CN106523032A - Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine - Google Patents

Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine Download PDF

Info

Publication number
CN106523032A
CN106523032A CN201611241806.5A CN201611241806A CN106523032A CN 106523032 A CN106523032 A CN 106523032A CN 201611241806 A CN201611241806 A CN 201611241806A CN 106523032 A CN106523032 A CN 106523032A
Authority
CN
China
Prior art keywords
laser
vault
fixing bolt
inductor
surrounding rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611241806.5A
Other languages
Chinese (zh)
Inventor
张若飞
郝万福
王江水
夏东升
李金永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201611241806.5A priority Critical patent/CN106523032A/en
Publication of CN106523032A publication Critical patent/CN106523032A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a device used for conducting sudden-change early-warning on weak surrounding rock in the tunnel machine excavating construction process, in particular to a sudden-change early-warning device for weak surrounding rock excavating through a tunnel machine. The sudden-change early-warning device is designed mainly for solving the problem that currently, the monitoring and early-warning time for tunnel weak surrounding rock deformation and support structures is long. Two fixing bolts are mounted on a vault, two haunches are each provided with a fixing bolt, lower laser reflecting sensing plates are mounted on the fixing bolts at the haunches, and an upper laser reflecting sensing plate is mounted on the front fixing bolt at the vault. A laser receiving and sending sensor is mounted at the vault, three laser emitting heads of the laser receiving and sending sensor are aligned with the centers of the laser reflecting sensing plates at the vault and the haunches correspondingly, a data line on the laser receiving and sending sensor is connected with a lighting power line in a tunnel, and a sensor early-warning loudspeaker is connected to the joint of the data line and the lighting power line. The sudden-change early-warning device has the advantage that safety early-warning is provided for a site in time.

Description

A kind of tunnel machine excavates weak surrounding rock mutation prior-warning device
Technical field:
The present invention relates to a kind of device for being mutated early warning during tunnel machine excavation construction to weak surrounding rock.
Background technology:
During for tunnel machine excavation construction, according to many changes of geological condition, great uncertain factor can be run into, be led to In often constructing when deforming to tunnel weak surrounding rock and supporting construction is monitored early warning, it is, by manual work mode, to take The measuring apparatus such as spirit level, total powerstation, will be analyzed after data acquisition, and this process is very long, but the weakness in tunnel Wall damage occurs to occur in the short period of time, and the country rock mutation in tunnel can produce serious to in-cavity construction personal security Threaten.
The content of the invention:
The technical problem to be solved is to provide a kind of tunnel machine and excavates weak surrounding rock mutation prior-warning device, its solution Because tunnel machine is excavated can not the problem of early warning in time after weak surrounding rock mutation.
What above-mentioned purpose was realized in:First, the vault for excavating country rock in tunnel machine is installed former and later two and fixes spiral shell Bolt, the two described fixing bolt will respectively install a fixing bolt, after just propping up at two haunches on same straight line Lower laser reflection tablet is respectively mounted on the fixing bolt at two haunches, is located on anterior fixing bolt in vault and is pacified Laser reflection tablet is loaded onto, is pacified on second fixing bolt at the vault apart from vault laser reflection tablet 10-20m Dress laser transmitting-receiving inductor, ensures during installation that balance is firm, and three on laser transmitting-receiving inductor laser beam emitting head is respectively aligned to Laser reflection tablet center at vault, haunch, the data wire on laser transmitting-receiving inductor are connected with tunnel intraoral illumination power line Connect, be connected with data wire and mains lighting supply line in junction connection inductor early warning loudspeaker, i.e. the inductor early warning loudspeaker, After weak surrounding rock is mutated, after the laser signal of laser transmitting-receiving inductor irradiation departs from reflection tablet, immediately signal can be passed Pass inductor early warning loudspeaker and send alarm, act on there is provided safe early warning to scene.
It is an advantage of the invention that:After weak surrounding rock is mutated, the laser signal of laser transmitting-receiving inductor irradiation departs from reflection After tablet, signal transmission can be sent into alarm to inductor early warning loudspeaker immediately, be acted on there is provided safe early warning to scene, Workmen is made to receive early warning information.Accurately, method is simple for its early warning information.
Description of the drawings:
Fig. 1 is the installment state schematic diagram of the present invention.
Specific embodiment:
With reference to Fig. 1, first, the vault 7 for excavating country rock in tunnel machine installs former and later two fixing bolts, and the two described are solid Determine bolt and a fixing bolt will be respectively installed after just propping up on same straight line at two haunches 8, consolidating at two haunches Determine on bolt, to be respectively mounted lower laser reflection tablet 1, be located on anterior fixing bolt in vault and install laser reflection sense Plate 2 is answered, laser transmitting-receiving sense is installed on second fixing bolt at the vault apart from vault laser reflection tablet 10-20m Device 3 is answered, during installation, ensures that balance is firm, three on laser transmitting-receiving inductor laser beam emitting head is respectively aligned at vault, haunch Laser reflection tablet center, the data wire 4 on laser transmitting-receiving inductor is connected with tunnel intraoral illumination power line 5, in the company Place's connection inductor early warning loudspeaker 6 is connect, i.e. inductor early warning loudspeaker is connected with data wire and mains lighting supply line, when weakness is enclosed After petrosal process becomes, after the laser signal of laser transmitting-receiving inductor irradiation departs from reflection tablet, can be immediately by signal transmission to sensing Device early warning loudspeaker sends alarm, acts on there is provided safe early warning to scene.

