CN105910442A - Refractory brick hanging device and furnace top brickwork hanging method - Google Patents
Refractory brick hanging device and furnace top brickwork hanging method Download PDFInfo
- Publication number
- CN105910442A CN105910442A CN201610248243.6A CN201610248243A CN105910442A CN 105910442 A CN105910442 A CN 105910442A CN 201610248243 A CN201610248243 A CN 201610248243A CN 105910442 A CN105910442 A CN 105910442A
- Authority
- CN
- China
- Prior art keywords
- hanging
- nut
- pieces
- suspender member
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/14—Supports for linings
- F27D1/145—Assembling elements
- F27D1/147—Assembling elements for bricks
- F27D1/148—Means to suspend bricks
Abstract
The invention belongs to the technical field of non-ferrous metal smelting furnaces, particularly relates to a refractory brick hanging device and also relates to a furnace top brickwork hanging method based on the refractory brick hanging device. The refractory brick hanging device comprises a hanging beam, hanging rods and hanging parts. The two side faces of the upper end of each hung brick are provided with grooves. A hole is formed in the upper middle portion of each hung brick. Each hanging part comprises two hanging plates, wherein the upper ends of the two hanging plates are connected through a connecting plate; a hole is formed in the center of the connecting plate; the lower ends of the two hanging plates are provided with hook parts bent inwards. The upper ends of the hanging rods are inserted into the hanging beam and fastened on the upper surface of the hanging beam through nuts. A nut is mounted on the part, below the hanging beam, of each hanging rod. Gaps required for upward expansion of a furnace body are reserved between the nuts and the hanging beam. The lower ends of the hanging rods are inserted into the holes of the hanging parts and fastened through nuts. By adopting the refractory brick hanging device and the furnace top brickwork hanging method based on the refractory brick hanging device, the defects that in original design, unlimited upward movement space and instability are caused due to the fact that iron chains are used for being connected with hanging parts are overcome.
Description
Technical field
The invention belongs to non-ferrous metal smelting furnace technical field, be specifically related to a kind of refractory brick erecting by overhang, further relate to base
Furnace roof masonry suspending method in this erecting by overhang.
Background technology
Jiangxi Copper group Guixi Smelter (hereinafter referred to as your smelting) tilting furnace workshop fixed anode furnace furnace roof masonry is former
The suspending way of design is: insert the hole of middle and upper part between refractory brick with heat-resisting round steel, hanger brick circle hooks, and then uses
Iron chains is connected with hanging screw rod, with single nut, hanging screw rod is positioned on hanging beam fastening simultaneously.Due to hook and spiral shell
Using iron chains to connect between bar, up activity space is unlimited, and stove heats up or in production process, masonry is heated and up expands, and leads
Cause masonry and form dislocation up and down, be susceptible to brick or partial collapse accident.Simultaneously during producing charging, charging vehicle easily hits
Hit furnace roof masonry, cause furnace roof masonry to occur loosening, masonry to the phenomenon that even collapses of arch, force stove take insulation or
Impaired position is overhauled by the measure of blowing out, and what impact produced is normally carried out.In the process of your smelting wound mark post, to stove
The requirement of the key indexs such as body operation, furnace life, ton copper refractory material unit consumption is more and more higher, owing to above-mentioned masonry structure is unreasonable and
The impact of the factors such as external force so that the stove phase after operation easily occur rubescent, burn, the thing such as collapse to leak cigarette, deformation even local
Therefore, it is impossible to realize consecutive production, can not meet existing Production requirement.
Summary of the invention
It is an object of the invention to improve the structural strength of furnace roof masonry, improve the service life of furnace roof masonry, it is provided that one
Plant refractory brick erecting by overhang, additionally provide a kind of simple and practical, effect significant furnace lining improved method.
In order to achieve the above object, the present invention adopts the following technical scheme that
A kind of refractory brick erecting by overhang, including hanging beam, suspension rod, suspender member, hanging beam is inserted in suspension rod upper end, uses above hanging beam
Nut fastens, on the suspension rod below hanging beam equipped with a nut, and upwards expanding needed for leaving body of heater between nut and hanging beam
Gap, fastens in the hole of downrod lower end insertion suspender member and with nut, and described suspender member is about by long 540mm, wide 80mm, thick
It is bent into hook clip-like after the heat-resisting steel sheet and plate center boring of 10mm, is especially connected by connecting plate such as two pieces of hanging board upper ends, connecting plate center
Being provided with hole, the lower end of two pieces of hanging boards is equipped with the hook part bent inwards.
