CN203323563U - Chain grate top anchoring brick hanging piece - Google Patents
Chain grate top anchoring brick hanging piece Download PDFInfo
- Publication number
- CN203323563U CN203323563U CN2013202942200U CN201320294220U CN203323563U CN 203323563 U CN203323563 U CN 203323563U CN 2013202942200 U CN2013202942200 U CN 2013202942200U CN 201320294220 U CN201320294220 U CN 201320294220U CN 203323563 U CN203323563 U CN 203323563U
- Authority
- CN
- China
- Prior art keywords
- chain grate
- hanging piece
- anchoring brick
- brick
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model belongs to the technical field of chain grate devices, and particularly relates to a chain grate top anchoring brick hanging piece which comprises a hanging beam and an anchoring brick. The chain grate top anchoring brick hanging piece is characterized in that a hanging piece body is fixedly connected to the hanging beam, and the hanging piece body is composed of a vertical hanging beam and a claw hook fixedly connected to the bottom of the vertical hanging beam. The chain grate top anchoring brick hanging piece is simple in structure, convenient to manufacture, capable of firmly catching the top of the anchoring brick and enabling the anchoring brick not to move, and capable of being strictly paved according to the size of layout design, force can be evenly exerted on fireproof materials on the top of a chain grate, maintenance is convenient, and site construction time is saved.
Description
Technical field
The utility model belongs to chain grate machine equipment technical field, especially relates to a kind of chain grate machine top anchor brick suspender member.
Background technology
Along with the fast development that China's " chain-kiln " pelletizing process is produced, this pelletizing process progressively is subject to the approval of industry.The normal operational relation of chain grate machine is to the operating rate of whole production line, and the refractory material laying of its medium chain grate machine is the key factor that affects the normal operation of chain grate machine.Chain grate machine top needs a large amount of anchored bricks to carry out " holding " to the top refractory material, and the form of anchored brick suspender member, will be to production, site operation, maintenance is changed in the future very large impact.The form of machine top anchored brick suspender member was " single pole is hung two bricks " in the past, and the suspender member bottom is a cross bar, and this cross bar is hung anchored brick through the preformed hole of two anchored bricks.Such anchored brick form of hanging has a lot of shortcomings: (1) complex structure, production process is many.(2) site operation can't be fixed.After cross bar is through two anchored brick preformed holes, have no idea anchored brick and cross bar are fixed, cause on-the-spot anchored brick to hang dislocation, can't meet the distance of predesignating in design, chain grate machine machine top refractory material local pressure inequality.(3) engineering time is long.Because anchored brick can't be fixed, during the refractory material of construction chain grate machine machine top, the workmen must proofread and correct one by one to it, has greatly lengthened the engineering time.
Summary of the invention
The purpose of this utility model is a kind of simple in structure, firmly fixedly anchored brick, easily construction and the easy chain grate machine top anchor brick suspender member of changing that overhauls.
The purpose of this utility model realizes by following technical proposals:
Chain grate machine top anchor brick suspender member of the present utility model, comprise hanging beam, and anchored brick, is characterized in that being fixedly connected with a hanging piece with described hanging beam, and this hanging piece is comprised of with the grapple that vertically the hanging beam bottom is fixedly connected with therewith vertical hanging beam.
Advantage of the present utility model:
Chain grate machine top anchor brick suspender member of the present utility model is simple in structure, easy to make, can clench the anchored brick top, anchored brick can't be moved, can be laid in strict accordance with the size of layout design, guarantee that chain grate machine machine top refractory material is stressed even and easy to maintenance, save on-site construction time.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The right view that Fig. 2 is the utility model Fig. 1.
The specific embodiment
Further illustrate the specific embodiment of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, 2, a kind of chain grate machine top anchor brick suspender member of the present utility model, comprise hanging beam 1, anchored brick 4, it is characterized in that being fixedly connected with a hanging piece with described hanging beam 1, this hanging piece is comprised of with the grapple 3 that vertically hanging beam 2 bottoms are fixedly connected with therewith vertical hanging beam 2.Grapple 3 anchored brick 4 of directly holding, substitute the suspender member of old-fashioned " bar is hung two bricks " type with a kind of " grapple " type suspender member, can clench anchored brick 4 tops, anchored brick 4 can't be moved, it is simple in structure, easy to make, and anchored brick 4 can be laid in strict accordance with the size of layout design when construction, guarantee that chain grate machine machine top refractory material is stressed even and easy to maintenance, save on-site construction time.
Claims (1)
1. a chain grate machine top anchor brick suspender member, comprise hanging beam, and anchored brick, is characterized in that being fixedly connected with a hanging piece with described hanging beam, and this hanging piece is comprised of with the grapple that vertically the hanging beam bottom is fixedly connected with therewith vertical hanging beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202942200U CN203323563U (en) | 2013-05-27 | 2013-05-27 | Chain grate top anchoring brick hanging piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202942200U CN203323563U (en) | 2013-05-27 | 2013-05-27 | Chain grate top anchoring brick hanging piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203323563U true CN203323563U (en) | 2013-12-04 |
Family
ID=49662905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202942200U Expired - Fee Related CN203323563U (en) | 2013-05-27 | 2013-05-27 | Chain grate top anchoring brick hanging piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203323563U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105910442A (en) * | 2016-04-20 | 2016-08-31 | 江西铜业股份有限公司 | Refractory brick hanging device and furnace top brickwork hanging method |
-
2013
- 2013-05-27 CN CN2013202942200U patent/CN203323563U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105910442A (en) * | 2016-04-20 | 2016-08-31 | 江西铜业股份有限公司 | Refractory brick hanging device and furnace top brickwork hanging method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203323563U (en) | Chain grate top anchoring brick hanging piece | |
CN204266133U (en) | A kind of pier stud reinforcing cage whole lifting structure | |
CN201236340Y (en) | Novel tool type hanging steel bar | |
CN204456908U (en) | A kind of heavy beam equipment | |
CN203938396U (en) | A kind of engineering hanging device | |
CN104480959A (en) | General tower crane supporting base | |
CN204265208U (en) | A kind of segment lifting appliance | |
CN204286098U (en) | A kind of hanger brick | |
CN201735789U (en) | Ladle brick cup positioning device | |
CN202007410U (en) | Novel tower crane base | |
CN204138148U (en) | Prefabricated Equipment Foundations double-machine lifting crane suspender | |
CN201771458U (en) | Apparatus for expanding well and salvaging | |
CN204042181U (en) | Large-diameter steel pipe range distance through bridge constructing device | |
CN204401570U (en) | A kind of stake formula concrete checkdam structure | |
CN205206330U (en) | Novel early tear head open | |
CN204024495U (en) | Transmission line of electricity rock bolt rig circular base plate | |
CN204848024U (en) | Girder steel hoist device for construction | |
CN202248877U (en) | Reinforced concrete beam support plate for upper portion of window | |
CN203462700U (en) | Keel for outdoor floor | |
CN204224060U (en) | The self-closing weight of elevator door | |
CN203323564U (en) | Chain grate top hanging beam | |
CN202137834U (en) | Forming mould for cement precast slab | |
CN204690744U (en) | Full prestressing short-term platform band pier nose steel boots square pile | |
CN201077992Y (en) | Maintenance oil pumping machine foundation | |
CN204098331U (en) | A kind of bearing-type self-heat-insulating building block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131204 Termination date: 20200527 |
|