CN110296649A - A kind of form bracing system deformation monitoring device and monitoring method - Google Patents

A kind of form bracing system deformation monitoring device and monitoring method Download PDF

Info

Publication number
CN110296649A
CN110296649A CN201910706156.4A CN201910706156A CN110296649A CN 110296649 A CN110296649 A CN 110296649A CN 201910706156 A CN201910706156 A CN 201910706156A CN 110296649 A CN110296649 A CN 110296649A
Authority
CN
China
Prior art keywords
support
construction
pushbutton unit
pbu pushbutton
distance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910706156.4A
Other languages
Chinese (zh)
Inventor
张玉田
杨秀莲
唐杰林
杨友财
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjian Xinjiang Construction Engineering Group Fourth Construction Engineering Co Ltd
China Construction Xinjiang Construction Engineering Group Fourth Construction Engineering Co Ltd
Original Assignee
Zhongjian Xinjiang Construction Engineering Group Fourth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjian Xinjiang Construction Engineering Group Fourth Construction Engineering Co Ltd filed Critical Zhongjian Xinjiang Construction Engineering Group Fourth Construction Engineering Co Ltd
Priority to CN201910706156.4A priority Critical patent/CN110296649A/en
Publication of CN110296649A publication Critical patent/CN110296649A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/0002Arrangements for supporting, fixing or guiding the measuring instrument or the object to be measured
    • G01B5/0004Supports
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/30Measuring arrangements characterised by the use of mechanical techniques for measuring the deformation in a solid, e.g. mechanical strain gauge

Abstract

The present invention specifically discloses a kind of form bracing system deformation monitoring device, including the support system bracket formed by several transverse support bars and longitudinal bracing column weave in, longitudinal bracing column bottom is equipped with pedestal, the transverse support bar and longitudinal bracing column for the girder lower end constructed according to actual needs form the support of " T " font, in the side for the longitudinal bracing column that " T " font supports at least provided with a support rod side by side, the two is connected by several connectors, the PBU pushbutton unit between supporting bar top is equipped with construction elevator radio layer, there is the alarm distance d being arranged according to the actual situation between the transverse support bar of PBU pushbutton unit distance " T " font support, the PBU pushbutton unit passes through wireless and/or wired forms external-connection displayer.The alarm distance d distance set between the transverse support bar in PBU pushbutton unit and practice of construction is that maximum allowable deformation values are alarmed, and device construction is very convenient, and application prospect is very extensive.