Optimizing further, also set up reinforcing plate between two pieces of hanging boards, to improve suspender member intensity, two pieces of hanging boards are put down
OK, between their hook part axisymmetricly.
Present invention also offers a kind of furnace roof masonry suspending method, the two sides, upper end of hanger brick are provided with groove, hanging
The middle and upper part of brick is provided with hole;When building by laying bricks or stones after shutdown maintenance formwork, by the hole between two pieces of hanger bricks just to and put into short
Round steel, hanger brick hung after puzzling by body of heater again with suspender member, and two hook part of suspender member are stuck in the groove of hanger brick
In, suspender member connects suspension rod by nut, inserts hanging beam with suspension rod during hanging, fastens with nut, hang on hanging beam
Fill a nut below drop in beam, and reserved body of heater upwards expands required gap;Finally will be positioned over hanging on furnace roof spandrel girder
The two ends firm welding of drop in beam.
The income effect of the present invention is: have employed the furnace lining structure that structural strength is bigger, heats up or production process at stove
In, due to the activity within the reserved confined space of hanging masonry, solve original design iron chains and connect suspender member activity space
Infinitely, unsteady defect;Furnace roof masonry after improvement bears the ability of mechanical impact, and resisting expands with heat and contract with cold causes deformation of masonry
Ability strengthened;The method of the present invention, improves the service life of furnace roof masonry so that furnace roof fire resisting material can be hard
Hold 2 long production cycles, decrease to dig and repair and sporadicly overhaul number of times, reduce fault rate, saved refractory material expense and inspection
Repair expense;The method of the present invention, improves furnace life, and the fixed anode furnace of your smelting is the average furnace of (2010~2012) before transformation
Being respectively 295,309.25,273.6 heats age, improved average furnace life (2013) is 339.33 heats, promotes substantially, warp
Ji remarkable benefit.
Accompanying drawing explanation
Fig. 1 is original design furnace roof suspending way.
Fig. 2 is furnace roof suspending way after improvement.
Fig. 3 is suspender member schematic diagram.
Figure is labeled as 1, high strength nut 2, hanging beam 3, suspension rod 4, suspender member 5, refractory brick 41, hanging board
42, connecting plate 43, hook part 44, reinforcing plate.
Specific embodiments
Below in conjunction with the accompanying drawings the present invention is further elucidated with.
A kind of refractory brick erecting by overhang, changes to Fig. 2 by fixed anode furnace furnace roof furnace lining intrinsic Fig. 1 suspending way
Suspending way, the material of furnace roof refractory brick changes to by Fig. 2 Semi bonded magnesia chrome brick, hanger brick (refractory brick of hanging)
Two sides, upper end be provided with groove, the middle and upper part of hanger brick is provided with hole;The middle and upper part of common refractory brick 5 is provided with hole, corresponding
Ground, devises suspender member 4, and described hanging 4 includes being similar to two pieces of hanging boards 41, and connecting plate 42 is passed through in the upper end of two pieces of hanging boards 41
Connecting, connecting plate 42 center is provided with hole, and the lower end of two pieces of hanging boards 41 is equipped with the hook part 43 bent inwards.More particularly
Being to also set up reinforcing plate 44 between two pieces of hanging boards 41, with lifting suspension member intensity, two pieces of hanging boards are parallel, their hook part
Between 43 axisymmetricly.Being formed erecting by overhang by hanging beam 2, suspension rod 3, suspender member 4, hanging beam 2 is inserted and with high in suspension rod 3 upper end
Intensity nut 1 fastens, and fastens up and down in the hole of suspension rod 3 lower end insertion suspender member 4 and with nut.
After using above-mentioned erecting by overhang, improve furnace roof masonry suspending method, by two when building by laying bricks or stones after shutdown maintenance formwork
Hole between block hanger brick (including common refractory brick 5) just to and put into short round steel, body of heater puzzle after again with suspender member 4 to hanging
Hanging brick to hang, two hook part of suspender member 4 are stuck in the groove of hanger brick, and suspender member 4 connects suspension rod 3 by nut,
During hanging with suspension rod 3 insert above hanging beam 2 and fasten with high strength nut 1, below hanging beam 2, fill one reserved certain
Expansion clearance nut;The two ends firm welding of hanging beam 2 being finally positioned on furnace roof spandrel girder.
