CN103074909B - 风电场风机基础单桩竖向抗压承载力静载试验方法 - Google Patents

风电场风机基础单桩竖向抗压承载力静载试验方法 Download PDF

Info

Publication number
CN103074909B
CN103074909B CN201310030298.6A CN201310030298A CN103074909B CN 103074909 B CN103074909 B CN 103074909B CN 201310030298 A CN201310030298 A CN 201310030298A CN 103074909 B CN103074909 B CN 103074909B
Authority
CN
China
Prior art keywords
pile
bearing capacity
vertical compression
test
compression bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310030298.6A
Other languages
English (en)
Other versions
CN103074909A (zh
Inventor
刘蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Water Conservancy and Hydropower Engineering Co Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN201310030298.6A priority Critical patent/CN103074909B/zh
Publication of CN103074909A publication Critical patent/CN103074909A/zh
Application granted granted Critical
Publication of CN103074909B publication Critical patent/CN103074909B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明涉及一种风电场风机基础单桩竖向抗压承载力静载试验方法,其特征是:设第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的竖向抗压承载力试桩;设第一半径处布置4根混凝土灌注桩作为竖向抗压承载力锚桩;由4个锚桩构工字梁,工字梁的中间通过千斤顶与抗压承载力试桩连接,由4个锚桩和工字梁提供反向力,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行单桩竖向抗压静载试验。该方法竖向抗压承载力试桩施工工艺性好,软基基础安全性高,成本合理,适应于沿海滩涂流沙区域。

