CN203320678U CN2013204029419U CN201320402941U CN203320678U CN 203320678 U CN203320678 U CN 203320678U CN 2013204029419 U CN2013204029419 U CN 2013204029419U CN 201320402941 U CN201320402941 U CN 201320402941U CN 203320678 U CN203320678 U CN 203320678U
Authority
CN
China
Prior art keywords
pond
water
connects
stream pond
stream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013204029419U
Other languages
Chinese (zh)
Inventor
陈尚洪
王昌桃
刘定辉
陈红琳
沈学善
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Soil and Fertilizer Research Institute SAAS
Original Assignee
Soil and Fertilizer Research Institute SAAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Soil and Fertilizer Research Institute SAAS filed Critical Soil and Fertilizer Research Institute SAAS
Priority to CN2013204029419U priority Critical patent/CN203320678U/en
Application granted granted Critical
Publication of CN203320678U publication Critical patent/CN203320678U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model discloses a catchment area which mainly solves the problems that an existing catchment area overland runoff is not measured accurately, and the cost for constructing the catchment area is high. The catchment area comprises a test plot, a water containing pond (1) and a drainage channel. The catchment area is characterized in that the lower portion of the water containing pond (1) is provided with a bottom water draining pipe (2), wherein one end of the bottom water draining pipe (2) is communicated with the interior of the water containing pond (1), and the other end of the bottom water draining pipe (2) is located outside the water containing pond (1); a valve (3) and a first measuring water meter (4) are sequentially arranged at one end, close to a water draining port, of the bottom water draining pipe (2), wherein the first measuring water meter (4) is used for measuring the quantity of drained water; a top water draining pipe (5) communicated with the water containing pond (1) is arranged on the upper portion of the water containing pond (1), and a second measuring water meter (6) for measuring the quantity of drained water is arranged at one end, close to a water draining port, of the top water draining pipe (5).

