EP3584371B1 - Device for verifying the bearing capacity of a pile of an offshore foundation construction - Google Patents

Device for verifying the bearing capacity of a pile of an offshore foundation construction Download PDF

Info

Publication number
EP3584371B1
EP3584371B1 EP18178335.8A EP18178335A EP3584371B1 EP 3584371 B1 EP3584371 B1 EP 3584371B1 EP 18178335 A EP18178335 A EP 18178335A EP 3584371 B1 EP3584371 B1 EP 3584371B1
Authority
EP
European Patent Office
Prior art keywords
pile
adapter
foundation construction
offshore foundation
offshore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP18178335.8A
Other languages
German (de)
French (fr)
Other versions
EP3584371A1 (en
Inventor
Andreas Lammers
Daniel Strötgen
Niels Haakman
Hans Phil
Christophe Jaeck
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vallourec Deutschland GmbH
Original Assignee
Vallourec Deutschland GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to EP18178335.8A priority Critical patent/EP3584371B1/en
Application filed by Vallourec Deutschland GmbH filed Critical Vallourec Deutschland GmbH
Priority to PL18178335.8T priority patent/PL3584371T3/en
Priority to KR1020217000384A priority patent/KR20210020993A/en
Priority to TW108121158A priority patent/TW202001090A/en
Priority to EP19732004.7A priority patent/EP3807466A1/en
Priority to CN201980040944.2A priority patent/CN112352080A/en
Priority to PCT/EP2019/066086 priority patent/WO2019243364A1/en
Priority to US17/251,512 priority patent/US20210246623A1/en
Priority to SG11202012236UA priority patent/SG11202012236UA/en
Priority to BR112020024752-9A priority patent/BR112020024752A2/en
Publication of EP3584371A1 publication Critical patent/EP3584371A1/en
Application granted granted Critical
Publication of EP3584371B1 publication Critical patent/EP3584371B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/06Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers for observation while placing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground

Definitions

  • the present invention relates to the technical field of offshore foundation constructions, in particular offshore foundation constructions intended to support an offshore wind turbine. More specifically, the invention relates to a device for verifying the bearing capacity of a pile of such an offshore foundation construction.
  • Offshore devices such as offshore wind turbines usually rest on an offshore foundation construction including a structure and foundation piles.
  • the offshore foundation construction is secured to a seabed by the foundation piles driven into the seabed.
  • An upper end of the foundation piles is attached to the structure optionally by means of pile sleeves.
  • the foundation piles are driven into the seabed by the so-called impact driving technique including the application of a large load on a foundation pile to be driven during a short duration, for instance less than one second and repeating the application of this load, such as generally known from WO 2013/043055 A1 .
  • the dynamic testing method is implemented.
  • the application of a load is still repeated with a hammer while acceleration and strains in the pile are monitored.
  • the pile bearing capacity can be back-calculated based on the monitored data.
  • a major drawback of the dynamic testing is that it generates an important noise or important vibrations which may be harmful to the wildlife surrounding the offshore foundation construction and the offshore device.
  • the correlation or safety factors to be used in conjunction with the dynamic testing method are generally larger than for static testing, increasing the pile bearing capacity that has to be measured by means of dynamic testing, increasing pile diameter and therefore material cost.
  • the invention aims at overcoming the above-mentioned drawbacks.
  • the invention aims at allowing to verify the bearing capacity of a foundation pile of an offshore foundation construction in a way more respectful of the surrounding wildlife.
  • an adapter with a device for verifying the installation of a first pile of an offshore foundation construction comprising a body, a first means for connecting the body to a referential element, a second means for connecting the body to the first pile, a means for applying a load on the first pile in a direction parallel to the axis of the first pile according to claim 1.
  • the device further includes a means for measuring a displacement of the first pile.
  • the insertion of the first pile may be verified without implementing the dynamic testing technology.
  • the first and second means for connecting allow the means for applying to apply a lighter load under static conditions compared to dynamic testing. The generation of noise or vibrations is thus considerably decreased.
  • the first means for connecting includes a contact surface intended to rest against a frontal surface of the referential element.
  • the second means for connecting includes a contact surface intended to rest against a frontal surface of the first pile.
  • the first means for connecting is intended to fasten the body to a structure or to an adapter of the offshore foundation construction.
  • the first means for connecting includes a first means for gripping a second pile of the offshore foundation construction.
  • Such designs of the first means for connecting allow using a structure, an adapter or a second pile, as the case may be, as a counterweight for the load applied. It is thus avoided to use cumbersome ballast weights. This is particularly advantageous for a subsea equipment because of the more important buoyancy of a ballast weight in the seawater.
  • the second means for connecting includes a second means for gripping the first pile.
  • At least one of the first and the second means for gripping includes at least two radially movable clamping chucks.
  • the means for applying is so configured to apply a load in a way tending towards pushing the first pile into the seabed.
  • the means for applying includes a cylinder and a piston, the means for measuring being able to measure directly the displacement of the piston with respect to the cylinder.
  • Such a design provides a simple and compact solution for applying the load and determining whether the first pile has moved.
  • the means for measuring is able to measure the displacement of the first pile with respect to the body.
  • Such a configuration avoids a measurement offset due to the elasticity of the means for applying.
  • At least one of the first means for connecting, the second means for connecting and the means for applying is actuated by a hydraulic energy and/or an electric energy.
  • Such energies are particularly preferable for subsea equipment because they allow having a power generation unit being distant, for instance on a vessel.
  • the device is itself rendered more compact.
  • the cylindrical sleeve is so designed to receive a pile having a circular radial cross-section with a diameter within a range 0,1 to 3,0 m, preferably 0,6 m to 1,5 m.
  • Such diameters allow limiting the load to be exerted by the means for applying of the device.
  • One may also foresee at least two cylindrical sleeves each intended to receive a pile of the offshore foundation construction, together forming an adapter.
  • the inventive adapter allows increasing the number of foundation piles so as to decrease the diameter of each pile without jeopardizing the reliability of the attachment of the offshore foundation construction to the seabed and the combined bearing capacity.
  • a method of testing the installation of a first pile of an offshore foundation construction preferably of an offshore foundation construction intended to support an offshore wind turbine, including placing an adapter according to claim 1 as set forth above on the offshore foundation construction so that the body is connected to a referential element, connecting the body to the first pile, applying a load to the first pile in a direction parallel to the axis of the first pile, measuring the load and measuring a displacement of the first pile.
  • FIG 1 it is schematically depicted an offshore foundation construction 2.
  • the offshore foundation construction 2 aims at resting on a seabed 3 and at supporting an offshore device (not depicted), in particular an offshore wind turbine. Nonetheless, the offshore foundation construction 2 may be used for supporting another kind of offshore device, such as an offshore hydrocarbon platform.
  • the base 4 consists of a vector x , a vector y and a vector z .
  • cylindrical will be understood according to its common definition, being namely that a cylindrical surface is a surface consisting of all the points on all the lines which are parallel to a given line and which pass through a fixed plane curve in a plane not parallel to the given line.
  • the offshore foundation construction 2 includes a structure 6.
  • the structure 6 includes four main legs 8, only two legs 8 being visible on the side view of figure 1 .
  • the structure 6 also includes a plurality of braces 10.
  • the braces 10 connect mechanically a leg 8 with another leg 8. On the side view of figure 1 , only four braces 10 are visible.
  • the structure 6 is a jacket.
  • a structure having a different design being for instance a tripod.
  • the offshore foundation construction 2 includes, for each main leg 8, an adapter 12. That is, in the embodiment of figure 1 , the offshore foundation construction 2 includes four adapters 12, only two of them being visible on the side view of figure 1 .
  • the adapters 12 are intended to form the mechanical connection between the structure 6 and foundation piles 22, 22a (see figure 3 ).
  • the foundation piles 22, 22a have an axis along which they extend and are cylindrical about the direction of said axis.
  • the foundation piles 22, 22a also have a circular radial cross section with a diameter d 22 .
  • the words "radial" and “axial” will be understood as referring to the axis of revolution of a pile 22 or 22a.
  • an adapter 12 is attached to a lower end of the main leg 8.
  • the adapters 12 are welded to the legs 8 before the offshore foundation construction 2 is launched in the sea.
  • the adapter 12 includes a central sleeve 14 and five peripheral sleeves 16. Nonetheless, a different number of peripheral sleeves 16 may be foreseen, for instance six peripheral sleeves.
  • the sleeves 14 and 16 are cylindrical about the direction of the vector z .
  • the sleeves 16 are all located on a circle about the axis of the sleeve 14. Nonetheless, a different geometrical arrangement of peripheral sleeves 16 may be foreseen.
  • the sleeve 14 and the sleeves 16 have a circular radial cross-section.
  • the diameter d 16 of the radial cross section is substantially the same for all the sleeves 16.
  • the diameter d 14 of the radial cross section of the sleeve 14 is approximately twice the diameter d 16 .
  • the diameter d 16 is so chosen that the adapter 12 is adapted to receive piles having a diameter d 22 within a range 0,6 m to 1,5 m. The diameter d 16 is then within a range 0,6 m to 1,8 m.
  • Each adapter 12 includes a metallic subframe 18.
  • the metallic subframe 18 includes a plurality of metallic hollow sections (not referenced) and metallic plates (not referenced).
  • the metallic subframe 18 aims at connecting the sleeve 14, the sleeves 16 and a joining portion for attaching the adapter 12 with a lower end of the main leg 8.
  • each sleeve 16 includes an upper portion 20.
  • the portion 20 is frustoconical about the axis of the peripheral sleeve 16. More specifically, the portion 20 vertically extends between a lower circular end with a diameter d 20d and an upper circular end with a diameter d 20u .
