitoring and inspection work.Find major accident hidden danger and geologic anomaly situation, necessary serious analysis, science judgment, in time take effective engineering safety technological prevention measure ", " each unit in charge of construction will strengthen tunnel surrounding and measure and analysis-by-synthesis, adheres to the country rock measurement is included in process management, by measuring the measurement that reaches surrouding rock deformation section and modification speed, analyze its deformation tendency, provide abundant foundation, guarantee the safe and reliable of preliminary bracing scheme " for adjusting supporting parameter.
15: 20 on the 15th November in 2008 for another example, the surface collapse accident takes place in Hangzhou, Zhejiang province city subway Line 1 Xiang Hu station workshop section construction site (oprn-work operation), cause 11 automobiles that travel herein to sink to subsideing (passengers inside the car's 2 people's slight wounds, all the other personal securities are escaped danger), workmen's 7 people's death, 14 people are missing.Through initial analysis, this time accident exposes the problem of five aspects: enterprise security production responsibility is not implemented, and manages not in place; Administer not firm, untimely, not thorough to the accident potential that finds; Safety technique training to the workmen becomes a mere formality, and does not even train just on duty; Labor service recruitment management is lack of standardization, the field management confusion; The supervision of relevant department of local government is ineffective.
Increasing along with new pick tunnel and tunnel, can suffer from the worse situation of geological hydrology condition.Owing to lack advanced interdisciplinary science Forecasting Methodology, the number of casualties sharply rises due to landslide and the water burst accident suddenly, and its painful consequence is startling.The accurately number of casualties and the loss of monitoring to reduce or to avoid great landslide in tunnel and tunnel and water burst accident to be caused, real is the task of top priority.
Present tunnel deformation monitoring method: 1) adopt steel ruler formula convergence gauge and hang the ways of contact such as steel ruler levelling and measure, it is low, simple to operate and adapt to the advantage of abominable construction environment that this method has a cost.Along with building of increasing longspan tunnel will be arranged, the continuous increase of span makes this monitoring method have tangible limitation, as hanging the chi difficulty, construction is disturbed big, and be difficult to guarantee the precision of construction Deformation monitoring, measurement result is influenced by human factor easily.2) non-contact three-dimensional observation (no dipstick metering is surveyed).No dipstick metering survey technology has been applied in the headroom displacement measurement of underground works in states such as Japan, Switzerland.The method that realizes roughly has three kinds; One, being is the 3 D analysis measurement of major equipment with many electronic theodolites; Two, being is the 3 D deformation measurement of major equipment with the total powerstation [1~2]Three, being is the close shot deformation measurement of major equipment with the close-range camera.
But the total powerstation method causes that survey station point coordinate error is very big, and does not carry out adjustment processing in the observation process, so the error of coordinate of observation station because the physical state of reference point is stable inadequately〉± 1.0mm.Concerning the tunnel clearance deformation monitoring, can not satisfy accuracy requirement.And owing to reasons such as various objective external conditions such as measurement personnel, measuring equipment, testing elements, the on-the-spot firsthand data that obtains exists all errors or mistake inevitably.
In a word, present domestic tunnel surrounding monitoring, the one, generally adopt the contact class to measure means, inefficiency consume great amount of manpower and financial resources, and observation effect is not good, has the excessive problem that causes the monitoring result distortion of human factor influence; The 2nd, some is with advanced BJSD-3 laser tunnel cross-section detector, and total powerstation etc., but the automatic warning function of tool not can not be monitored in real time, and man's activity also has.
Summary of the invention:
The object of the present invention is to provide a kind of tunnel wall rock deformation monitoring method and monitoring system thereof, this method and system thereof help the number of casualties and the loss that reduce and avoid tunnel, the great landslide in tunnel to be caused, thereby improve construction operation safety.
Tunnel wall rock deformation monitoring method of the present invention is characterized in that:
Described monitoring method is as follows:
(1) at first laser instrument is fixed on the stable tunnel surrounding inwall, install and fix photosensitive displacement signal monitor in the preliminary bracing of unstable country rock again in construction tunnel, the signal output part of described laser instrument is relative with the receiving end of photosensitive displacement signal monitor signal;
When (2) monitoring, the photosensitive displacement signal monitor in order to receive laser signal of laser instrument in the tunnel sends real-time laser signal, and photosensitive displacement signal monitor sends the Monitoring Data of unstable surrouding rock deformation displacement in real time in the observation process to the signal Processing terminal;
(3) the signal Processing terminal is according to the data analysis of collecting, and when the surrouding rock deformation shift value met or exceeded the dangerous deformations value, the signal Processing terminal was promptly sent alerting signal through warning system.
