CN201679231U - Template clamp for construction - Google Patents
Template clamp for construction Download PDFInfo
- Publication number
- CN201679231U CN201679231U CN2010201792096U CN201020179209U CN201679231U CN 201679231 U CN201679231 U CN 201679231U CN 2010201792096 U CN2010201792096 U CN 2010201792096U CN 201020179209 U CN201020179209 U CN 201020179209U CN 201679231 U CN201679231 U CN 201679231U
- Authority
- CN
- China
- Prior art keywords
- pull rod
- fastener
- tie
- longitudinal
- drag link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a template clamp for construction, which belongs to the technical field of construction components and comprises a rectangular clamp body. The clamp body consists of transverse pull rods and longitudinal pull rods, each pull rod includes a pull rod body (2) and a fastener (1) fixedly connected with one end of the pull rod body (1), adjusting holes (5) are arranged at the other ends of the pull rod bodies (1), stripy adjusting grooves (6) and through holes (7) are arranged on the fasteners (1), the stripy adjusting grooves (6) are arranged along the length directions of the pull rods, and the through holes adapt to the widths of the pull rod bodies(2). Additionally, one end, with the fastener, of each transverse pull rod is connected with the pull rod body (2) of the longitudinal pull rod penetrating through the through hole (7) of the transverse pull rod via a hinge shaft (4) while the other end is connected with the fastener end of the other longitudinal pull rod via the hinge shaft (4), and adjusting screws (3) for adjusting distances among the transverse pull rods and the longitudinal pull rods are arranged at the ends of the fasteners (1). The template clamp for construction has the advantages of simple structure, convenient operation, capability of rapidly assembling clamps during construction and work and labor saving.
Description
Technical field
The utility model relates to the form clamp that a kind of building operations is used, and specifically is the form clamp that a kind of cast-in-situ concrete wall column is used, and belongs to the building unit technical field.
Background technology
Adopting the wall column formwork to build in the Building technology of wall column, the wall column formwork need carry out assembly unit earlier, forms the wall column cavity, and then in cavity configuration reinforcement, fluid concrete, form wall column.In the process of assembly unit and fluid concrete, formwork need be fixed by anchor clamps, and the existing templates anchor clamps are scarcely suitable, or has the defective of regulating inconvenience.
The utility model content
The purpose of this utility model provides a kind of building form anchor clamps easy and simple to handle, easy to adjust.
The utility model is achieved by the following technical solution: a kind of building form anchor clamps, constitute the clamp body of rectangle by cross-tie and longitudinal tie, described pull bar comprises drag link body and the fastener that is connected with drag link body one end, the other end of drag link body is provided with adjustment hole, fastener is provided with along the bar shaped regulating tank of pull bar length direction and the through hole that adapts with the drag link body width, one end of cross-tie bracelet spare is connected by the drag link body of bearing pin with the longitudinal tie that passes its through hole, and its other end is connected with the fastener end of another longitudinal tie by bearing pin; The termination of described fastener is provided with the adjustment screw that is used to regulate distance between cross-tie and the longitudinal tie.
During use, the utility model is stuck in around the template after the assembly unit, carries out Primary Location, regulate distance between cross-tie and the longitudinal tie by adjustment screw by the adjustment hole on bearing pin and the drag link body, thereby template is clamped, and bearing pin slides along the regulating tank of bar shaped in adjustment process; During dismounting, the bearing pin or unclamp adjustment screw of only need dismantling can unclamp anchor clamps and remove.
The utility model is simple in structure, and is easy to operate, and assembling jig fast in the work progress can be regulated the distance between cross-tie and the longitudinal tie easily.The utility model not only can be applicable to utilize the wall column formwork to build in the Building technology of wall column, and can be widely used in the construction of cast-in-place beam, post, the job practices that can replace available technology adopting iron wire fixed form fully, have saving of labor, labour-saving advantage, and anchor clamps can reuse, and have saved cost.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is that A-A among Fig. 1 is to enlarged diagram;
Fig. 3 is user mode figure of the present utility model;
Among the figure, 1, fastener, 2, drag link body, 3, adjustment screw, 4, bearing pin, 5, adjustment hole, 6, the bar shaped regulating tank, 7, through hole, 8, template.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described:
As accompanying drawing 1, shown in 2, a kind of building form anchor clamps, constitute the clamp body of rectangle by cross-tie and longitudinal tie, described pull bar comprises drag link body 2 and the fastener 1 that is connected with drag link body 2 one ends, the other end of drag link body 2 is provided with a plurality of adjustment holes 5, fastener 1 is provided with the bar shaped regulating tank 6 along the pull bar length direction, also be provided with the through hole 7 that adapts with drag link body 2 width in the fastener 1, the end that cross-tie has fastener is connected with the drag link body 2 of the longitudinal tie that passes its through hole 7 by bearing pin 4, its other end passes the through hole 7 on the fastener 1 of another longitudinal tie and is connected the clamp body of cross-tie and longitudinal tie formation rectangle with the fastener end of this longitudinal tie by bearing pin 4.The termination of fastener 1 also is provided with the adjustment screw 3 that is used to regulate distance between cross-tie and the longitudinal tie.
As shown in Figure 3, during use, the utility model is stuck in around the template 8 after the assembly unit, carry out Primary Location by the adjustment hole on bearing pin 4 and the drag link body 25, by adjustment screw 3 cross-tie and longitudinal tie are moved, regulate the distance between cross-tie and the longitudinal tie, thereby anchor clamps are clamped template 8, bearing pin 4 slides along the regulating tank 6 of bar shaped in adjustment process.During dismounting, the bearing pin or unclamp adjustment screw of only need dismantling can unclamp anchor clamps and remove.
