CN203308095U - Concrete pouring reserved hole positioning sleeve - Google Patents

Concrete pouring reserved hole positioning sleeve Download PDF

Info

Publication number
CN203308095U
CN203308095U CN2013202350208U CN201320235020U CN203308095U CN 203308095 U CN203308095 U CN 203308095U CN 2013202350208 U CN2013202350208 U CN 2013202350208U CN 201320235020 U CN201320235020 U CN 201320235020U CN 203308095 U CN203308095 U CN 203308095U
Authority
CN
China
Prior art keywords
sleeve
hole
concrete pouring
reserved hole
hole positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202350208U
Other languages
Chinese (zh)
Inventor
陈胜文
熊启东
张清军
高江旺
胡奇有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN2013202350208U priority Critical patent/CN203308095U/en
Application granted granted Critical
Publication of CN203308095U publication Critical patent/CN203308095U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to the technical field of concrete building construction tools, in particular to a concrete pouring reserved hole positioning sleeve. The concrete pouring reserved hole positioning sleeve comprises a sleeve body and a lifting handle, and a sleeve positioning fixing mechanism is arranged at the bottom end of the inner portion of the sleeve body. According to the technical scheme, reserved holes can be accurately positioned, the unnecessary process in pipeline mounting is reduced, the pipeline construction speed is higher compared with an existing process, construction quality and construction efficiency are improved, labor cost and labor intensity are lowered, constriction security is improved, meanwhile, local materials can be reused, plenty of materials are saved, and the concrete pouring reserved hole positioning sleeve is of great significance to environmental protection.

Description

Concreting hole to be provided abutment sleeve
Technical field
The utility model relates to concrete construction frock technical field.
Background technology
In the process of building operations concreting, tend to, on floor or building wall, hole to be provided or preformed hole are set, to carry out the installation work through walls of the electric grade of pipeline, in modern frame-shear wall building structure, the hole to be provided of plumbing pipe through-flooring need to, when structure floor concreting, be reserved in openings position with reserved hole sleeve barrel.Traditional method is after floor slab formerecting, starts openings position is positioned, and treats that reinforcing bar binding is complete, with tie up the silk by the reserved hole sleeve barrel colligation on reinforcing bar.The shortcoming of this way is that reserved hole sleeve barrel is fixing, time-consuming with tying up silk, takes a lot of work, and the reserved hole sleeve barrel reserved location is difficult for accurately, and in concreting, easily makes the skew of sleeve bottom.The skew of hole to be provided position is very large to the subsequent installation work influence.If be offset too greatly, particularly the standpipe reserved opening departs from center, will use water and bore and again get into the cave, and so not only agent structure is affected, and also can fulgurite pre-buried in floor be damaged simultaneously.
Therefore urgent need is a kind of now can locate the position of reserved hole sleeve barrel rapidly and accurately, and makes its position that can not make sleeve in the process of concreting that the device of skew occur.
The utility model content
This novel technical problem that will solve is to provide a kind of position that can locate rapidly and accurately hole to be provided, and concreting hole to be provided abutment sleeve that can the occurrence positions skew in the process of concreting.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of concreting hole to be provided abutment sleeve, comprise sleeve, handle, and it is characterized in that being provided with sleeve location fixed mechanism in the inner bottom of sleeve.
Preferred described sleeve location fixed mechanism is for being welded on the diametric band iron in sleeve bottom; Described band iron is provided with locating hole and fixing hole.Described locating hole is positioned at the centre position of band iron; Described fixed hole position is in the both sides of locating hole.
When reserved, first with taper things such as saw blades, on template, draw accurately cross hairs, then in the sleeve outside, brush release agent, the locating hole of sleeve bottom is aimed to cross hairs, with self-tapping screw, by the fixing hole around the locating hole of bottom, sleeve is fixed on template again, then covers the lid that composite board does and get final product.After the pouring concrete initial set, unlid, the fixed screw that comes loose, just can extract sleeve with cutting pliers.
The effect that adopts technique scheme to obtain: the location of hole to be provided is very accurate, reduced unnecessary operation in the pipeline installation, pipeline construction speed is faster than existing technique, construction quality, efficiency of construction have been improved, reduce cost of labor, reduce labour intensity, improved working security, gather materials on the spot simultaneously reusable, saved a large amount of materials, certain environment protection significance has been arranged.
The accompanying drawing explanation
The structural representation of an embodiment of Fig. 1 the utility model.
In figure: 1, sleeve 2, handle 3, band iron 4, locating hole 5, fixing hole.
The specific embodiment
For solving the problems of the technologies described above, we describe according to figure, and this concreting hole to be provided abutment sleeve, comprise sleeve 1, handle 2 as shown in Figure 1, it is characterized in that being provided with sleeve location fixed mechanism in the inner bottom of sleeve 1.The diameter of sleeve 1 is changeable specifically to be determined according to the diameter of the hole that will reserve, general sleeve 1 adopts the irony equipment, on the top of sleeve 1, being provided with handle 2, pulling away concrete for promoting slowly sleeve 1, all can in outside or inside that handle 2 can be located at sleeve 1.Described sleeve location fixed mechanism is for being welded on the sleeve 1 diametric band iron 3 in bottom; Described band iron 3 is provided with locating hole 4 and fixing hole 5.The width of band iron 3 is too not wide, and the size of the locating hole 4 of doing in the above is advisable can see the cross hairs be identified on template.Described locating hole 4 is positioned at the centre position of band iron 3; Described fixing hole 5 is positioned at the both sides of locating hole 4.The quantity of fixing hole 5 can be come to determine as required, generally with the self-tapping screw nail, squeezes into fixing hole 5 and fixes sleeve 1.
When reserved, first with taper things such as saw blades, on template, draw accurately cross hairs, then in sleeve 1 outside, brush release agent, the locating hole of sleeve 1 bottom 4 is aimed to cross hairs, with self-tapping screw, by the fixing hole 5 around bottom locating hole 4, sleeve 1 is fixed on template again, then covers the lid that composite board does and get final product.After the pouring concrete initial set, unlid, the fixed screw that comes loose, just can extract sleeve 1 with cutting pliers.
The effect that adopts technique scheme to obtain: the location of hole to be provided is very accurate, reduced unnecessary operation in the pipeline installation, pipeline construction speed is faster than existing technique, construction quality, efficiency of construction have been improved, reduce cost of labor, reduce labour intensity, improved working security, gather materials on the spot simultaneously reusable, saved a large amount of materials, certain environment protection significance has been arranged.

