CN203361207U CN 201320043444 CN201320043444U CN203361207U CN 203361207 U CN203361207 U CN 203361207U CN 201320043444 CN201320043444 CN 201320043444 CN 201320043444 U CN201320043444 U CN 201320043444U CN 203361207 U CN203361207 U CN 203361207U
Authority
CN
China
Prior art keywords
pile
bearing capacity
resistant bearing
test
vertically pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320043444
Other languages
English (en)
Inventor
刘蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
PowerChina Northwest Engineering Corp Ltd
Original Assignee
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTHWEST HYDRO CONSULTING ENGINEERS CHECC filed Critical NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority to CN 201320043444 priority Critical patent/CN203361207U/zh
Application granted granted Critical
Publication of CN203361207U publication Critical patent/CN203361207U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置,其特征是:设第一半径的内圆圆心内布置1根护筒型混凝土灌注桩作为该基础的竖向抗拔承载力试桩;设第一半径处布置2根混凝土灌注桩作为竖向抗拔承载力锚桩;由2个锚桩和试桩构成杠杆,杠杆的中间与抗拔承载力试桩连接,杠杆的两端通过千斤顶与2个锚桩连接,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行竖向抗拔承载力试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩荷载、位移值确定风电场风机基础结构。该结构竖向抗压承载力试桩施工工艺性好,软基基础安全性高,成本合理,适应于沿海滩涂流沙区域。