Description

A kind of runoff field
Technical field
The utility model relates to a kind of runoff field.
Background technology
Runoff field refers to an experimental area of carrying out field or artificially-simulated rainfall soil erosion test, and different specifications and configuration are arranged, and the general 20-25 rice of standard runoff field is long, and 4-5 rice is wide.Runoff field generally is divided into ,Jie Liu pond, experimental plot, shunting pond and escape canal etc., according to test objective and concrete condition, is built.In prior art, generally built and connect stream pond and shunting pond for detection of the runoff field of surface flow, as shown in Figure 1, wherein, connect the stream pond for tackling the stream that connects of normal precipitation, the shunting pond is for tackling larger amount of precipitation, as: heavy rain now, connects stream pool inner water amount and branches in the shunting pond.Based on above-mentioned, the monitoring of the surface flow of traditional runoff field adopts ruler measure and/or visually observe, and its accuracy of detection is low; In traditional surface flow monitoring, need to connect stream pond and the cooperation of shunting pond, cost is higher, and impracticable.
Therefore, research and develop a kind of simple in structure, with low cost, measure runoff field accurately, just become those skilled in the art's important topic.
The utility model content
The purpose of this utility model is to overcome above-mentioned defect, provide a kind of simple in structure, with low cost, measure runoff field accurately.
To achieve these goals, the technical solution adopted in the utility model is as follows:
A kind of runoff field, comprise ,Jie Liu pond, experimental plot and escape canal, be provided with an end in the described bottom that connects the stream pond and connect stream pond internal communication, the other end is positioned at the bottom discharge pipe that connects stream outside, pond, be provided with successively valve at this bottom discharge pipe near an end of its outfall and for measuring the first metering water meter of displacement, be provided with on the top that connects the stream pond top gutter be communicated with it, the end at this top gutter near its outfall is provided with for measuring the second metering water meter of displacement.
In one embodiment, described top gutter is " Z " shape, wherein the port of an end is positioned at the port that connects stream pond, the other end and is positioned to connect and flows the outside, pond, the middle part of top gutter is built in the pool wall that connects the stream pond, its two ends port is positioned at same level, and described the second metering water meter is connected with the middle part of top gutter.
Wherein, described connect stream pond be brick mix structure.
In order better to realize the utility model, in this runoff field, the pond connection possesses the sand trap function simultaneously.
As a kind of optimal way, described bottom discharge pipe, top gutter are pvc pipe.
Further, described bottom discharge pipe, top gutter are positioned at the pipe shaft part that connects stream outside, pond and all are enclosed with topping.
Further, described topping is made by cement or concrete.
Compared with prior art, the beneficial effects of the utility model are:
(1) the utility model design is ingenious, simple in structure, with low cost.
(2) the utility model only needs to build one and connects the stream pond, and the upper and lower that simultaneously at this, connects the stream pond is equipped with for measuring the metering water meter of displacement: the first metering water meter and the second metering water meter, when the metering water meter of bottom is used for Active Drainage, the metering displacement; When the metering water meter on top is to connect stream pool inner water position over the top gutter, measure the displacement of passive draining, not only metering precisely, water meter for metering is cheap, and be applicable to the larger weather of amount of precipitation such as heavy rain, extra torrential rain fully, without building separately again the shunting pond, greatly reduced the construction cost of runoff field.
(3) in the utility model, the top gutter is " Z " shape, and the second metering water meter is connected with its middle part, thereby has improved the accuracy that metering water meter records displacement.
(4) in the utility model, bottom discharge pipe, top gutter are positioned at the pipe shaft part that connects stream outside, pond and all are enclosed with topping, can effectively protect drainage pipe not corroded by rainwater or its thing damages.
(5) in the utility model, each component are by common product on the market, and it is with low cost, manufacture simply, not only possess novelty and creativeness, and possess very high practicality, for it, apply on a large scale, established solid foundation.
The accompanying drawing explanation
Fig. 1 is the structural representation that connects the stream pond in prior art.
Fig. 2 is the front view that connects the stream pond in the utility model.
Fig. 3 is the lateral view that connects the stream pond in the utility model.
Fig. 4 is the partial schematic diagram that connects the stream pond in the utility model.
Wherein, the corresponding title of Reference numeral: 1-connects stream pond, 2-bottom discharge pipe, 3-valve, 4-the first metering water meter, 5-top gutter, 6-the second metering water meter.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.Embodiment of the present utility model includes but not limited to the following example.
Embodiment
Connect stream pond and shunting pond comprising in existing runoff field, and the pool inner water position changes by visually observing, construction cost is high, and the detection accuracy is low.In order to overcome above-mentioned defect, the present embodiment provides a kind of runoff field, as shown in Figures 2 to 4, this runoff field comprises ,Jie Liu pond, experimental plot 1 and escape canal three parts, connecing the stream pond is brick mix structure, and on this basis, runoff field also can be set up the parts such as channel of approach, reservoir according to actual needs.
In order to realize measuring accurately, reduce the purpose of construction cost, the present embodiment is provided with an end and connects stream pond 1 internal communication in the bottom that connects stream pond 1, the other end is positioned at the bottom discharge pipe 2 that connects stream 1 outside, pond, be provided with successively valve 3 at this bottom discharge pipe 2 near an end of its outfall and for measuring the first metering water meter 4 of displacement, be provided with on the top that connects stream pond 1 the top gutter 5 be communicated with it, an end at this top gutter 5 near its outfall is provided with for measuring the second metering water meter 6 of displacement, wherein, bottom discharge pipe 2, top gutter 5 is pvc pipe.The first metering water meter is realized Active Drainage by valve, metering Active Drainage amount during draining; The second metering water meter is for measuring the passive displacement that connects the stream pond, and concrete condition is as follows: while connecing stream pool inner water position over the top gutter, the water that exceeds part is discharged through the top gutter, the second metering water meter work, the water yield that metering is discharged through the top gutter.Metering water meter not only measures precisely, and cheap.Connect stream upper and lower two positions, pond metering water meter all is set, make the utility model can be applicable to the larger weather of amount of precipitation such as heavy rain, extra torrential rain fully, only building one and connect the stream pond and get final product, without build shunting separately again pond, greatly having reduced the construction cost of runoff field.
As a kind of preferred, in the present embodiment, top gutter 5 is " Z " shape, wherein the port of an end is positioned at the port that connects stream pond 1, the other end and is positioned to connect and flows 1 outside, pond, the middle part of top gutter 5 is built in the pool wall that connects stream pond 1, its two ends port is positioned at same level, the second middle part of 6 of metering water meters with top gutter 5 is connected, thereby has effectively improved the accuracy that metering water meter records displacement.
Further, connect the stream pond in the present embodiment and possess the sand trap function simultaneously.Bottom discharge pipe 2, top gutter 5 are positioned at the pipe shaft part that connects stream 1 outside, pond and all are enclosed with topping, and as preferably, topping is made by cement or concrete.
According to above-described embodiment, just can realize well the utility model.What deserves to be explained is; under prerequisite based on above-mentioned design principle; for solving same technical problem; even some that make on architecture basics disclosed in the utility model are without substantial change or polishing; the essence of the technical scheme adopted is still the same with the utility model, therefore it also should be in protection domain of the present utility model.