Tunnel wall rock deformation monitoring system of the present invention, it is characterized in that: comprise laser instrument and optical beam transformation module, photosensitive displacement signal acquisition system module, location and supporting module and monitoring and signal processing software module, the long-distance radio communication module, acoustic scene light alarm system module, described module all is connected with power module, described laser instrument and beam shaping system module send laser beam to photosensitive displacement signal acquisition system module, the output of described photosensitive displacement signal acquisition system module is sent to monitoring and signal processing system module, the output of described monitoring and signal processing system module by signal is shielded to text display respectively, the long-distance radio communication module, acoustic scene light alarm system module, described long-distance radio communication module output signal to the remote signal receiving terminal.
Remarkable advantage of the present invention is: thus the distortion situation that can monitor the country rock of construction tunnel instability in real time is issued on early warning information to avoid the generation of accident.
Description of drawings
Fig. 1 installs and uses view for laser instrument of the present invention and PSD.
Fig. 2 is a Fundamentals of Supervisory Systems block diagram of the present invention.
Embodiment:
Tunnel wall rock deformation monitoring method of the present invention is characterized in that:
Described monitoring method is as follows:
(1) at first laser instrument is fixed on the stable tunnel surrounding inwall, install and fix photosensitive displacement signal monitor in the preliminary bracing of unstable country rock again in construction tunnel, the signal output part of described laser instrument is relative with the receiving end of photosensitive displacement signal monitor signal;
When (2) monitoring, the photosensitive displacement signal monitor in order to receive laser signal of laser instrument in the tunnel sends real-time laser signal, and photosensitive displacement signal monitor sends the Monitoring Data of unstable surrouding rock deformation displacement in real time in the observation process to the signal Processing terminal;
(3) the signal Processing terminal is according to the data analysis of collecting, and when the surrouding rock deformation shift value met or exceeded the dangerous deformations value, the signal Processing terminal was promptly sent alerting signal through warning system.
When the surrouding rock deformation shift value surpasses safe deformation values but when reinforcing safe deformation values, the signal Processing terminal is sent and reinforced the country rock instruction.
When near horizontal convergence (arch springing) speed less than 0.2mm/d, the arch rate of sinking is less than 0.15mm/d, it is stable that country rock reaches substantially, system does not report to the police, and signal lamp does not work; When near horizontal convergence (arch springing) speed greater than 0.2mm/d, the arch rate of sinking is greater than 0.15mm/d, and the headroom pace of change is during less than 5.0mm/d, country rock is in safe deformation stage, system does not report to the police, but signal lamp lights green light; When the headroom pace of change continued greater than 5.0mm/d, country rock was in rapid deformation state, should strengthen the preliminary bracing system, and system sends alerting signal, the bright orange lamp of signal lamp.When the headroom pace of change continued greater than 10.0mm/d, accident was big, was the omen of landslide, and system sends rapid alerting signal, and signal lamp flashes the redlight, and the prompting site operation personnel withdraws the tunnel at once.
The said fixing bearing is to be arranged in the preliminary bracing of unstable country rock inwall, described hold-down support is connected with in order to monitor the photosensitive displacement signal monitor of unstable surrouding rock deformation, and described each photosensitive displacement signal monitor is connected with the signal Processing terminal through signal wire respectively.Also be provided with hold-down support on the described stable tunnel surrounding inwall, this hold-down support is connected with laser instrument, in order to emission of lasering beam.
Above-mentioned photosensitive displacement signal monitor is PSD, CCD or fibre faceplate.
In order to realize above-mentioned monitoring method tunnel wall rock deformation monitoring system of the present invention, comprise laser instrument and optical beam transformation module, photosensitive displacement signal acquisition system module, location and supporting module and monitoring and signal processing software module, the long-distance radio communication module, acoustic scene light alarm system module, described module all is connected with power module, described laser instrument and beam shaping system module by signal come downwards to photosensitive displacement signal acquisition system module, the output of described photosensitive displacement signal acquisition system module is sent to monitoring and signal processing system module, the output of described monitoring and signal processing system module by signal is shielded to text display respectively, the long-distance radio communication module, acoustic scene light alarm system module, described long-distance radio communication module output signal to the remote signal receiving terminal.
The method applied in the present invention and system have solved this significant problem of security in the existing tunnel construction operation, the safety coefficient of constructing tunnel operation is provided greatly, thereby ensured the safety of people's life and property, helped large-area promotion and implementation and use.