Description

A kind of form bracing system deformation monitoring device and monitoring method
Technical field
It is specific open the invention belongs to the design and technical field of improvement of construction equipment and method of real-time of constructing A kind of form bracing system deformation monitoring device and monitoring method.
Background technique
With the development of society, layer height be more than 8m, span be more than 18m building it is more and more, in work progress, collapse thing Therefore take place frequently, such engineering is classified as more than the biggish item engineering of the risk of certain scale by national house town and country construction general office, portion Range.
In order to ensure the safety of high formwork support system and going on smoothly for concrete structure construction, monitoring standard module is monitored in real time Support system set up, reinforcement installation, concrete pour deformation condition during smashing and before and after concrete final set, it is ensured that form bracing system exists Under the action of various construction operating conditions and load, high formwork support system deformation is predicted in advance and reaches early warning value, personnel is avoided to hurt It dies and property loss.Traditional method is manually using total station, theodolite periodic monitoring, and there are observation time differences for such way, no It can be carried out real-time monitoring.
Summary of the invention
The purpose of the present invention is to provide a kind of monitoring devices whether real time monitoring high formwork support system deforms, should Monitoring device energy Real-time Feedback set up, reinforcement installation, concrete pour deformation condition during smashing and before and after concrete final set, effectively solve Deformation monitoring of high formwork support system under the action of various construction operating conditions and load.
Technical solution of the present invention: a kind of form bracing system deformation monitoring device, including by several transverse support bars and The support system bracket that longitudinal bracing column weave in is formed, longitudinal bracing column bottom are equipped with pedestal, apply according to actual needs The transverse support bar and longitudinal bracing column of the girder lower end of work form the support of " T " font, in the longitudinal bracing column of " T " font support Side at least provided with a support rod side by side, the two is connected by several connectors, supporting bar top be equipped with construction electricity PBU pushbutton unit between terraced radio layer, the PBU pushbutton unit exist between the transverse support bar apart from the support of " T " font according to practical feelings The alarm distance d of condition setting, the PBU pushbutton unit pass through wireless and/or wired forms external-connection displayer.The construction elevator without PBU pushbutton unit is range sensor between line electric layer.The connector is adhesive tape or rope.The distance between described adjacent connections For 1500mm.
A kind of form bracing system deformation monitoring method, concrete operations: the transverse direction in setting PBU pushbutton unit and practice of construction Alarm distance d distance between support rod is maximum allowable deformation values, that is, alarming value;In work progress, form bracing system is each Under the action of kind construction operating condition and load, when deformation meets or exceeds alarming value d, transverse support bar touches construction elevator radio Interlayer PBU pushbutton unit, remote data indicator are shown simultaneously, that is, are alarmed, and construction personnel stops constructing immediately, take measures to handle.
The utility model has the advantages that high formwork support system is in the construction process, and it only need to be at beam bottom mother plate supported rod erecting, fixation is applied PBU pushbutton unit between work elevator wireless electric layer, is arranged radio marker outside support system, that is, can reach real-time monitoring, in real time report It is alert, and do not limited by environment, easy to operate, high-efficient, accuracy is high, substantially increases construction personnel's safety, construction ten It is convenient to divide, and meets modern rapid construction requirement, application prospect is very extensive.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of monitoring device of the present invention;Fig. 2 is monitoring flow diagram.
Specific embodiment
A kind of form bracing system deformation monitoring device, as shown in Fig. 1, including by several transverse support bars 1 and longitudinal direction The support system bracket that 2 weave in of support column is formed, 2 bottom of longitudinal bracing column are equipped with pedestal 3, construct according to actual needs Girder lower end transverse support bar 1 and longitudinal bracing column 2 formed " T " font support, " T " font support longitudinal bracing column 2 side is connected at least provided with a support rod 4 side by side, the two by several connectors 5, is equipped with and is applied on 4 top of support rod PBU pushbutton unit 6 between work elevator wireless electric layer, there are bases between the transverse support bar 1 that " T " font supports for the PBU pushbutton unit 6 The alarm distance d of actual conditions setting, the PBU pushbutton unit 6 pass through wireless and/or wired forms external-connection displayer 7.Described applies PBU pushbutton unit 6 is range sensor between work elevator wireless electric layer.The connector 5 is adhesive tape or rope.The adjacent connections 5 The distance between be 1500mm.
A kind of form bracing system deformation monitoring method, as shown in figure 1 and 2, concrete operations: setting PBU pushbutton unit 6 with Alarm distance d distance between transverse support bar 1 in practice of construction is maximum allowable deformation values, that is, alarming value;Work progress In, form bracing system is under the action of various construction operating conditions and load, when deformation meets or exceeds alarming value d, cross-brace Bar 1 touches PBU pushbutton unit 6 between construction elevator radio layer, and remote data indicator 7 is shown simultaneously, that is, is alarmed, and construction personnel stops immediately It only constructs, takes measures to handle.
Concrete practice, 1, lightened restrictions on using 30 support rod of ¢ and beam bottom mother plate supported rod erecting (longitudinal bracing column), in support rod PBU pushbutton unit between construction elevator radio layer is fixed at top, and PBU pushbutton unit and beam bottom girder are (lateral between construction elevator radio layer Support rod) (48 steel pipe of ¢) distance be the maximum allowable deformation values of beam bottom, that is, alarming value d, radio is set outside form bracing system Display.2, in work progress, for form bracing system under the action of various construction operating conditions and load, deformation reaches alarming value When, beam bottom girder (transverse support bar) (48 steel pipe of ¢) touches button between construction elevator radio layer, external radio electricity display It shows, alarms at once simultaneously.3, PBU pushbutton unit and radio marker can be used in turn between construction elevator radio layer, only be replaced Battery.
Concrete application, applicant collect money to build house project, the garden Zhong Haicuijing project, Guang Hui in Urumqi City Shayibak District Remittance profit city project, library car market Yingjisha school project, Wensu prison project apply this scheme, have received extraordinary technology effect Fruit and significant economic effect.