Description

风电场风机基础单桩竖向抗压承载力静载试验方法
技术领域
本发明涉及一种陆上沿海滩涂流沙软土风机基础护筒工艺,特别是滩涂流沙软弱地基风机基础护筒型混凝土灌注桩竖向抗压承载力试桩的风电场风机基础单桩竖向抗压承载力静载试验方法。
背景技术
海南东方感城风电场地处南海,属热带湿润季风性海洋气候,以高温多雨及台风为主要特征,极大风速59.0m/s,属Ⅱ类风场,风场地质条件属沿海滩涂流沙区域,场地土为软土,地质条件复杂。由于沿海受台风影响,其风机、塔架、风机基础等均需特殊加强设计,以使风机基础安全可靠。
在沿海滩涂流沙软土区域及在Ⅱ类风场和台风区域建设风电场,国内外均未有技术借鉴,特别是对装机容量大的风机,地质条件复杂、场地土为流沙软土地基,对基础地基处理方案是否能满足抗压承载力和倾斜要求,对桩基施工工艺和竖向抗压承载力试桩都提出了很高的要求。
发明内容
本发明的目的是提供一种竖向抗压承载力试桩施工工艺性好,软基基础安全性高,成本合理,适应于沿海滩涂流沙区域的风电场风机基础单桩竖向抗压承载力静载试验方法。
本发明的目的是这样实现的,风电场风机基础单桩竖向抗压承载力静载试验方法:其特征是:设第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的竖向抗压承载力试桩;设第一半径处布置4根混凝土灌注桩作为竖向抗压承载力锚桩;由4个锚桩上部的钢筋连接工字梁,工字梁的中间通过千斤顶与抗压承载力试桩连接,由4个锚桩和工字梁提供反向力,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行单桩竖向抗压静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩荷载、补压位移值确定风电场风机基础结构。
所述的单桩竖向抗压静载试验包括破坏性试验和非破坏性试验。
所述的破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置四根锚桩,四根锚桩桩径Φ1000mm,桩长L=25~30m,试桩单桩抗压承载力约为2000kN,破坏性试验试桩最大加载极限值为6000kN。
所述的非破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置四根锚桩,桩径Φ1000mm,桩长L=25~30m,非破坏性试验试桩单桩抗压承载力约为2000kN,试桩最大加载极限值为4000kN 。
所述的竖向抗压承载力试桩上部螺旋筋间距200mm,竖向抗压承载力试桩长度方向箍筋间距2000mm,竖向抗压承载力试桩长度方向螺旋筋直径d=10mm,竖向抗压承载力试桩长度方向主筋直径d=22mm,竖向抗压承载力试桩长度计算为所需要承受上部荷载结合侧摩阻力及端阻力的方向主筋,竖向抗压承载力试桩的采用护筒型结合护壁的施工工艺。
所述的设竖向抗压承载力锚桩上部螺旋筋间距150mm,所述的设竖向抗压承载力锚桩长方向箍筋间距1500mm,所述的设竖向抗压承载力锚桩长度方向螺旋筋直径d=12mm,所述的设竖向抗压承载力锚桩长度方向主筋直径d=25mm,所述的竖向抗压承载力锚桩的采用护筒型结合护壁的施工工艺。
所述的竖向抗压承载力锚桩间距:4390mm。
竖向抗压承载力锚桩与试桩间距:3100mm。
本发明的优点是:设第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的竖向抗压承载力试桩;设第一半径处布置4根混凝土灌注桩作为竖向抗压承载力锚桩;通过4根锚桩提供反力梁,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行单桩竖向抗压静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩荷载、补压位移值确定风电场风机基础结构。本发明结合实际机位优化布置的单桩竖向抗压静载试验试桩方案,加快了工程进度,在实际机位的地基基础上做试桩,更加真实地反映了机为基础的地基抗压承载力状况,根据这样布置的试桩方法,得出的试桩实验结论,真实的反应了桩基础设计的安全、经济和结构的合理性。
附图说明
以下结合附图及具体实施方式对本发明作进一步描述:
图1是本发明实施例基础竖向抗压承载力试桩、锚桩平面图;
图2是本发明实施例基础竖向抗压承载力试桩、锚桩剖面图;
图3是图1的试桩结构图;
图4是图1锚桩桩身剖面。
 图中:1、风电场风机基础;2、试桩;3、锚桩;4、工程桩。
具体实施方式
如图1所示,风电场风机基础单桩竖向抗压静载试验方法:设第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的竖向抗压承载力试桩;设第一半径处布置4根混凝土灌注桩作为竖向抗压承载力锚桩;由4个锚桩构工字梁,工字梁的中间通过千斤顶与抗压承载力试桩连接,由4个锚桩和工字梁提供反向力,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行单桩竖向抗压静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩荷载、补压位移值确定风电场风机基础结构。
如图2所示,包括:试桩2、锚桩3和工程桩4,四根锚桩3按90度分布在第一半径的圆周上,工程桩4分布在第二半径的圆周上,第二半径大于第一半径,第一半径的圆周和第二半径的圆周中心与试桩2同心。工程桩4高度低于试桩2和锚桩3,试桩2和锚桩3高度面齐平。工程桩4 由风电场风机基础1覆盖,试桩2、锚桩3高出风电场风机基础1。
单桩竖向抗压静载试验包括破坏性试验和非破坏性试验。
破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置四根锚桩,四根锚桩桩径Φ1000mm,桩长L=25~30m,试桩单桩抗压承载力约为2000kN,破坏性试验试桩最大加载极限值为6000kN。
非破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置四根锚桩,桩径Φ1000mm,桩长L=25~30m,非破坏性试验试桩单桩抗压承载力约为2000kN,试桩最大加载极限值为4000kN 。
如图3所示,试桩2上部螺旋筋间距200mm,竖向抗压承载力试桩长度方向箍筋间距2000mm,竖向抗压承载力试桩长度方向螺旋筋直径d=10mm,竖向抗压承载力试桩长度方向主筋直径d=22mm,竖向抗压承载力试桩长度计算为所需要承受上部荷载结合侧摩阻力及端阻力的方向主筋,竖向抗压承载力试桩的采用护筒型结合护壁的施工工艺。
如图4所示,优设竖向抗压承载力锚桩上部螺旋筋间距150mm,所述的设竖向抗压承载力锚桩长方向箍筋间距1500mm,所述的设竖向抗压承载力锚桩长度方向螺旋筋直径d=12mm,所述的设竖向抗压承载力锚桩长度方向主筋直径d=25mm,所述的竖向抗压承载力锚桩的采用护筒型结合护壁的施工工艺。
竖向抗压承载力锚桩间距:4390mm。
竖向抗压承载力锚桩与试桩间距:3100mm。
结合实际机位优化布置的单桩竖向抗压静载试验试桩方案,加快了工程进度,在实际机位的地基基础上做试桩,更加真实地反映了机为基础的地基抗压承载力状况,根据这样布置的试桩方法,得出的试桩实验结论,真实的反应了桩基础设计的安全、经济和结构的合理性。
实际机位的试验成果:
72#桩:当试验荷载加至5400kN时,桩顶沉降量为10.81㎜,Q—S曲线呈缓变型,S—lgt曲线呈平行或亚平行排列;当试验荷载加至6000kN时,桩顶沉降量为21.43㎜,已达到设计最大加荷值,同时单桩抗压承载力已达极限,故停止试验。综合判定该桩单桩极限抗压承载力Qu为6000kN。
74#桩:当试验荷载加至4000kN时,桩顶沉降量仅为4.70㎜,Q—S曲线呈缓变型,S—lgt曲线呈平行或亚平行排列;已达到设计最大加荷值,故停止试验。综合判定该桩单桩极限抗压承载力Qu>4000kN。
由此可见,72#风机试桩竖向抗压静载试验单桩抗压承载力已达极限;74#风机试桩竖向抗压静载试验未达极限值发生破坏,故土74#机位的土阻力尚未发挥至极限。将实验结果提交设计后,对74#风机试桩的桩长作调整设计。
由这样布置的单桩竖向抗压静载试验试桩方案看出,每个机位之间的土层差异很大,这样的试桩布置方案,解决了设计的盲目性,针对不同的土层分布的机位,根据实验结果,提出了安全的、合理的、经济的、实用的地基桩基础设计方案。
试验详细结果见表1。
表1 单桩竖向抗压静载试验结果汇总表
本实施例没有详细叙述的部件和结构属本行业的公知部件和常用结构或常用手段,这里不一一叙述。