Description

风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置
技术领域
本实用新型涉及一种陆上沿海滩涂流沙软土风机基础护筒工艺结构,特别是滩涂流沙软弱地基风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置。 
背景技术
海南东方感城风电场地处南海,属热带湿润季风性海洋气候,以高温多雨及台风为主要特征,极大风速59.0m/s,属Ⅱ类风场,风场地质条件属沿海滩涂流沙区域,场地土为软土,地质条件复杂。由于沿海受台风影响,其风机、塔架、风机基础等均需特殊加强设计,以使风机基础安全可靠。 
在沿海滩涂流沙软土区域及在Ⅱ类风场和台风区域建设风电场,国内外均未有技术借鉴,特别是对装机容量大的风机,地质条件复杂、场地土为流沙软土地基,对基础地基处理方案是否能满足承载力和倾斜要求,对桩基施工工艺和竖向抗拔承载力试桩都提出了很高的要求。 
实用新型内容
本实用新型的目的是提供一种竖向抗拔承载力试桩施工工艺性好,软基基础安全性高,成本合理,适应于沿海滩涂流沙区域的风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置。 
本实用新型的目的是这样实现的,风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置,其特征是:在第一半径的内圆圆心布置1根护筒型混凝土灌注桩作为该基础的竖向抗拔承载力试桩;在第一半径处布置2根混凝土灌注桩作为竖向抗拔承载力锚桩;由2个锚桩和试桩构成杠杆,杠杆的中间与抗拔承载力试桩连接,杠杆的两端通过千斤顶与2个锚桩连接,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行竖向抗拔承载力试验,通过压力传感器和位移传感器获取荷载值和试桩位移值。 
所述的竖向抗拔承载力试桩上部螺旋筋间距200mm,竖向抗拔承载力试桩长度方向箍筋间距2000mm,竖向抗拔承载力试桩长度方向螺旋筋直径d=10mm,竖向抗拔承载力试桩长度方向主筋直径d=22mm。 
所述的竖向抗拔承载力锚桩上部螺旋筋间距150mm,所述的竖向抗拔承载力锚桩长方向箍筋间距1500mm,所述的竖向抗拔承载力锚桩长度方向螺旋筋直径d=12mm,所述的竖向抗拔承载力锚桩长度方向主筋直径d=25mm。 
所述的竖向抗拔承载力锚桩与试桩间距为3100mm。 
所述的竖向抗拔承载力锚桩间距为6200mm。 
本实用新型的优点是:在第一半径的内圆圆心布置1根护筒型混凝土灌注桩作为该基础的竖向抗拔承载力试桩;在第一半径处布置2根混凝土灌注桩作为竖向抗拔承载力锚桩;通过2根锚桩提供反力梁,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行单桩竖向抗压静载试验,通过压力传感器和位移传感器获取荷载值和试桩位移值。本实用新型结合实际机位优化布置的单桩竖向抗压静载试验试桩方案,加快了工程进度,在实际机位的地基基础上做试桩,更加真实地反映了机为基础的地基抗拔承载力状况,根据这样布置的试桩方法,得出的试桩实验结论,真实的反应了桩基础设计的安全、经济和结构的合理性。 
附图说明
以下结合附图及具体实施方式对本实用新型作进一步描述: 
图1 是本实用新型实施例基础竖向抗拔承载力试桩、锚桩平面图;
图2 是本实用新型实施例基础竖向抗拔承载力试桩、锚桩剖面图;
图3是图1的试桩结构图;
图4是图1锚桩桩身剖面。 
图中:1、风电场风机基础;2、试桩;3、锚桩;4、工程桩。 
具体实施方式   
如图1所示,风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置:在第一半径的内圆圆心布置1根护筒型混凝土灌注桩作为该基础的竖向抗拔承载力试桩2;在第一半径处布置2根混凝土灌注桩作为竖向抗拔承载力锚桩3;由2个锚桩3和试桩2构成杠杆,杠杆的中间与抗拔承载力试桩连接,杠杆的两端通过千斤顶与2个锚桩3连接,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩2上进行竖向抗拔承载力试验,通过压力传感器和位移传感器获取荷载值和试桩位移值,由计算机记录和显示试桩荷载、位移值确定风电场风机基础结构。 
如图2所示,包括:试桩2、锚桩3和工程桩4,四根锚桩3按90度分布在第一半径的圆周上,工程桩4分布在第二半径的圆周上,第二半径大于第一半径,第一半径的圆周和第二半径的圆周中心与试桩2同心。工程桩4高度低于试桩2和锚桩3,试桩2和锚桩3高度面齐平。工程桩4 由风电场风机基础1覆盖,试桩2、锚桩3高出风电场风机基础1。 
单桩竖向抗拔静载试验包括破坏性试验和非破坏性试验。 
破坏性试验:在基础中心点布置一根试桩;桩型为钻孔灌注桩,在试桩纵横向轴布置两根锚桩,桩径Φ1000mm,经计算桩长L=25~30m。试桩分别在指定的一个机位中布置。试桩单桩抗拔承载力约为1000kN,试桩采用双控,试桩最大加载极限值为3000kN(做破坏性试验)。 
非破坏性试验:在基础中心点布置一根试桩;桩型为钻孔灌注桩,在试桩纵横向轴布置两根锚桩,桩径Φ1000mm,经计算桩长L=25~30m。试桩分别在指定的一个机位中布置。试桩单桩抗拔承载力约为1000kN,试桩采用双控,试桩最大加载极限值为2000kN (不做破坏性试验)。 
如图3所示,所述的竖向抗拔承载力试桩上部螺旋筋间距200mm,竖向抗拔承载力试桩长度方向箍筋间距2000mm,竖向抗拔承载力试桩长度方向螺旋筋直径d=10mm,竖向抗拔承载力试桩长度方向主筋直径d=22mm,竖向抗拔承载力试桩长度计算为所需要承受上部荷载结合侧摩阻力及端阻力的方向主筋,竖向抗拔承载力试桩的采用护筒型结合护壁的施工工艺。 
如图4所示,所述的设竖向抗拔承载力锚桩上部螺旋筋间距150mm,所述的设竖向抗拔承载力锚桩长方向箍筋间距1500mm,所述的设竖向抗拔承载力锚桩长度方向螺旋筋直径d=12mm,所述的设竖向抗拔承载力锚桩长度方向主筋直径d=25mm,所述的竖向抗拔承载力锚桩的采用护筒型结合护壁的施工工艺。 
竖向抗拔承载力锚桩间距:6200mm。 
竖向抗拔承载力锚桩与试桩间距:3100mm。 
结合实际机位优化布置的单桩竖向抗拔承载力静载试验试桩方案,加快了工程进度,在实际机位的地基基础上做试桩,更加真实地反映了机为基础的地基抗拔承载力状况,根据这样布置的试桩方法,得出的试桩实验结论,真实的反应了桩基础设计的安全、经济和结构的合理性。 
实际机位的试验成果: 
114#桩:当试验荷载加至2400kN时,桩顶上拔量仅为6.11㎜,U—δ曲线呈缓变型,δ—lgt曲线呈平行或亚平行排列。因钢筋拉断,故停止试验。综合判定该桩单桩竖向抗拔极限抗拔承载力为2100kN;
115#桩:当试验荷载加至2000 kN时,桩顶上拔量仅为3.96㎜,U—δ曲线呈缓变型,δ—lgt曲线呈平行或亚平行排列。因达到设计要求最大加荷值,故停止试验。综合判定该桩单桩竖向抗拔极限抗拔承载力>2000 kN。
由此可见,114#、115#风机单桩竖向抗拔静载荷试验均发生破坏,破坏方式为钢筋拉断。由于上拔量仅为几毫米,故单桩竖向抗拔抗拔承载力受钢筋强度控制,单桩竖向抗拔静载试验详细结果见表1。 
试验详细结果见表1。 
表1 单桩竖向抗拔静载试验结果汇总表 
Figure DEST_PATH_887870DEST_PATH_IMAGE002
   本实施例没有详细叙述的部件和结构属本行业的公知部件和常用结构或常用手段,这里不一一叙述。

Claims (5)