Claims (6)

1, a kind of tunnel wall rock deformation monitoring method is characterized in that:
Described monitoring method is as follows:
(1) at first laser instrument is fixed on the stable tunnel surrounding inwall, install and fix photosensitive displacement signal monitor in the preliminary bracing of unstable country rock again in construction tunnel, the signal output part of described laser instrument is relative with the receiving end of photosensitive displacement signal monitor signal;
When (2) monitoring, the photosensitive displacement signal monitor in order to receive laser signal of laser instrument in the tunnel sends real-time laser signal, and photosensitive displacement signal monitor sends the Monitoring Data of unstable surrouding rock deformation displacement in real time in the observation process to the signal Processing terminal;
(3) the signal Processing terminal is according to the data analysis of collecting, and when the surrouding rock deformation shift value met or exceeded the dangerous deformations value, the signal Processing terminal was promptly sent alerting signal through warning system.
2, tunnel wall rock deformation monitoring method according to claim 1 is characterized in that: when the surrouding rock deformation shift value surpasses safe deformation values but when reinforcing safe deformation values, the signal Processing terminal is sent and reinforced the country rock instruction.
3, tunnel wall rock deformation monitoring method according to claim 1 is characterized in that: when near horizontal convergence (arch springing) speed less than 0.2mm/d, the arch rate of sinking is less than 0.15mm/d, it is stable that country rock reaches substantially, system does not report to the police, and signal lamp does not work; When near horizontal convergence (arch springing) speed greater than 0.2mm/d, the arch rate of sinking is greater than 0.15mm/d, and the headroom pace of change is during less than 5.0mm/d, country rock is in safe deformation stage, system does not report to the police, but signal lamp lights green light; When the headroom pace of change continued greater than 5.0mm/d, country rock was in rapid deformation state, should strengthen the preliminary bracing system, and system sends alerting signal, the bright orange lamp of signal lamp.When the headroom pace of change continued greater than 10.0mm/d, accident was big, was the omen of landslide, and system sends rapid alerting signal, and signal lamp flashes the redlight, and the prompting site operation personnel withdraws the tunnel at once.
4, tunnel wall rock deformation monitoring method according to claim 1 and 2, it is characterized in that: described hold-down support is to be arranged in the preliminary bracing of unstable country rock inwall, described hold-down support is connected with in order to monitor the photosensitive displacement signal monitor of unstable surrouding rock deformation, and described each photosensitive displacement signal monitor is connected with the signal Processing terminal through signal wire respectively.Also be provided with hold-down support on the described stable tunnel surrounding inwall, this hold-down support is connected with laser instrument, in order to emission of lasering beam.
5, tunnel wall rock deformation monitoring system according to claim 4 is characterized in that: described photosensitive displacement signal monitor is PSD, CCD or fibre faceplate.
6, a kind of tunnel wall rock deformation monitoring system, it is characterized in that: comprise laser instrument and optical beam transformation module, photosensitive displacement signal acquisition system module, location and supporting module and monitoring and signal processing software module, the long-distance radio communication module, acoustic scene light alarm system module, described module all is connected with power module, described laser instrument and beam shaping system module send laser beam to photosensitive displacement signal acquisition system module, the output of described photosensitive displacement signal acquisition system module is sent to monitoring and signal processing system module, the output of described monitoring and signal processing system module by signal is shielded to text display respectively, the long-distance radio communication module, acoustic scene light alarm system module, described long-distance radio communication module output signal to the remote signal receiving terminal.
CN2008100725142A 2008-12-30 2008-12-30 Tunnel wall rock deformation monitoring method and monitoring system thereof Active CN101458069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100725142A CN101458069B (en) 2008-12-30 2008-12-30 Tunnel wall rock deformation monitoring method and monitoring system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100725142A CN101458069B (en) 2008-12-30 2008-12-30 Tunnel wall rock deformation monitoring method and monitoring system thereof

Publications (2)

Publication Number Publication Date
CN101458069A true CN101458069A (en) 2009-06-17
CN101458069B CN101458069B (en) 2011-02-23

Family

ID=40769073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100725142A Active CN101458069B (en) 2008-12-30 2008-12-30 Tunnel wall rock deformation monitoring method and monitoring system thereof