  • the diameter d 20d equals the diameter d 16 and the diameter d 20u is larger than the diameter d 20d .
  • the angle of the frustoconical shape of the portion 20 is within a range 40° to 55°.
  • the frustoconical shape of the portion 20 helps inserting a foundation pile 22, 22a in a sleeve 16 in order to secure the offshore foundation construction 2 to the seabed 3.
  • FIG 3 is a cross sectional view about the plane III-III of figure 1 .
  • each peripheral sleeve 16 includes a lower, enlarged portion 23.
  • the portion 23 includes a lower frontal surface 24 intended to rest on the seabed 3.
  • the surface 24 forms a disc perpendicular to the vector z .
  • the portion 23 includes a plurality of, for instance eight, vertical uprights 25 intended to increase the rigidity of the connection between the portion 23 and the sleeve 16.
  • the offshore foundation construction 2 includes a device 26.
  • the device 26 is intended to verify the bearing capacity of the piles 22, 22a after their insertion.
  • the device 26 is not shown on the figures 1 and 2 for a better clarity of the drawings.
  • the device 26 includes a body 28.
  • the body 28 is substantially flat and perpendicular to the vector z .
  • the body 28 includes five through holes (not referenced) so located to receive the five piles 22, 22a.
  • the body 28 rests axially on an upper end of the portion 20 of the peripheral sleeves 16.
  • the device 26 For each pile 22, 22a to be verified, the device 26 includes a sub-assembly 27.
  • the sub-assemblies 27 are identical. Accordingly, only the sub-assembly 27 associated to the pile 22a will be detailed in the following description. It will be understood that, unless indicated otherwise, the below description concerning the sub-assembly 27 associated to the pile 22a also applies to the sub-assemblies associated to the piles 22.
  • the number of piles to be verified may be lower than the total number of piles to be installed.
  • the sub-assembly 27 includes a collar 30 radially surrounding the pile 22a.
  • the collar 30 is cylindrical about the direction of the axis of the pile 22a, which in the depicted embodiment is in the direction of vector z .
  • the collar 30 is also visible on figure 4 which is a cross section along the plane IV-IV.
  • the collar 30 is adapted to receive the pile 22a having a diameter d 22 within a range 0,6 m to 1,5 m. More specifically, the collar 30 is radially inwardly delimited by a cylindrical surface having a circular radial cross-section.
  • the circular radial cross section of the collar 30 has a diameter d 30 bigger than the diameter d 22a : d 22 ⁇ d 30 ⁇ 1,5 ⁇ d 22
  • the collar 30 includes three radially movable clamping chucks 32.
  • the chucks 32 are depicted in detail on the radial, cross-sectional view of figure 4 .
  • the chucks 32 are provided for centering and gripping the pile 22a to the collar 30. To do so, the chucks 32 are regularly spread over the internal circumference of the collar 30.
  • the chucks 32 are able to move radially inward so as to grip the pile 22a. In this way, there is provided a means for mechanically connecting the body 28 to the pile 22a.
  • the sub-assembly 27 includes a pair of hydraulic actuator 34.
  • the actuators 34 are depicted on the detailed view of figure 5 .
  • Each actuator 34 includes a cylinder 36 attached to the body 28 and a piston 38 attached to the collar 30.
  • each actuator 34 is able to exert an axial, downward load within a range 3,75 Mega Newtons to 30 Mega Newtons.
  • an axial load within a range 7,5 Mega Newtons to 60 Mega Newtons may be exerted on the pile 22a.
  • the chucks 32 and the hydraulic actuators 34 are in hydraulic connection with a hydraulic power generation unit (not shown) arranged on a vessel in the vicinity of the offshore foundation construction.
  • the hydraulic connection may be provided by means of hydraulic ducts (not depicted). Nonetheless, it is possible to use a different energy, for instance electric energy, for actuating the chucks 32 and/or the actuators 34.
  • the sub-assembly 27 further includes displacement sensors 40 and 41 (there are two in the depicted embodiment).
  • the sensors 40 and 41 are provided for measuring whether the pile 22a moves or not.
  • the sensor 40 is attached to the body 28.
  • the sensor 40 is able to measure directly the axial displacement of the pile 22a and to compare the measured displacement with a predefined threshold as per standard EAP/ASTM D1143.
  • the sensor 41 is attached to the cylinder 36.
  • the sensor 41 may also be mounted in a recess of the cylinder 36 (not represented).
  • the sensor 41 is able to measure directly the displacement of the piston 38 and to compare the measured displacement with a predefined threshold.
  • the sensors 40 and 41 may include an end of stroke sensor.
  • two displacement sensors are provided for each sub-assembly 27. This allows performing a redundant metering so as to increase the reliability of the detection of a displacement of the pile 22a. Nonetheless, it may be foreseen only one of the two sensors 40 and 41 or more than two sensors 40 and 41 per sub-assembly 27 without departing from the scope of the invention.
  • the means for connecting the piles 22, 22a to the body 28 are the same for all the piles 22 and 22a.
  • the means for connecting the pile 22a to be tested is the same than the means for connecting the piles 22 not to be tested. It is particularly advantageous because it does not require to displace the device 26 each time that a different pile 22, 22a has to be tested.
  • the means for connecting the pile 22a may include a contact surface (not depicted) axially contacting an upper end of the pile 22a.
  • the means for connecting the piles 22 includes a contact surface axially contacting an upper end of the piles 22 and the actuator 34 of the sub-assembly 27 associated with the pipe 22a is intended to apply an axial, upward load.
  • the body 28 is not connected to the piles 22 but to a part of the adapter 12 or the structure 6.
  • the device 26 includes a means for fastening the body 28 to the upper portion 20 of a sleeve 16.
  • FIG. 6 it has been depicted a means for connecting that may be used as a variant of the clamping chucks 32.
  • the means for connecting of figure 6 intend to attach the device 26 to an inner surface of the piles 22, 22a.
  • the collar 30 is replaced with a disc 42 having the same outer diameter and the same axial thickness than the collar 30.
  • the disc 42 may be mechanically connected to the body 28 via the same actuators 34 (not shown in figure 6 ).
  • a rod 43 extends from the disc 42 in a direction perpendicular to the disc 42. In the depicted embodiment this direction is parallel to the vector z .
  • the rod 43 includes a cylindrical portion 44 proximal to the disc 42 and a tapered portion 46 distal to the disc 42.
  • the portion 44 has a circular radial cross-section with a diameter d 44 slightly smaller than the diameter d 22 : d 22 ⁇ 0,8 ⁇ d 44 ⁇ d 22
  • the portion 46 is radially, outwardly delimited by a tapered surface forming a cone frustum about the axis of the portion 44.
  • the portion 46 extends between an upper end having a larger diameter d 46u being substantially equal to the diameter d 44 and a lower end having a smaller diameter d 46d .
  • the portion 44 includes eight radially movable pads 48.
  • the pads 48 are actuated by a hydraulic force supplied by the hydraulic power generation unit.
  • the rod 43 may be received within a pile 22, 22a. Then, the pads 48 are radially, outwardly moved so as to exert a pressure on the inner cylindrical surface of the pile 22, 22a. This clamps the rod 43 to the pile 22, 22a.
  • Such a means for connecting may also be used to secure the body 28 to the sleeve 14. In such case, it is no longer necessary to provide a means for connecting a pile 22 and it is possible to considerably improve the compacity of the device 26.
  • the verifying method is implemented after insertion of the foundation piles 22 and 22a of the offshore foundation construction 2 into the seabed 3.
  • Driving the foundation piles 22 and 22a may be performed by any suitable method known in the art, preferably a method being different from the impact driving technique.
  • one of the piles 22, 22a is chosen as being the pile to be tested.
  • the pile 22a will be chosen as the pile to be tested.
  • the device 26 is placed on an adapter 12 in the position as illustrated on figure 3 .
  • the chucks 32 of the sub-assemblies 27 associated to the piles 22 are radially inwardly moved so as to connect mechanically the piles 22 to the body 28.
  • the chucks 32 of the sub-assembly 27 associated to the pile 22a are radially inwardly moved so as to connect mechanically the pile 22a to the body 28.
  • a displacement of the pile is detected when at least one of the displacements measured by the sensors 40 and 41 exceeds the associated predefined threshold. Nonetheless, it may be foreseen that the displacement of the pile is detected only if both displacements measured by the sensors 40 and 41 exceed the associated predefined thresholds.
  • the first step is repeated by choosing another pile to be tested 22.
  • the following steps are repeated.
  • the device 26 is displaced to another adapter 12 and the verifying method is repeated on the piles of the other adapter 12.
  • the verifying method is complete when the number of piles of the offshore foundation construction defined in the standard EAP/ASTM D1143 has been verified.
  • the above detailed device 26 and method allow verifying whether the foundation piles 22, 22a have been properly installed without exerting a large load on a short duration. In this way, the generation of important noise or vibrations is avoided.

Description

  • The present invention relates to the technical field of offshore foundation constructions, in particular offshore foundation constructions intended to support an offshore wind turbine. More specifically, the invention relates to a device for verifying the bearing capacity of a pile of such an offshore foundation construction.
  • Offshore devices such as offshore wind turbines usually rest on an offshore foundation construction including a structure and foundation piles. The offshore foundation construction is secured to a seabed by the foundation piles driven into the seabed. An upper end of the foundation piles is attached to the structure optionally by means of pile sleeves.
  • Traditionally, the foundation piles are driven into the seabed by the so-called impact driving technique including the application of a large load on a foundation pile to be driven during a short duration, for instance less than one second and repeating the application of this load, such as generally known from WO 2013/043055 A1 .
  • Once the foundation pile is inserted, the dynamic testing method is implemented. According to the dynamic testing method, the application of a load is still repeated with a hammer while acceleration and strains in the pile are monitored. By matching the modelled pile behavior during a hammer stroke with the recorded signals (so-called signal matching method), the pile bearing capacity can be back-calculated based on the monitored data. A major drawback of the dynamic testing is that it generates an important noise or important vibrations which may be harmful to the wildlife surrounding the offshore foundation construction and the offshore device. Moreover, the correlation or safety factors to be used in conjunction with the dynamic testing method are generally larger than for static testing, increasing the pile bearing capacity that has to be measured by means of dynamic testing, increasing pile diameter and therefore material cost.
  • In order to avoid these drawbacks, it has been proposed various improved methods of driving a pile into the seabed. Nonetheless, these methods do not allow verifying whether the pile has been driven with the required capacity. Currently, the only way to verify the bearing capacity of a foundation pile driven by such an improved method is still to implement the dynamic testing method after the pile has been inserted. Accordingly, there is still a need for allowing to verify the bearing capacity of a foundation pile without requiring to implement the dynamic testing method.
  • The invention aims at overcoming the above-mentioned drawbacks.
  • More specifically, the invention aims at allowing to verify the bearing capacity of a foundation pile of an offshore foundation construction in a way more respectful of the surrounding wildlife.
  • According to a first aspect of the invention, it is proposed an adapter with a device for verifying the installation of a first pile of an offshore foundation construction, comprising a body, a first means for connecting the body to a referential element, a second means for connecting the body to the first pile, a means for applying a load on the first pile in a direction parallel to the axis of the first pile according to claim 1.
  • According to the invention, the device further includes a means for measuring a displacement of the first pile.
  • By virtue of such a device, the insertion of the first pile may be verified without implementing the dynamic testing technology. More specifically, the first and second means for connecting allow the means for applying to apply a lighter load under static conditions compared to dynamic testing. The generation of noise or vibrations is thus considerably decreased.
  • In one embodiment, the first means for connecting includes a contact surface intended to rest against a frontal surface of the referential element.
  • According to another embodiment, the second means for connecting includes a contact surface intended to rest against a frontal surface of the first pile.
  • In a specific embodiment, the first means for connecting is intended to fasten the body to a structure or to an adapter of the offshore foundation construction.
  • In another specific embodiment, the first means for connecting includes a first means for gripping a second pile of the offshore foundation construction.
  • Such designs of the first means for connecting allow using a structure, an adapter or a second pile, as the case may be, as a counterweight for the load applied. It is thus avoided to use cumbersome ballast weights. This is particularly advantageous for a subsea equipment because of the more important buoyancy of a ballast weight in the seawater.
  • In a further embodiment, the second means for connecting includes a second means for gripping the first pile.
  • In a specific embodiment, at least one of the first and the second means for gripping includes at least two radially movable clamping chucks.
  • In another embodiment, the means for applying is so configured to apply a load in a way tending towards pushing the first pile into the seabed.
  • In a further embodiment, the means for applying includes a cylinder and a piston, the means for measuring being able to measure directly the displacement of the piston with respect to the cylinder.
  • Such a design provides a simple and compact solution for applying the load and determining whether the first pile has moved.
  • In another embodiment, the means for measuring is able to measure the displacement of the first pile with respect to the body.
  • Such a configuration avoids a measurement offset due to the elasticity of the means for applying.
  • In a further embodiment, at least one of the first means for connecting, the second means for connecting and the means for applying is actuated by a hydraulic energy and/or an electric energy.
  • Such energies are particularly preferable for subsea equipment because they allow having a power generation unit being distant, for instance on a vessel. The device is itself rendered more compact.
  • In a specific embodiment, the cylindrical sleeve is so designed to receive a pile having a circular radial cross-section with a diameter within a range 0,1 to 3,0 m, preferably 0,6 m to 1,5 m.
  • Such diameters allow limiting the load to be exerted by the means for applying of the device.
  • One may also foresee at least two cylindrical sleeves each intended to receive a pile of the offshore foundation construction, together forming an adapter.
  • The inventive adapter allows increasing the number of foundation piles so as to decrease the diameter of each pile without jeopardizing the reliability of the attachment of the offshore foundation construction to the seabed and the combined bearing capacity.
  • According to a further aspect of the invention, it is proposed a method of testing the installation of a first pile of an offshore foundation construction, preferably of an offshore foundation construction intended to support an offshore wind turbine, including placing an adapter according to claim 1 as set forth above on the offshore foundation construction so that the body is connected to a referential element, connecting the body to the first pile, applying a load to the first pile in a direction parallel to the axis of the first pile, measuring the load and measuring a displacement of the first pile.
  • The present invention and its advantages will be better understood by studying the detailed description of a specific embodiment given by way of nonlimiting examples and illustrated by the appended drawings on which:
    • figure 1 is a side view of an offshore foundation construction including an adapter according to aspects of the invention,
    • figure 2 is a tridimensional view of the adapter of figure 1,
    • figure 3 is a cross sectional view of the adapter of figures 1 and 2 equipped with a device according to one aspect of the invention,
    • figure 4 is a partial, cross sectional view of a first means for connecting of the device of figure 3,
    • figure 5 is a detailed side view of a means for applying a load of the device of figure 3, and
    • figure 6 is a detailed side view of a means for connecting equipping a variant embodiment of the device of figure 3.
  • With reference to figure 1, it is schematically depicted an offshore foundation construction 2. The offshore foundation construction 2 aims at resting on a seabed 3 and at supporting an offshore device (not depicted), in particular an offshore wind turbine. Nonetheless, the offshore foundation construction 2 may be used for supporting another kind of offshore device, such as an offshore hydrocarbon platform.
  • It is defined an orthonormal direct vector base 4 attached to the offshore foundation construction 2. The base 4 consists of a vector x , a vector y and a vector z .
  • In the present application, terms "low", "down" and "up" will be understood as referring relative to the base 4 when the offshore foundation construction 2 is normally installed on a horizontal seabed, that is assuming that the vector z is vertically upwardly directed.
  • The word "cylindrical" will be understood according to its common definition, being namely that a cylindrical surface is a surface consisting of all the points on all the lines which are parallel to a given line and which pass through a fixed plane curve in a plane not parallel to the given line.
  • The offshore foundation construction 2 includes a structure 6. The structure 6 includes four main legs 8, only two legs 8 being visible on the side view of figure 1. The structure 6 also includes a plurality of braces 10. The braces 10 connect mechanically a leg 8 with another leg 8. On the side view of figure 1, only four braces 10 are visible.
  • In the depicted embodiment, the structure 6 is a jacket. However, it would be possible without departing from the scope of the invention to have a structure having a different design, being for instance a tripod.
  • The offshore foundation construction 2 includes, for each main leg 8, an adapter 12. That is, in the embodiment of figure 1, the offshore foundation construction 2 includes four adapters 12, only two of them being visible on the side view of figure 1. The adapters 12 are intended to form the mechanical connection between the structure 6 and foundation piles 22, 22a (see figure 3). The foundation piles 22, 22a have an axis along which they extend and are cylindrical about the direction of said axis. The foundation piles 22, 22a also have a circular radial cross section with a diameter d22. In the following description, unless indicated otherwise, the words "radial" and "axial" will be understood as referring to the axis of revolution of a pile 22 or 22a. The piles are not depicted on figures 1 and 2 for a better clarity of the drawings. For each main leg 8, an adapter 12 is attached to a lower end of the main leg 8. In the depicted embodiment, the adapters 12 are welded to the legs 8 before the offshore foundation construction 2 is launched in the sea.
  • With reference to figure 2, the adapter 12 includes a central sleeve 14 and five peripheral sleeves 16. Nonetheless, a different number of peripheral sleeves 16 may be foreseen, for instance six peripheral sleeves. The sleeves 14 and 16 are cylindrical about the direction of the vector z . The sleeves 16 are all located on a circle about the axis of the sleeve 14. Nonetheless, a different geometrical arrangement of peripheral sleeves 16 may be foreseen. The sleeve 14 and the sleeves 16 have a circular radial cross-section. The diameter d16 of the radial cross section is substantially the same for all the sleeves 16. The diameter d14 of the radial cross section of the sleeve 14 is approximately twice the diameter d16. More specifically, the diameter d16 is so chosen that the adapter 12 is adapted to receive piles having a diameter d22 within a range 0,6 m to 1,5 m. The diameter d16 is then within a range 0,6 m to 1,8 m.
  • Each adapter 12 includes a metallic subframe 18. The metallic subframe 18 includes a plurality of metallic hollow sections (not referenced) and metallic plates (not referenced). For each adapter 12, the metallic subframe 18 aims at connecting the sleeve 14, the sleeves 16 and a joining portion for attaching the adapter 12 with a lower end of the main leg 8.
  • As visible on figure 2, each sleeve 16 includes an upper portion 20. For each sleeve 16, the portion 20 is frustoconical about the axis of the peripheral sleeve 16. More specifically, the portion 20 vertically extends between a lower circular end with a diameter d20d and an upper circular end with a diameter d20u. The diameter d20d equals the diameter d16 and the diameter d20u is larger than the diameter d20d. Preferably, the angle of the frustoconical shape of the portion 20 is within a range 40° to 55°. The frustoconical shape of the portion 20 helps inserting a foundation pile 22, 22a in a sleeve 16 in order to secure the offshore foundation construction 2 to the seabed 3.
  • Figure 3 is a cross sectional view about the plane III-III of figure 1. As visible on figure 3, each peripheral sleeve 16 includes a lower, enlarged portion 23. More particularly, the portion 23 includes a lower frontal surface 24 intended to rest on the seabed 3. The surface 24 forms a disc perpendicular to the vector z . The portion 23 includes a plurality of, for instance eight, vertical uprights 25 intended to increase the rigidity of the connection between the portion 23 and the sleeve 16.
  • The offshore foundation construction 2 includes a device 26. The device 26 is intended to verify the bearing capacity of the piles 22, 22a after their insertion. The device 26 is not shown on the figures 1 and 2 for a better clarity of the drawings.
  • The device 26 includes a body 28. The body 28 is substantially flat and perpendicular to the vector z . In the embodiment of Fig. 2, the body 28 includes five through holes (not referenced) so located to receive the five piles 22, 22a. The body 28 rests axially on an upper end of the portion 20 of the peripheral sleeves 16.
  • For each pile 22, 22a to be verified, the device 26 includes a sub-assembly 27. In the depicted embodiment, the sub-assemblies 27 are identical. Accordingly, only the sub-assembly 27 associated to the pile 22a will be detailed in the following description. It will be understood that, unless indicated otherwise, the below description concerning the sub-assembly 27 associated to the pile 22a also applies to the sub-assemblies associated to the piles 22. The number of piles to be verified may be lower than the total number of piles to be installed.
  • The sub-assembly 27 includes a collar 30 radially surrounding the pile 22a. The collar 30 is cylindrical about the direction of the axis of the pile 22a, which in the depicted embodiment is in the direction of vector z . The collar 30 is also visible on figure 4 which is a cross section along the plane IV-IV. As well as the sleeves 16, the collar 30 is adapted to receive the pile 22a having a diameter d22 within a range 0,6 m to 1,5 m. More specifically, the collar 30 is radially inwardly delimited by a cylindrical surface having a circular radial cross-section. The circular radial cross section of the collar 30 has a diameter d30 bigger than the diameter d22a: d 22 < d 30 < 1,5 × d 22
    Figure imgb0001
  • The collar 30 includes three radially movable clamping chucks 32. The chucks 32 are depicted in detail on the radial, cross-sectional view of figure 4. The chucks 32 are provided for centering and gripping the pile 22a to the collar 30. To do so, the chucks 32 are regularly spread over the internal circumference of the collar 30. The chucks 32 are able to move radially inward so as to grip the pile 22a. In this way, there is provided a means for mechanically connecting the body 28 to the pile 22a.
