CN203230178U - Column formwork and column hoop - Google Patents

Column formwork and column hoop Download PDF

Info

Publication number
CN203230178U
CN203230178U CN 201320231857 CN201320231857U CN203230178U CN 203230178 U CN203230178 U CN 203230178U CN 201320231857 CN201320231857 CN 201320231857 CN 201320231857 U CN201320231857 U CN 201320231857U CN 203230178 U CN203230178 U CN 203230178U
Authority
CN
China
Prior art keywords
steel
channel
channel steel
section steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320231857
Other languages
Chinese (zh)
Inventor
施竣
梁晓荣
杜勇
汤镇宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nantong Sanjian Construction Group Co ltd
Original Assignee
Jiangsu Nantong No3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong No3 Construction Group Co Ltd filed Critical Jiangsu Nantong No3 Construction Group Co Ltd
Priority to CN 201320231857 priority Critical patent/CN203230178U/en
Application granted granted Critical
Publication of CN203230178U publication Critical patent/CN203230178U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a column formwork and column hoop which is formed by multiple channel steel fixing members. Each channel steel fixing member comprises channel steel, a round steel pulling and knotting rod and a fastening screw, a round hole is drilled at one position of the end portion of each channel steel, a hole groove is formed at the other position of the end portion of each channel, a reinforcing steel plate is additionally welded between channel steel flanges of the round hole and the hole groove, a steel plate is additionally welded equidistantly between the reinforcing steel plates at two ends of each channel steel, the round steel pulling and knotting rods are used for fixing two longitudinally-parallel channel steel, and the fastening screws are used for fixing two transversely-parallel channel steel. The column formwork and column hoop has the advantages that four of the channel steel fixing members are taken as one group and taken as one pair in two-two parallel, two ends of the channel steel fixing members are fixed by the screws (the round steel pulling and knotting rods and the fastening screws), reusability is realized, form erecting and form removing efficiency is improved, and process is simple; a concrete column after form removing is good in forming quality and bright and clean in surface; treatment of the pulling and knotting screws is not needed, so that steel is saved; hole drilling is not needed for a column formwork, so that slurry leakage is reduced and formwork turnover rate is obviously improved.

Description

Post mould tie
Technical field
The utility model relates to a kind of post mould tie.
Background technology
Traditional steel column formwork reinforcement method generally adopts welding drawknot lead screw and steel pipe composite reinforcement in the post.This method is waste material, work efficiency but also low not only; Damage to template is very big, greatly reduces the template number of turnover; Occur the mould phenomenon that rises when building concrete easily, also through regular meeting's spillage, influence the cylinder pouring quality around the lead screw.Therefore, need provide a kind of new technical scheme to solve the problems referred to above.
The utility model content
The purpose of this utility model provides a kind of reusable post mould tie.
The technical solution adopted in the utility model is:
Post mould tie, it is made of a plurality of channel-section steel fixtures, each channel-section steel fixture inboard equidistantly is placed with the many lumps of wood, each channel-section steel fixture comprises channel-section steel, round steel drawknot bar and fastening screw, one place, described channel-section steel end is drilled with a circular hole, another place, described channel-section steel end has a hole slot, be welded with strengthening steel slab between the channel-section steel edge of a wing of this circular hole and hole slot, between the strengthening steel slab at channel-section steel two ends, equidistantly be welded with steel plate, described round steel drawknot bar is used for fixedly two channel-section steels of parallel longitudinal, and described fastening screw is used for two parallel channel-section steels of fixed lateral.
The channel-section steel fixture is 4.
The length that the length of described round steel drawknot bar and fastening screw is longer than channel-section steel respectively.
The beneficial effects of the utility model: new formwork reinforcement method utilizes channel-section steel to make post mould tie, abandon the traditional approach that uses drawknot screw rod and steel pipe combination to fix in the post, post mould tie is one group by four channel-section steel fixtures, parallel in twos is a pair of, channel-section steel fixture two ends adopt long screw rod (round steel drawknot bar, fastening screw) fixing, reusable.
, the form removal work efficiency improves, operation is simple; Concrete post Forming Quality is good after the form removal, any surface finish; Do not need to handle again the drawknot screw rod, save steel; Column template need not to burrow, and has reduced spillage, and form cycling rate obviously improves.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Wherein: 1, channel-section steel, 2, round steel drawknot bar, 3, fastening screw, 4, circular hole, 5, hole slot, 6, strengthening steel slab, 7, steel plate, 8, the lumps of wood.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
As shown in Figure 1, post mould tie of the present utility model, it is made of 4 channel-section steel fixtures, each channel-section steel fixture inboard equidistantly is placed with the many lumps of wood 8, each channel-section steel fixture comprises channel-section steel 1, round steel drawknot bar 2 and fastening screw 3, one place, channel-section steel 1 end is drilled with a circular hole 4, another place, channel-section steel 1 end has a hole slot 5, be welded with strengthening steel slab 6 between channel-section steel 1 edge of a wing of this circular hole 4 and hole slot 5, between the strengthening steel slab 6 at channel-section steel 1 two ends, equidistantly be welded with steel plate 7, round steel drawknot bar 2 is used for fixedly two channel-section steels 1 of parallel longitudinal, and fastening screw 3 is used for two parallel channel-section steels 1 of fixed lateral.
The length that the length of round steel drawknot bar 2 and fastening screw 3 is longer than channel-section steel 1 respectively shows among Fig. 1, and length is long 3-5 ㎝ slightly.
Between channel-section steel 1 edge of a wing at circular hole 4 places and other end hole slot 5 places, add weldering strengthening steel slab 6 respectively, be used for reinforcing channel-section steel 1, equidistantly add welding steel plate 7 again 6 of these two strengthening steel slabs, improve the whole bending resistance of channel-section steel fixture; By round steel drawknot bar 2 two channel-section steel fixtures of parallel longitudinal are fixed, carried out the fixing of horizontal direction then, tighten tight round steel drawknot bar 2 and fastening screw 3 at last again, guarantee that tie fastening screw 3 can not become flexible.
New formwork reinforcement method utilizes channel-section steel 1 to make post mould tie, abandon the traditional approach that uses drawknot screw rod and steel pipe combination to fix in the post, post mould tie is one group by four channel-section steel fixtures, parallel in twos is a pair of, channel-section steel fixture two ends adopt long screw rod (round steel drawknot bar 2, fastening screw 3) fixing, reusable.
, the form removal work efficiency improves, operation is simple; Concrete post Forming Quality is good after the form removal, any surface finish; Do not need to handle again the drawknot screw rod, save steel; Column template need not to burrow, and has reduced spillage, and form cycling rate obviously improves.