Country Status (1)

Country Link
CN (1) CN101458069B (en)

Cited By (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061941A (en) * 2010-11-27 2011-05-18 山东理工大学 Tunnel and gob surrounding rock safety and real-time directional non-destructive monitoring device and early warning method
CN102494628A (en) * 2011-12-13 2012-06-13 吉林省明普光学科技有限公司 Laser measuring method and laser measuring device for tunnel deformation
CN102589438A (en) * 2011-12-01 2012-07-18 中建八局大连建设工程有限公司 Method for detecting vault subsidence and clearance convergence of tunnel
CN102607540A (en) * 2012-03-16 2012-07-25 天地科技股份有限公司 Device for measuring relative variation of underground space
CN102679840A (en) * 2012-06-11 2012-09-19 中国矿业大学 External port free type convergence instrument and measurement method thereof
CN102721365A (en) * 2012-06-01 2012-10-10 北京交通大学 Method and device for high-speed and accurate measurement of tunnel section
CN103017673A (en) * 2012-12-26 2013-04-03 中铁二十四局集团有限公司 Real-time continuous monitoring alarming method for tunnel surrounding rock deformation
CN103438816A (en) * 2013-08-16 2013-12-11 合肥工业大学 High-precision measuring device for measuring joint type equipment member bar deformation
CN103646527A (en) * 2013-12-24 2014-03-19 山东大学 Automatic monitoring and early-warning system and method for monitoring and measuring interior of tunnel
CN103791849A (en) * 2014-01-27 2014-05-14 武汉长澳大地工程有限公司 Monitoring system and measuring method for laser intelligent response type tunnel convergence
CN104005795A (en) * 2014-06-16 2014-08-27 孙军振 Tunnel clearance monitoring safety alarm apparatus
CN104122236A (en) * 2014-07-28 2014-10-29 张蕾 Automatic prompting-warning method and system for harm variables of traffic environment of tunnel
CN104216365A (en) * 2014-08-22 2014-12-17 山东大学 Cloud-based remote tunnel surrounding rock displacement monitoring and warning system
CN104482874A (en) * 2014-11-21 2015-04-01 上海卫星工程研究所 On-orbit measurement system used for pointing relative deformation of satellite load
CN104949629A (en) * 2015-04-20 2015-09-30 同济大学 Laser ranging-based dangerous-rock deformation multipoint information extraction and warning system
CN105004271A (en) * 2015-04-29 2015-10-28 广州市地平线岩土工程有限公司 System of utilizing light rays having angles therebetween to carry out displacement monitoring and measurement method thereof
CN105180897A (en) * 2015-09-28 2015-12-23 长安大学 Method for improving precision of opposite side measurement for settlement of tunnel vault
CN105332739A (en) * 2015-10-14 2016-02-17 同济大学 Tunnel supporting structure stress monitoring device and method
CN105511402A (en) * 2015-12-01 2016-04-20 西安交通大学 Heavy-duty machine tool body deformation automatic monitoring and alarm device
CN106441136A (en) * 2016-09-27 2017-02-22 上海建工集团股份有限公司 Rectangular shield tunneling phase full-section deformation monitoring method
CN106523032A (en) * 2016-12-29 2017-03-22 中铁十九局集团第工程有限公司 Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine
CN106595579A (en) * 2016-11-23 2017-04-26 中铁四局集团第工程有限公司 Tunnel convergence on-line monitoring apparatus based on torque-type included angle measurement
CN106895787A (en) * 2017-02-27 2017-06-27 武汉理工大学 Deformation monitoring system and method based on visible ray location technology
CN106958460A (en) * 2017-05-16 2017-07-18 山东大学 A kind of wisdom sensory perceptual system and method suitable for tunneling and underground engineering monitoring measurement information