Claims (6)

1. a runoff field, comprise experimental plot, connect stream pond (1) and escape canal, it is characterized in that, be provided with an end in the described bottom that connects stream pond (1) and connect stream pond (1) internal communication, the other end is positioned at and connects the outside bottom discharge pipe (2) in stream pond (1), be provided with successively valve (3) at this bottom discharge pipe (2) near an end of its outfall and for measuring first metering water meter (4) of displacement, be provided with on the top that connects stream pond (1) the top gutter (5) be communicated with it, an end at this top gutter (5) near its outfall is provided with for measuring second metering water meter (6) of displacement.
2. a kind of runoff field according to claim 1, it is characterized in that: described top gutter (5) is " Z " shape, wherein the port of an end is positioned at the port that connects stream pond (1), the other end and is positioned to connect and flows outside, pond (1), the middle part of top gutter (5) is built in the pool wall that connects stream pond (1), its two ends port is positioned at same level, and described the second metering water meter (6) is connected with the middle part of top gutter (5).
3. a kind of runoff field according to claim 1 is characterized in that: the described stream pond (1) that connects is made by brick mix structure.
4. a kind of runoff field according to claim 1, it is characterized in that: described bottom discharge pipe (2), top gutter (5) are pvc pipe.
5. a kind of runoff field according to claim 2 is characterized in that: described bottom discharge pipe (2), top gutter (5) are positioned at and connect the outside pipe shaft part in stream pond (1) and all be enclosed with topping.
6. a kind of runoff field according to claim 5, it is characterized in that: described topping is made by cement or concrete.
CN2013204029419U 2013-07-08 2013-07-08 Catchment area Expired - Fee Related CN203320678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013204029419U CN203320678U (en) 2013-07-08 2013-07-08 Catchment area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013204029419U CN203320678U (en) 2013-07-08 2013-07-08 Catchment area

Publications (1)

Publication Number Publication Date
CN203320678U true CN203320678U (en) 2013-12-04

Family

ID=49660044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013204029419U Expired - Fee Related CN203320678U (en) 2013-07-08 2013-07-08 Catchment area

Country Status (1)

Country Link
CN (1) CN203320678U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234172A (en) * 2014-09-04 2014-12-24 长江水资源保护科学研究所 Surface runoff uniform arrangement device and arrangement application method for complicated small catchment areas
CN104452652A (en) * 2014-11-19 2015-03-25 广东省生态环境与土壤研究所 Construction method of slope runoff field

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234172A (en) * 2014-09-04 2014-12-24 长江水资源保护科学研究所 Surface runoff uniform arrangement device and arrangement application method for complicated small catchment areas
CN104452652A (en) * 2014-11-19 2015-03-25 广东省生态环境与土壤研究所 Construction method of slope runoff field

Similar Documents

Publication Publication Date Title
CN102608288B (en) Experimental device for roughness and erosion quantity of slope surface and using method of experimental device
CN102890147B (en) Test system for simulating pore-fissure double-medium seepage hydraulic characteristics
CN205404570U (en) A small -size footpath flow field device for monitoring of earth's surface soil erosion and water loss
CN101788543B (en) Lysimeter
CN203324144U (en) Runoff infiltration simulation device
CN204203487U (en) A kind of evaporation from water surface device
CN104239729B (en) A kind of agricultural non -point pollution measuring method and device based on water circulation
CN203320678U (en) Catchment area
CN105717023B (en) A kind of permeable structure performance detector and detection method
CN102561253A (en) Washout district of original-state in-situ gully system
CN206990832U (en) A kind of rainfall gauge
CN205506824U (en) Experimental moisture of crops evaporates and oozes measurement appearance
CN104375220B (en) A kind of rainfall catcher of band primary filter function
CN205404352U (en) Structural performance detector permeates water
CN208568766U (en) A kind of monomer-type or Contiuum type soil loss monitoring runoff plots
CN204374202U (en) A kind of device measuring rainfall on slope land-discharge series process and run-off
CN206378383U (en) Desilting device for mao bamboo woods soil loss monitoring
CN107219346B (en) New soil tensometer and soil water potential measurement method
CN202041234U (en) Flow meter of final-stage channel
CN106592687A (en) Rainwater collection system for container-type movable house
CN206132149U (en) Slope cropland earth channel combination formula tipping bucket flowmeter
CN205228998U (en) Soil erosion and water loss automatic monitoring appearance
CN102767193B (en) Remote dam foundation seepage monitoring device with sewage drainage function
CN104897879B (en) A kind of method for the rainwash in site measurement of southern orchard
CN204405495U (en) A kind of device detecting waterproof material infiltration coefficient

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20140708

EXPY Termination of patent right or utility model