Being provided with two hanging boards in the suspender member 4 of the present invention, and in grabbing shape between the two, intensity is high, with hanger brick it
Between be firmly combined with, use high strength nut to connect suspender member 4 and suspension rod 3, suspension rod 3 will not rock with hanging beam 2, solves former setting
Meter iron chains connects suspender member activity space defect unlimited, unsteady;Furnace roof masonry after improvement bears the energy of mechanical impact
Power, resisting expands with heat and contract with cold causes the ability of deformation of masonry to be strengthened.
Claims (3)
1. a refractory brick erecting by overhang, it is characterised in that: including hanging beam, suspension rod, suspender member, hanging is inserted in suspension rod upper end
Beam, fastens with nut on hanging beam, equipped with a nut on the suspension rod below hanging beam, stays between nut and hanging beam
There is body of heater upwards to expand required space, fasten in the hole of downrod lower end insertion suspender member and with nut, described suspender member bag
Including two pieces of hanging boards, the upper end of two pieces of hanging boards is connected by connecting plate, and connecting plate center is provided with hole, and the lower end of two pieces of hanging boards is equal
It is provided with the hook part bent inwards.
Refractory brick erecting by overhang the most according to claim 1, it is characterised in that: also set up reinforcement between two pieces of hanging boards
Plate, two pieces of hanging boards are parallel, between their hook part axisymmetricly.
3. a furnace roof masonry suspending method, it is characterised in that: the two sides, upper end of hanger brick are provided with groove, in hanger brick
Top is provided with hole;Suspender member includes two pieces of hanging boards, and the upper end of two pieces of hanging boards is connected by connecting plate, and connecting plate center is provided with hole
Hole, the lower end of two pieces of hanging boards is equipped with the hook part bent inwards;By two pieces of hanger bricks when building by laying bricks or stones after shutdown maintenance formwork
Between hole just to and put into short round steel, hanger brick is hung after puzzling by body of heater again with suspender member, two of suspender member
Hook part is stuck in the groove of hanger brick, and suspender member connects suspension rod by nut, inserts hanging beam with suspension rod upper end during hanging,
The above nut fastening of hanging beam, equipped with a nut on the suspension rod below hanging beam, leaves body of heater between nut and hanging beam
Upwards expand required space;The two ends firm welding of hanging beam being finally positioned on furnace roof spandrel girder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610248243.6A CN105910442B (en) | 2016-04-20 | 2016-04-20 | A kind of refractory brick erecting by overhang and furnace roof masonry suspending method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610248243.6A CN105910442B (en) | 2016-04-20 | 2016-04-20 | A kind of refractory brick erecting by overhang and furnace roof masonry suspending method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105910442A true CN105910442A (en) | 2016-08-31 |
CN105910442B CN105910442B (en) | 2018-08-14 |
Family
ID=56747486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610248243.6A Active CN105910442B (en) | 2016-04-20 | 2016-04-20 | A kind of refractory brick erecting by overhang and furnace roof masonry suspending method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105910442B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109592883A (en) * | 2019-01-29 | 2019-04-09 | 咸宁南玻光电玻璃有限公司 | The hanging structure for preventing 3D high alumina glass channel front arch to be broken |
CN113251804A (en) * | 2021-06-10 | 2021-08-13 | 大冶有色金属有限责任公司 | Fixed anode furnace with adjustable furnace top |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6427610B1 (en) * | 2000-10-11 | 2002-08-06 | Merkle Engineers, Inc. | High temperature industrial furnace roof structure |
CN2658683Y (en) * | 2003-10-16 | 2004-11-24 | 淄博联星窑业技术有限公司 | High-temp. flat type kiln top |
CN2876663Y (en) * | 2006-02-27 | 2007-03-07 | 中冶长天国际工程有限责任公司 | Refractory brick for rotary furnace lining |