CN108007378A (en) * 2017-12-28 2018-05-08 苏州市测绘院有限责任公司 A kind of deformation monitoring integrated system and its application method
CN108195301A (en) * 2018-01-19 2018-06-22 安徽省(水利部淮河水利委员会)水利科学研究院(安徽省水利工程质量检测中心站) A kind of long shaft-like hollow member DEFORMATION MONITORING SYSTEM and method
CN108387210A (en) * 2018-01-26 2018-08-10 山东大学 A kind of monitoring system and method for measuring tunnel vault sedimentation in real time
CN108386230A (en) * 2018-04-20 2018-08-10 中国水利水电第十四工程局有限公司 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation
CN109141509A (en) * 2018-07-31 2019-01-04 刘建娥 The system of remote real time monitoring vcehicular tunnel dynamic and state of surrounding rock stability
CN109238161A (en) * 2018-09-21 2019-01-18 中国矿业大学 A kind of observation device and observation method of tunnel surface absolute convergence amount
CN109373926A (en) * 2018-12-30 2019-02-22 江龙 The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system
CN109405758A (en) * 2018-10-25 2019-03-01 四川大学 A kind of tunnel wall rock deformation monitoring method and its monitoring system
CN109681275A (en) * 2019-01-20 2019-04-26 江龙 A kind of continuous monitoring alarm method of constructing tunnel surrouding rock deformation and system
CN109931109A (en) * 2019-04-19 2019-06-25 贵州省交通规划勘察设计研究院股份有限公司 A kind of constructing tunnel dynamic landslide safety comprehensive method for early warning based on multivariate data
CN110108215A (en) * 2019-06-12 2019-08-09 苏州龙杰特种纤维股份有限公司 Displacement detector between a kind of transmission device connecting shaft
CN110145366A (en) * 2019-05-10 2019-08-20 山东大学 A kind of vehicular Tunnel Landslide monitoring and pre-warning system and method
CN110296649A (en) * 2019-08-01 2019-10-01 中建新疆建工集团第四建筑工程有限公司 A kind of form bracing system deformation monitoring device and monitoring method
CN110686609A (en) * 2018-07-04 2020-01-14 山东省科学院激光研究所 Full-tunnel safety monitoring system and implementation method
CN111537026A (en) * 2020-05-25 2020-08-14 中国电器科学研究院股份有限公司 Method and device for verifying vertical installation reliability of double-sided assembly
CN112268797A (en) * 2020-10-09 2021-01-26 武汉威思顿环境系统有限公司 All-round comprehensive detector in tunnel
CN112598243A (en) * 2020-12-15 2021-04-02 重庆电子工程职业学院 Method for dynamically evaluating operation and maintenance safety of pipe rack
CN112668904A (en) * 2020-12-31 2021-04-16 河南华能联合电力建设有限公司 Accurate detection method and system for electric power underground construction channel
CN112781517A (en) * 2021-01-08 2021-05-11 浪潮商用机器有限公司 Machine case of detectable deformation
CN112902863A (en) * 2021-02-07 2021-06-04 中国人民解放军军事科学院国防工程研究院工程防护研究所 Tunnel surrounding rock large deformation monitoring method based on automatic target finding and ranging system
CN112964188A (en) * 2021-02-07 2021-06-15 中国人民解放军军事科学院国防工程研究院工程防护研究所 Method for improving laser automatic measurement precision of tunnel deformation in construction period
CN113404541A (en) * 2021-06-29 2021-09-17 陕西工业职业技术学院 Tunnel surrounding rock deformation on-line monitoring and early warning system
CN116972765A (en) * 2023-08-01 2023-10-31 中交第三公路工程局有限公司 Tunnel surrounding rock deformation monitoring system
US11908121B2 (en) * 2021-02-22 2024-02-20 Nanjing Pioneer Awareness Information Technology Co., Ltd Conveying manipulator for machining precision parts
CN117738743A (en) * 2024-02-19 2024-03-22 中国矿业大学(北京) Method for monitoring adaptive surrounding rock supporting structure of long mountain tunnel