  • The sub-assembly 27 includes a pair of hydraulic actuator 34. The actuators 34 are depicted on the detailed view of figure 5. Each actuator 34 includes a cylinder 36 attached to the body 28 and a piston 38 attached to the collar 30. In the depicted embodiment, each actuator 34 is able to exert an axial, downward load within a range 3,75 Mega Newtons to 30 Mega Newtons. By virtue of such actuators, an axial load within a range 7,5 Mega Newtons to 60 Mega Newtons may be exerted on the pile 22a.
  • In the depicted embodiment, the chucks 32 and the hydraulic actuators 34 are in hydraulic connection with a hydraulic power generation unit (not shown) arranged on a vessel in the vicinity of the offshore foundation construction. The hydraulic connection may be provided by means of hydraulic ducts (not depicted). Nonetheless, it is possible to use a different energy, for instance electric energy, for actuating the chucks 32 and/or the actuators 34.
  • The sub-assembly 27 further includes displacement sensors 40 and 41 (there are two in the depicted embodiment). The sensors 40 and 41 are provided for measuring whether the pile 22a moves or not. The sensor 40 is attached to the body 28. The sensor 40 is able to measure directly the axial displacement of the pile 22a and to compare the measured displacement with a predefined threshold as per standard EAP/ASTM D1143. The sensor 41 is attached to the cylinder 36. The sensor 41 may also be mounted in a recess of the cylinder 36 (not represented). The sensor 41 is able to measure directly the displacement of the piston 38 and to compare the measured displacement with a predefined threshold. For instance, the sensors 40 and 41 may include an end of stroke sensor.
  • In the depicted embodiment, two displacement sensors are provided for each sub-assembly 27. This allows performing a redundant metering so as to increase the reliability of the detection of a displacement of the pile 22a. Nonetheless, it may be foreseen only one of the two sensors 40 and 41 or more than two sensors 40 and 41 per sub-assembly 27 without departing from the scope of the invention.
  • In the depicted embodiment, the means for connecting the piles 22, 22a to the body 28 are the same for all the piles 22 and 22a. In particular, the means for connecting the pile 22a to be tested is the same than the means for connecting the piles 22 not to be tested. It is particularly advantageous because it does not require to displace the device 26 each time that a different pile 22, 22a has to be tested.
  • In a variant embodiment, it may be foreseen a means for connecting the pile 22a different than the means for connecting the piles 22. For instance, the means for connecting the pile 22a may include a contact surface (not depicted) axially contacting an upper end of the pile 22a. In another variant embodiment, the means for connecting the piles 22 includes a contact surface axially contacting an upper end of the piles 22 and the actuator 34 of the sub-assembly 27 associated with the pipe 22a is intended to apply an axial, upward load.
  • In a further embodiment, the body 28 is not connected to the piles 22 but to a part of the adapter 12 or the structure 6. For instance, the device 26 includes a means for fastening the body 28 to the upper portion 20 of a sleeve 16.
  • On figure 6, it has been depicted a means for connecting that may be used as a variant of the clamping chucks 32. The means for connecting of figure 6 intend to attach the device 26 to an inner surface of the piles 22, 22a. In this variant, the collar 30 is replaced with a disc 42 having the same outer diameter and the same axial thickness than the collar 30. The disc 42 may be mechanically connected to the body 28 via the same actuators 34 (not shown in figure 6). A rod 43 extends from the disc 42 in a direction perpendicular to the disc 42. In the depicted embodiment this direction is parallel to the vector z . The rod 43 includes a cylindrical portion 44 proximal to the disc 42 and a tapered portion 46 distal to the disc 42. The portion 44 has a circular radial cross-section with a diameter d44 slightly smaller than the diameter d22: d 22 × 0,8 < d 44 < d 22
    Figure imgb0002
  • The portion 46 is radially, outwardly delimited by a tapered surface forming a cone frustum about the axis of the portion 44. The portion 46 extends between an upper end having a larger diameter d46u being substantially equal to the diameter d44 and a lower end having a smaller diameter d46d.
  • As may be seen on figure 6, the portion 44 includes eight radially movable pads 48. The pads 48 are actuated by a hydraulic force supplied by the hydraulic power generation unit.
  • By means of such an arrangement, the rod 43 may be received within a pile 22, 22a. Then, the pads 48 are radially, outwardly moved so as to exert a pressure on the inner cylindrical surface of the pile 22, 22a. This clamps the rod 43 to the pile 22, 22a.
  • Such a means for connecting may also be used to secure the body 28 to the sleeve 14. In such case, it is no longer necessary to provide a means for connecting a pile 22 and it is possible to considerably improve the compacity of the device 26.
  • By means of the device 26, the following verifying method may be implemented. The verifying method is implemented after insertion of the foundation piles 22 and 22a of the offshore foundation construction 2 into the seabed 3. Driving the foundation piles 22 and 22a may be performed by any suitable method known in the art, preferably a method being different from the impact driving technique.
  • As a first step, one of the piles 22, 22a is chosen as being the pile to be tested. For the purpose of illustration, the pile 22a will be chosen as the pile to be tested.
  • Secondly, the device 26 is placed on an adapter 12 in the position as illustrated on figure 3.
  • Thirdly, the chucks 32 of the sub-assemblies 27 associated to the piles 22 are radially inwardly moved so as to connect mechanically the piles 22 to the body 28.
  • Then, the chucks 32 of the sub-assembly 27 associated to the pile 22a are radially inwardly moved so as to connect mechanically the pile 22a to the body 28.
  • An axial downward load corresponding to the required bearing capacity of the pile 22a is then exerted by the actuators 34 of the sub-assembly 27 associated to the pile 22a. Said load is measured and recorded. In the meantime, the sensors 40 and 41 monitor the displacement of the pile 22a relative to the body 28 and the displacement of the piston 38 relative to the cylinder 36, respectively. If one of these displacement is more important than the associated predefined threshold, the pile 22a is considered unproperly installed.
  • In the depicted embodiment, it is considered that a displacement of the pile is detected when at least one of the displacements measured by the sensors 40 and 41 exceeds the associated predefined threshold. Nonetheless, it may be foreseen that the displacement of the pile is detected only if both displacements measured by the sensors 40 and 41 exceed the associated predefined thresholds.
  • Then, the first step is repeated by choosing another pile to be tested 22. The following steps are repeated. When all the piles 22, 22a of the adapter 12 have been tested, the device 26 is displaced to another adapter 12 and the verifying method is repeated on the piles of the other adapter 12. The verifying method is complete when the number of piles of the offshore foundation construction defined in the standard EAP/ASTM D1143 has been verified.
  • The above detailed device 26 and method allow verifying whether the foundation piles 22, 22a have been properly installed without exerting a large load on a short duration. In this way, the generation of important noise or vibrations is avoided.