CN102466409A (en) * | 2010-11-19 | 2012-05-23 | 中冶天工集团有限公司 | Inside liner construction method for suspended furnace top of heating furnace |
CN203323563U (en) * | 2013-05-27 | 2013-12-04 | 中冶北方(大连)工程技术有限公司 | Chain grate top anchoring brick hanging piece |
CN203586819U (en) * | 2013-11-11 | 2014-05-07 | 河南省宏达炉业有限公司 | Anchoring brick hanging element |
CN204612484U (en) * | 2015-04-22 | 2015-09-02 | 河南省宏达炉业有限公司 | A kind of high temperature industrial furnace novel lining structure |
CN205119822U (en) * | 2015-11-20 | 2016-03-30 | 郑州汇特耐火材料有限公司 | Limited slip formula silicon brick subassembly not for cement kiln |
-
2016
- 2016-04-20 CN CN201610248243.6A patent/CN105910442B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6427610B1 (en) * | 2000-10-11 | 2002-08-06 | Merkle Engineers, Inc. | High temperature industrial furnace roof structure |
CN2658683Y (en) * | 2003-10-16 | 2004-11-24 | 淄博联星窑业技术有限公司 | High-temp. flat type kiln top |
CN2876663Y (en) * | 2006-02-27 | 2007-03-07 | 中冶长天国际工程有限责任公司 | Refractory brick for rotary furnace lining |
CN102466409A (en) * | 2010-11-19 | 2012-05-23 | 中冶天工集团有限公司 | Inside liner construction method for suspended furnace top of heating furnace |
CN203323563U (en) * | 2013-05-27 | 2013-12-04 | 中冶北方(大连)工程技术有限公司 | Chain grate top anchoring brick hanging piece |
CN203586819U (en) * | 2013-11-11 | 2014-05-07 | 河南省宏达炉业有限公司 | Anchoring brick hanging element |
CN204612484U (en) * | 2015-04-22 | 2015-09-02 | 河南省宏达炉业有限公司 | A kind of high temperature industrial furnace novel lining structure |
CN205119822U (en) * | 2015-11-20 | 2016-03-30 | 郑州汇特耐火材料有限公司 | Limited slip formula silicon brick subassembly not for cement kiln |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109592883A (en) * | 2019-01-29 | 2019-04-09 | 咸宁南玻光电玻璃有限公司 | The hanging structure for preventing 3D high alumina glass channel front arch to be broken |
CN109592883B (en) * | 2019-01-29 | 2022-02-01 | 咸宁南玻光电玻璃有限公司 | Hanging structure for preventing 3D high-alumina glass runner cover plate brick from being broken |
CN113251804A (en) * | 2021-06-10 | 2021-08-13 | 大冶有色金属有限责任公司 | Fixed anode furnace with adjustable furnace top |
Also Published As
Publication number | Publication date |
---|---|
CN105910442B (en) | 2018-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103509566B (en) | Overhaul construction method of double chute position of dry quenching furnace | |
CN102564135A (en) | Construction method for patching of refractory materials of furnace top of heating furnace | |
CN105910442B (en) | A kind of refractory brick erecting by overhang and furnace roof masonry suspending method | |
CN104560065B (en) | False corbel bracket and using method thereof during examining and repairing corbel bricks in dry quenching chute | |
CN210154324U (en) | Novel arched furnace top structure of heating furnace in forging shop | |
CN202430107U (en) | Jackscrew device for arch foot beam of glass kiln furnace | |
CN201293554Y (en) | Large-sized heating-furnace top straight wall steel structure | |
CN203586817U (en) | Reinforced refractory material lining anchoring nail | |
CN204255081U (en) | A kind of EAF bottom ramming mass Rotating fields | |
CN210153762U (en) | Reform transform 600MW power plant boiler | |
CN207570343U (en) | It is molten to divide stove | |
CN206919671U (en) | A kind of sintering ignition furnace crossbeam prefabricated component | |
CN201764825U (en) | A fireproof prefabricated flue wall of carbon roaster bin | |
CN201407901Y (en) | Tyre mold for wall of heating furnace | |
CN205664679U (en) | Step -by -step brickwork steel structure | |
CN207570307U (en) | It is molten to divide stove support open type arch furnace roof | |
CN202836183U (en) | Molten pool smelting furnace | |
CN214537397U (en) | Resistant material construction structures of walking-beam furnace boundary beam | |
CN203083368U (en) | Novel furnace door fragmentation-proof weatherstrip brick | |
CN204455167U (en) | Flat pattern fire grate | |
CN217520241U (en) | Trolley type silicon-carbon rod high-temperature resistance furnace lining with automatic oxide skin falling function | |
CN202181253U (en) | U-shaped hanging screen for float glass smelting kiln | |
CN220380255U (en) | Metallurgical kiln furnace roof hanging structure | |
CN111197114B (en) | Blast furnace cooling wall | |
CN219347325U (en) | Anode furnace oxidation-reduction eye brick group capable of being replaced on line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |