CN203361209U - 风电场风机基础单桩水平力承载力静载试验装置 - Google Patents

风电场风机基础单桩水平力承载力静载试验装置 Download PDF

Info

Publication number
CN203361209U
CN203361209U CN 201320043578 CN201320043578U CN203361209U CN 203361209 U CN203361209 U CN 203361209U CN 201320043578 CN201320043578 CN 201320043578 CN 201320043578 U CN201320043578 U CN 201320043578U CN 203361209 U CN203361209 U CN 203361209U
Authority
CN
China
Prior art keywords
pile
bearing capacity
test
horizontal bearing
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320043578
Other languages
English (en)
Inventor
刘蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Water Conservancy and Hydropower Engineering Co Ltd
Original Assignee
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTHWEST HYDRO CONSULTING ENGINEERS CHECC filed Critical NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority to CN 201320043578 priority Critical patent/CN203361209U/zh
Application granted granted Critical
Publication of CN203361209U publication Critical patent/CN203361209U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本实用新型涉及风电场风机基础单桩水平力承载力静载试验装置,是:在第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的水平承载力试桩;第一半径处布置1根混凝土灌注桩作为水平承载力锚桩;在锚桩和试桩设置水平钢部件底座,千斤顶水平连接在锚桩和试桩的水平钢部件底座之间,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到锚桩和试桩上进行水平承载力静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值;在锚桩和试桩之间的千斤顶水平放置,千斤顶连接件上有水平度检测传感器,通过水平度检测传感器检测试桩或锚桩位移。本实用新型安全性高,成本合理。