Claims (14)

  1. Adapter (12) for an offshore foundation construction (2) including a cylindrical sleeve (16) for receiving a pile (22a, 22) of the offshore foundation construction (2), the adapter being characterized by a device (26) for verifying the bearing capacity of a first pile (22a) of the offshore foundation construction (2) after its insertion, the device (26) comprising a body (28), a first means for connecting the body (28) to a referential element, a second means for connecting the body (28) to the first pile (22a), a means for applying (34) a load on the first pile (22a) in a direction parallel to the axis of the first pile (22a), and further including a means for measuring a displacement of the first pile (22a).
  2. Adapter (12) according to claim 1, wherein the first means for connecting includes a contact surface intended to rest against a frontal surface of the referential element.
  3. Adapter (12) according to claim 1, wherein the second means for connecting includes a contact surface intended to rest against a frontal surface of the first pile.
  4. Adapter (12) according to any of claims 1 to 3, wherein the first means (48) for connecting is intended to fasten the body to a structure or to an adapter of the offshore foundation construction.
  5. Adapter (12) according to any of claims 1 to 3, wherein the first means for connecting includes a first means for gripping a second pile (22) of the offshore foundation construction.
  6. Adapter (12) according to any of claims 1 to 5, wherein the second means for connecting includes a second means for gripping the first pile.
  7. Adapter (12) according to claim 5 or 6, wherein at least one of the first and the second means for gripping includes at least two radially movable clamping chucks (32).
  8. Adapter (12) according to any of claims 1 to 7, wherein the means for applying (34) is so configured to apply a load in a way tending towards pushing the first pile (22a) into the seabed (3).
  9. Adapter (12) according to any of claims 1 to 8, wherein the means for applying (34) includes a cylinder (36) and a piston (38), the means for measuring (41) being able to measure directly the displacement of the piston (38) with respect to the cylinder (36).
  10. Adapter (12) according to any of claims 1 to 9, wherein the means for measuring (40) is able to measure the displacement of the first pile (22a) with respect to the body (28).
  11. Adapter (12) according to any of claims 1 to 10, wherein at least one of the first means for connecting, the second means for connecting and the means for applying (34) is actuated by a hydraulic energy and/or an electric energy.
  12. Adapter (12) according to any of claims 1 to 11, wherein the cylindrical sleeve (16) is so designed to receive a pile (22a, 22) having a circular radial cross-section with a diameter (d22) within a range 0,6 m to 1,5 m.
  13. Adapter (12) according to any of claims 11 to 12, including at least two cylindrical sleeves (16) each intended to receive a pile (22a, 22) of the offshore foundation construction (2).
  14. Method of verifying the bearing capacity of a first pile (22a) of an offshore foundation construction (2), preferably of an offshore foundation construction intended to support an offshore wind turbine, the offshore foundation construction including an adapter (12) according to any of claims 1 to 13, the method including placing the device (26) of the adapter (12) on the offshore foundation construction (2) so that the body (28) is connected to a referential element, connecting the body (28) to the first pile (22a), applying a load to the first pile (22a) in a direction parallel to the axis of the first pile (22a), measuring the load, and measuring a displacement of the first pile (22a).
EP18178335.8A 2018-06-18 2018-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction Active EP3584371B1 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
PL18178335.8T PL3584371T3 (en) 2018-06-18 2018-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
EP18178335.8A EP3584371B1 (en) 2018-06-18 2018-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
TW108121158A TW202001090A (en) 2018-06-18 2019-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
EP19732004.7A EP3807466A1 (en) 2018-06-18 2019-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
CN201980040944.2A CN112352080A (en) 2018-06-18 2019-06-18 Verifying attachment of bearing capacity of stake of inspection seaside foundation building
PCT/EP2019/066086 WO2019243364A1 (en) 2018-06-18 2019-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
KR1020217000384A KR20210020993A (en) 2018-06-18 2019-06-18 Device for checking the bearing capacity of piles of offshore foundation buildings
US17/251,512 US20210246623A1 (en) 2018-06-18 2019-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
SG11202012236UA SG11202012236UA (en) 2018-06-18 2019-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
BR112020024752-9A BR112020024752A2 (en) 2018-06-18 2019-06-18 device for checking the carrying capacity of a pile in an offshore foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP18178335.8A EP3584371B1 (en) 2018-06-18 2018-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction

Publications (2)

Publication Number Publication Date
EP3584371A1 EP3584371A1 (en) 2019-12-25
EP3584371B1 true EP3584371B1 (en) 2022-08-17

Family

ID=62705521

Family Applications (2)

Application Number Title Priority Date Filing Date
EP18178335.8A Active EP3584371B1 (en) 2018-06-18 2018-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction
EP19732004.7A Withdrawn EP3807466A1 (en) 2018-06-18 2019-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP19732004.7A Withdrawn EP3807466A1 (en) 2018-06-18 2019-06-18 Device for verifying the bearing capacity of a pile of an offshore foundation construction

Country Status (9)

Country Link
US (1) US20210246623A1 (en)
EP (2) EP3584371B1 (en)
KR (1) KR20210020993A (en)
CN (1) CN112352080A (en)
BR (1) BR112020024752A2 (en)
PL (1) PL3584371T3 (en)
SG (1) SG11202012236UA (en)
TW (1) TW202001090A (en)
WO (1) WO2019243364A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2021775B1 (en) * 2018-10-08 2020-05-12 Heerema Marine Contractors Nl Device for pushing four piles into the ground or into a seabed
NL2025306B1 (en) * 2020-04-08 2021-10-25 Heerema Marine Contractors Nl Devices and methods for installing piles into the ground or seabed
CN112856151B (en) * 2020-12-30 2023-01-24 厦门捷航工程检测技术有限公司 Foundation detection equipment with tripod horizontal support frame for building construction
JP7241855B1 (en) * 2021-12-27 2023-03-17 日鉄エンジニアリング株式会社 Joining member, jacket structure and offshore wind turbine
US11608609B1 (en) * 2022-09-14 2023-03-21 Qingdao university of technology Pile-side lateral static load device