Claims (5)

1. a kind of form bracing system deformation monitoring device, including interweaved by several transverse support bars (1) and longitudinal bracing column (2) The support system bracket formed together, longitudinal bracing column (2) bottom are equipped with pedestal (3), it is characterised in that: according to actual needs The transverse support bar (1) and longitudinal bracing column (2) of the girder lower end of construction form the support of " T " font, in the vertical of " T " font support To the side of support column (2) at least provided with a support rod (4) side by side, the two is connected by several connectors (5), is being supported Bar (4) top is equipped with PBU pushbutton unit (6) between construction elevator radio layer, the transverse direction of the PBU pushbutton unit (6) distance " T " font support There is the alarm distance d being arranged according to the actual situation between support rod (1), which passes through wireless and/or have linear Formula external-connection displayer (7).
2. a kind of form bracing system deformation monitoring device according to claim 1, it is characterised in that: the construction electricity PBU pushbutton unit (6) is range sensor between terraced radio layer.
3. a kind of form bracing system deformation monitoring device according to claim 1 or 2, it is characterised in that: the connection Part (5) is adhesive tape or rope.
4. a kind of form bracing system deformation monitoring device according to claim 1 or 2, it is characterised in that: described adjacent The distance between connector (5) is 1500mm.
5. a kind of form bracing system deformation monitoring method, concrete operations: the transverse direction in setting PBU pushbutton unit (6) and practice of construction Alarm distance d distance between support rod (1) is maximum allowable deformation values, that is, alarming value;In work progress, form bracing system Under the action of various construction operating conditions and load, when deformation meets or exceeds alarming value d, transverse support bar (1) touching construction electricity PBU pushbutton unit (6) between terraced radio layer, remote data indicator (7) is shown simultaneously, that is, is alarmed, and construction personnel stops constructing immediately, is adopted Measure is taken to handle.
CN201910706156.4A 2019-08-01 2019-08-01 A kind of form bracing system deformation monitoring device and monitoring method Pending CN110296649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910706156.4A CN110296649A (en) 2019-08-01 2019-08-01 A kind of form bracing system deformation monitoring device and monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910706156.4A CN110296649A (en) 2019-08-01 2019-08-01 A kind of form bracing system deformation monitoring device and monitoring method

Publications (1)

Publication Number Publication Date
CN110296649A true CN110296649A (en) 2019-10-01

Family

ID=68032459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910706156.4A Pending CN110296649A (en) 2019-08-01 2019-08-01 A kind of form bracing system deformation monitoring device and monitoring method

Country Status (1)