Claims (1)

1.风电场风机基础单桩竖向抗压承载力静载试验方法,其特征是:第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的竖向抗压承载力试桩;第一半径处布置4根混凝土灌注桩作为竖向抗压承载力锚桩;由4个锚桩构工字梁,工字梁的中间通过千斤顶与抗压承载力试桩连接,由4个锚桩和工字梁提供反向力,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行单桩竖向抗压静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩荷载、补压位移值确定风电场风机基础结构;所述的单桩竖向抗压静载试验包括破坏性试验和非破坏性试验;所述的破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置四根锚桩,四根锚桩桩径Φ1000mm,桩长L=25~30m,试桩单桩抗压承载力为2000kN,破坏性试验试桩最大加载极限值为6000kN;所述的非破坏性试验:在基础中心点布置一根试桩,在试桩纵横向轴布置四根锚桩,桩径Φ1000mm,桩长L=25~30m,非破坏性试验试桩单桩抗压承载力为2000kN,试桩最大加载极限值为4000kN ;所述的竖向抗压承载力试桩上部螺旋筋间距200mm,竖向抗压承载力试桩长度方向箍筋间距2000mm,竖向抗压承载力试桩长度方向螺旋筋直径d=10mm,竖向抗压承载力试桩长度方向主筋直径d=22mm,竖向抗压承载力试桩长度计算为所需要承受上部荷载结合侧摩阻力及方向主筋的端阻力,竖向抗压承载力试桩的采用护筒型结合护壁的施工工艺;所述的竖向抗压承载力锚桩上部螺旋筋间距150mm,所述的竖向抗压承载力锚桩长方向箍筋间距1500mm,所述的竖向抗压承载力锚桩长度方向螺旋筋直径d=12mm,所述的竖向抗压承载力锚桩长度方向主筋直径d=25mm,所述的竖向抗压承载力锚桩的采用护筒型结合护壁的施工工艺;所述的竖向抗压承载力锚桩与试桩间距3100mm;所述的竖向抗压承载力锚桩间距4390mm。
CN201310030298.6A 2013-01-28 2013-01-28 风电场风机基础单桩竖向抗压承载力静载试验方法 Active CN103074909B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310030298.6A CN103074909B (zh) 2013-01-28 2013-01-28 风电场风机基础单桩竖向抗压承载力静载试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310030298.6A CN103074909B (zh) 2013-01-28 2013-01-28 风电场风机基础单桩竖向抗压承载力静载试验方法

Publications (2)

Publication Number Publication Date
CN103074909A CN103074909A (zh) 2013-05-01
CN103074909B true CN103074909B (zh) 2015-10-28

Family

ID=48151598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310030298.6A Active CN103074909B (zh) 2013-01-28 2013-01-28 风电场风机基础单桩竖向抗压承载力静载试验方法

Country Status (1)