Claims (3)

1. a concreting hole to be provided abutment sleeve, comprise sleeve (1), handle (2), it is characterized in that being provided with sleeve location fixed mechanism in the inner bottom of sleeve (1).
2. concreting hole to be provided abutment sleeve according to claim 1 is characterized in that: described sleeve location fixed mechanism is for being welded on the diametric band iron in sleeve (1) bottom (3); Described band iron (3) is provided with locating hole (4) and fixing hole (5).
3. concreting hole to be provided abutment sleeve according to claim 1 and 2, it is characterized in that: described locating hole (4) is positioned at the centre position of band iron (3); Described fixing hole (5) is positioned at the both sides of locating hole (4).
CN2013202350208U 2013-05-03 2013-05-03 Concrete pouring reserved hole positioning sleeve Expired - Fee Related CN203308095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202350208U CN203308095U (en) 2013-05-03 2013-05-03 Concrete pouring reserved hole positioning sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202350208U CN203308095U (en) 2013-05-03 2013-05-03 Concrete pouring reserved hole positioning sleeve

Publications (1)

Publication Number Publication Date
CN203308095U true CN203308095U (en) 2013-11-27

Family

ID=49614313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202350208U Expired - Fee Related CN203308095U (en) 2013-05-03 2013-05-03 Concrete pouring reserved hole positioning sleeve

Country Status (1)

Country Link
CN (1) CN203308095U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482338A (en) * 2021-06-30 2021-10-08 上海宝冶集团有限公司 Cast-in-place floor reserved hole pre-burying device and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482338A (en) * 2021-06-30 2021-10-08 上海宝冶集团有限公司 Cast-in-place floor reserved hole pre-burying device and construction method

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN203247600U (en) Equipment foundation bolt preformed hole die
CN206495501U (en) A kind of cast-in-place concrete floor reserving hole template
CN103291072A (en) Method for reserving holes in floors by aid of PVC (polyvinyl chloride) sleeves
CN202644990U (en) Fixing device for reserved pipeline or hole template
CN202187556U (en) Tool-type hole reserving mould
CN201679231U (en) Template clamp for construction
CN202925896U (en) A hole reservation device for constructional engineering
CN203308095U (en) Concrete pouring reserved hole positioning sleeve
CN203230178U (en) Column formwork and column hoop
CN203050108U (en) Concrete slab pipe installation reserved hole construction mold
CN202416869U (en) Novel building engineering basement exterior wall split bolt
CN204609293U (en) Portablely locate buttress casting mold
CN203559586U (en) PVC (Polyvinyl chloride) electric wire pipe embedded direct connector for concrete
CN208105876U (en) A kind of mold for top plate hole to be provided
CN204343343U (en) Reflection wave method pipe location quick access device
CN203307931U (en) Embedded part positioning screw connecting structure
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN204531421U (en) A kind of concrete support mould and fixing templates
CN204370564U (en) Underfloor constructional column concrete pouring structure
CN204531420U (en) Concreting plate device
CN208918276U (en) A kind of simple plugging device of vertical duct preformed hole
CN205025090U (en) Wear wall sleeve fixing device
CN203426965U (en) Device for disassembling split bolt reserved gasket
CN209353705U (en) What a kind of quick peace was torn open blocks up hole device to pull-type exterior wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131127

Termination date: 20140503