Claims (1)

1. a kind of tunnel machine excavates weak surrounding rock mutation prior-warning device, it is characterized in that:Country rock is excavated in tunnel machine first Vault(7)Former and later two fixing bolts are installed, the two described fixing bolt will be on same straight line, at two after just propping up Haunch(8)One fixing bolt of each installation in place, is respectively mounted lower laser reflection tablet on the fixing bolt at two haunches (1), it is located on anterior fixing bolt in vault and installs laser reflection tablet(2), sensing apart from vault laser reflection On second fixing bolt of the vault of plate 10-20m, laser transmitting-receiving inductor is installed at place(3), during installation, ensure that balance is firm, swashs Three laser beam emitting heads on light transmitting-receiving inductor are respectively aligned to the laser reflection tablet center at vault, haunch, and laser is received Send out the data wire on inductor(4)With tunnel intraoral illumination power line(5)Connection, connects inductor early warning loudspeaker in the junction (6), i.e. inductor early warning loudspeaker is connected with data wire and mains lighting supply line, after weak surrounding rock is mutated, laser transmitting-receiving sensing After the laser signal of device irradiation departs from reflection tablet, signal transmission can be sent into alarm to inductor early warning loudspeaker immediately.
CN201611241806.5A 2016-12-29 2016-12-29 Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine Pending CN106523032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611241806.5A CN106523032A (en) 2016-12-29 2016-12-29 Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611241806.5A CN106523032A (en) 2016-12-29 2016-12-29 Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine

Publications (1)

Publication Number Publication Date
CN106523032A true CN106523032A (en) 2017-03-22

Family

ID=58339159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611241806.5A Pending CN106523032A (en) 2016-12-29 2016-12-29 Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine

Country Status (1)

Country Link
CN (1) CN106523032A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100717849B1 (en) * 2006-03-08 2007-05-14 주식회사 도담이앤씨 Construction method of 2-arch tunnel
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
CN201463843U (en) * 2009-07-10 2010-05-12 上海同岩土木工程科技有限公司 Digital photography-based geotechnical engineering deformation remote monitoring system
CN201680823U (en) * 2010-05-21 2010-12-22 中国矿业大学 Dynamic measuring device for roadway surrounding rock deformation
CN102564335A (en) * 2012-01-16 2012-07-11 苏州临点三维科技有限公司 Method for measuring deformation of large-scale tunnel
CN103335596A (en) * 2013-06-26 2013-10-02 同济大学 Tunnel convergence displacement and arch crown settlement measuring device and measuring method
CN103646527A (en) * 2013-12-24 2014-03-19 山东大学 Automatic monitoring and early-warning system and method for monitoring and measuring interior of tunnel
CN104373129A (en) * 2014-10-24 2015-02-25 合肥工业大学 Shield tunnel vault crown settlement monitoring device
CN205445677U (en) * 2016-03-29 2016-08-10 福建高新源工程科技有限公司 Tunnel safety precaution and automatic control system of measurationing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100717849B1 (en) * 2006-03-08 2007-05-14 주식회사 도담이앤씨 Construction method of 2-arch tunnel
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
CN201463843U (en) * 2009-07-10 2010-05-12 上海同岩土木工程科技有限公司 Digital photography-based geotechnical engineering deformation remote monitoring system
CN201680823U (en) * 2010-05-21 2010-12-22 中国矿业大学 Dynamic measuring device for roadway surrounding rock deformation
CN102564335A (en) * 2012-01-16 2012-07-11 苏州临点三维科技有限公司 Method for measuring deformation of large-scale tunnel
CN103335596A (en) * 2013-06-26 2013-10-02 同济大学 Tunnel convergence displacement and arch crown settlement measuring device and measuring method
CN103646527A (en) * 2013-12-24 2014-03-19 山东大学 Automatic monitoring and early-warning system and method for monitoring and measuring interior of tunnel
CN104373129A (en) * 2014-10-24 2015-02-25 合肥工业大学 Shield tunnel vault crown settlement monitoring device
CN205445677U (en) * 2016-03-29 2016-08-10 福建高新源工程科技有限公司 Tunnel safety precaution and automatic control system of measurationing

Similar Documents

Publication Publication Date Title
RU2667986C2 (en) System and method for detection of dumbbel lock destruction of scraper conveyor
CN203283810U (en) Underground belt conveyor detecting system based on image processing technique
CN108350684A (en) Method and system for detecting heavy-duty machinery abrasion
CN110439618B (en) Mining optical fiber roof dynamic monitoring and crushing treatment system
CN104330819A (en) Recyclable installation device of microseism sensor and installation method
WO2014121643A1 (en) Advanced detection system and method for tunnelling disasters
CN110158673A (en) A kind of foundation pit deformation real-time monitoring system
CN106291661A (en) Intelligent early-warning instrument and method for early warning thereof are monitored in stope microseism continuously
CN102889075B (en) Coal mine drilling angle measuring system and method
CN104088620A (en) Intelligent pneumatic supporting leg type vibrating anchor drilling rig capable of recognizing looseness range of surrounding rock
CN106523032A (en) Sudden-change early-warning device for weak surrounding rock excavating through tunnel machine
CN110984255A (en) Foundation pit support structure horizontal displacement monitoring and early warning system
CN110738825A (en) open TBM broken stratum early warning method and system
CN103512527B (en) The on-line measuring device of hard rock tunnel development machine disk cutter wearing and tearing
CN206397545U (en) A kind of tunnel machine excavates weak surrounding rock mutation prior-warning device
CN203025912U (en) Anti-sloughing alarming system for high-danger side slope
CN104265184A (en) Intelligent on-line drill rod
CN105443157A (en) Coal mine roof collapse prevention early warning device based on laser detection technology
CN105003293A (en) Gas drainage system for high-gas-content coal mine
CN116434491A (en) Underground cable vibration alarm device and system capable of preventing external damage
KR20130016890A (en) On line monitoring system of underground utility
CN102705012A (en) Monitoring system of coal roadway roof separation based on M-BUS
CN110080823A (en) Tunnel support structure safety monitoring and warning method based on steelframe stress identification
CN110186417A (en) A kind of corner monitoring device for push pipe electric power tunnel
CN110824552B (en) Unfavorable geology detection system and method carried on shield machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170322