Cited By (67)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061941B (en) * 2010-11-27 2013-01-23 山东理工大学 Tunnel and gob surrounding rock safety and real-time directional non-destructive monitoring device and early warning method
CN102061941A (en) * 2010-11-27 2011-05-18 山东理工大学 Tunnel and gob surrounding rock safety and real-time directional non-destructive monitoring device and early warning method
CN102589438A (en) * 2011-12-01 2012-07-18 中建八局大连建设工程有限公司 Method for detecting vault subsidence and clearance convergence of tunnel
CN102494628A (en) * 2011-12-13 2012-06-13 吉林省明普光学科技有限公司 Laser measuring method and laser measuring device for tunnel deformation
CN102607540A (en) * 2012-03-16 2012-07-25 天地科技股份有限公司 Device for measuring relative variation of underground space
CN102607540B (en) * 2012-03-16 2013-08-21 天地科技股份有限公司 Device for measuring relative variation of underground space
CN102721365B (en) * 2012-06-01 2015-04-15 北京交通大学 Method and device for high-speed and accurate measurement of tunnel section
CN102721365A (en) * 2012-06-01 2012-10-10 北京交通大学 Method and device for high-speed and accurate measurement of tunnel section
CN102679840A (en) * 2012-06-11 2012-09-19 中国矿业大学 External port free type convergence instrument and measurement method thereof
CN102679840B (en) * 2012-06-11 2015-08-19 中国矿业大学 External port free type convergence instrument and measuring method thereof
CN103017673A (en) * 2012-12-26 2013-04-03 中铁二十四局集团有限公司 Real-time continuous monitoring alarming method for tunnel surrounding rock deformation
CN103017673B (en) * 2012-12-26 2015-08-19 中铁二十四局集团有限公司 Tunnel wall rock deformation real-time continuous alarming method by monitoring
CN103438816A (en) * 2013-08-16 2013-12-11 合肥工业大学 High-precision measuring device for measuring joint type equipment member bar deformation
CN103646527A (en) * 2013-12-24 2014-03-19 山东大学 Automatic monitoring and early-warning system and method for monitoring and measuring interior of tunnel
CN103791849A (en) * 2014-01-27 2014-05-14 武汉长澳大地工程有限公司 Monitoring system and measuring method for laser intelligent response type tunnel convergence
CN104005795B (en) * 2014-06-16 2016-06-29 孙军振 A kind of tunnel clearance monitoring security alarm instrument
CN104005795A (en) * 2014-06-16 2014-08-27 孙军振 Tunnel clearance monitoring safety alarm apparatus
CN104122236A (en) * 2014-07-28 2014-10-29 张蕾 Automatic prompting-warning method and system for harm variables of traffic environment of tunnel
CN104216365A (en) * 2014-08-22 2014-12-17 山东大学 Cloud-based remote tunnel surrounding rock displacement monitoring and warning system
CN104482874A (en) * 2014-11-21 2015-04-01 上海卫星工程研究所 On-orbit measurement system used for pointing relative deformation of satellite load
CN104482874B (en) * 2014-11-21 2017-05-03 上海卫星工程研究所 On-orbit measurement system used for pointing relative deformation of satellite load
CN104949629A (en) * 2015-04-20 2015-09-30 同济大学 Laser ranging-based dangerous-rock deformation multipoint information extraction and warning system
CN105004271A (en) * 2015-04-29 2015-10-28 广州市地平线岩土工程有限公司 System of utilizing light rays having angles therebetween to carry out displacement monitoring and measurement method thereof
CN105004271B (en) * 2015-04-29 2019-12-06 广州市地平线岩土工程有限公司 System and method for monitoring displacement by utilizing light rays forming angles with each other
CN105180897A (en) * 2015-09-28 2015-12-23 长安大学 Method for improving precision of opposite side measurement for settlement of tunnel vault
CN105332739A (en) * 2015-10-14 2016-02-17 同济大学 Tunnel supporting structure stress monitoring device and method
CN105511402A (en) * 2015-12-01 2016-04-20 西安交通大学 Heavy-duty machine tool body deformation automatic monitoring and alarm device
CN106441136A (en) * 2016-09-27 2017-02-22 上海建工集团股份有限公司 Rectangular shield tunneling phase full-section deformation monitoring method
CN106441136B (en) * 2016-09-27 2019-03-12 上海建工集团股份有限公司 Rectangular shield phase of boring tunneling boring deformation monitoring method
CN106595579A (en) * 2016-11-23 2017-04-26 中铁四局集团第工程有限公司 Tunnel convergence on-line monitoring apparatus based on torque-type included angle measurement
CN106595579B (en) * 2016-11-23 2019-07-30 中铁四局集团第一工程有限公司 A kind of tunnel convergence on-Line Monitor Device based on the measurement of torque type angle
CN106523032A (en) * 2016-12-29 2017-03-22 中铁十九局集团第工程有限公司 Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine
CN106895787A (en) * 2017-02-27 2017-06-27 武汉理工大学 Deformation monitoring system and method based on visible ray location technology
CN106895787B (en) * 2017-02-27 2019-04-26 武汉理工大学 Deformation monitoring system and method based on visible light location technology