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2094856B (en) * 1981-01-28 1984-12-19 Southeastern Drilling Services Slip assembly for subsea template
JPS58213920A (en) * 1982-06-04 1983-12-13 Takeshi Ito Measure for displacing amount of driven pile during driving period
US4669918A (en) * 1986-02-04 1987-06-02 Riles William G Offshore platform construction including preinstallation of pilings
US4720214A (en) * 1986-05-21 1988-01-19 Shell Offshore Inc. Mudmat design
KR950004586B1 (en) * 1991-10-07 1995-05-02 대한주택공사 Apparatus of and method for measurement for piling work
GB2323174B (en) * 1997-03-14 2000-08-09 Kvaerner Cementation Found Ltd Automatic static load testing for piles
KR100392109B1 (en) * 2001-03-24 2003-07-22 대림산업 주식회사 The creation of load test set for large diameter battered steel pipe pile constructed on the coastal area
NO20093082A1 (en) * 2009-10-01 2011-04-04 Aker Jacket Technology As Device, system and method for lining piles in a seabed
EP2354321B1 (en) * 2010-01-13 2012-10-24 GeoSea NV Method of providing a foundation for an elevated mass, and assembly of a jack-up platform and a framed template for carrying out the method.
BE1019832A4 (en) * 2011-02-22 2013-01-08 Geosea N V DEVICE FOR MANUFACTURING A FOUNDATION FOR A HIGH-FIXED MASS, RELATED METHOD AND COMPOSITION OF THE DEVICE AND A LIFTING PLATFORM.
BE1019834A4 (en) * 2011-02-22 2013-01-08 Geosea N V DEVICE FOR MANUFACTURING A FOUNDATION FOR A HIGH-FIXED MASS, RELATED METHOD AND COMPOSITION OF THE DEVICE AND A LIFTING PLATFORM.
NO333643B1 (en) * 2011-09-23 2013-07-29 Norwind Installer As Recordable pre-peel frame for offshore wind turbine foundations
CN103074909B (en) * 2013-01-28 2015-10-28 中国电建集团西北勘测设计研究院有限公司 Foundation single pile of wind power vertical compression bearing capacity Static Load Test Method
US9254894B2 (en) * 2013-02-19 2016-02-09 Conocophillips Company Flotable subsea platform (FSP)
NL2011003C2 (en) * 2013-06-18 2014-12-22 Ihc Hydrohammer B V Pile driving methods and systems.
DK3039192T3 (en) * 2013-08-28 2017-11-20 Mhi Vestas Offshore Wind As PROCEDURE FOR INSTALLING A FOUNDATION FOR A OFFSHORE WINDOW MILL AND A TEMPLATE FOR USE HERE
NL2016401B1 (en) * 2016-03-09 2017-09-26 Ihc Holland Ie Bv Frame for guiding and supporting a foundation element, the frame comprising a plurality of guide mechanisms.
CN206245359U (en) * 2016-12-02 2017-06-13 广东中科华大工程技术检测有限公司 Foundation pile static loading test device
US10907320B2 (en) * 2018-06-08 2021-02-02 Central South University Test apparatus for pile-soil interface shear mechanical properties
EP3584369A1 (en) * 2018-06-18 2019-12-25 Vallourec Deutschland GmbH Device for levelling an offshore foundation construction

Also Published As

Publication number Publication date
BR112020024752A2 (en) 2021-03-23
EP3807466A1 (en) 2021-04-21
US20210246623A1 (en) 2021-08-12
EP3584371A1 (en) 2019-12-25
WO2019243364A1 (en) 2019-12-26
SG11202012236UA (en) 2021-01-28
CN112352080A (en) 2021-02-09
TW202001090A (en) 2020-01-01
PL3584371T3 (en) 2022-12-19
KR20210020993A (en) 2021-02-24

Similar Documents

Publication Publication Date Title
EP3584371B1 (en) Device for verifying the bearing capacity of a pile of an offshore foundation construction
CN105258683A (en) Deep sea floor shallow sediment in-situ testing device
CN113237766B (en) Pipeline pressure chamber loading system capable of loading multiple loads simultaneously
CN105606267A (en) Measuring device and method of explosive underwater explosion power
CN207739295U (en) A kind of uplift pile detection device
CA2804438A1 (en) Method and apparatus for measuring helical pile installation torque
WO2014129704A1 (en) Cone penetration testing device with double-hollow-pipe structure for measuring horizontal resistance of ground
CN112577827B (en) Test method for simulating uniform load of pipeline in deepwater environment
WO2012038309A2 (en) A wind turbine tower
CN111356819B (en) Rock anchor rod
EP3584369A1 (en) Device for levelling an offshore foundation construction
CN111397885A (en) Marine drilling riser soft suspension simulation test device
JP2007169988A (en) Bearing pile press-in method and load testing method
EP3584372B1 (en) Pile installation system for an offshore foundation construction and method of installing a pile
CN104236837A (en) Load impact experimental system and application method thereof
EP2979070A1 (en) Support structure location and load measurement
CN115387403B (en) Detection device and detection method for integrity of existing foundation pile
US10167608B1 (en) Apparatus for bi-directional load testing of driven piles and injection piles, and method thereof
Meijers et al. Magnetomechanical response of a steel monopile during impact pile driving
CN111827371A (en) Internal force measuring method for steel structure foundation pit fender pile
JP4823377B2 (en) Ground strain detection end
CN116163689B (en) Underwater wellhead running tool assembly and application method thereof
KR101010724B1 (en) Method and specimen for testing the tensile strength of line pipe
CN116735131B (en) Device and method for simulating continuous collapse resistance of structure under explosive load
CN213572081U (en) Sounding pipe for foundation pile detection

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200312

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200618

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220322

RIN1 Information on inventor provided before grant (corrected)

Inventor name: JAECK, CHRISTOPHE

Inventor name: PHIL, HANS

Inventor name: HAAKMAN, NIELS

Inventor name: STROETGEN, DANIEL

Inventor name: LAMMERS, ANDREAS

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018039316

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1512254

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220915

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20220817

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220817

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221219

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1512254

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221217

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602018039316

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

26N No opposition filed

Effective date: 20230519

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602018039316

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220817

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230630

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230618

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230618

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230618

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230618