Claims (3)

1. post mould tie, it is characterized in that: it is made of a plurality of channel-section steel fixtures, each channel-section steel fixture inboard equidistantly is placed with the many lumps of wood, each channel-section steel fixture comprises channel-section steel, round steel drawknot bar and fastening screw, one place, described channel-section steel end is drilled with a circular hole, another place, described channel-section steel end has a hole slot, be welded with strengthening steel slab between the channel-section steel edge of a wing of this circular hole and hole slot, between the strengthening steel slab at channel-section steel two ends, equidistantly be welded with steel plate, described round steel drawknot bar is used for fixedly two channel-section steels of parallel longitudinal, and described fastening screw is used for two parallel channel-section steels of fixed lateral.
2. post mould tie according to claim 1, it is characterized in that: the channel-section steel fixture is 4.
3. post mould tie according to claim 1 is characterized in that: the length that the length of described round steel drawknot bar and fastening screw is longer than channel-section steel respectively.
CN 201320231857 2013-05-02 2013-05-02 Column formwork and column hoop Expired - Fee Related CN203230178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320231857 CN203230178U (en) 2013-05-02 2013-05-02 Column formwork and column hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320231857 CN203230178U (en) 2013-05-02 2013-05-02 Column formwork and column hoop

Publications (1)

Publication Number Publication Date
CN203230178U true CN203230178U (en) 2013-10-09

Family

ID=49286311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320231857 Expired - Fee Related CN203230178U (en) 2013-05-02 2013-05-02 Column formwork and column hoop

Country Status (1)

Country Link
CN (1) CN203230178U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119903A (en) * 2017-07-03 2017-09-01 陈瑶吉 The advantageous embodiment accessory of concrete square column formwork external application fastener
RU2633622C1 (en) * 2016-06-09 2017-10-16 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Device for reinforcing load-bearing structures
RU2641141C1 (en) * 2017-04-27 2018-01-16 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Long-dimensional steel concrete element
CN108193872A (en) * 2018-01-10 2018-06-22 山西三建集团有限公司 Reinforced concrete column formwork fastener and fastening method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2633622C1 (en) * 2016-06-09 2017-10-16 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Device for reinforcing load-bearing structures
RU2641141C1 (en) * 2017-04-27 2018-01-16 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Long-dimensional steel concrete element
CN107119903A (en) * 2017-07-03 2017-09-01 陈瑶吉 The advantageous embodiment accessory of concrete square column formwork external application fastener
CN108193872A (en) * 2018-01-10 2018-06-22 山西三建集团有限公司 Reinforced concrete column formwork fastener and fastening method

Similar Documents

Publication Publication Date Title
CN203230178U (en) Column formwork and column hoop
CN212026866U (en) Double-layer reinforcing mesh support frame for building construction
CN201679231U (en) Template clamp for construction
CN203452378U (en) Post-cast strip locating structure
CN203487777U (en) Reinforcing system, in which split screws do not penetrate through templates, for large shear wall
CN204510792U (en) A kind of steel form
CN203701432U (en) Positioning clamp for horizontal steel reinforcements of shearing wall
CN205243011U (en) Instrument of shaped steel concrete shear wall structure drawknot template
CN204626961U (en) A kind of steel form trussed construction of swallow-tail form large-sized concrete pier stud
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN206346371U (en) A kind of new reinforcing steel bar truss mould plate
CN203924708U (en) The vertical plugging structure in a kind of concrete wall ater-casting
CN211597386U (en) Anti-offset structure of longitudinal reinforcement of large-section core column
CN204826653U (en) Stupefied fixing clip of vertical back of body of aluminum mould board
CN201850700U (en) Secondary beam of corrugated web H-shaped steel floor and supporting support rod
CN102587653A (en) Novel reinforcing tie bolt for side form of side beam
CN203441105U (en) Hole template supporting tool
CN204386168U (en) A kind of shaped steel assembly type type pillar shuttering clamp
CN203821830U (en) Reinforcing device of shear wall wood template
CN204060730U (en) Longitudinal constuction joint waterstop installation positioner
CN206289802U (en) The prefabricated built-in presstressed reinforcing steel steel reinforced concrete wall of formwork
CN203145447U (en) Typified form
CN205591551U (en) Novel concrete member template clip
CN203394043U (en) Shaping steel support inside corner template transverse bar
CN201406838Y (en) Clamp for fixing side form on beam bottom

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 131, Haiman City, Jiangsu Province, Haimen City, Jiangsu

Patentee after: JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP Co.,Ltd.

Address before: No. 131, Haiman City, Jiangsu Province, Haimen City, Jiangsu

Patentee before: NANTONG NO.3 CONSTRUCTION GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131009