CN106958460A (en) * 2017-05-16 2017-07-18 山东大学 A kind of wisdom sensory perceptual system and method suitable for tunneling and underground engineering monitoring measurement information
CN106958460B (en) * 2017-05-16 2019-02-05 山东大学 A kind of wisdom sensory perceptual system and method suitable for tunneling and underground engineering monitoring measurement information
CN108007378A (en) * 2017-12-28 2018-05-08 苏州市测绘院有限责任公司 A kind of deformation monitoring integrated system and its application method
CN108007378B (en) * 2017-12-28 2020-06-02 苏州市测绘院有限责任公司 Deformation monitoring integrated system and use method thereof
CN108195301A (en) * 2018-01-19 2018-06-22 安徽省(水利部淮河水利委员会)水利科学研究院(安徽省水利工程质量检测中心站) A kind of long shaft-like hollow member DEFORMATION MONITORING SYSTEM and method
CN108387210A (en) * 2018-01-26 2018-08-10 山东大学 A kind of monitoring system and method for measuring tunnel vault sedimentation in real time
CN108386230A (en) * 2018-04-20 2018-08-10 中国水利水电第十四工程局有限公司 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation
CN110686609A (en) * 2018-07-04 2020-01-14 山东省科学院激光研究所 Full-tunnel safety monitoring system and implementation method
CN109141509A (en) * 2018-07-31 2019-01-04 刘建娥 The system of remote real time monitoring vcehicular tunnel dynamic and state of surrounding rock stability
CN109238161A (en) * 2018-09-21 2019-01-18 中国矿业大学 A kind of observation device and observation method of tunnel surface absolute convergence amount
WO2020057363A1 (en) * 2018-09-21 2020-03-26 中国矿业大学 Observation device and observation method for absolute convergence amount of surface of roadway
CN109405758A (en) * 2018-10-25 2019-03-01 四川大学 A kind of tunnel wall rock deformation monitoring method and its monitoring system
CN109373926A (en) * 2018-12-30 2019-02-22 江龙 The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system
CN109681275A (en) * 2019-01-20 2019-04-26 江龙 A kind of continuous monitoring alarm method of constructing tunnel surrouding rock deformation and system
CN109931109A (en) * 2019-04-19 2019-06-25 贵州省交通规划勘察设计研究院股份有限公司 A kind of constructing tunnel dynamic landslide safety comprehensive method for early warning based on multivariate data
CN110145366A (en) * 2019-05-10 2019-08-20 山东大学 A kind of vehicular Tunnel Landslide monitoring and pre-warning system and method
CN110145366B (en) * 2019-05-10 2020-04-21 山东大学 Vehicle-mounted tunnel collapse monitoring and early warning system and method
CN110108215A (en) * 2019-06-12 2019-08-09 苏州龙杰特种纤维股份有限公司 Displacement detector between a kind of transmission device connecting shaft
CN110296649A (en) * 2019-08-01 2019-10-01 中建新疆建工集团第四建筑工程有限公司 A kind of form bracing system deformation monitoring device and monitoring method
CN111537026A (en) * 2020-05-25 2020-08-14 中国电器科学研究院股份有限公司 Method and device for verifying vertical installation reliability of double-sided assembly
CN111537026B (en) * 2020-05-25 2022-04-22 中国电器科学研究院股份有限公司 Method and device for verifying vertical installation reliability of double-sided assembly
CN112268797A (en) * 2020-10-09 2021-01-26 武汉威思顿环境系统有限公司 All-round comprehensive detector in tunnel
CN112598243A (en) * 2020-12-15 2021-04-02 重庆电子工程职业学院 Method for dynamically evaluating operation and maintenance safety of pipe rack
CN112668904A (en) * 2020-12-31 2021-04-16 河南华能联合电力建设有限公司 Accurate detection method and system for electric power underground construction channel
CN112781517A (en) * 2021-01-08 2021-05-11 浪潮商用机器有限公司 Machine case of detectable deformation
CN112902863A (en) * 2021-02-07 2021-06-04 中国人民解放军军事科学院国防工程研究院工程防护研究所 Tunnel surrounding rock large deformation monitoring method based on automatic target finding and ranging system
CN112964188A (en) * 2021-02-07 2021-06-15 中国人民解放军军事科学院国防工程研究院工程防护研究所 Method for improving laser automatic measurement precision of tunnel deformation in construction period
CN112964188B (en) * 2021-02-07 2022-03-25 中国人民解放军军事科学院国防工程研究院工程防护研究所 Method for improving laser automatic measurement precision of tunnel deformation in construction period
US11908121B2 (en) * 2021-02-22 2024-02-20 Nanjing Pioneer Awareness Information Technology Co., Ltd Conveying manipulator for machining precision parts
CN113404541A (en) * 2021-06-29 2021-09-17 陕西工业职业技术学院 Tunnel surrounding rock deformation on-line monitoring and early warning system
CN116972765A (en) * 2023-08-01 2023-10-31 中交第三公路工程局有限公司 Tunnel surrounding rock deformation monitoring system
CN117738743A (en) * 2024-02-19 2024-03-22 中国矿业大学(北京) Method for monitoring adaptive surrounding rock supporting structure of long mountain tunnel
CN117738743B (en) * 2024-02-19 2024-05-24 中国矿业大学(北京) Method for monitoring adaptive surrounding rock supporting structure of long mountain tunnel