Description

风电场风机基础单桩水平力承载力静载试验装置
技术领域
本实用新型涉及一种陆上沿海滩涂流沙软土风机基础护筒工艺,特别是滩涂流沙软弱地基风机基础护筒型混凝土灌注桩水平承载力试桩的风电场风机基础单桩水平力承载力静载试验装置。 
背景技术
海南东方感城风电场地处南海,属热带湿润季风性海洋气候,以高温多雨及台风为主要特征,极大风速59.0m/s,属Ⅱ类风场,风场地质条件属沿海滩涂流沙区域,场地土为软土,地质条件复杂。由于沿海受台风影响,其风机、塔架、风机基础等均需特殊加强设计,以使风机基础安全可靠。 
在沿海滩涂流沙软土区域及在Ⅱ类风场和台风区域建设风电场,国内外均未有技术借鉴,特别是对装机容量大的风机,地质条件复杂、场地土为流沙软土地基,对基础地基处理方案是否能满足承载力和倾斜要求,对桩基施工工艺和水平承载力试桩都提出了很高的要求。 
实用新型内容
本实用新型的目的是提供一种水平承载力试桩施工工艺性好,软基基础安全性高,成本合理,适应于沿海滩涂流沙区域的风电场风机基础单桩水平力承载力静载试验装置。 
本实用新型的目的是这样实现的,风电场风机基础单桩水平力承载力静载试验装置,其特征是:在第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的水平承载力试桩;第一半径处布置1根混凝土灌注桩作为水平承载力锚桩;在锚桩和试桩设置水平钢部件底座,千斤顶水平连接在锚桩和试桩的水平钢部件底座之间,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到锚桩和试桩上进行水平承载力静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值;在锚桩和试桩之间的千斤顶水平放置,千斤顶连接件上有水平度检测传感器,通过水平度检测传感器检测试桩或锚桩位移量。 
所述的水平承载力试桩上部螺旋筋间距200mm,水平承载力试桩长度方向箍筋间距2000mm,水平承载力试桩长度方向螺旋筋直径d=10mm,水平承载力试桩长度方向主筋直径d=22mm。 
所述的水平承载力锚桩上部螺旋筋间距150mm,所述的水平承载力锚桩长方向箍筋间距1500mm,所述的水平承载力锚桩长度方向螺旋筋直径d=12mm,所述的水平承载力锚桩长度方向主筋直径d=25mm。 
所述的水平承载力锚桩与试桩间距:3100mm。 
所述的水平承载力锚桩间距:0mm。 
本实用新型的优点是:在第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的水平承载力试桩;第一半径处布置1根混凝土灌注桩作为水平承载力锚桩;通过1根锚桩提供反力梁,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行单桩水平承载力静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩荷载、补压位移值确定风电场风机基础结构。本实用新型结合实际机位优化布置的单桩水平承载力静载试验试桩方案,加快了工程进度,在实际机位的地基基础上做试桩,更加真实地反映了机为基础的地基承载力状况,根据这样布置的试桩方法,得出的试桩实验结论,真实的反应了桩基础设计的安全、经济和结构的合理性。 
附图说明
以下结合附图及具体实施方式对本实用新型作进一步描述: 
图1 是本实用新型实施例基础水平承载力试桩、锚桩平面图;
图2是本实用新型实施例基础水平承载力试桩、锚桩剖面图;
图3是图1的试桩结构图;
图4是图1锚桩桩身剖面;
图中:1、风电场风机基础;2、试桩;3、锚桩;4、工程桩。
具体实施方式
如图1所示,风电场风机基础单桩水平力承载力静载试验装置:在第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的水平承载力试桩2;第一半径处布置1根混凝土灌注桩作为水平承载力锚桩3;在锚桩3和试桩2设置水平钢部件底座,千斤顶水平连接在锚桩3和试桩2的水平钢部件底座之间,由电动高压油泵向千斤顶供给动力,千斤顶将荷载加载到锚桩3和试桩2上进行水平承载力静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩2荷载、试桩位移值确定风电场风机基础结构。 
在锚桩3和试桩2之间的千斤顶水平放置,千斤顶连接件上有水平度检测传感器,通过水平度检测传感器检测试桩2或锚桩3位移量,当锚桩3位移量大时,水平度检测传感器检测的水平角向锚桩3倾斜,当试桩2位移量大时,水平度检测传感器检测的水平角向试桩2倾斜,通过三角形公式得到试桩2的水平位移。 
如图2所示,包括:试桩2、锚桩3和工程桩4,四根锚桩3按90度分布在第一半径的圆周上,工程桩4分布在第二半径的圆周上,第二半径大于第一半径,第一半径的圆周和第二半径的圆周中心与试桩2同心。工程桩4高度低于试桩2和锚桩3,试桩2和锚桩3高度面齐平。工程桩4 由风电场风机基础1覆盖,试桩2、锚桩3高出风电场风机基础1。 
单桩水平承载力静载试验包括破坏性试验和非破坏性试验。 
破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置1根锚桩,1根锚桩桩径Φ1000mm,桩长L=25~30m,试桩单桩承载力约为250kN,破坏性试验试桩最大加载极限值为750kN。 
非破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置1根锚桩,桩径Φ1000mm,桩长L=25~30m,非破坏性试验试桩单桩承载力约为250kN,试桩最大加载极限值为500kN 。 
如图3所示,所述的水平承载力试桩上部螺旋筋间距200mm,水平承载力试桩长度方向箍筋间距2000mm,水平承载力试桩长度方向螺旋筋直径d=10mm,水平承载力试桩长度方向主筋直径d=22mm。 
如图4所示,所述的水平承载力锚桩上部螺旋筋间距150mm,所述的水平承载力锚桩长方向箍筋间距1500mm,所述的水平承载力锚桩长度方向螺旋筋直径d=12mm,所述的水平承载力锚桩长度方向主筋直径d=25mm。 
水平承载力锚桩间距:0mm。 
水平承载力锚桩与试桩间距:3100mm。 
结合实际机位优化布置的单桩水平承载力静载试验试桩方案,加快了工程进度,在实际机位的地基基础上做试桩,更加真实地反映了机为基础的地基承载力状况,根据这样布置的试桩方法,得出的试桩实验结论,真实的反应了桩基础设计的安全、经济和结构的合理性。 
实际机位的试验成果: 
203#桩:当试验荷载加至675kN时,桩顶水平位移为19.81㎜,H—Y0曲线呈缓变型,Y0—logt曲线呈平行或亚平行排列;:当试验荷载加至750kN时,桩顶水平位移为35.63mm,地基土强度破坏,故终止试验。综合判定该桩水平极限承载力为675kN;208#桩:当试验荷载加至500kN时,桩顶水平位移为17.45㎜,H—Y0曲线呈缓变型,Y0—logt曲线呈平行或亚平行排列;已达到设计最大加荷值,故终止试验。综合判定该桩水平极限承载力>500kN;由此可见,203#风机单桩水平静载试验发生破坏,破坏方式为地基土强度破坏,单桩水平承载力受桩上部土层强度控制。
单桩水平承载力静载试验数据见附表1。 
表1 单桩水平静载试验结果汇总表 
Figure DEST_PATH_DEST_PATH_IMAGE001
本实施例没有详细叙述的部件和结构属本行业的公知部件和常用结构或常用手段,这里不一一叙述。

Claims (5)

1.风电场风机基础单桩水平力承载力静载试验装置,其特征是:在第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的水平承载力试桩;第一半径处布置1根混凝土灌注桩作为水平承载力锚桩;在锚桩和试桩设置水平钢部件底座,千斤顶水平连接在锚桩和试桩的水平钢部件底座之间,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到锚桩和试桩上进行水平承载力静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值;在锚桩和试桩之间的千斤顶水平放置,千斤顶连接件上有水平度检测传感器,通过水平度检测传感器检测试桩或锚桩位移量。
2.根据权利要求1所述的风电场风机基础单桩水平力承载力静载试验装置,其特征是:所述的水平承载力试桩上部螺旋筋间距200mm,水平承载力试桩长度方向箍筋间距2000mm,水平承载力试桩长度方向螺旋筋直径d=10mm,水平承载力试桩长度方向主筋直径d=22mm。
3.根据权利要求1所述的风电场风机基础单桩水平力承载力静载试验装置,其特征是:所述的水平承载力锚桩上部螺旋筋间距150mm,所述的水平承载力锚桩长方向箍筋间距1500mm,所述的水平承载力锚桩长度方向螺旋筋直径d=12mm,所述的水平承载力锚桩长度方向主筋直径d=25mm。
4.根据权利要求1所述的风电场风机基础单桩水平力承载力静载试验装置,其特征是:所述的水平承载力锚桩与试桩间距:3100mm。
5.根据权利要求1所述的风电场风机基础单桩水平力承载力静载试验装置,其特征是:所述的水平承载力锚桩间距:0mm。
CN 201320043578 2013-01-28 2013-01-28 风电场风机基础单桩水平力承载力静载试验装置 Expired - Lifetime CN203361209U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320043578 CN203361209U (zh) 2013-01-28 2013-01-28 风电场风机基础单桩水平力承载力静载试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320043578 CN203361209U (zh) 2013-01-28 2013-01-28 风电场风机基础单桩水平力承载力静载试验装置