1.风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置,其特征是:在第一半径的内圆圆心布置1根护筒型混凝土灌注桩作为该基础的竖向抗拔承载力试桩;在第一半径处布置2根混凝土灌注桩作为竖向抗拔承载力锚桩;由2个锚桩和试桩构成杠杆,杠杆的中间与抗拔承载力试桩连接,杠杆的两端通过千斤顶与2个锚桩连接,由电动高压油泵向千斤顶供给动力,由千斤顶将荷载加载到中心点布置的试桩上进行竖向抗拔承载力试验,通过压力传感器和位移传感器获取荷载值和试桩位移值。
2.根据权利要求1所述的风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置,其特征是:所述的竖向抗拔承载力试桩上部螺旋筋间距200mm,竖向抗拔承载力试桩长度方向箍筋间距2000mm,竖向抗拔承载力试桩长度方向螺旋筋直径d=10mm,竖向抗拔承载力试桩长度方向主筋直径d=22mm。
3.根据权利要求1所述的风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置,其特征是:所述的竖向抗拔承载力锚桩上部螺旋筋间距150mm,所述的竖向抗拔承载力锚桩长方向箍筋间距1500mm,所述的竖向抗拔承载力锚桩长度方向螺旋筋直径d=12mm,所述的竖向抗拔承载力锚桩长度方向主筋直径d=25mm。
4.根据权利要求1所述的风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置,其特征是:所述的竖向抗拔承载力锚桩与试桩间距为3100mm。
5.根据权利要求1所述的风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置,其特征是:所述的竖向抗拔承载力锚桩间距为6200mm。
CN 201320043444 2013-01-28 2013-01-28 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置 Expired - Lifetime CN203361207U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320043444 CN203361207U (zh) 2013-01-28 2013-01-28 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320043444 CN203361207U (zh) 2013-01-28 2013-01-28 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置

Publications (1)

Publication Number Publication Date
CN203361207U true CN203361207U (zh) 2013-12-25

Family

ID=49808995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320043444 Expired - Lifetime CN203361207U (zh) 2013-01-28 2013-01-28 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置

Country Status (1)

Country Link
CN (1) CN203361207U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046584A (zh) * 2013-01-28 2013-04-17 中国水电顾问集团西北勘测设计研究院 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩结构
CN108643249A (zh) * 2018-05-21 2018-10-12 东南大学 用于研究桩-岩界面破坏机理的实验装置及其组装方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046584A (zh) * 2013-01-28 2013-04-17 中国水电顾问集团西北勘测设计研究院 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩结构
CN103046584B (zh) * 2013-01-28 2015-08-19 中国电建集团西北勘测设计研究院有限公司 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩结构
CN108643249A (zh) * 2018-05-21 2018-10-12 东南大学 用于研究桩-岩界面破坏机理的实验装置及其组装方法

Similar Documents

Publication Publication Date Title
Ding et al. Model tests on the bearing capacity of wide-shallow composite bucket foundations for offshore wind turbines in clay
CN103046585B (zh) 风电场风机基础单桩水平力承载力静载试验方法
Svensson Design of foundations for wind turbines
CN103911983B (zh) 轮胎-碎石排水桩复合地基处理方法
CN103074909B (zh) 风电场风机基础单桩竖向抗压承载力静载试验方法
Wang et al. Analysis of deep foundation pit construction monitoring in a metro station in Jinan city
Sharma et al. Laboratory investigation of pullout behavior of hollow and solid shaft helical nail in frictional soil
CN107806116A (zh) 一种纤维筋微型抗拔桩抗拔承载力测试方法
CN203361207U (zh) 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩装置
CN203361209U (zh) 风电场风机基础单桩水平力承载力静载试验装置
CN205502052U (zh) 适用于预应力岩石锚杆风机基础的地基结构
CN107816066A (zh) 一种纤维筋微型抗拔桩抗拔承载力测试装置
CN103046584B (zh) 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩结构
CN203361208U (zh) 风电场风机基础单桩竖向抗压承载力静载试验装置
CN109403318A (zh) 一种海上风电植入型单桩基础及其施工方法
Bingjian Study of the pore water pressure variation rule in saturated soft soil caused by prestressed concrete pile penetration
CN209243712U (zh) 一种海上风电植入型单桩基础
CN201339188Y (zh) 预制花管桩
Liu et al. Compression/tension load capacity of stone column anchors
Lamiman et al. Bearing capacity reduction of vibratory installed large diameter pipe piles
Yamchi et al. Reinforcement of floating stone columns with spaced reinforcing rings
Zhu et al. Centrifuge modelling of lateral cyclic behaviour of a tetrapod piled jacket in soft clay
Xiao et al. Foundation design for the Shanghai Center Tower
Chao et al. Study on vertical bearing capacity of the riser composite pile in clay
Nouri et al. The Influence of Cyclic Thermal Loading on the Response of Energy Piles Subjected to Combined Axial/Horizontal Loading

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST

Free format text: FORMER NAME: HYDROCHINA XIBEI ENGINEERING CORPORATION

Owner name: HYDROCHINA XIBEI ENGINEERING CORPORATION

Free format text: FORMER NAME: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING

CP01 Change in the name or title of a patent holder

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee before: Northwest Hydro Consulting Engineers, CHECC

CX01 Expiry of patent term

Granted publication date: 20131225

CX01 Expiry of patent term