Country Link
CN (1) CN103074909B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938660B (zh) * 2014-04-14 2015-12-09 天津大学 确定溜桩之后桩基承载力的方法
CN106120880A (zh) * 2016-08-31 2016-11-16 长江三峡生态园林有限公司 一种海上风电单桩基础抗压承载力试验装置
EP3584371B1 (en) * 2018-06-18 2022-08-17 Vallourec Deutschland GmbH Device for verifying the bearing capacity of a pile of an offshore foundation construction
CN112459140A (zh) * 2020-11-24 2021-03-09 深圳智润新能源电力勘测设计院有限公司 一种基桩静载试验布桩方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2905910Y (zh) * 2005-09-01 2007-05-30 赵海生 基桩静载试验反力装置
WO2007068903A1 (en) * 2005-12-12 2007-06-21 Terrain Geotechnical Consultants Limited A pile test apparatus
CN201857620U (zh) * 2010-11-05 2011-06-08 中国科学院武汉岩土力学研究所 一种输变电铁塔桩板基础进行竖向抗拔静载实验的装置
CN102828533A (zh) * 2012-09-17 2012-12-19 中国建筑第八工程局有限公司 灌注桩竖向抗压静载试验桩头超前处理节点及施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2905910Y (zh) * 2005-09-01 2007-05-30 赵海生 基桩静载试验反力装置
WO2007068903A1 (en) * 2005-12-12 2007-06-21 Terrain Geotechnical Consultants Limited A pile test apparatus
CN201857620U (zh) * 2010-11-05 2011-06-08 中国科学院武汉岩土力学研究所 一种输变电铁塔桩板基础进行竖向抗拔静载实验的装置
CN102828533A (zh) * 2012-09-17 2012-12-19 中国建筑第八工程局有限公司 灌注桩竖向抗压静载试验桩头超前处理节点及施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大唐吉林向阳风电场一期150MW工程风机桩基础设计分析;刘蔚等;《西北水电》;20091031(第5期);期刊第91- 99页第3-5、8节及图1 *

Also Published As

Publication number Publication date
CN103074909A (zh) 2013-05-01

Similar Documents

Publication Publication Date Title
CN103046585B (zh) 风电场风机基础单桩水平力承载力静载试验方法
CN103074909B (zh) 风电场风机基础单桩竖向抗压承载力静载试验方法
CN104110039B (zh) 具有压力分散型布置高强预应力锚杆(索)的风机基础
CN103510551A (zh) 一种桥梁深水基础三向静动力加载模型试验平台
CN103911983B (zh) 轮胎-碎石排水桩复合地基处理方法
CN203639954U (zh) 一种桥梁深水基础三向静动力加载模型试验平台
CN103835306A (zh) 一种适用于液化软基的风机基础及其施工方法
CN205502052U (zh) 适用于预应力岩石锚杆风机基础的地基结构
CN203361209U (zh) 风电场风机基础单桩水平力承载力静载试验装置
CN203361207U (zh) 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置
CN110485455A (zh) 黄土暗穴区桥梁桩基竖向承载力及修正系数计算方法
CN204875886U (zh) 一种水泥搅拌桩单桩复合地基静载荷试验装置
CN203361208U (zh) 风电场风机基础单桩竖向抗压承载力静载试验装置
CN105569067A (zh) 适用于预应力岩石锚杆风机基础的地基结构及施工方法
CN103046584B (zh) 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩结构
CN109403318A (zh) 一种海上风电植入型单桩基础及其施工方法
Yang et al. Seismic response analysis of shallow utility tunnel in liquefiable soils
CN209243712U (zh) 一种海上风电植入型单桩基础
CN203403433U (zh) 光伏电站中光伏组件支架简易条形基础设置结构
CN108505531A (zh) 海上风电嵌岩混合桩基础
CN204125965U (zh) 具有压力分散型布置高强预应力锚杆/锚索的风机基础
CN203684267U (zh) 一种新型海上风电基础结构
Xiao et al. Foundation design for the Shanghai Center Tower
Indraratna et al. Performance and prediction of marine clay treated with vacuum and surcharge consolidation at Port of Brisbane
CN220225261U (zh) 有翼预制桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Applicant after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Applicant before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Applicant after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Applicant before: Northwest Hydro Consulting Engineers, CHECC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING TO: HYDROCHINA XIBEI ENGINEERING CORPORATION

Free format text: CORRECT: APPLICANT; FROM: HYDROCHINA XIBEI ENGINEERING CORPORATION TO: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170615

Address after: 710065, No. eight, No. 18 East Road, Yanta District, Shaanxi, Xi'an

Patentee after: NORTHWEST WATER CONSERVANCY & HYDROPOWER ENGINEERING CO.,LTD.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee before: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

TR01 Transfer of patent right