Publications (1)

Publication Number Publication Date
CN203361209U true CN203361209U (zh) 2013-12-25

Family

ID=49808997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320043578 Expired - Lifetime CN203361209U (zh) 2013-01-28 2013-01-28 风电场风机基础单桩水平力承载力静载试验装置

Country Status (1)

Country Link
CN (1) CN203361209U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059955A (zh) * 2017-04-05 2017-08-18 河南科技大学 一种用于模拟理想单桩响应的固定及加载系统
CN107794957A (zh) * 2017-11-24 2018-03-13 中交上海港湾工程设计研究院有限公司 超大直径单桩基础水平静载装置及试验方法
CN110565704A (zh) * 2019-08-12 2019-12-13 中国能源建设集团江苏省电力设计院有限公司 一种风机静载试验时单桩水平加载力的计算方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059955A (zh) * 2017-04-05 2017-08-18 河南科技大学 一种用于模拟理想单桩响应的固定及加载系统
CN107794957A (zh) * 2017-11-24 2018-03-13 中交上海港湾工程设计研究院有限公司 超大直径单桩基础水平静载装置及试验方法
CN110565704A (zh) * 2019-08-12 2019-12-13 中国能源建设集团江苏省电力设计院有限公司 一种风机静载试验时单桩水平加载力的计算方法

Similar Documents

Publication Publication Date Title
CN103046585B (zh) 风电场风机基础单桩水平力承载力静载试验方法
CN103510551B (zh) 一种桥梁深水基础三向静动力加载模型试验平台
Cox et al. Centrifuge study on the cyclic performance of caissons in sand
CN103911983B (zh) 轮胎-碎石排水桩复合地基处理方法
CN206308720U (zh) Cfg桩检验承载力加载反力装置
CN203639954U (zh) 一种桥梁深水基础三向静动力加载模型试验平台
CN203361209U (zh) 风电场风机基础单桩水平力承载力静载试验装置
CN110984214A (zh) 海上风电单桩-翼板-堆石体复合基础及其施工方法
CN103074909B (zh) 风电场风机基础单桩竖向抗压承载力静载试验方法
CN103422517A (zh) 叠加式桩身自反力平衡荷载箱
CN105806721A (zh) 一种大型岩土体原位直剪试验装置
KR101137237B1 (ko) 수중기초구조물의 지지력 측정장치
CN205502052U (zh) 适用于预应力岩石锚杆风机基础的地基结构
CN203361207U (zh) 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置
CN204825999U (zh) 单桩竖向抗拔静载试验装置
CN102155583A (zh) 矿浆管道在滑坡体、塌方体、泥石流区的敷设方法及结构
CN203361208U (zh) 风电场风机基础单桩竖向抗压承载力静载试验装置
CN103046584B (zh) 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩结构
CN109403318A (zh) 一种海上风电植入型单桩基础及其施工方法
CN203420293U (zh) 穿心环形基桩承载力检测装置
CN205679487U (zh) 一种大型岩土体原位直剪试验装置
CN209243712U (zh) 一种海上风电植入型单桩基础
CN203569600U (zh) 一种桩底基岩载荷试验装置
CN104746522B (zh) 一种用于疏浚淤泥质土地区基坑的可智能变形调节的斜抛撑支护系统
CN204000819U (zh) 一种横向受荷体顶部驱动式土压力测模装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST

Free format text: FORMER NAME: HYDROCHINA XIBEI ENGINEERING CORPORATION

Owner name: HYDROCHINA XIBEI ENGINEERING CORPORATION

Free format text: FORMER NAME: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING

CP01 Change in the name or title of a patent holder

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee before: Northwest Hydro Consulting Engineers, CHECC

CP03 Change of name, title or address

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

TR01 Transfer of patent right

Effective date of registration: 20170620

Address after: 710065, No. eight, No. 18 East Road, Yanta District, Shaanxi, Xi'an

Patentee after: NORTHWEST WATER CONSERVANCY & HYDROPOWER ENGINEERING CO.,LTD.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee before: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20131225

CX01 Expiry of patent term