Also Published As

Publication number Publication date
CN101458069B (en) 2011-02-23

Similar Documents

Publication Publication Date Title
CN101458069B (en) Tunnel wall rock deformation monitoring method and monitoring system thereof
CN201811722U (en) Tunnel surrounding rock deformation monitoring and alarm device
KR102042616B1 (en) IoT Based Safety Management System of Urban Construction Site
CN103017673B (en) Tunnel wall rock deformation real-time continuous alarming method by monitoring
CN105783868B (en) Subway tunnel deformation online monitoring system and monitoring method
CN104655101B (en) High Precision Traverses formula tunneling boring stability of slope monitoring and warning system and its monitoring method
AU2017204543A1 (en) System for dynamically monitoring roadway roof separation based on fibre grating and pre-warning method
CN108180885B (en) Automatic monitoring system and method for tunnel deformation
CN111648826A (en) Coal mine rock burst prediction early warning system and method
CN108280969A (en) A kind of high slope surface deformation monitoring and warning system and its method for early warning
CN104374466B (en) Optical fiber vibration real-time monitoring and alarming system for roadbed collapse
CN105806311A (en) Optical fiber slope dam displacement settlement monitoring system
CN106323223B (en) Highway cutting slope deformation monitoring and early warning system
CN102636147A (en) Deformation monitoring method for existing railway line
CN103591930B (en) The apparatus and method of distributed optical fiber sensing tunnel subsidence
CN103321681B (en) A kind of monitoring and pre-alarming method of coal mine roadway roof collapse disaster and system
CN205138471U (en) Railway roadbed subsides real -time monitoring system based on big dipper dual -frenquency is measured
CN203025912U (en) Anti-sloughing alarming system for high-danger side slope
CN212620695U (en) Automatic monitoring system for subway engineering structure
CN104832213A (en) Coal theft-mining monitoring method based on personnel positioning system
CN114086967B (en) Anti-excavation vibration monitoring method for subway tunnel
CN115369885A (en) BIM and unmanned aerial vehicle-based dynamic monitoring method for deep foundation pit construction
CN210268562U (en) Digital display roof separation layer displacement alarm
CN211264432U (en) Anti-mistaken-digging warning system
Li et al. Tailings dam breach disaster on-line monitoring method and system realization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 350013 NO.77, QINYUAN ROAD, JIN AN DISTRICT, FUZHOU CITY, FUJIAN PROVINCE TO: 200071 NO.2, HUIWEN ROAD, SHANGHAI, CHINA

TA01 Transfer of patent application right

Effective date of registration: 20101214

Address after: 200071 Chinese Shanghai City Road 2

Applicant after: China Railway 24th Bureau Group Co., Ltd.

Co-applicant after: Fuzhou University

Address before: Qinyuan road in Jinan District of Fuzhou city of Fujian Province, No. 77 350013

Applicant before: Fujian Railway Construction Engineering Co., Ltd.of China Railway 24th Bureau Group Shanghai Railway Co., Ltd.

Co-applicant before: Fuzhou University

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: FUZHOU UNIVERSITY FUJIAN RAILWAY BUILDING CO., LTD

Free format text: FORMER OWNER: FUZHOU UNIVERSITY

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20110217

Address after: 200071 Chinese Shanghai City Road 2

Applicant after: China Railway 24th Bureau Group Co., Ltd.

Co-applicant after: Fuzhou University

Co-applicant after: Fujian Railway Construction Engineering Co., Ltd.of China Railway 24th Bureau Group Shanghai Railway Co., Ltd.

Address before: 200071 Chinese Shanghai City Road 2

Applicant before: China Railway 24th Bureau Group Co., Ltd.

Co-applicant before: Fuzhou University