Claims (1)
1. building form anchor clamps, it is characterized in that: the clamp body that constitutes rectangle by cross-tie and longitudinal tie, described pull bar comprises drag link body (2) and the fastener (1) that is connected with drag link body (2) one ends, the other end of drag link body (2) is provided with adjustment hole (5), fastener (1) is provided with along the bar shaped regulating tank (6) of pull bar length direction and the through hole (7) that adapts with drag link body (2) width, one end of cross-tie bracelet spare is connected with the drag link body (2) of the longitudinal tie that passes its through hole (7) by bearing pin (4), and its other end is connected with the fastener end of another longitudinal tie by bearing pin (4); The termination of fastener (1) is provided with the adjustment screw (3) that is used to regulate distance between cross-tie and the longitudinal tie.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201792096U CN201679231U (en) | 2010-05-05 | 2010-05-05 | Template clamp for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201792096U CN201679231U (en) | 2010-05-05 | 2010-05-05 | Template clamp for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201679231U true CN201679231U (en) | 2010-12-22 |
Family
ID=43344281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201792096U Expired - Fee Related CN201679231U (en) | 2010-05-05 | 2010-05-05 | Template clamp for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201679231U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444283A (en) * | 2011-12-22 | 2012-05-09 | 中建二局大连建筑工程有限公司 | Lateral bracing structure of building formwork |
CN103225399A (en) * | 2013-05-17 | 2013-07-31 | 中水北方勘测设计研究有限责任公司 | Bandage of round PVC (polyvinyl chloride) template for pouring concrete |
CN103406981A (en) * | 2013-07-17 | 2013-11-27 | 许金锔 | Clamping frame for concrete formworks |
CN103912120A (en) * | 2014-04-22 | 2014-07-09 | 山西省宏图建设工程有限公司 | Novel tool type rectangular column mold reinforcing device |
CN103963146A (en) * | 2014-04-23 | 2014-08-06 | 富于安(福建)环保模板有限公司 | Construction method for column mold composed of concrete formworks |
CN104374500A (en) * | 2014-09-26 | 2015-02-25 | 天津大学 | Adjustable template fixing device for studying multipoint seismic oscillation through dynamic photoelastic method |
CN105863265A (en) * | 2016-05-07 | 2016-08-17 | 杨露萍 | Formwork fixing clamp for building |
-
2010
- 2010-05-05 CN CN2010201792096U patent/CN201679231U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444283A (en) * | 2011-12-22 | 2012-05-09 | 中建二局大连建筑工程有限公司 | Lateral bracing structure of building formwork |
CN103225399A (en) * | 2013-05-17 | 2013-07-31 | 中水北方勘测设计研究有限责任公司 | Bandage of round PVC (polyvinyl chloride) template for pouring concrete |
CN103225399B (en) * | 2013-05-17 | 2015-04-01 | 中水北方勘测设计研究有限责任公司 | Bandage of round PVC (polyvinyl chloride) template for pouring concrete |
CN103406981A (en) * | 2013-07-17 | 2013-11-27 | 许金锔 | Clamping frame for concrete formworks |
CN103912120A (en) * | 2014-04-22 | 2014-07-09 | 山西省宏图建设工程有限公司 | Novel tool type rectangular column mold reinforcing device |
CN103963146A (en) * | 2014-04-23 | 2014-08-06 | 富于安(福建)环保模板有限公司 | Construction method for column mold composed of concrete formworks |
CN104374500A (en) * | 2014-09-26 | 2015-02-25 | 天津大学 | Adjustable template fixing device for studying multipoint seismic oscillation through dynamic photoelastic method |
CN105863265A (en) * | 2016-05-07 | 2016-08-17 | 杨露萍 | Formwork fixing clamp for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201679231U (en) | Template clamp for construction | |
CN204470473U (en) | Screw concrete stirrup coiling shaped device | |
CN111962858B (en) | Positioning device for mounting wall body reinforcing steel bars and templates and construction process | |
CN204781970U (en) | Template fixing device with adjustable | |
CN202338111U (en) | Special supporting frame for building template | |
CN203230178U (en) | Column formwork and column hoop | |
CN103967042B (en) | Mounting correction tool for protection corner angle of frame column and manufacturing method thereof | |
CN209025458U (en) | A kind of reinforcing bar binding positioning and fixed device | |
CN209025461U (en) | A kind of Assembled universal reinforcing bar positioning tool | |
CN201144521Y (en) | Big formwork split bolt capable of positioning wall thickness | |
CN203905493U (en) | Template reinforcing fixture structure | |
CN204001747U (en) | Shear wall termination erecting device | |
CN203924718U (en) | A kind of formwork reinforcement combination tool | |
CN208749083U (en) | A kind of shear-wall strengthening tool | |
CN208702156U (en) | A kind of construction formwork reinforcement fixture | |
CN202810179U (en) | Overhanging element anchoring tool for overhanging scaffold | |
CN213573001U (en) | Beam formwork reinforcing device | |
CN207176691U (en) | A kind of Universal adjustable pull bar | |
CN205444481U (en) | Core tube shear wall and post-cast frame beam steel bar embedded part | |
CN202108521U (en) | U-shaped hook head fastener for template connection | |
CN203947773U (en) | A kind of for fixed form to support to draw rod device | |
CN202718388U (en) | Formwork reinforcement fixture | |
CN203045969U (en) | Back-loaded embedded anchor fixing device | |
CN210233415U (en) | Tool for assisting in penetrating and installing split bolts during T-beam steel formwork splicing | |
CN218479548U (en) | Assembled side form reinforcing fastener |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101222 Termination date: 20130505 |