Country Link
CN (1) CN110296649A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006052979A1 (en) * 2006-11-10 2008-05-21 Matysek, Jerzy Supporting construction unit's e.g. roof support, deformation monitoring device for building, has monitoring carrier to interrupt laser light radiation radiated from transmitter to receiver, in passage via which laser light radiation passes
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
CN207515736U (en) * 2017-12-14 2018-06-19 中铁建工集团有限公司 The deformation monitoring device of high and big die plate and its support system
CN108868107A (en) * 2018-07-25 2018-11-23 中建新疆建工集团第四建筑工程有限公司 A kind of pre-buried wall attaching parts of postposition and its erection construction method
US20180371907A1 (en) * 2016-11-07 2018-12-27 China University Of Mining And Technology Full-roadway full-process full-cross-section surface deformation monitoring device and method
CN109750829A (en) * 2019-01-24 2019-05-14 中建八局第三建设有限公司 The construction method that the unit-combination type support system of deformation monitoring automation is early torn open
CN109781368A (en) * 2019-02-14 2019-05-21 中国建筑科学研究院有限公司 Large-span steel structure support unloading monitoring method
CN210198301U (en) * 2019-08-01 2020-03-27 中建新疆建工集团第三建设工程有限公司 Template support system deformation monitoring device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006052979A1 (en) * 2006-11-10 2008-05-21 Matysek, Jerzy Supporting construction unit's e.g. roof support, deformation monitoring device for building, has monitoring carrier to interrupt laser light radiation radiated from transmitter to receiver, in passage via which laser light radiation passes
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
US20180371907A1 (en) * 2016-11-07 2018-12-27 China University Of Mining And Technology Full-roadway full-process full-cross-section surface deformation monitoring device and method
CN207515736U (en) * 2017-12-14 2018-06-19 中铁建工集团有限公司 The deformation monitoring device of high and big die plate and its support system
CN108868107A (en) * 2018-07-25 2018-11-23 中建新疆建工集团第四建筑工程有限公司 A kind of pre-buried wall attaching parts of postposition and its erection construction method
CN109750829A (en) * 2019-01-24 2019-05-14 中建八局第三建设有限公司 The construction method that the unit-combination type support system of deformation monitoring automation is early torn open
CN109781368A (en) * 2019-02-14 2019-05-21 中国建筑科学研究院有限公司 Large-span steel structure support unloading monitoring method
CN210198301U (en) * 2019-08-01 2020-03-27 中建新疆建工集团第三建设工程有限公司 Template support system deformation monitoring device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李淦泉;: "高大支模浇筑施工实时监测分析", 广州建筑, no. 03, 15 June 2016 (2016-06-15) *

Similar Documents

Publication Publication Date Title
CN208313351U (en) A kind of high-supported formwork multifunctional intellectual data wireless acquisition system
CN202881856U (en) Concrete pouring support prepressing device
CN206279743U (en) A kind of tool-type temporary steel support device
KR20060010852A (en) System for preventing and forecasting a breakdown of a structure
CN206986719U (en) A kind of bridge floor anti-collision wall reinforcing bar positioning installation apparatus
CN204815441U (en) High altitude construction safety belt hangs lifeline system
CN101514542B (en) Device for overhauling bridge approach pier, bent cap and box girder of a bridge
CN109610834A (en) The high-altitude construction method of Long-span Multi-storey Frame heavy duty concrete structure
CN210164286U (en) Support arrangement for high altitude large-span steel structure truss installation usefulness
CN108489440A (en) A kind of high-supported formwork supporting rack upright bar dynamic level displacement monitor and its application method
CN103362069A (en) Steel and concrete combined box girder concrete wing plate formwork and construction method
CN110296649A (en) A kind of form bracing system deformation monitoring device and monitoring method
CN210198301U (en) Template support system deformation monitoring device
CN201786004U (en) Dismountable and assemble type overhanging unloading platform
CN206767452U (en) A kind of lifting framework for GIS device Disintegration overhaul
CN203856183U (en) Fabricated overhanging type discharging platform
CN111207872A (en) Stress monitoring system of overhanging steel wire rope/pull rod system of overhanging scaffold
CN207063484U (en) Movable operation platform for corridor construction
CN212642755U (en) Two lining platform trucks informationization monitored control system
CN204439250U (en) A kind of management high-supported formwork real-time monitoring and alarming
CN102400558A (en) Method for mounting process steel platform steel columns in project of mounting benzene hydrogenation steel structure
CN207032671U (en) Steel and concrete post and the attachment structure of steel and concrete post and Vierendeel girder
CN203020404U (en) Vehicle with operating platform
CN206928695U (en) The supporting construction that a kind of engineering construction uses
CN216616897U (en) Overload alarm type overhanging discharging platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination