CN203856183U - Fabricated overhanging type discharging platform - Google Patents

Fabricated overhanging type discharging platform Download PDF

Info

Publication number
CN203856183U
CN203856183U CN201420254091.7U CN201420254091U CN203856183U CN 203856183 U CN203856183 U CN 203856183U CN 201420254091 U CN201420254091 U CN 201420254091U CN 203856183 U CN203856183 U CN 203856183U
Authority
CN
China
Prior art keywords
platform
discharging platform
skeleton
node component
secondary beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420254091.7U
Other languages
Chinese (zh)
Inventor
黄庆为
赵智慧
赵万胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Is Built And Is Built Work Group Co ltd
Shenzhen Hui Datong Construction Work Co Ltd
Original Assignee
Jiangsu Is Built And Is Built Work Group Co ltd
Shenzhen Hui Datong Construction Work Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Is Built And Is Built Work Group Co ltd, Shenzhen Hui Datong Construction Work Co Ltd filed Critical Jiangsu Is Built And Is Built Work Group Co ltd
Priority to CN201420254091.7U priority Critical patent/CN203856183U/en
Application granted granted Critical
Publication of CN203856183U publication Critical patent/CN203856183U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a fabricated overhanging type discharging platform. The fabricated overhanging type discharging platform comprises a platform framework, a control device and an alarm device; a first end of the platform framework is fixed onto a structural floor through more than two embedded anchor bars, a second end of the platform framework is in stay connection with an upper structural floor through steel wire ropes, guard rods are connected to the outer side of the platform framework which comprises more than two main beams and more than two secondary beams, more than two node parts are welded to the inner side of each main beam, and the main beams and the secondary beams are fixedly connected through the node parts; turn buckles capable of controlling tightening degree of the steel wire ropes are arranged on the steel wire ropes; a supporting plate is laid on the platform framework, and more than four pressure sensors are arranged between the platform framework and the supporting plate; the control device sends an alarm message to the alarm device to enable the alarm device to raise the alarm when pressure information of the pressure sensors exceeds a set threshold. According to the technical scheme, safety of the overhanging type discharging platform can be improved effectively.

Description

A kind of assembled overhanging formula discharging platform
Technical field
The utility model belongs to building engineering field, relates in particular to a kind of assembled overhanging formula discharging platform.
Background technology
At present, building trade development is swift and violent, and building structure reaches its maturity, and highrise building, super highrise building are of common occurrence.
In building trade operating mechanism, already under ripe background, we are faced with the pressure that no small control construction cost drops into, and therefore, the turnover utilization rate that improves material, mould is the link that we must capture.Along with increasing of building, overhanging type discharging platform enters people's the visual field gradually.It is an entirety that traditional overhanging type discharging platform completes product, in dismounting, transport and turnover use, has many drawbacks.When damaging appears in wherein certain member of the overhanging type discharging platform of this integration, maintenance will be a no small workload.Once finish using, due to the cause that size has been shaped, it is deposited with transporting and has just become problem, while end, only has after being decomposed and transports etc. engineering, has so just wasted many labour costs and cost of materials.
And, traditional overhanging type discharging platform cannot calculate or measure the bearing capacity value that bear on its surface, conventionally only have by workman's experience and judge, neither one criterion can be real-time the actual bearer circumstances that monitors overhanging type discharging platform, can directly cause overhanging type discharging platform bulk deformation when overhanging type discharging platform carries when overweight, even can collapse, cause very large economic loss, meanwhile, also cannot ensure operating personnel's personal safety.
Utility model content
The utility model provides a kind of assembled overhanging formula discharging platform, for providing a kind of dismounting easy, and assembled overhanging formula discharging platform that can overweight automatic alarm, the safety that improves overhanging type discharging platform.
The utility model is achieved in that a kind of assembled overhanging formula discharging platform comprises: platform skeleton, control device and warning device;
Wherein, the first end of above-mentioned platform skeleton is fixed on structure floor by two above pre-buried dowels, the second end of above-mentioned platform skeleton adopts wire rope to be connected with superstructure floor drawknot, and the outside at above-mentioned platform skeleton is connected with guard rail, above-mentioned platform skeleton comprises more than two girder and more than two secondary beam, the inner side of above-mentioned girder is welded with more than two node component, and in above-mentioned node component, offer more than two the first hole body, corresponding above-mentioned first hole body in two ends of above-mentioned secondary beam offers respectively the second hole body, being arranged in above-mentioned the first hole body by bolt is fixedly connected with above-mentioned secondary beam with in above-mentioned the second hole body with above-mentioned node component, above-mentioned wire rope is provided with the flower basket bolt of controlling above-mentioned wire rope degree of tightening,
On above-mentioned platform skeleton, be equipped with gripper shoe, between above-mentioned platform skeleton and above-mentioned gripper shoe, more than four pressure sensor be set;
Above-mentioned control device is connected with above-mentioned warning device and above-mentioned more than four pressure sensor signal respectively, and above-mentioned control device, in the time that the pressure information that receives pressure sensor exceeds the threshold values of setting, sends warning message to above-mentioned warning device; Above-mentioned warning device gives the alarm receiving after above-mentioned warning message.
Therefore, in the utility model, on the one hand, by adopt the mode of node component assembly connection between girder and secondary beam, a kind of easy-to-mount assembled overhanging formula discharging platform is provided, dismounting is easy, can repeatedly recycle, spillage of material is low, greatly reduces its use cost; On the other hand, detect the weight of the goods in gripper shoe by pressure sensor, and by control device, the threshold values of the pressure signal detecting and setting is contrasted, in the time that threshold values exceeds setting value, control device control warning device gives the alarm, thereby has improved security performance when discharging platform uses.
Brief description of the drawings
The partial schematic diagram of the assembled overhanging formula discharging platform that Fig. 1 provides for the utility model;
The overall structure schematic diagram of the assembled overhanging formula discharging platform that Fig. 2 provides for the utility model;
The partial schematic diagram of platform skeleton in the assembled overhanging formula discharging platform that Fig. 3 provides for the utility model;
The structural representation of the assembled overhanging formula discharging platform middle girder that Fig. 4 provides for the utility model;
The structural representation of node component in the assembled overhanging formula discharging platform that Fig. 5 provides for the utility model;
The structural representation of secondary beam in the assembled overhanging formula discharging platform that Fig. 6 provides for the utility model.
The scheme of installation of node component in the assembled overhanging formula discharging platform that Fig. 7 provides for the utility model;
The connection diagram of primary-secondary beam in the assembled overhanging formula discharging platform that Fig. 8 provides for the utility model;
The schematic diagram of platform skeleton in the assembled overhanging formula discharging platform that Fig. 9 provides for the utility model;
The scheme of installation of guard rail in the assembled overhanging formula discharging platform that Figure 10 provides for the utility model;
Foot guard plate and hard protection scheme of installation in the assembled overhanging formula discharging platform that Figure 11 provides for the utility model.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and beneficial effect clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
Below in conjunction with the drawings and specific embodiments, the assembled overhanging formula discharging platform in the utility model is described further.
Please refer to the partial schematic diagram of the assembled overhanging formula discharging platform shown in Fig. 1, as seen from Figure 1, assembled overhanging formula discharging platform comprises platform skeleton 11, control device (not shown) and warning device, on platform skeleton 11, be equipped with gripper shoe 12, more than four pressure sensor 13 is set between platform skeleton 11 and gripper shoe 12;
Above-mentioned control device is connected with above-mentioned warning device and more than four pressure sensor 13 signals respectively, and above-mentioned control device, in the time that the pressure information that receives pressure sensor 13 exceeds the threshold values of setting, sends warning message to above-mentioned warning device; Above-mentioned warning device gives the alarm receiving after above-mentioned warning message.
Concrete, as shown in Figure 1, warning device is any in light alarming device 14 or audible alarm unit 15, or warning device comprises light alarming device 14 and audible alarm unit 15, the maximum of reminding the weight of the carrying of operator's assembled overhanging formula discharging platform to exceed whole assembled overhanging formula discharging platform by light and/or sound is born weight.
Please refer to the overall structure schematic diagram of the assembled overhanging formula discharging platform shown in Fig. 2, the first end 111 of platform skeleton 11 is fixed on structure floor 21 by two above pre-buried dowels 211, the second end 112 of platform skeleton 11 adopts wire rope 31 to be connected with superstructure floor 22 drawknots, concrete, weld respectively two diameter 16HPB300 reinforcing bar draw ring (not shown)s in the outside of the second end 112 of platform skeleton 11, reinforcing bar draw ring is fixedly connected with the first end of wire rope 31, the second end of wire rope 31 is fixedly connected with the reserved steel bar 221 on superstructure floor 22, the second end 112 of platform skeleton 11 is connected with superstructure floor 22 drawknots.Wire rope 31 is provided with the flower basket bolt 311 of controlling wire rope 31 degree of tightening;
As shown in Figure 2, be connected with guard rail 16 in the outside of platform skeleton 11, concrete, at more than two reinforcing bar of the outside of platform skeleton 11 welding, just the seamless steel pipe fixed cover of 48 millimeters of external diameters is located on the reinforcing bar in outside of platform skeleton 11 and is formed guard rail 16.
Please refer to the partial schematic diagram of the platform skeleton 11 shown in Fig. 3, as seen from Figure 3, platform skeleton 11 comprises more than two girder 111 and more than two secondary beam 112.The inner side of girder 111 is welded with two node component, and in above-mentioned node component, offer more than two the first hole body, corresponding above-mentioned first hole body in two ends of secondary beam 112 offers respectively the second hole body, is arranged in above-mentioned the first hole body with in above-mentioned the second hole body, secondary beam 112 is fixedly connected with above-mentioned node component by bolt.
Below in conjunction with Fig. 4-Fig. 9, the structure of platform skeleton 11 is described, the structural representation of girder 111 as shown in Figure 4, girder 111 adopts No. 16 i iron to make, non-corroding, bending and other defect; Optionally, weld respectively two diameter 16HPB300 reinforcing bar draw rings in girder 111 outsides, reinforcing bar draw ring is fixedly connected with the first end of wire rope 31, and the second end of wire rope 31 is fixedly connected with the reserved steel bar 221 on superstructure floor 22.The structural representation of node component 113 as shown in Figure 5, node component 113 adopts No. 16 i iron to make, on the web of node component 113, offer 2 the first hole bodies 171, one end of node component 113 is clipped frange plate and is formed one first connection web 161, as shown in Figure 7, the first connection web 161 adopts the bilateral weldering full weld of E43 welding rod in the inner side of girder 111.The structural representation of secondary beam 112 as shown in Figure 6, secondary beam 112 adopts No. 16 i iron to make, the two ends of secondary beam 112 are clipped respectively frange plate and are formed the second connection web 162, second connects corresponding the first hole body 171 on web 162 offers respectively 2 the second hole bodies 172, as shown in Figure 8, being arranged in the first hole body 171 by bolt 17 is fixedly connected with secondary beam 112 with the second hole body 172 is interior with node component 113, and then as shown in Figure 9, secondary beam 112 is installed on girder 111 by node component 113, forms platform skeleton 11.Optionally, bolt 17 installation directions are contrary.
As shown in figure 10, welded reinforcement on platform skeleton 11, the seamless steel pipe that fixed outer diameter is 48 millimeters.Set up guard rail 16 according to the requirement to steel pipe scaffold in scaffold specification.
As shown in figure 11, composite board 18 use iron wire colligations are formed to composite board hard protection on guard rail 16, and on platform skeleton 11, lay foot guard plate 19, foot guard plate 19 must be close to i iron, prevents object landing, and composite board hard protection must form enclosure space.
The utility model improves for traditional existing drawback of monolithic overhanging type discharging platform just, for construction operation personnel provide a kind of easy-to-mount prefabricated assembled overhanging type discharging platform, provide a kind of and be convenient to transport, have enough to meet the need, be convenient to the discharging instrument of maintenance, to reach cost-saving object.
Therefore, in the utility model, on the one hand, by adopt the mode of node component assembly connection between girder and secondary beam, a kind of easy-to-mount assembled overhanging formula discharging platform is provided, dismounting is easy, can repeatedly recycle, spillage of material is low, greatly reduces its use cost; On the other hand, detect the weight of the goods in gripper shoe by pressure sensor, and by control device, the threshold values of the pressure signal detecting and setting is contrasted, in the time that threshold values exceeds setting value, control device control warning device gives the alarm, thereby has improved security performance when discharging platform uses.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all any amendments of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (7)

1. an assembled overhanging formula discharging platform, is characterized in that, comprising: platform skeleton, control device and warning device;
Wherein, the first end of described platform skeleton is fixed on structure floor by two above pre-buried dowels, the second end of described platform skeleton adopts wire rope to be connected with superstructure floor drawknot, and the outside at described platform skeleton is connected with guard rail, described platform skeleton comprises more than two girder and more than two secondary beam, the inner side of described girder is welded with more than two node component, and in described node component, offer more than two the first hole body, corresponding described first hole body in two ends of described secondary beam offers respectively the second hole body, being arranged in described the first hole body by bolt is fixedly connected with described secondary beam with in described the second hole body with described node component, described wire rope is provided with the flower basket bolt of controlling described wire rope degree of tightening,
On described platform skeleton, be equipped with gripper shoe, between described platform skeleton and described gripper shoe, more than four pressure sensor be set;
Described control device is connected with described warning device and described more than four pressure sensor signal respectively, and described control device, in the time that the pressure information that receives pressure sensor exceeds the threshold values of setting, sends warning message to described warning device; Described warning device gives the alarm receiving after described warning message.
2. assembled overhanging formula discharging platform according to claim 1, it is characterized in that: described girder adopts No. 16 i iron to make, be welded with respectively two diameter 16HPB300 reinforcing bar draw rings in described girder outside, described reinforcing bar draw ring is fixedly connected with the first end of described wire rope, and the second end of described wire rope is fixedly connected with the reserved steel bar on superstructure floor.
3. assembled overhanging formula discharging platform according to claim 2, it is characterized in that: described node component adopts No. 16 i iron to make, one end of described node component is clipped frange plate and is formed one first connection web, described first connects web adopts the bilateral weldering full weld of E43 welding rod in described girder inner side, offers 2 described the first hole bodies on the web of described node component.
4. assembled overhanging formula discharging platform according to claim 3, it is characterized in that: described secondary beam adopts No. 16 i iron to make, the two ends of described secondary beam are clipped respectively frange plate and are formed the second connection web, on described the second connection web, offer respectively 2 described the second hole bodies.
5. assembled overhanging formula discharging platform according to claim 4, is characterized in that: described bolt installation direction is contrary.
6. assembled overhanging formula discharging platform according to claim 1, it is characterized in that: at more than two reinforcing bar of the outside of described platform skeleton welding, the seamless steel pipe fixed cover of 48 millimeters of external diameters is located at and on described reinforcing bar, is formed described guard rail, and on described guard rail with iron wire colligation composite board hard protection.
7. assembled overhanging formula discharging platform according to claim 1, is characterized in that:
On described platform skeleton, be equipped with foot guard plate.
CN201420254091.7U 2014-05-16 2014-05-16 Fabricated overhanging type discharging platform Expired - Fee Related CN203856183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420254091.7U CN203856183U (en) 2014-05-16 2014-05-16 Fabricated overhanging type discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420254091.7U CN203856183U (en) 2014-05-16 2014-05-16 Fabricated overhanging type discharging platform

Publications (1)

Publication Number Publication Date
CN203856183U true CN203856183U (en) 2014-10-01

Family

ID=51606045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420254091.7U Expired - Fee Related CN203856183U (en) 2014-05-16 2014-05-16 Fabricated overhanging type discharging platform

Country Status (1)

Country Link
CN (1) CN203856183U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN107165427A (en) * 2017-06-28 2017-09-15 中国冶集团有限公司 A kind of intelligent overhanging unloading platform
CN112049396A (en) * 2020-07-25 2020-12-08 中建二局第一建筑工程有限公司 Pull-up type overhanging outer frame of turn buckle pull rod

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN107165427A (en) * 2017-06-28 2017-09-15 中国冶集团有限公司 A kind of intelligent overhanging unloading platform
CN112049396A (en) * 2020-07-25 2020-12-08 中建二局第一建筑工程有限公司 Pull-up type overhanging outer frame of turn buckle pull rod

Similar Documents

Publication Publication Date Title
CN203856183U (en) Fabricated overhanging type discharging platform
US20180187407A1 (en) Prefabricated reinforced concrete-filled steel pipe sleeve joint
CN103628680A (en) Construction method for large-area steel structure hanging layer
CN104088467A (en) High-altitude construction deformation monitoring method of large-cantilever steel truss structure
CN205012629U (en) Assembled modularization platform of unloading of encorbelmenting
CN104100090A (en) High-altitude comprehensive construction method of big-cantilever steel truss structure
CN207268073U (en) Novel flexible formwork bearing frame
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN203947756U (en) Exterior wall protective frame
CN203499258U (en) Prefabricated overhanging type discharging platform
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN201786004U (en) Dismountable and assemble type overhanging unloading platform
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN104278628A (en) Light hanging basket applicable to bridge detection and maintenance operations
CN203924047U (en) Antidetonation rural area sectionalized house foundation pile
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN204401454U (en) A kind of light hanging basket being applicable to bridge machinery and maintenance activity
CN107227964A (en) It is a kind of to be effective against mine pressure and the drive device of CONTROL OF STRATA MOVEMENT
CN208965414U (en) Pier stud stock casting platform
CN207551767U (en) By the use of precast main beam as the bridge construction hanging device of primary structure member
CN208844411U (en) A kind of steel reinforced concrete compound web plate structure of box beam beam-ends
CN218815305U (en) A platform of unloading of encorbelmenting for building engineering
CN202788877U (en) Horizontal-vertical loading tunnel combined type full space supporting and propping frame
CN206220547U (en) A kind of operating platform for steel structure column installation
CN206385750U (en) A kind of mixed structure precast stair

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141001

Termination date: 20150516

EXPY Termination of patent right or utility model